Attachment_15_-_Construction_Cost_Estimate_Breakdown.xls

XLS spreadsheet 150 KB Posted

Attached to
Industrial Building Hallway Construction Federal contract opportunity
Solicitation number
HQ0727-15-R-JW04
Issued by
Defense Microelectronics Activity

About this file

Attachment 15 - Construction Cost Estimate Breakdown (EXL)

View the file

Other files for this federal contract opportunity

Other files attached to Industrial Building Hallway Construction, newest first.
File Type Posted
Solicitation_Clarifications.pdf PDF
Image_20.JPG JPG image
Image_26.JPG JPG image
Image_25.JPG JPG image
Image_6.JPG JPG image
Image_15.JPG JPG image
HQ0727-15-R-JW04_RFI_Answers.docx DOCX document
Image_7.JPG JPG image
Image_22.JPG JPG image
Image_2.JPG JPG image
Image_1.JPG JPG image
Image_14.JPG JPG image
A-111_Floor_Plan(Photo).pdf PDF
Image_19.JPG JPG image
Image_24.JPG JPG image
Image_23.JPG JPG image
Image_4.JPG JPG image
Image_5.JPG JPG image
Image_21.JPG JPG image
Image_18.JPG JPG image
Image_11.JPG JPG image
Image_12.JPG JPG image
Image_16.JPG JPG image
Image_27.JPG JPG image
Image_9.JPG JPG image
Image_10.JPG JPG image
Image_17.JPG JPG image
Image_13.JPG JPG image
Image_3.JPG JPG image
Image_8.JPG JPG image
HQ0727-15-R-JW04-0001.pdf PDF
HQ0727-15-R-JW04-0001_Conform_Copy.pdf PDF
HQ0727-15-R-JW04.pdf PDF
Attachment_15_-_Construction_Cost_Estimate_Breakdown.pdf PDF
Attachment_6_-_S1_0-Layout1.pdf PDF
Attachment_2_-_A-601_Door_Types_ _Details.pdf PDF
Attachment_13_-_High_Performance_and_Sustainable_Buildings_Guidance.pdf PDF
Attachment_7_-_S2_1-Layout1.pdf PDF
Attachment_3_-_A-001_Cover_Sheet.pdf PDF
Attachment_1_-_A-501_Details.pdf PDF
Attachment_14__Wage_Determination.docx DOCX document
Attachment_8_-_S3_1-Layout1.pdf PDF
Attachment_9_-_S4_1-Layout1.pdf PDF
Attachment_10_-_DMEA_Hot_Work_Permit.doc DOC document
Attachment_14__Wage_Determination.pdf PDF
Attachment_5_-_A-121_Reflected_Ceiling_Plan.pdf PDF
Attachment_4_-_A-111_(2).pdf PDF
Attachment_12_-_Vendor_POC's_5M15F401.docx DOCX document
Attachment_11_-_Materials_List_5M15F401.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CCEB FRONT

CONSTRUCTION COST ESTIMATE BREAKDOWNOMB No. 0704-0193
Expires 31 October 1989
CONTRACTORADDRESS
CONTRACT FOR (Work to be preformed)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTS
LINEUNITOTHER
NO.ITEMOFMANHOURAVERAGEDIRECTLINE
MEASUREQUANTITYUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

CCEB CONT SHEET

CONSTRUCTION COST ESTIMATE BREAKDOWN CONTINUATION SHEETOMB No. 0704-0193
Expires 31 October 1989
CONTRACTORADDRESS
CONTRACT FOR (Work to be preformed)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTS
LINEUNITOTHER
NO.ITEMOFMANHOURAVERAGEDIRECTLINE
MEASUREQUANTITYUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)

CCEB BACK

INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issed. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
TOTAL MATERIAL COSTS$- 0
TOTAL LABOR COSTS$- 0
TOTAL OTHER DIRECT COSTS$- 0
TOTAL DIRECT COSTS$- 0
OVERHEAD___%$- 0
SUBTOTAL$- 0
PROFIT___%$- 0
TOTAL PRICE$- 0
DATE ______________________________FIRM NAME ________________________________________
TITLE ______________________________BY _________________________________________________
(Signature)
__________________________________________________________________________________________________________________
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

File details come from the government source that posted it. Updated .