Attachment 10 - DMEA Hot Work Permit

View the file

Other files for this federal contract opportunity

Other files attached to Industrial Building Hallway Construction, newest first.
File Type Posted
Solicitation_Clarifications.pdf PDF
Image_20.JPG JPG image
Image_26.JPG JPG image
Image_25.JPG JPG image
Image_6.JPG JPG image
Image_15.JPG JPG image
HQ0727-15-R-JW04_RFI_Answers.docx DOCX document
Image_7.JPG JPG image
Image_22.JPG JPG image
Image_2.JPG JPG image
Image_1.JPG JPG image
Image_14.JPG JPG image
A-111_Floor_Plan(Photo).pdf PDF
Image_19.JPG JPG image
Image_24.JPG JPG image
Image_23.JPG JPG image
Image_4.JPG JPG image
Image_11.JPG JPG image
Image_12.JPG JPG image
Image_16.JPG JPG image
Image_27.JPG JPG image
Image_9.JPG JPG image
Image_10.JPG JPG image
Image_17.JPG JPG image
Image_13.JPG JPG image
Image_3.JPG JPG image
Image_8.JPG JPG image
Image_5.JPG JPG image
Image_21.JPG JPG image
Image_18.JPG JPG image
HQ0727-15-R-JW04-0001.pdf PDF
HQ0727-15-R-JW04-0001_Conform_Copy.pdf PDF
HQ0727-15-R-JW04.pdf PDF
Attachment_15_-_Construction_Cost_Estimate_Breakdown.pdf PDF
Attachment_6_-_S1_0-Layout1.pdf PDF
Attachment_2_-_A-601_Door_Types_ _Details.pdf PDF
Attachment_13_-_High_Performance_and_Sustainable_Buildings_Guidance.pdf PDF
Attachment_15_-_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
Attachment_7_-_S2_1-Layout1.pdf PDF
Attachment_3_-_A-001_Cover_Sheet.pdf PDF
Attachment_1_-_A-501_Details.pdf PDF
Attachment_14__Wage_Determination.docx DOCX document
Attachment_8_-_S3_1-Layout1.pdf PDF
Attachment_5_-_A-121_Reflected_Ceiling_Plan.pdf PDF
Attachment_4_-_A-111_(2).pdf PDF
Attachment_12_-_Vendor_POC's_5M15F401.docx DOCX document
Attachment_11_-_Materials_List_5M15F401.xlsx XLSX spreadsheet
Attachment_9_-_S4_1-Layout1.pdf PDF
Attachment_14__Wage_Determination.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposed statement to add to all facility contract Statement of Work:

DMEA has an extensive gas alarm system and fire alarm system that is susceptible to activation from contractor activities (solvent use, grinding, welding, soldering, refrigerant work, etc.). Additionally, DMEA lab, clean room and security systems are sensitive. Therefore, to avoid potential alarms and subsequent facility evacuations caused by contractor activities, or other activities that could potentially disrupt operations, DMEA has implemented a work permit process for all work involving:

· Hot Work:

· Soldering

· Brazing

· Welding

· Seam Sealing

· Grinding

· Solvents/chemicals/gases

· Alcohols

· Paint thinners

· Aerosol cans

· Refrigerants (R-123 and others)

· Odorous Materials

· Paints and Epoxies

· Adhesives including contact cement, PVC and ABS glue, etc.

· Tar

· Roof seam sealing

· Electrical Work (energized and shut down)

· Wiring

· Panel work

· Equipment connection

· Confined Space Work (ARMS 1 Attic)

The work permits shall be filled out by the contractor staff with assistance from the facility/environmental team. The forms will be reviewed and evaluated by the DMEA facility and environmental/safety team before work is initiated. The permit form is attached.

DMEA Work Permit Form

(Hot Work, Odorous Work, Electrical Work, Confined Space)

Company Name

Date

Company Telephone Number

Planned Duration
Start Time:

Stop Time:

Technician(s) Name(s) and Cell Number

Describe Work

Work Location and Systems Involved

Chemicals/gases involved

Gas sensors in area?

Smoke Detectors in area?

Precautions (check all that apply)

Buddy System
Responsible Buddy name:
Emergency support/evaluation equipment required (list eg. Two-way radio, harness)
List

Technicians to have fire extinguisher, emergency numbers (911 and 231-1667*) and know where emergency equipment is and evacuation routes and assembly area

Combustible materials removed/shielded
List
Equipment purged of chemicals/combustibles/flammables (list)
Equipment

Gases shutdown and lines/equipment purged

30 minute fire watch after work complete with fire extinguisher and water source on-hand

Covers suspended beneath work to collect sparks

Other special precautions (describe use additional sheets if required):

Electrical Work: Equipment to be shutdown and locked out and tagged out

Electrical Work: Energized – Contractor to provide all necessary safety equipment and procedures

Individuals (list)to be with present valid first aid/CPR card:
Names:
Area Inspected by to prevent fire IAW NFPA 51B
Name
Briefing to technicians on the DMEA fire and gas alarm system and emergency procedures
DMEA Briefer Sign once briefing conducted:
DMEA Personnel requiring notification (list) and OPR to notify
Names:

OPR:

Contractor Signature__________________________________ Date:________________________________ DMEA Approval Signature _____________________________ Date:________________________________

Work Complete and Precautions followed certification:

Contractor Signature__________________________________ Date:________________________________

*NOTE: Contact the DMEA Security Booth in the event of an emergency (after calling 911). Security will assist the first responders (Fire, Ambulance/EMT, etc.) .