Attachment_10_-_DMEA_Hot_Work_Permit.doc
DOC document 48 KB Posted
- Attached to
- Industrial Building Hallway Construction Federal contract opportunity
- Solicitation number
- HQ0727-15-R-JW04
- Issued by
- Defense Microelectronics Activity
About this file
Attachment 10 - DMEA Hot Work Permit
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposed statement to add to all facility contract Statement of Work:
DMEA has an extensive gas alarm system and fire alarm system that is susceptible to activation from contractor activities (solvent use, grinding, welding, soldering, refrigerant work, etc.). Additionally, DMEA lab, clean room and security systems are sensitive. Therefore, to avoid potential alarms and subsequent facility evacuations caused by contractor activities, or other activities that could potentially disrupt operations, DMEA has implemented a work permit process for all work involving:
· Hot Work:
· Soldering
· Brazing
· Welding
· Seam Sealing
· Grinding
· Solvents/chemicals/gases
· Alcohols
· Paint thinners
· Aerosol cans
· Refrigerants (R-123 and others)
· Odorous Materials
· Paints and Epoxies
· Adhesives including contact cement, PVC and ABS glue, etc.
· Tar
· Roof seam sealing
· Electrical Work (energized and shut down)
· Wiring
· Panel work
· Equipment connection
· Confined Space Work (ARMS 1 Attic)
The work permits shall be filled out by the contractor staff with assistance from the facility/environmental team. The forms will be reviewed and evaluated by the DMEA facility and environmental/safety team before work is initiated. The permit form is attached.
DMEA Work Permit Form
(Hot Work, Odorous Work, Electrical Work, Confined Space)
Company Name
Date
Company Telephone Number
| Planned Duration |
| Start Time: |
Stop Time:
Technician(s) Name(s) and Cell Number
Describe Work
Work Location and Systems Involved
Chemicals/gases involved
Gas sensors in area?
Smoke Detectors in area?
Precautions (check all that apply)
| Buddy System |
| Responsible Buddy name: |
| Emergency support/evaluation equipment required (list eg. Two-way radio, harness) |
| List |
Technicians to have fire extinguisher, emergency numbers (911 and 231-1667*) and know where emergency equipment is and evacuation routes and assembly area
| Combustible materials removed/shielded |
| List |
| Equipment purged of chemicals/combustibles/flammables (list) |
| Equipment |
Gases shutdown and lines/equipment purged
30 minute fire watch after work complete with fire extinguisher and water source on-hand
Covers suspended beneath work to collect sparks
Other special precautions (describe use additional sheets if required):
Electrical Work: Equipment to be shutdown and locked out and tagged out
Electrical Work: Energized – Contractor to provide all necessary safety equipment and procedures
| Individuals (list)to be with present valid first aid/CPR card: |
| Names: |
| Area Inspected by to prevent fire IAW NFPA 51B |
| Name |
| Briefing to technicians on the DMEA fire and gas alarm system and emergency procedures |
| DMEA Briefer Sign once briefing conducted: |
| DMEA Personnel requiring notification (list) and OPR to notify |
| Names: |
OPR:
Contractor Signature__________________________________ Date:________________________________ DMEA Approval Signature _____________________________ Date:________________________________
Work Complete and Precautions followed certification:
Contractor Signature__________________________________ Date:________________________________
*NOTE: Contact the DMEA Security Booth in the event of an emergency (after calling 911). Security will assist the first responders (Fire, Ambulance/EMT, etc.) .
File details come from the government source that posted it. Updated .