ATTACHMENT_5.docx

DOCX document 21 KB Posted

Attached to
Pentagon Support Operations Center (PSOC) Project Federal contract opportunity
Solicitation number
HQ003417R0086
Issued by
DOD Washington Headquarters Service

About this file

Amendment 1 Attachments

View the file

Other files for this federal contract opportunity

Other files attached to Pentagon Support Operations Center (PSOC) Project, newest first.
File Type Posted
Site_Walk_Attendees_list.pdf PDF
SW_Pic_1.JPG JPG image
RFI_Submission_Final_Answers.pdf PDF
SW_Pic_3.JPG JPG image
SW_Pic_2.JPG JPG image
HQ0034-17-R-0086_U0004.docx DOCX document
Contractors_Unit_Price_Schedule_-_PSOC.XLSX XLSX spreadsheet
SW_Pic_4.AVI AVI file
HQ003417R0086_U03.pdf PDF
HQ0034-17-R-0086_Amendment_02.pdf PDF
ATTACHMENT_7.docx DOCX document
HQ0034-17-R-0086_01.pdf PDF
ATTACHMENT_4.docx DOCX document
PSOC_DD254.pdf PDF
ATTACHMENT_6.docx DOCX document
4____North_Village_Visitor_Parking_Form.pdf PDF
4____North_Village_Visitor_Parking_Map.pdf PDF
4____How_to_Acquire_Visitor_Parking.docx DOCX document
HQ0034-17-R-0086.pdf PDF
4____North_Village_Visitor_Parking_Form_Completed_Sample.pdf PDF
Attachment_8_Estimating_Template.xlsx XLSX spreadsheet
HQ0034-17-R-0086_Draft_6_1_2017.pdf PDF
DRAFT_RFP_PSOC_HQ0034-17-R-0086.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 5 – PAST PERFORMANCE QUESTIONNAIRE

This is a past performance questionnaire for the Washington Headquarters Services (WHS) to obtain past performance information on the contractor listed below. You should have received this questionnaire along with a Client Authorization Letter from the contractor listed below asking for your cooperation in completing this questionnaire. Information obtained in this questionnaire is for the sole purpose of evaluating the contractor’s past performance history to assist WHS in determining the best value for award of a contract resulting from our solicitation. As an evaluator, your participation in this questionnaire is greatly appreciated.

INSTRUCTIONS

To complete this questionnaire, the contractor should:

1. Complete the CONTRACT DATA section on Page 2.

1. Forward this questionnaire along with a Client Authorization Letter to the reviewer.

To complete this questionnaire, the evaluator should:

1. Review the CONTRACT DATA section on Page 2.

1. Review and complete the ADMINISTRATIVE INFORMATION section on Page 2.

1. Complete the EVALUATION FACTORS section starting on Page 5 using the RATINGS on Pages 3-4 based on the Contractor Performance Rating System (CPARS). Evaluate and assign a rating for Quality of Product or Service, Schedule, Cost Control, Management, Utilization of Small business, and Regulatory Compliance. Include a narrative for each rating if appropriate.

1. Return the questionnaire by email to jennifer.m.mack2.civ@mail.mil by July 14, 2017.

QUESTIONS

If you have any questions about completing or submitting this questionnaire, please contact the Contract Specialist for this acquisition, Jennifer Mack, at jennifer.m.mack2.civ@mail.mil.

CONTRACT DATA

Contract Number:

Contractor Name:

Contract Title:

Contractor Address:

Contract Value:

Contractor DUNS:

Contract Type:

Contract Award Date:

Agency/Org. Name:

Reporting Period (Start):

Contracting Office:

Reporting Period (End):

TASK ORDER DATA (IF APPLICABLE)

Task Order Number:

Task Order Value:

Task Order Title:

Task Order Award Date:

Reporting Period (Start):

Task Order Type:

Reporting Period (End):

ADMINISTRATIVE DATA

Evaluator:

Contracting Officer:

Phone:

Phone:

Fax:

Fax:

Email:

Email:

Contractor Rep.:

Alt. Contractor Rep.:

Phone:

Phone:

Fax:

Fax:

Email:

Email:

(Next page)

RATINGS

The following ratings and definitions apply to the Quality, Schedule, Cost Control, Management, Utilization of Small Business and Regulatory Compliance factors:

Rating
Definition
Note
Exceptional
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
Very Good
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub- element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
N/A
N/A (not applicable) should be used if the ratings are not going to be applied to a particular area for evaluation.
Please explain all ratings of N/A

EVALUATION FACTORS

1. Quality of Product or Service. Quality reflects the contractor’s management of the quality control program, as well as the quality of the work itself. Assess the Contractor's conformance to contract requirements, specifications and standards of good workmanship (e.g. commonly accepted technical, professional, environmental, or safety and health standards).

RATING
Provide comments on Quality of Product or Service (2000 characters maximum):

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

1. Schedule. Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g., efforts that contribute to or affect the schedule variance).

This evaluation of the contractor’s adherence to the required delivery schedule should include the contractor’s efforts during the evaluation period that contribute to or affect the schedule variance. Also, address significance of scheduled events (e.g., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions. This element applies to contract/order closeout activities as well as contract/order performance. Instances of adverse actions such as the evaluation of liquidated damages or issuance of Cure Notices, Show Cause Notices, and Delinquency Notices are indicators of problems which may have resulted in variance to the contract/order schedule and should, therefore, be noted in the evaluation.

RATING
Provide comments on Schedule (2000 characters maximum):

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

1. Cost Control (Not required for Firm Fixed Price or Firm Fixed Price with Economic Price Adjustment). Assess the contractor’s effectiveness in forecasting, managing, and controlling contract/order cost. If the contractor is experiencing cost growth or underrun, discuss the causes and contractor-proposed solutions for the cost overruns or underruns. For contracts/orders where task or contract sizing is based upon contractor-provided person hour estimates, the relationship of these estimates to ultimate task cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources, in each work effort should be assessed.

RATING
Provide comments on Cost Control (2000 characters maximum):

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

0. Management. Assess the integration and coordination of all activity needed to execute the contract/order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts.

RATING
Provide comments on Management (2000 characters maximum):

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

0. Utilization of Small Business (Not applicable if contractor is a small business or if the contract did not require a Subcontracting Plan). Assess whether the contractor provided maximum practicable opportunity for Small Business (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned Small Businesses, HUBZone, Veteran Owned, Service Disabled Veteran Owned Small Business, and ANCs and Indian Tribes that are not Small Disadvantaged Businesses or Small Businesses) to participate in contract/order performance consistent with efficient performance of the contract/order.

RATING
Provide comments on Utilization of Small Business (2000 characters maximum):

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

0. Regulatory Compliance (e.g failure to report in accordance with contract terms and conditions, late or nonpayment to subcontractors, trafficking violations, tax delinquency, defective cost or pricing data, terminations, suspension and debarments). Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes, using the Evaluation Ratings Definitions above. Consider aspects of performance such as compliance with financial, environmental (example: Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.

RATING
Provide comments on Regulatory Compliance (2000 characters maximum):

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory