HQ0028-12-R-0004-03-3-21-2012.doc
DOC document 78 KB Posted
- Attached to
- ENGINEERING SERVICES
- Solicitation number
- HQ0028-12-R-0004
- Issued by
-
Defense Media Activity
About this file
Amendment to RFP-03
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HQ0028-12-D-0011-6-11-2012.doc | DOC document | |
| HQ0028-12-D-0011-6-11-2012.doc | DOC document | |
| HQ0028-12-R-0004-02.doc | DOC document | |
| Question on RFP HQ0028-12-R-0004 Engineering Services 3-12-2012.doc | DOC document | |
| RFP HQ0028-12-R-0004 Engineering Services-Questions-3-9-2012.doc | DOC document | |
| HQ0028-12-R-0004-REVISED-3-1-2012.doc | DOC document | |
| HQ0028-12-R-0004-2-22-2012.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & ANSWERS
Amendment 03, Engineering Services Contract - HQ0028-12-R-0004
Various offerors have asked where the “key personnel” are referenced in the solicitation. The following response replaces the previous responses regarding key personnel provided in Amendment 01 and 02. It describes ten (10) key personnel, and the minimum experience and certifications they must possess.
Key personnel are listed below in the following two industry categories and shall have at least the minimum amount of experience listed below in that position working with Broadcasting Systems or VI Systems, as appropriate. Proposals that fail to provide resumes covering all ten labor categories and the minimum years of experience for key personnel position will be evaluated as unacceptable. Please also note according to PWS paragraph 5.1.1”The contractor key personnel shall hold a certification by an industry accredited institution such as, or equal to, the Society of Broadcast Engineers (SBE) or infoComm.”
I) Broadcasting Systems
Project Manager with a minimum of 8 yrs experience
Senior Field Engineer with a minimum of 5 yrs experience
Senior Design Engineer with a minimum of 5 yrs experience
Field Service Installation Manager with a minimum of 5 yrs experience
Field Installation Supervisor with a minimum of 5 yrs experience
II) VI Systems
Project Manager with a minimum of 8 yrs experience
Senior Field Engineer with a minimum of 5 yrs experience
Senior Design Engineer with a minimum of 5 yrs experience
Field Service Installation Manager with a minimum of 5 yrs experience
Field Installation Supervisor with a minimum of 5 yrs experience
Paragraph (c) (2) (B) 1) at page 80 of 109 of the solicitation is modified as below. Given this change offerors shall discuss in their proposal not only the key personnel, but also all other personnel “it proposes to fulfill the requirements of the PWS, define capabilities….”
Paragraph (c) (2) (B) 1)
Offerors shall discuss the key personnel and other personnel proposed to fulfill the requirements of the PWS, define the capabilities, qualifications and applicable Revised Attachment (1)
Contractor Labor Categories Summary
Contractor Name: ________________________
Fully Burdened/Escalated Rates
| Base Year |
| Option Year |
| Option Year |
| One |
| Two |
Project Manager
Engineer
Field Service Installation Manager
Field Installation Supervisor
Equipment Specialist
Technical Writer
Cable Installer
Draftsman
Senior Field Engineer
Senior Design Engineer
Electronic Helper
Revised Attachment (2) Integration/Design Project
| SAMPLE LABOR PROJECT |
| Hours |
| Rate |
| Total |
| Project Manager 2 |
| 80 |
| Senior Field Engineer 2 (V/I Systems) |
| 160 |
| Senior Design Engineer 2 (V/I Systems) |
| 120 |
| CAD Engineer |
| 16 |
| Field Service Installation Manager 1 |
| 24 |
| Acquisition Manager |
| 24 |
| Logistics Manager |
| 24 |
| Field Installation Supervisor |
| 120 |
| Senior Maintenance Engineer |
| 40 |
| Technician Level 4 |
| 120 |
| Technician Level 3 |
| 600 |
| Technician Level 2 |
| 480 |
| Technician Level 1 |
| 360 |
LABOR TOTAL:
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Mar-2012 02:00 PM to 30-Mar-2012 02:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .