HQ0028-12-R-0004
Section SF 1449 - CONTINUATION SHEET
ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
FSC: 9999 Name: SERVICES NON- Part Number: SERVICES
FFP
Description: SITE SURVEY, ENGINEERING, EQUIPMENT BUNDLING, INSTALLATION, TESTING AND TRAINING OF VISUAL INFORMATION (VI)/BROADCAST SYSTEMS FOR TASA'S DEPARTMENT OF DEFENSE (DOD)CUSTOMERS. THE TYPES OF VI AND BROADCAST SYSTEMS INCLUDE: CONFERENCE ROOM PRESENTATION SYSTEMS, COMPUTER CLASSROOMS, ANALOG/DIGITAL VIDEO/AUDIO/DATA DISTRIBUTION SYSTEMS, VIDEO TELECONFERENCING SYSTEMS, ELECTRONIC IMAGING SYSTEMS, ANALOG/DIGITAL TV/VIDEO PRODUCTION FACILITIES, ANALOG/DIGITAL VIDEO/AUDIO EDITING SUITES, SOUND REINFORCEMENT, TELEVISION STUDIOS AND MISCELLANEOUS VI/BROADCAST SYSTEMS. THIS PWS DESCRIBES A LIST OF ENGINEERING TASKS TO BE PERFORMED AT LOCATIONS WORLDWIDE.PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
FOB: Destination
NSN: 9999-01-SNP-0621
MILSTRIP: HQ002810590001
PURCHASE REQUEST NUMBER: HQ002810596603
PROJECT: 1TC LI: 1
ESTIMATED
NET AMT
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AA
SITE SURVEY
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
FOB: Destination
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AB
SYSTEM DESIGN
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AC
SUPPLY INTEGRATION
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AD
INSTALLATION
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AE
TESTING
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AF
TRAINING
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AG
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AH
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AJ
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AK
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AL
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AM
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AN
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AP
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AQ
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AR
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AS
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AT
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AU
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AV
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AW
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AX
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AY
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0001AZ
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
OPTION
FFP
Description: SITE SURVEY, ENGINEERING, EQUIPMENT BUNDLING, INSTALLATION, TESTING AND TRAINING OF VISUAL INFORMATION (VI)/BROADCAST SYSTEMS FOR TASA'S DEPARTMENT OF DEFENSE (DOD)CUSTOMERS. THE TYPES OF VI AND BROADCAST SYSTEMS INCLUDE: CONFERENCE ROOM PRESENTATION SYSTEMS, COMPUTER CLASSROOMS, ANALOG/DIGITAL VIDEO/AUDIO/DATA DISTRIBUTION SYSTEMS, VIDEO TELECONFERENCING SYSTEMS, ELECTRONIC IMAGING SYSTEMS, ANALOG/DIGITAL TV/VIDEO PRODUCTION FACILITIES, ANALOG/DIGITAL VIDEO/AUDIO EDITING SUITES, SOUND REINFORCEMENT, TELEVISION STUDIOS AND MISCELLANEOUS VI/BROADCAST SYSTEMS. THIS PWS DESCRIBES A LIST OF ENGINEERING TASKS TO BE PERFORMED AT LOCATIONS WORLDWIDE.PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
FOB: Destination
NSN: 9999-01-SNP-0621
MILSTRIP: HQ002810590001
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AA
FFP
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AB
FFP
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AC
FFP
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 NOV 2013 THROUGH 14 NOV 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AD
FFP
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AE
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 NOV 2013 THROUGH 14 NOV 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AF
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AG
FFP
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AH
FFP
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AJ
FFP
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AK
FFP
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AL
FFP
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AM
FFP
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AN
FFP
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 NOV 2013 THROUGH 14 NOV 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AP
FFP
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 NOV 2013 THROUGH 14 NOV 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AQ
FFP
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 NOV 2013 THROUGH 14 NOV 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AR
FFP
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AS
FFP
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AT
FFP
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AU
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 NOV 2013 THROUGH 14 NOV 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AV
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 NOV 2013 THROUGH 14 NOV 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AW
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 NOV 2013 THROUGH 14 NOV 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AX
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AY
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0002AZ
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2013 THROUGH 14 MAY 2014.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
FFP
Description: SITE SURVEY, ENGINEERING, EQUIPMENT BUNDLING, INSTALLATION, TESTING AND TRAINING OF VISUAL INFORMATION (VI)/BROADCAST SYSTEMS FOR TASA'S DEPARTMENT OF DEFENSE (DOD)CUSTOMERS. THE TYPES OF VI AND BROADCAST SYSTEMS INCLUDE: CONFERENCE ROOM PRESENTATION SYSTEMS, COMPUTER CLASSROOMS, ANALOG/DIGITAL VIDEO/AUDIO/DATA DISTRIBUTION SYSTEMS, VIDEO TELECONFERENCING SYSTEMS, ELECTRONIC IMAGING SYSTEMS, ANALOG/DIGITAL TV/VIDEO PRODUCTION FACILITIES, ANALOG/DIGITAL VIDEO/AUDIO EDITING SUITES, SOUND REINFORCEMENT, TELEVISION STUDIOS AND MISCELLANEOUS VI/BROADCAST SYSTEMS. THIS PWS DESCRIBES A LIST OF ENGINEERING TASKS TO BE PERFORMED AT LOCATIONS WORLDWIDE.PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
FOB: Destination
NSN: 9999-01-SNP-0621
MILSTRIP: HQ002810590001
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AA
FFP
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AB
FFP
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AC
FFP
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AD
FFP
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AE
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AF
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AG
FFP
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AH
FFP
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AJ
FFP
Description: NON-PERSONAL; SITE SURVEY; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.1PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AK
FFP
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AL
FFP
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AM
FFP
Description: NON-PERSONAL; SYSTEM DESIGN IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.2, PERIOD OF PERFORMANCE 15 MAY 2012 THROUGH 14 MAY 2013.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AN
FFP
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AP
FFP
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AQ
FFP
Description: NON-PERSONAL; SUPPLY INTEGRATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.3, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AR
FFP
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AS
FFP
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AT
FFP
Description: NON-PERSONAL; INSTALLATION; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.4, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AU
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AV
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AW
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.5, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AX
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AY
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
ESTIMATED QUANTITY
UNIT
UNIT PRICE
0003AZ
FFP
Description: NON-PERSONAL; IN ACCORDANCE WITH PERFORMANCE WORK STATEMENT PARAGRAPH 3.6, PERIOD OF PERFORMANCE 15 MAY 2014 THROUGH 14 MAY 2015.
PWS
EXHIBIT A
Performance Work Statement
ENGINEERING SERVICES CONTRACT
FOR THE
DEFENSE MEDIA ACTIVITY (DMA)
TELEVISION-AUDIO SUPPORT ACTIVITY (T-ASA)
(Project 1TC)
1.0 SCOPE: The purpose of this Performance Work Statement (PWS) is to obtain site survey, system design, supply integration, installation, testing and training of Visual Information (VI)/broadcast systems for T-ASA's Department of Defense (DoD) customers.
1.1 The types of VI and broadcast systems include but are not limited to: conference room presentation systems, training facilities, analog/digital video/audio/data distribution systems, video teleconferencing systems, electronic imaging systems, analog/digital HD TV/video production facilities, analog/digital video/audio non-linear editing suites, sound reinforcement, television studios, TV/Radio terrestrial transmitter and Satellite receive only systems.
1.2 This PWS describes a list of engineering tasks and equipment deliverables to be performed/delivered at locations worldwide (CONUS/OCONUS). This PWS is in support of the Television-Audio Support Activity (T-ASA), Defense Media Activity (DMA), and Office of the Assistant Secretary of Defense for Public Affairs (OSAD-PA).
1.3 This is a firm fixed-price requirements type contract. Subject to the availability of funding, this contract obligates the Government to issue delivery orders in a given fiscal year in the schedule. The contract requires the Contractor to furnish products and services, when ordered, up to and including the number of tasks designated in the schedule. Before any delivery order is issued the Contractor and Government shall reach agreement as to the work to be performed and the firm fixed-price for the Task/Delivery Order. The Government will review the Contractor’s price proposal for price reasonableness and seek to a definitive firm-fixed-price and other necessary terms before issuance of the Task/Delivery Order. In the event the Government and Contractor are unable to agree upon the price or other terms of the Task/Delivery Order, the Government reserves the right to satisfy the requirement through other means without incurring any liability towards the Contractor.
2.0 APPLICABLE DOCUMENTS: The following documents form a part of this specification to the extent specified herein. In the event of conflict between the documents referenced herein and the contents of the PWS, the PWS shall take precedence.
2.1 National Association of Broadcasters (NAB) Handbook, latest version.
2.2 National Electric Code NFPA.
2.3 National Electrical Safety Code ANSI C2‑93.
2.4 Proposed EIA Standard RS‑170A.
2.5 SMPTE 170M Composite Analog Video Signal-NTSC for Studio Applications
2.6 SMPTE 259M Serial Digital Interface for 10-bit 4:2:2 component and 4 times subcarrier frequency NTSC Composite Digital Signals
2.7 SMPTE 274 1920 x 1080 Sample Structure
2.8 SMPTE 292 1.5 Gbit/Sec Signal/Data Serial Interface
2.9 SMPTE 424 3.0 Gbit/Sec Signal/Data Serial Interface
2.10 IEEE IT Networking Standards and Recommended Practices
2.11 IEEE Emerald Book Power & Grounding Standard
2.12 Cisco IT Networking Standards as specified in the Cisco Certification (CCxx) Programs
2.13 ANSI/EIAJ RS-310-C Standard for Racks and Enclosures
3.0 REQUIREMENTS: Tasks/Deliverables. The Contractor shall complete the following tasks/deliverables in accordance with the contract provisions and under the guidance of the Contracting Officer (KO). All deliverables become the property of the Government upon acceptance by the KO. Note: Many of the deliverables require cost estimates for related tasking/deliveries. These separate cost estimates are required because the Government may issue task/delivery order(s) for one, multiple or all of the CLINs contained in this contract.
3.1 Site Survey (CLINS 0001AA, 0001AG, 0001AH, 0001AJ, 0002AA, 0002AG , 0002AH , 0002AJ ,0003AA, 0003AG , 0003AG , 0003AH , ): The Contractor shall perform an on-location site survey to determine the customer’s requirements. In addition, the contractor will develop a cost estimate for any anticipated future work that will be used for planning/funding purposes. Any tests and data required by T-ASA will be specified in the Site Survey Task/Delivery Order. Site Surveys shall follow the format and procedures of the applicable documents listed in PWS para 2.0. Site Surveys shall be performed at a mutually acceptable time/date/price.
3.1.1 The functions to be performed and addressed by the Contractor under the site survey requirement at minimum include the following: Meeting with appropriate end users and action officers to discuss site-specific requirements; Coordinating, along with Government representatives, proposed facilities with base/facility engineering, etc.; Determining from site personnel if asbestos or other hazmat are present; Determining if the facilities physical attributes/layout will support the proposed system; Ensure heating, ventilation, and air conditioning (HVAC) are sufficient to dissipate heat load of equipment/personnel; Check available electrical service and recommend any changes/upgrades required to meet system/facility/ancillary power requirements; estimate minimum usable space for system equipment and personnel; Determine acoustic reinforcement and treatment requirements for proper system operation; facility/system lighting requirements and end user operational/training requirements.
3.1.2 Site Survey/Report: Upon completion of the physical site survey, and within the time parameters of the Site Survey Task/Delivery Order, the Contractor shall furnish the Government a Site Survey Report which shall include at a minimum: single line floor plan drawing(s) on 11 X 17 inch paper of the proposed facility depicting room dimensions and placement of the proposed system(s); typewritten , subject oriented, trip report that details findings compiled during the survey; a chronology of events relating to people, places, times/dates, and locations relative to the survey; Contractor's overall technical assessment of the proposed system; cost estimate for System design, supply integration, installation, testing and training; Noted facility deficiencies (physical/logistical) with recommended solutions; digital images (JPEG) of existing facilities; Recommendations to allow the customer optimal utilization of the proposed system while operating within a conservative budget; Summary of overall findings. The Site Survey report shall be formatted for IBM/Compatible computer with data in Microsoft Word or Microsoft Excel (MS Office latest version), and drawings in Autodesk, INC. AUTOCAD/VIDCAD latest version. The Site Survey report shall be attached to email and sent to the T-ASA engineer specified in the task/delivery order.
3.2 System design (CLINS 0001AB, 0001AK, 0001AL , 0001AM , 0002AB, 0002AK, 0002AL , 0002AM, 0003AB, 0003AK, 0003AL , 0003AM ): The Contractor shall provide a system design engineering package based on the material contained in the Site Survey Report (Government or Contractor furnished) as specified in the Task/Delivery Order.
3.2.1 The System design engineering package shall include a detailed price proposal including; man hour/labor categories required for Installation, Testing and Training; system configuration drawings showing audio/video/remote control flow; equipment rack elevations, acoustic analysis data, applicable studio lighting, cable charts, critical signal path/measurements and remote control panel layout; estimated performance schedule; Bill of Materials (BOM) listing recommended equipment by brands, models and quantities with brochures and specifications and detailed cost data for each. The information provided must contain sufficient depth of detail to order materials and install the system. A softcopy of the System design engineering package shall be formatted for IBM/Compatible computer with data in Microsoft Word or Microsoft Excel (MS Office latest version) and drawings in Autodesk, INC. AUTOCAD/VIDCAD (latest version). The System design engineering package shall be attached to email and sent to the T-ASA engineer specified in the task/delivery order.
3.3 Supply integration (CLINS 0001AC, 0001AN, 0001AP , 0001AQ ,0002AC, 0002AN, 0002AP , 0002AQ ,0003AC, 0003AN, 0003AP , 0003AQ ): The Contractor shall perform supply chain integration as specified in the supply integration Delivery Order. This includes procuring the equipment specified in the BOM, consolidating and shipping to the specified location within the required timeframe.
3.3.1 The Contractor shall furnish all equipment in compliance with the supply integration task/delivery order. The acquisition of supplies and services is considered an inherent governmental function and is subject to the requirements of federal procurement laws and regulations. As such, the Government shall not exercise the contract line items associated with acquiring a list of equipment of a bill of materials to circumvent compliance with procurement laws and regulations. The Government shall only exercise contract line items associated with "bill of materials" in conjunction with a service identified by another line item (e.g., design, installation, testing, and training).
3.3.2 The Contractor shall furnish the Brands/Models as specified in the task/delivery order. Any equipment substitutions must be approved by the Contracting Officer (KO) prior to Contractor procurement. This includes substitutions for an “or equal” and substitutions for items that are no longer available.
3.3.3 In addition to items that are no longer available, the Contractor occasionally may not be able to provide a small number of items listed on the BOM, within the negotiated percentage over invoice cost, due to equipment manufacturer sales restrictions. The Contracting officer may, at his/her discretion, issue the delivery order minus these items and procure these through alternate means.
3.3.4 Contractor Furnished Equipment shall be new, "off‑the‑shelf" commercial type except where modifications or fabrications are required to meet the requirements specified by the Government. See FAR Subpart 2.101 for the government’s definition of commercial-off-the-shelf.
3.4 Installation (CLINS 0001AD, 0001AR, 0001AS, 0001AT ,0002AD, 0002AR, 0002AS, 0002AT , 0003AD, 0003AR, 0003AS, 0003AT ): The Contractor shall install and integrate the system including all hardware, firmware, and software to achieve the required capabilities and demonstrate that the system operates as designed.
3.4.1 The installed system shall be complete with all necessary integration, end items, hardware, software, connectors, and cables. All minor installation items, not specifically identified by the design documents, shall be provided by the Contractor to meet optimum performance requirements. The system shall be fully operational at the completion and acceptance of installation without further addition or modification.
3.4.2 The Contractor shall ensure proper positioning and functioning of Contractor Furnished Equipment and Government Furnished Equipment for optimum performance and easy access by operator/maintenance personnel as indicated in the equipment/rack elevation drawings.
3.4.3 The Contractor shall provide all necessary equipment, tools, and safety items to install and test the System.
3.4.4 The Contractor shall utilize the industrially recognized equipment safety and procedures during installation and testing to avoid personnel injury and property damage.
3.4.5 The Contractor shall install the system in accordance with the Task/Delivery Order and the applicable documents listed in PWS Paragraph 2.0.
3.4.6 The installation, fabrication, and interfacing shall be in accordance with industry standards.
3.4.7 When equipment cabinet anchoring is required by local regulations, the equipment cabinets shall be anchored firmly in place. Fasteners and hardware shall be adequate to support their loads with a safety factor of at least three. Any non-rack mounted equipment installed 36 inches or greater above floor level shall have a safety factor of at least five.
3.4.8 All switches, outlets, cables, ports, controls, etc. shall be clearly, logically, and permanently marked. All cables/wires shall be properly terminated and neatly dressed.
3.4.9 Adequate overload protection shall be employed on all electrical equipment. Adequate power conditioning shall be employed in areas with sub-standard power delivery. Proper phase balancing and grounding shall be employed for the installation’s power delivery system.
3.4.10 The Contractor shall take such precautions as necessary to guard against electromagnetic and electrostatic interference, to supply adequate ventilation within equipment cabinets, racks and consoles, and to install equipment so as to provide maximum safety to the operating personnel. Equipment cabinets shall be designed to allow personnel to turn power on/off from the front of the cabinets when defined in System Design Report and approved the Contracting Officer Technical Representative (COTR) and T-ASA engineering.
3.4.11 Blank panels shall be furnished and installed in equipment cabinets to cover the front of all unoccupied cabinet and rack spaces.
3.4.12 The Contractor shall fabricate and install cables and cable assemblies in tailored lengths to interconnect the equipment components.
3.4.13 All cabling external to the electronic cabinets shall be installed in accordance with local electrical/fire regulations. In the event that adequate space is not available in the existing conduits/raceways or additional conduits/raceway are required for any other reason, the Contractor shall furnish and install the required conduits/raceways when defined in System Design Report and approved the Contracting Officer Technical Representative (COTR) and T-ASA engineering.
3.4.14 Manuals: The Contractor shall furnish commercial/system manuals to the Government Technical Representative (GTR) prior to system acceptance testing. The exact number of commercial/system manuals will be specified in the installation task order. These manuals shall include equipment/component data as well as system data.
3.4.14.1 Commercial Manuals: The Contractor shall provide a commercial operation/service manual for hardware, firmware, and software, as provided by the original manufacturers, for each piece of equipment and software furnished by the Contractor to the Government Technical Representative (GTR) at system acceptance testing.
3.4.14.2 System Manuals: The Contractor shall provide the System operations/service manual(s) to the GTR at acceptance. The manuals shall be in Contractor format and shall contain the procedures necessary to properly operate, maintain, and support the system.
3.4.15 Installation Documentation: The Contractor shall furnish As-Built drawings and digital images depicting all equipment, components, and rack layout of subsystems and of the system. The drawings shall show all connections, wire numbers, and signal flow within the system. The digital images shall show the overall installation, equipment layout/placement and any specific areas of interest that were discovered during the installation. The images shall be imbedded in a MS Word document that gives a brief narrative of the images. A preliminary, complete, set of As-Built drawings (red lines) shall be furnished to the GTR at the time of acceptance testing. A formal set of As-Built drawings (one master and two copies), not to exceed ANSI "D" size and the digital image document shall be furnished within 30 calendar days of final acceptance. A softcopy of the As-Built drawings and the digital image document shall be attached to email and sent to the T-ASA engineer specified in the task order. The softcopy of as-built drawings shall be on Autodesk, INC. AUTOCAD/VIDCAD (latest version) and be formatted for IBM/Compatible computers. The digital image document shall be formatted for IBM/Compatible computer with data in Microsoft Word (latest version). The contractor shall furnish all programming, source codes, and passwords to the government. The programming, source code, and passwords should be considered the property of the government after delivery by the contractor.
3.5 Testing (CLINS 0001AE, 0001AU, 0001AV, 0001AW, 0002AE, 0002AU, 0002AV, 0002AW, 0003AE, 0003AU, 0003AV, 0003AW ) : The Contractor shall perform the acceptance test with Government personnel observing the results. The Contractor shall appoint a Test Director to coordinate all tests to be performed. The Test Director (Contractor) shall coordinate the test schedule with the GTR/ALT GTR five working days prior to the proposed starting of the tests. One copy of the annotated test report shall be furnished to the GTR at the completion of the acceptance test and one copy forwarded to the Contracting Officer within ten days after completion of the test.
3.5.1 Installation Test Procedures: System acceptance test procedures shall be prepared by the Contractor and submitted to the Contracting Officer 30 days prior to start of acceptance testing.
3.5.2 The test procedures shall be prepared in sufficient depth to demonstrate the full capability (functions and features) of the system with pass/fail criteria on all significant specifications. The procedure shall include a step‑by‑step process that will be used to test the system. Each test shall be described in detail explaining the purpose of the test, the test equipment and/or charts to be used, and the expected results. A written copy of the step-by-step test procedure shall be provided to the Government Technical Representative (GTR) enabling the GTR to follow the performance and record the results.
3.5.3 The Contractor shall provide all applicable equipment and personnel required to perform the acceptance test.
3.5.4 Nothing contained in this section shall be construed to prohibit the Government from conducting additional tests on the system to validate compliance with this Performance Work Statement or any part thereof.
3.6 Training (CLINS 0001AF, CLINS 0001AX, CLINS 0001AY, CLINS 0001AZ 0002AF, CLINS 0002AX, CLINS 0002AY, CLINS 0002AZ , 0003AF, CLINS 0003AX, CLINS 0003AY, CLINS 0003AZ ): The Contractor shall provide on-site operator training, at the Government's facility for the installed system including all personnel and materials required to perform the training. The training shall be scheduled for the period immediately prior to system acceptance. As a minimum the training shall cover overall operation of the system, operator's procedures including the various software operations for the software furnished by the Contractor, operator's troubleshooting for isolating equipment malfunctions, and ON/OFF procedures that are part of system operation. The time/date, number of government personnel to be trained, and level of training will be detailed in the Training task/delivery order.
3.6.1 The Contractor shall furnish a lesson plan to the Government for approval, at least 30 days prior to the system training. The lesson plan shall include, as a minimum, course outline, specific definition and direction on learning objectives, equipment requirements, instructional media requirements, and subjects to be presented and conduct of training.
3.6.2 The Contractor shall provide all necessary training materials, literature, and training aids required for the training. As a minimum each trainee will be provided with a copy of the operator's instruction manual, signal block diagrams of the system, and interconnecting cabling diagram.
3.7 Engineering Change Proposals (ECPs): The Contractor is encouraged to submit Engineering Change Proposals on their own initiative or at the request of the Government. There shall be NO cost to the Government associated with the preparation and submission of the ECPs. However, additional costs for Labor and Materials associated with implementation of the ECP shall be included in the ECP and must be approved by the Contracting Officer prior to implementation. The ECPs may provide changes in standards, format or equipment to meet evolving industry standards, enhance services and system performance, and solve system/program issues.
4.0 Quality Assurance Provisions: The quality assurance provisions of the contract include Engineering documentation, Monthly status reports, Government evaluation, warranty, workforce composition/qualifications. The adequacy of reports and documentation specified in this PWS shall be the Contractor's responsibility. Contractor conformance to the PWS requirements will be measured by KO/GTR evaluation of contract deliverables. Unacceptable deliverables will be returned to the Contractor for re-work prior to Government acceptance.
4.1 Task/Delivery order documentation: The contractor shall provide task/delivery order documentation governing the configuration and quality of equipment, system design, acquisition, installation, operation and support as it applies to the requirement. This documentation shall include standards, systems/subsystem design plans, equipment listings, installation instructions and site survey reports.
4.2 Warranty: The Contractor shall provide equipment and services warranty in accordance with the warranty clauses of the contract. The Contractor shall be responsible for warranty service of all Contractor installed systems for a period of one year from date of system acceptance. Warranty shall include all parts, labor, travel and per diem, as required, to place the system in full operation. All warranty repair and/or replacement shall be coordinated through the Contracting Officer or Contracting Officer designated Contract Administrator (i.e. the Contractor shall NOT deal directly with the customer on warranty issues without the knowledge and consent of DAM Contracting).
4.2.1 Warranty of supply integrated equipment: In the event the Contractor only supplies the equipment (PWS Para. 3.3 - CLINS 0001AC, 00002AC, 0003AC ) along with another CLIN such as system design as describe in para 3.3.1, the contractor is still responsible for warranty service of the individual end items for a period not less than the Original Equipment Manufacturer (OEM) standard commercial warranty period for the equipment from date of delivery. During the equipment installation or joint inventory by government personnel, if any item is found to be damaged, not functioning or missing, the contractor shall arrange and cover the cost of overnight expressing a replacement to the on-site installation team.
Contractor Minimum Technical Qualifications and Facilities Requirements:
Contractor Qualifications:
Contractor personnel may need security clearances issued by Defense Security Service (DSS). Recently some of the T-ASA customer facilities and programs served by the T-ASA Engineering Services Contractor required “TOP SECRET” cleared personnel for work performance.
The contractor key personnel shall hold a certification by an industry accredited institution such as, but not limited to, the Society of Broadcast Engineers (SBE) or infoComm.
Contractor Facilities:
The contractor must have a modern state-of-the art facility with sufficient space to accommodate the staging, integration, storage, testing and training of client visual & broadcast equipment & systems as related to the SOW requirements.
The contractor shall successfully have passed a financial and facility audit by the Defense Contracting Management Agency (DCMA).
The contractor financial system shall be DCAA approved.
TRAVEL EXPENSES:
The contractor will be reimbursed for all travel and per diem costs for contractor staff, as well as, travel and lodging arrangements for contractor staff. The contractor shall provide receipts for all travel expenditures for actual costs incurred for travel expenses. Such travel expenses shall be consistent with then-current General Services Administration (GSA) policies and procedures. Costs for transportation may be based on mileage rates, actual costs incurred, or on a combination thereof, provided the method used results in a reasonable charge. Costs for lodging, meals, and incidental expenses may be based on per diem, actual expenses, or a combination thereof, provided the method used results in a reasonable charge.
Costs incurred for lodging, meals, and incidental expenses shall be considered to be reasonable and allowable only to the extent that they do not exceed on a daily basis the maximum per diem rates in effect at the time of travel as set forth in the Standardized Regulations (Government Civilians, Foreign Areas), Section 925, “Maximum Travel Per Diem Allowances for Foreign Areas,” prescribed by the Department of State, for travel in areas not covered in para 6.1.1 above.
Airfare costs in excess of the lowest customary standard, coach, or equivalent airfare offered during normal business hours are unallowable except when such accommodations require circuitous routing, require travel during unreasonable hours, excessively prolong travel, result in increased cost that would offset transportation savings, are not reasonable adequate for the physical or medical needs of the traveler, or are not reasonably available to meet mission requirements. However, in order for airfare costs in excess of the above standard airfare to be allowable, the applicable condition(s) set forth above must be documented and justified.
The contractor shall coordinate overseas travel arrangements with Government representatives not less than 30 days prior to overseas travel. The coordination shall include the contractor’s proposal of the number of contract staff to accomplish each trip. The government, however, shall have final approval of the size of each traveling party.
DELIVERY INFORMATION
CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
POP 15-MAY-2015 TO
14-MAY-2016
N/A
HQ0028 DEFENSE MEDIA ACTIVITY_SHIP TO
GERALD TUCKY
14855 6TH STREET
RIVERSIDE CA 92518-2031
951-413-2430
HQ0028
0001AA
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AB
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AC
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AD
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AE
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AF
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AG
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AH
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AJ
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AK
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AL
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AM
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AN
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AP
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AQ
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AR
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AS
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AT
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AU
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AV
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AW
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AX
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AY
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0001AZ
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AA
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AB
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AC
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AD
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AE
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AF
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AG
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AH
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AJ
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AK
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AL
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AM
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AN
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AP
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AQ
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AR
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AS
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AT
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AU
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AV
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AW
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AX
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AY
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0002AZ
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AA
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AB
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AC
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AD
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AE
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AF
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AG
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AH
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AJ
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AK
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AL
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AM
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AN
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AP
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AQ
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AR
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AS
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AT
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AU
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AV
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AW
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AX
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AY
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
0003AZ
14-MAY-2016
N/A
(SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.204-9 Personal Identity Verification of Contractor Personnel
JAN 2011
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation
MAY 2011
52.209-5 Certification Regarding Responsibility Matters
APR 2010
52.212-2 Evaluation - Commercial Items
JAN 1999
52.222-50 Combating Trafficking in Persons
FEB 2009
52.228-5 Insurance - Work On A Government Installation
JAN 1997
52.242-1 Notice of Intent to Disallow Costs
APR 1984
52.252-1 Solicitation Provisions Incorporated By Reference
FEB 1998
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
MAR 2008
252.247-7023 Alt III Transportation of Supplies by Sea (May 2002) Alternate III
MAY 2002
CLAUSES INCORPORATED BY FULL TEXT
52.0100-4042 LIABILITY (INSURANCE) (FAR 28.307-2)(DMC)(MAR 2004)
Worker's Compensation and Employer's Liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statues, they shall be covered under employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is hereby required.
(a) General Liability: Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence is hereby required.
(b) Automobile Liability: The Contractor shall submit proof of automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage is hereby required. The amount of liability coverage on other policies shall be commensurate with any legal requirement of the locality and sufficient to meet normal and customary claims.
The amounts of liability coverage listed above are minimum amounts only. The amount of coverage shall be commensurate with any staturory requirements of the locality and sufficient to meet any normal and customary claims.
(End of Local Instruction)
52.0100-4094 MARKING INSTRUCTIONS FOR ALL ITEMS TO INCLUDE DROP
SHIP AND DIRECT SHIPMENT (DMA)(OCT 2008)
The Contractor shall attach two (2) copies of a detailed packing list with each box or container with unlike items where the full description of the contents is not authorized or cannot be shown. Include one (1) copy of the packing list inside the box or container and attach one (1) copy of the packing list on the outside of the box or container. The outside of the box or container must also include the complete shipping address as provided in the schedule and the Contract/Purchase/Delivery Order number located on Page 1 of this document.
The packing list shall contain the following information:
(a) Contract number/Purchase Order number or Delivery Order number
(b) Package number and set number (if any) of the container.
(c) A list of the contents which shows the quantity by item, item description, part number, type and size, unit of issue if other than each.
NOTE!
The government WILL NOT ACCEPT items shipped without a packing list especially when the content of the package is unidentifiable; rejected items will be returned at the contractor’s expense.
INCOMPLETE DELIVERIES
Incomplete delivery refers to the incomplete shipment of a unit of issue of an individual contract line item (CLIN). Such Incomplete, or fragmented delivery of any part of a CLIN is not authorized and will not be accepted. Each item (CLIN), including all components and sub-items, is to be delivered complete. Where sub-line items are reflected as component parts of an item, all sub-line items must be delivered simultaneously to form the complete item.
(End of Local Instruction)
52.212-3 OFFEROR…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| HQ0028-12-D-0011-6-11-2012.doc | DOC document | |
| HQ0028-12-D-0011-6-11-2012.doc | DOC document | |
| HQ0028-12-R-0004-03-3-21-2012.doc | DOC document | |
| HQ0028-12-R-0004-02.doc | DOC document | |
| Question on RFP HQ0028-12-R-0004 Engineering Services 3-12-2012.doc | DOC document | |
| RFP HQ0028-12-R-0004 Engineering Services-Questions-3-9-2012.doc | DOC document | |
| HQ0028-12-R-0004-REVISED-3-1-2012.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .