PPQ_Updated.docx

DOCX document 123 KB Posted

Attached to
Acquisition Customer Service Support Federal contract opportunity
Solicitation number
HQ001316R0008
Issued by
Defense Security Cooperation Agency

About this file

Updated Past Performance Questionnaire

View the file

Other files for this federal contract opportunity

Other files attached to Acquisition Customer Service Support, newest first.
File Type Posted
HQ001316R0008_0002.pdf PDF
HQ001316R0008_Conformed_with_Amendment_0001_and_0002_Incorporated.pdf PDF
HQ001316R0008_0001.pdf PDF
HQ001316R0008_DD254.pdf PDF
CLIN_Information.pdf PDF
PPQ.pdf PDF
PWS_for_Customer_Support_Services_DBO_CON_03_28_16.pdf PDF
Clauses_and_Provisions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

HQ0013-16-R-0008

Acquisition Customer Support DUE: 1:00 PM July 15, 2016

(Note: Complete questionnaire and email to La Vivian Peasant at lavivian.r.peasant.civ@mail.mil )

I. EVALUATION OF OFFEROR:

Company/Division Providing Services: Address:

Description of Project:

Contract Number: Dollar Value (Annual):

Performance Period: Performance Location:

Type of Contract:

Check One:

Fixed Price Cost Reimbursement Time & Material Other (Please Specify):

Type & Extent of Subcontracting:

II. EVALUATED BY:

Company/Organization/Address:

Name & Title: Signature: Date: Telephone: FAX:

III. EVALUATION CRITERIA:

Please answer questions 1 through 13 using the following criteria. Circle only one response per question.

Rating
Definition
Note
Exceptional (4)
Performance met contractual requirements and exceeded many to the government’s benefit. The contractual performance of the element or sub element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
To justify an “exceptional” rating, identify multiple significant events and state how they were of benefit to the government. A singular benefit, however, could be of such magnitude that it alone merits an “exceptional” rating. Also, there should have been no significant weaknesses identified.
Very Good (3)
Performance met contractual requirements and exceeded some to the government’s benefit. The contractual performance of the element or sub element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
To justify a “very good” rating, identify a significant event and state how it was a benefit to the government. There should have been no significant weaknesses identified.
Satisfactory (2)
Performance met contractual requirements. The contractual performance of the element or sub element contained some minor problems for which corrective actions taken by the contractor appeared to be or were satisfactory.
To justify a “satisfactory” rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been no significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than “satisfactory” solely for not performing beyond the requirements of the contract/order.
Marginal (1)
Performance did not meet some contractual requirements. The contractual performance of the element or sub element being evaluated reflected a serious problem for which the contractor did not identify corrective actions. The contractor’s proposed actions were only marginally effective or were not fully implemented.
To justify a “marginal” performance rating, identify a significant event in each category that the contractor had trouble overcoming and state how it affected the government. A “marginal” rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
Unsatisfactory (0)
Performance did not meet most contractual requirements and recovery was not accomplished in a timely manner. The contractual performance of the element or sub element contained a serious problem(s) for which the contractor’s corrective actions were ineffective.
To justify an “unsatisfactory” rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it affected the government. A singular problem, however, could be of such serious magnitude that it alone merits an “unsatisfactory” rating. An “unsatisfactory” rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency report or letter.

IV. QUESTIONS:

Question
Re
sponse

1. Evaluate the contractor's overall commitment to quality performance and customer satisfaction.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

2. Evaluate the contractor's overall technical competence.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

3. Evaluate the contractor's cooperation and willingness to work as a team (with your personnel, other contractors, etc.).

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

4. Evaluate the contractor's compliance with contractual requirements.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

5. Evaluate the contractor's responsiveness to contract, program and/or schedule changes.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

6. Evaluate the effectiveness of the contractor's overall quality control procedures.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

7. Evaluate the effectiveness of the contractor's safety program or efforts.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal

Question
Re
sponse

8. Evaluate the effectiveness of the contractor's management and supervision.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

9. Evaluate the contractor's ability to overcome technical problems, labor issues, and/or other performance difficulties.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

10. Evaluate the contractor's ability to plan and conduct operations in the most effective manner.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

11. Evaluate the contractor's ability to adhere to schedules and complete work on time.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

12. Evaluate the quality and stability of the contractor's workforce and continuity of services.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal 0 – Unsatisfactory N/A

13. Evaluate the availability, adequacy, and suitability of the contractor's staffing for the work required.

Comment:

4 – Exceptional 3 – Very Good 2 – Satisfactory 1 – Marginal

File details come from the government source that posted it. Updated .