PRS.pdf

PDF 73 KB Posted

Attached to
Support Services for Washington DC Regional Centers Federal contract opportunity
Solicitation number
HQ0013-15-R-0007
Issued by
Defense Security Cooperation Agency

About this file

PRS

View the file

Other files for this federal contract opportunity

Other files attached to Support Services for Washington DC Regional Centers, newest first.
File Type Posted
Amendment_0002_Conformed_Copy.pdf PDF
Amend_0002.pdf PDF
Technical_Exhibition_3_19_Aug.pdf PDF
Combined_Sheet_Responses_To_Mod.pdf PDF
Amendment_0001.pdf PDF
Amend_0001_Conformed_Copy.pdf PDF
HQ0013-15-R-0007.pdf PDF
ANNEX_A.pdf PDF
DD254_Regional_Centers_11_June.pdf PDF
PPQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY (PRS)

13 Aug 2014

1.0 Overview. This PRS summary identifies critical success factors for the contract. It identifies both the performance objectives for those factors and the performance threshold required for each performance objective. The Government reserves the right to surveil all services called for in the contract to determine whether or not the performance objectives and goals were met.

1.1. This PRS:

1.1.1 Lists the performance objectives for the required service that the Government will conduct surveillance upon.

1.1.2 The absence of any contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract including the clauses entitled “Inspection of Services” and “Default”.

1.1.3 Will be used as the baseline to develop a QASP. The QASP will identify the surveillance methods the Government will use to evaluate the contractor’s performance.

1.1.4 Surveillance methods may include: Random Sampling, 100 Percent Inspection, Periodic

Surveillance, Validated Customer Complaint, or any combination of the methods.

1.1.5 Methods of surveillance can change after contract award based on, but not limited to:

1.1.5.1 Acceptance of a contractor QC plan.

1.1.5.4 A partnering agreement which established the metrics to be used.

1.1.5.3 Contractor performance.

1.2 Performance Evaluation. Performance of a service will be evaluated to determine whether or not it meets the performance threshold. Re-performance at no cost to the Government is the preferred method of correcting any unacceptable performance. The contractor shall provide the Government written response why the performance threshold was not met, how performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future.

1.3 Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success and are as shown in Technical Exhibit #3 of the PWS.