Amendment_0002.pdf
PDF 39 KB Posted
- Attached to
- Exhibits For International Trade Shows
- Solicitation number
- HQ0013-15-R-0005
- Issued by
-
Defense Security Cooperation Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past_Performance_Questionnaire_Amended.pdf | ||
| Conformed_copy_after_Amend_0002.pdf | ||
| Amendment_0001.pdf | ||
| Conformed_copy_after_Amend_0001.pdf | ||
| HQ0013-15-R-0005.pdf | ||
| Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1ATDS4337A001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. The purpose of this amendment is to incorporate "Questions and Answ ers" into the solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Dec-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HQ0013-15-R-0005
X 9B. DATED (SEE ITEM 11)
12-Dec-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Dec-2014
CODE
DEFENSE SECURITY COOPERATION AGENCY-CON
WOODROW W. BELL JR
201 12TH STREET, SOUTH
SUITE 203
ARLINGTON VA 22202
HQ0013 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HQ0013-15-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
QUESTIONS AND ANSWERS
1. Has a contractor performed similar work to this for the government in the past?
If available, please provide the incumbent contract number. If you are unable to provide a contract number, is it safe to assume this is a new requirement for the government?
Answer: This is new requirement for DSCA. However, other partner organizations have purchased exhibits, in the past. Most recently, the Air Force purchased exhibits for the trade shows, under Contract FA7014-13-C-1005.
2. Do you want an overall consistent design for all the shows or are you open to seeing different designs for different regions?
Answer: Since each show space is different size/shape, DSCA anticipates that the exhibit structure will be designed differently for each show. DSCA is open to seeing different design options that we can choose from for the different shows, after contract award.
3. Does our final presentation to you need to be mailed or can it be sent electronically (email)?
Answer: Proposal submissions are to be mailed or hand delivered to the address that follows. Proposal delivered through electronic means will not be accepted.
Defense Security Cooperation Agency (DSCA) 201 12th Street South, Ste 116 Arlington, VA 22202
(703) 601-3728 Attn: Woodrow Bell
4. Is there any budget or price per square meter that we need to adhere too? We just want to make sure we deliver a design that fits the allocated budget so we do not over or under design any show.
Answer: DSCA cannot disclose any information regarding the budget for this requirement.
5. It states on page 51 that the contractor shall provide only, an example rendered drawing design for the Paris Air Show. Do you only want to see design renderings for the Paris Air Show only? We are in the process of designing renderings for all the shows inclusive of the RFP. Designs, layouts and features vary greatly from show to show as they are different space sizes and configurations. Therefore, it's essential to view designs for each event especially since pricing for each show will vary because of space size, configuration and region of the world.
Answer: The RFP requires only the design rendering for the Paris Air Show. The delivery of the Paris Air Show rendering is the only one that will meet the requirement of the RFP. However, additional designs are welcome.
6. Are rendered drawings required to be included in the offeror proposal for each show/booth mention in the solicitation? Are line drawings required to be included in the offeror proposal for each show/booth mentioned in the solicitation?
Answer: The RFP requires only the design rendering for the Paris Air Show. The delivery of the Paris Air Show rendering is the only one that will meet the requirement of the RFP. However, additional designs are welcome. The line drawings mentioned at 2.2.1. Exhibit Specifications are requirements of contract performance.
7. If rendered drawings are NOT required for all shows, can you clarify as to which one(s) they are required for?
Specifically in the solicitation, there are two mentions of "example rendered drawing designs" with regard to the offeror proposal.one for Paris Air Show in France (pg. 51) and one for Aero India in India (pg. 54).which of these should be included in proposal?
Answer: Only the design rendering for Paris Air Show is required. The solicitation shall be amended so that the requirement for the submission of a rendering for Aero India on page 54 shall be changed to a requirement for the Paris Air Show rendering (Now page 56.)
8. With regard to booth space and line drawings - while total booth space is given (in sqm) there is nothing to indicate the actual dimensions of the booth space (whether it's square, rectangular, etc.).is a floor plan or booth configuration information available for the shows which require a rendered drawing and/or line drawing?
The exact floor plan for “U.S DOD” exhibits are available from the following show consolidators, please contact:
For the IDEX show in the UAE:
The Association for the United States Army Michael Cerami
MCERAMI@AUSA.ORG
703.907.2413
For Aero India, Avalon-Australia, and Paris Air Kallman Worldwide, Inc Mike Petrassi mikep@kallman.com
201.251.2600 ext 105
9. In reviewing the solicitation referenced above, we had a clarification question regarding the Past Performance Questionnaire. On the actual PPQ form, it states the due date to be: NLT Friday, December 19, 2014; while in the solicitation packet, it states that the PPQ should be submitted by the closing date of the solicitation, which we understand to be January 5, 2015.
Answer: The Past Performance Questionnaire is amended to require submission NLT Monday, January 5, 2015.
The following have been modified:
52.212-2 EVALUATION--COMMERCIAL ITEMS (JAN 1999)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose proposal conforms to the solicitation requirements and presents the lowest price technically acceptable (LPTA) proposal, as determined by the evaluation criteria herein.
Contract award will be made to the lowest evaluated price of proposals meeting or exceeding the minimum acceptability standards for non-cost factors. Proposals will be evaluated on an “acceptable” or “unacceptable” basis. Proposals will be evaluated for acceptability, but not ranked using the non-price mailto:MCERAMI@AUSA.ORG mailto:mikep@kallman.com factors/sub-factors. In order to be considered awardable, there must be an “acceptable” rating in every non-price factor/sub-factor.
The following factors shall be used to evaluate offers:
Factor 1: Relevant Technical Experience: The Government will evaluate the Offeror’s technical capability to determine the degree to which the information provided by the offeror in its proposal demonstrates the offeror’s ability to perform the services identified in the Performance Work Statement.
Offerror should demonstrate their understanding of the work and how it intends to meet the performance objectives identified in the PWS. This technical evaluation includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies in determining acceptability -
Minimum requirements:
a. The minimum experience required of both the contractor and proposed contractor personnel in order to be considered "acceptable" is 4-5 years working with U.S. Government processes to provide necessary support to accomplish tasks that are similar to the tasks identified in this solicitation.
b. In order to be rated acceptable, the contractor shall meet the following minimum requirements:
- Contractor shall demonstrate in the proposal knowledge of and experience a minimum of 5 years working with the military or DoD services to provide designing, constructing, and providing exhibit and related accessories in support of DoD international trade shows.
- Contractor shall have a minimum of 5 years experience and must demonstrate in the proposal the ability to provide originally created, unique custom designed exhibits that contain aesthetic structure and layout, professional graphic design, ease of participant traffic flow, and ability to provide needed products and equipment. The Contractor shall provide an example rendered drawing design for the exhibit of the below tradeshow:
- Paris Air Show in France, June 15-21, 2015 o 87 sqm – Total Space (TS) o Three (3) meeting rooms (1 x 23 sqm, and 2 x 15 sqm) o outreach area o storage room
- Contractor shall demonstrate in the proposal the ability and knowledge to manage and organize the trade show events. Contractor must address processes for fast and accurate mobilization efforts for start-up and coordination for an event, planned daily start-up and shutdown times, resolutions of conflicts, meeting customer expectations and foreign shipment rules and regulations.
- The Contractor shall demonstrate in the proposal the ability to provide technically qualified personnel to perform the work specified in this PWS. Personnel assigned to, or utilized by, the contractor in performance of work shall be fully capable of performing the contemplated functions in an efficient, reliable, and professional manner.
- Contractor shall have experience and address in proposal working overseas in remote locations.
The Past Performance Sub-Factors are:
Sub-Factor A, Quality of Executing Requirements: Will be evaluated for the offeror's record of providing quality services.
Sub-Factor B, Timeliness of Performance: Will be evaluated for the offeror's ability to meet contractual performance schedules.
Sub-Factor C, Business Practices/Customer Satisfaction: Will be evaluated for the cohesiveness of the offeror’s business practices to ensure a cooperative and frictionless relationship for international tradeshow events.
Sources of Past Performance Information for Evaluation are as follows:
• Past performance information may be provided by the offeror, as solicited.
• Past performance information may be obtained from questionnaires tailored to the circumstances of the acquisition.
• Past performance information shall be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases such as CPARS; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
Factor 3 Price: Pricing will be evaluated in accordance with FAR 15-404-1(b)(2)(i) (ii), and (v).
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
(End of provision)
(End of Summary of Changes)