Hoover Renovation and Addition Furniture Bid Package 1 Addendum.pdf
PDF 170 KB Posted
- Solicitation number
- RFP LPP 200000001436 5
- Issued by
- Wayne County, Michigan
About this file
This is an addendum to a furniture bid package for the Lincoln Park Public Schools Hoover Elementary School Renovation and Addition project located in Lincoln Park, Michigan. The addendum, issued March 25, 2020, modifies the original bidding documents for Furniture and Equipment Bid Package 01 under IDS Project No. 17146-1000. The addendum clarifies that electronic bid submissions are accepted and addresses labor specifications, indicating that the project may utilize either union or non-union labor, with straight time or overtime hours as necessary to meet installation deadlines. No original project manual documents, drawings, or sketches were reissued with this addendum.
The addendum includes a product substitution for Item M2, discontinuing the Norva Nivel Linki model and replacing it with a Peter Pepper Products Model ZS2460 60"H Zuma Freestanding Screen with graphite base finish and Maharam fabric in Medium pattern, Marina color. The revised quantity for this item is established at 6 units. This addendum reflects clarifications and modifications necessary prior to bid receipt to ensure accurate bidding by all prospective vendors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 01
Issue Date: March 25, 2020
Project Name: Lincoln Park Public Schools
Hoover Elementary School Renovation and Addition Furniture and Equipment Bid Package 01 Lincoln Park, Michigan
IDS Project No.: 17146-1000
This Addendum is issued prior to receipt of bids in order to modify or interpret the Bidding Documents by additions, deletions, clarifications or corrections. Bidders are to indicate receipt of this Addendum in the space provided on the Bid Form.
NEW OR REVISED DOCUMENTS ISSUED WITH THIS ADDENDUM
Project Manual Documents: None
Drawings: None
Sketches: None
PROJECT MANUAL DOCUMENTS DELETED OR REVISED BUT NOT ISSUED
Item No. 1 Clarification:
Electronic bid submissions will be accepted.
Item No. 2 Question: Will this be non-union straight time labor?
Answer: This may be union or non union labor. Straight time or Over Time as required to complete the installation on time.
Item No. 3 Clarification: Item M2, Norva Nivel, Linki, has been discontinued. Replacement item is:
Peter Pepper Products, Model ZS2460, 60”H Zuma Freestanding Screen, Base Finish: Graphite, Fabric: Maharam, Pattern: Medium, Color: Marina. Revised Quantity of 6.
cc: File ec: Angela.Black@lpps.info ckoeth@ids-michigan.com
Addendum No. 01 IDS Project No.18136-1000 03-16-20
File details come from the government source that posted it. Updated .