HOLD_for_prevailing_wage.docx

DOCX document 13 KB Posted

Attached to
B027-12 Engine #2 Tank Removal
Solicitation number
B027-12
Issued by
New Haven County, Connecticut

About this file

This document is a hold notice related to prevailing wage requirements for the City of Meriden, Connecticut's B027-12 Engine #2 Tank Removal project. The file itself contains minimal substantive content beyond a test designation, indicating this is a placeholder document pending prevailing wage determination or documentation.

The project involves the removal, decontamination, and disposal of an underground storage tank at Engine Co #2 located at 168 Chamberlain Highway, Meriden, Connecticut. The contractor must develop and implement a comprehensive tank removal plan, including removal of associated piping and ancillary equipment, decontamination, disposal, and site restoration with backfilling and seeding. Contractors must demonstrate a minimum of two years of tank removal experience and maintain state certification from Connecticut for such work. The prevailing wage hold designation suggests that wage rates applicable to this project are pending finalization or verification before final bid solicitation or contract award.

View the file

Other files

File Type Posted
B027-12_Engine_#2_Tank_Removal.pdf PDF
EJCDC_General_&_Supplemental.pdf PDF
Sample_Payment_Bond.pdf PDF
General_Insurance.pdf PDF
CMG_Report_1-26.pdf PDF
Construction_Contract-Sample.pdf PDF
Sample_Performance_Bond.pdf PDF
TradeBe_Report.pdf PDF
Eng_#2_Tank_Removal_Drawing.pdf PDF
CHRO_ChecklistforMunicipalities.pdf PDF
Professional_Serv_Agreement-Sample.pdf PDF
Prevailing_Wage_Info_Packet.pdf PDF
School_Insurance.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEST

File details come from the government source that posted it. Updated .