About this file

This is an engineering drawing for the City of Meriden, Connecticut, related to underground storage tank (UST) removal and fuel system replacement at Fire Station Engine Co #2, located at 168 Chamberlain Highway. The project involves removal of an existing 3,000-gallon UST system and associated piping, with installation of a new UST, primary and spare supply and return piping in a secondary containment conduit system, and connection piping to boiler burners. The contractor must provide a containment sump and manhole, monitoring riser, and fill riser with spill containment manhole. Interior piping found in good condition may not require replacement and will be determined by the owner, though any piping designated for replacement shall include replacement of valves, fittings, filters, and associated equipment up to the burner apparatus. The contractor is responsible for removal and disposal of concrete pads beneath existing tanks and replacement with concrete anchor pads or deadman anchors. Where interior piping exists under building floors, the contractor must saw cut, remove floors, replace piping, and restore flooring.

The drawing notes indicate that the exact location of the existing UST and piping is assumed but unknown, and the proposed location of the new UST and appurtenances is approximate and subject to engineer adjustment. The contractor must obtain approval for on-site storage and laydown areas from the engineer. Provisions for temporary aboveground fuel storage of at least 275 gallons may be required at the owner's discretion and must be connected and operable to serve one boiler. The contractor is required to remove, store, and replace existing fuel volumes in tanks in accordance with project specifications and must manage all disturbed area restoration and seeding operations as part of the comprehensive tank removal plan.

View the file

Other files

File Type Posted
B027-12_Engine_#2_Tank_Removal.pdf PDF
EJCDC_General_&_Supplemental.pdf PDF
Sample_Payment_Bond.pdf PDF
General_Insurance.pdf PDF
CMG_Report_1-26.pdf PDF
Construction_Contract-Sample.pdf PDF
Sample_Performance_Bond.pdf PDF
TradeBe_Report.pdf PDF
HOLD_for_prevailing_wage.docx DOCX document
CHRO_ChecklistforMunicipalities.pdf PDF
Professional_Serv_Agreement-Sample.pdf PDF
Prevailing_Wage_Info_Packet.pdf PDF
School_Insurance.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROVIDE CONTAINMENT SUMP-~

AND MANHOLE

PROVIDE PRIMARY AND SPARE

SUPPLY AND RETURN PIPING IN

SECONDARY CONTAINMENT CONDUIT

SYSTEM

,>e-....-7 ,C=:A~~~~~~=---L--/--'

I I

~CB

146,7

PROVIDE 1' SUPPLY AND RETURN PIPING TO

BURNER OF EACH BOILER. ROUTE PIPING IN SAME

LOCATION AS EXISTING USING SUPPORTS AND

HANGERS. INTERIOR PIPING FOUND IN GOOD

,J: _ , . , -- • '""'lt..JilN __ DITION MAY NOT ALL BE REPLACED AND \./ILL ,, - BEJ.J)ETERMINED AND APPROVED BY THE O'w'NER.

': • ·· ·• • '" !14. )\ip eJPING THAT IS TD BE REPLACED SHALL

ALSO INCLUDE THE REPLACEMENT OF EXISTING

VALVES, FITTINGS, FILTERS, ETC. UP TO BUT NOT

INCLUDING THE BURNER APPARATUS IN THE BID

PRICE.

I ,i I

I

I j I I

146,61v1

~CB

142,2

NOTES 0

D THE LOCATION OF EXISTING UST AND PIPING IS ASSUMED. THE

EXACT LOCATION IS UNKNOVN.

2) THE PROPOSED LOCATION OF THE NE'w UST, PIPING AND

APPURTENANCES IS APPROIMATE ONLY AND MAY BE ADJUSTED

BY THE ENGINEER.

3) CONTRACTOR STORAGE AND LAYDOVN AREA ON-SITE TO BE

APPROVED BY THE ENGINEER.

4) THE CONTRACTOR SHALL BE RESPONSIBLE FDR REMOVAL AND

DISPOSAL OF ANY CONCRETE PAD UNDER THE EXISTING TANKS

AND REPLACEMENT 'wITH A CONCRETE ANCHOR PAD OR CONCRETE

DEADMAN ANCHORS. SEE NOTE 9 ON DETAIL SHEET.

5) PROVISIONS FOR TEMPORARY ABOVEGROUND FUEL STORAGE

MAYBE NECESSARY AT SOME SITES AS DEEMED NECESSARY BY

O'w'NER. \./HEN REQUIRED, IT SHALL BE CONNECTED TO AND MADE OPERABLE TD SERVE ONE BOiLER AND MAINTAINED BY THE

CONTRACTOR INCLUDING FUEL DELIVERY FROM STORAGE. THE

TEMPORARY FUEL STORAGE SHALL MEET ALL CODES AND TOTAL

AT LEAST 275 GALLONS.

6) AT SITES 'wHERE INTERIOR PIPING EXISTS UNDER THE FLOOR OF BUILDINGS THE FLOOR SHALL BE SA'w' CUT, REMOVED, PIPING

REPLACED AND FLOOR RESTORED,

7) THE CONTRACTORS REQUIRED TO REMOVE, STORE AND REPLACE

EXISTING VOLUMES OF FUEL IN TANK IN ACCORDANCE 'wITH

THE SPECIFICATIONS.

Bit, Cone. Drive

X 148,5

FIRE I

ST A TIDN

168 CAPITOL A \AENUE

142.5

DcB

CB

146,7

REMOVE EXISTING 3000 GALLON UST SYSTEM

AND PIPING. RESTORE DISTURBED AREA

PROVIDE MONITORING RISER

,,---- PROVIDE UST FILL RISER 'w'ITH

SPILL CONTAINMENT MANHOLE

<I: lL

PROVIDE 3' VENT

PIPE AND RISER

0 0 ---0

_J

150.6 X L □ CATIDf\l MAP

SCALE: 1" = 1000'

------~ PROVIDE 4000 GALLON DOUBLE \./ALL

Ff#l UST SYSTEM \./ITH NE\./ CDNCRET

BOTTOM "11ND TOP SLABS SEE NOTE 9

□tst FRP UST DETAIL SHEET AREA OF, TANK IS 'w'ITHIN TRAFFTC AREA.

--::_:_----------:".'.GENERAL NOTES:

p 1. THE LOCATION OF EXISTING UNDERGROUND PIPES, CONDUITS, 'wlRES, AND STRUCTURES AS SHO'wN ON THE PLANS HAS •

BEEN COLLECTED FROM THE BEST AVAILABLE SOURCES, THE

ENGINEER DOES NOT IMPLY NOR GUARANTEE THE ACCURATE-

MOUNTED TO BUILDING)(

0 ------- )(

NESS AND COMPLETENESS OF THIS INFORMATION, THE

CONTRACTOR IS SOLELY RESPONSIBLE FDR DETERMINING

ACTUAL FIELD LOCATIONS. THE CONTRACTOR SHALL CONTACT

'CALL BEFORE YOU DIG' (1-800-922-4455) FOR LOCATION

AND MARKING OF ALL EXISTING UTILITIES PRIOR TO ANY

EXCAVATION.

<C I cBCY I I r=n

<C

C )

PROVIDE TANK GUAGE AND LEAK DETECTION

LINES IN CONDUIT FOR THE TANK GAUGE AND

LEAK DETECTION PANELS MOUNTED ON BOILER

ROOM \./ALL.

NOT VALID UNLESS EMBOSSED

SEAL [S AFFIXED HEREON

REVISED

2, ALL DIMENSIONS AND ELEVATIONS MUST BE FIELD VERIFIED

BY THE CONTRACTOR.

3, 4.

ALL ELEVATIONS ARE BASED ON U.S,G.S. VERTICAL DATUM.

<CITY OF MERIDEN DATUM IS 28.05' BELO'w U.S.G,S,)

LAYOUT OF IMPROVEMENTS SHALL BE STAKED OUT IN THE

FIELD AND APPROVED BY THE ENGINEER PRIOR TD

INITIATING 'w□RK.

THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION

MEETING 'w'ITH CITY ENGINEERING STAFF PRIOR TO

COMMENCING CONSTRUCTION,

ALL GRASS AREAS TO BE LOAMED AND SEEDED BY

THE CONTRACTOR,

UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR

SHALL SUBMIT TO THE ENGINEERING BUREAU RECORD

DOCUMENTS AS SPECI'FIED IN ;;.S-EG;TIDN 01010, "GENERAL

REQUIREMENTS' OF - THE SPECIFICATION, RECORD DOCUMENTS

MUST BE CERTIFIED BY A LICENSED LAND SUR\lt'.'.'l'DR . ~......_ .... ......, CIVIL ENGINEER. ' , MAP REFERENCES"

1. MAP SHO'w'ING PLUMBING PLAN ''w'EST SIDE FIRE STATION'

MERIDEN CONNECTICUT - SCALE 1/8' = 1'-0'

2.

DATED NOVEMBER 1977 PREPARED BY: ENGINEERING DESIGN

GROUP, INC,

TOPOGRAPHIC MAP #57 CITY OF MERIDEN

CONNECTICUT - SCALE 1' = 100'

DATED APRIL 5, 1994 PREPARED BY

JAMES 'vi. SE'v/ALL COMPANY , OLD TO'v/N, MAINE

CITY OF MERIDEN

DEPARTMENT OF PUBllC \JORKS

DATE1

11/98 CAPITOL AVENUE FIRE ST ATION1-::0=EsI-:::--GN,--11

□ IL TANK REPLACEMENT DMJ

DRAl,IN, i------------------------1 Mw'N

DIRECTOR: or PUBLIC \/CRKS

AND

CITY EMGIHEER

BUREAU OF ENGINEERING

ROOM 19 • CITY HALL

MERIDEN, CONNECTICUT

SCALE1

1 • = 20'

Dl,IG, SHEET 6

Of 9

Susan Martel Cross-Out

Susan Martel Cross-Out

Susan Martel Cross-Out