Eng_#2_Tank_Removal_Drawing.pdf
PDF 3 MB Posted
- Attached to
- B027-12 Engine #2 Tank Removal
- Solicitation number
- B027-12
- Issued by
- New Haven County, Connecticut
About this file
This is an engineering drawing for the City of Meriden, Connecticut, related to underground storage tank (UST) removal and fuel system replacement at Fire Station Engine Co #2, located at 168 Chamberlain Highway. The project involves removal of an existing 3,000-gallon UST system and associated piping, with installation of a new UST, primary and spare supply and return piping in a secondary containment conduit system, and connection piping to boiler burners. The contractor must provide a containment sump and manhole, monitoring riser, and fill riser with spill containment manhole. Interior piping found in good condition may not require replacement and will be determined by the owner, though any piping designated for replacement shall include replacement of valves, fittings, filters, and associated equipment up to the burner apparatus. The contractor is responsible for removal and disposal of concrete pads beneath existing tanks and replacement with concrete anchor pads or deadman anchors. Where interior piping exists under building floors, the contractor must saw cut, remove floors, replace piping, and restore flooring.
The drawing notes indicate that the exact location of the existing UST and piping is assumed but unknown, and the proposed location of the new UST and appurtenances is approximate and subject to engineer adjustment. The contractor must obtain approval for on-site storage and laydown areas from the engineer. Provisions for temporary aboveground fuel storage of at least 275 gallons may be required at the owner's discretion and must be connected and operable to serve one boiler. The contractor is required to remove, store, and replace existing fuel volumes in tanks in accordance with project specifications and must manage all disturbed area restoration and seeding operations as part of the comprehensive tank removal plan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B027-12_Engine_#2_Tank_Removal.pdf | ||
| EJCDC_General_&_Supplemental.pdf | ||
| Sample_Payment_Bond.pdf | ||
| General_Insurance.pdf | ||
| CMG_Report_1-26.pdf | ||
| Construction_Contract-Sample.pdf | ||
| Sample_Performance_Bond.pdf | ||
| TradeBe_Report.pdf | ||
| HOLD_for_prevailing_wage.docx | DOCX document | |
| CHRO_ChecklistforMunicipalities.pdf | ||
| Professional_Serv_Agreement-Sample.pdf | ||
| Prevailing_Wage_Info_Packet.pdf | ||
| School_Insurance.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROVIDE CONTAINMENT SUMP-~
AND MANHOLE
PROVIDE PRIMARY AND SPARE
SUPPLY AND RETURN PIPING IN
SECONDARY CONTAINMENT CONDUIT
SYSTEM
,>e-....-7 ,C=:A~~~~~~=---L--/--'
I I
~CB
146,7
PROVIDE 1' SUPPLY AND RETURN PIPING TO
BURNER OF EACH BOILER. ROUTE PIPING IN SAME
LOCATION AS EXISTING USING SUPPORTS AND
HANGERS. INTERIOR PIPING FOUND IN GOOD
,J: _ , . , -- • '""'lt..JilN __ DITION MAY NOT ALL BE REPLACED AND \./ILL ,, - BEJ.J)ETERMINED AND APPROVED BY THE O'w'NER.
': • ·· ·• • '" !14. )\ip eJPING THAT IS TD BE REPLACED SHALL
ALSO INCLUDE THE REPLACEMENT OF EXISTING
VALVES, FITTINGS, FILTERS, ETC. UP TO BUT NOT
INCLUDING THE BURNER APPARATUS IN THE BID
PRICE.
I ,i I
I
I j I I
146,61v1
~CB
142,2
NOTES 0
D THE LOCATION OF EXISTING UST AND PIPING IS ASSUMED. THE
EXACT LOCATION IS UNKNOVN.
2) THE PROPOSED LOCATION OF THE NE'w UST, PIPING AND
APPURTENANCES IS APPROIMATE ONLY AND MAY BE ADJUSTED
BY THE ENGINEER.
3) CONTRACTOR STORAGE AND LAYDOVN AREA ON-SITE TO BE
APPROVED BY THE ENGINEER.
4) THE CONTRACTOR SHALL BE RESPONSIBLE FDR REMOVAL AND
DISPOSAL OF ANY CONCRETE PAD UNDER THE EXISTING TANKS
AND REPLACEMENT 'wITH A CONCRETE ANCHOR PAD OR CONCRETE
DEADMAN ANCHORS. SEE NOTE 9 ON DETAIL SHEET.
5) PROVISIONS FOR TEMPORARY ABOVEGROUND FUEL STORAGE
MAYBE NECESSARY AT SOME SITES AS DEEMED NECESSARY BY
O'w'NER. \./HEN REQUIRED, IT SHALL BE CONNECTED TO AND MADE OPERABLE TD SERVE ONE BOiLER AND MAINTAINED BY THE
CONTRACTOR INCLUDING FUEL DELIVERY FROM STORAGE. THE
TEMPORARY FUEL STORAGE SHALL MEET ALL CODES AND TOTAL
AT LEAST 275 GALLONS.
6) AT SITES 'wHERE INTERIOR PIPING EXISTS UNDER THE FLOOR OF BUILDINGS THE FLOOR SHALL BE SA'w' CUT, REMOVED, PIPING
REPLACED AND FLOOR RESTORED,
7) THE CONTRACTORS REQUIRED TO REMOVE, STORE AND REPLACE
EXISTING VOLUMES OF FUEL IN TANK IN ACCORDANCE 'wITH
THE SPECIFICATIONS.
Bit, Cone. Drive
X 148,5
FIRE I
ST A TIDN
168 CAPITOL A \AENUE
142.5
DcB
CB
146,7
REMOVE EXISTING 3000 GALLON UST SYSTEM
AND PIPING. RESTORE DISTURBED AREA
PROVIDE MONITORING RISER
,,---- PROVIDE UST FILL RISER 'w'ITH
SPILL CONTAINMENT MANHOLE
<I: lL
PROVIDE 3' VENT
PIPE AND RISER
0 0 ---0
_J
150.6 X L □ CATIDf\l MAP
SCALE: 1" = 1000'
------~ PROVIDE 4000 GALLON DOUBLE \./ALL
Ff#l UST SYSTEM \./ITH NE\./ CDNCRET
BOTTOM "11ND TOP SLABS SEE NOTE 9
□tst FRP UST DETAIL SHEET AREA OF, TANK IS 'w'ITHIN TRAFFTC AREA.
--::_:_----------:".'.GENERAL NOTES:
p 1. THE LOCATION OF EXISTING UNDERGROUND PIPES, CONDUITS, 'wlRES, AND STRUCTURES AS SHO'wN ON THE PLANS HAS •
BEEN COLLECTED FROM THE BEST AVAILABLE SOURCES, THE
ENGINEER DOES NOT IMPLY NOR GUARANTEE THE ACCURATE-
MOUNTED TO BUILDING)(
0 ------- )(
NESS AND COMPLETENESS OF THIS INFORMATION, THE
CONTRACTOR IS SOLELY RESPONSIBLE FDR DETERMINING
ACTUAL FIELD LOCATIONS. THE CONTRACTOR SHALL CONTACT
'CALL BEFORE YOU DIG' (1-800-922-4455) FOR LOCATION
AND MARKING OF ALL EXISTING UTILITIES PRIOR TO ANY
EXCAVATION.
<C I cBCY I I r=n
<C
C )
PROVIDE TANK GUAGE AND LEAK DETECTION
LINES IN CONDUIT FOR THE TANK GAUGE AND
LEAK DETECTION PANELS MOUNTED ON BOILER
ROOM \./ALL.
NOT VALID UNLESS EMBOSSED
SEAL [S AFFIXED HEREON
REVISED
2, ALL DIMENSIONS AND ELEVATIONS MUST BE FIELD VERIFIED
BY THE CONTRACTOR.
3, 4.
ALL ELEVATIONS ARE BASED ON U.S,G.S. VERTICAL DATUM.
<CITY OF MERIDEN DATUM IS 28.05' BELO'w U.S.G,S,)
LAYOUT OF IMPROVEMENTS SHALL BE STAKED OUT IN THE
FIELD AND APPROVED BY THE ENGINEER PRIOR TD
INITIATING 'w□RK.
THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION
MEETING 'w'ITH CITY ENGINEERING STAFF PRIOR TO
COMMENCING CONSTRUCTION,
ALL GRASS AREAS TO BE LOAMED AND SEEDED BY
THE CONTRACTOR,
UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR
SHALL SUBMIT TO THE ENGINEERING BUREAU RECORD
DOCUMENTS AS SPECI'FIED IN ;;.S-EG;TIDN 01010, "GENERAL
REQUIREMENTS' OF - THE SPECIFICATION, RECORD DOCUMENTS
MUST BE CERTIFIED BY A LICENSED LAND SUR\lt'.'.'l'DR . ~......_ .... ......, CIVIL ENGINEER. ' , MAP REFERENCES"
1. MAP SHO'w'ING PLUMBING PLAN ''w'EST SIDE FIRE STATION'
MERIDEN CONNECTICUT - SCALE 1/8' = 1'-0'
2.
DATED NOVEMBER 1977 PREPARED BY: ENGINEERING DESIGN
GROUP, INC,
TOPOGRAPHIC MAP #57 CITY OF MERIDEN
CONNECTICUT - SCALE 1' = 100'
DATED APRIL 5, 1994 PREPARED BY
JAMES 'vi. SE'v/ALL COMPANY , OLD TO'v/N, MAINE
CITY OF MERIDEN
DEPARTMENT OF PUBllC \JORKS
DATE1
11/98 CAPITOL AVENUE FIRE ST ATION1-::0=EsI-:::--GN,--11
□ IL TANK REPLACEMENT DMJ
DRAl,IN, i------------------------1 Mw'N
DIRECTOR: or PUBLIC \/CRKS
AND
CITY EMGIHEER
BUREAU OF ENGINEERING
ROOM 19 • CITY HALL
MERIDEN, CONNECTICUT
SCALE1
1 • = 20'
Dl,IG, SHEET 6
Of 9
Susan Martel Cross-Out
Susan Martel Cross-Out
Susan Martel Cross-Out
File details come from the government source that posted it. Updated .