TABLE OF CONTENTS
SECTION 9. DESCRIPTION OF WORK
9-1.01 DESCRIPTION OF WORK
SECTION 10. CONSTRUCTION DETAILS
SECTION 10-1. GENERAL
10-1.01 SEQUENCE OF WORK
10-1.02 NOTIFICATION
10-1.03 PROJECT SCHEDULE
10-1.04 PRODUCT REQUIREMENTS
10-1.05 PROJECT RECORD DOCUMENTS (AS-BUILTS)
10-1.06 SUBMITTAL PROCEDURES
10-1.07 HOURS OF WORK
10-1.08 TEMPORARY FACILITIES
10-1.09 EXISTING FACILITIES
10-1.10 TEMPORARY ENVIRONMENTAL CONTROLS
10-1.11 CLOSEOUT PROCEDURES
10-1.12 MOBILIZATION
10-1.13 CONSTRUCTION STAKING
10-1.14 WATER POLLUTION CONTROL
10-1.15 CONSTRUCTION SITE MANAGEMENT
10-1.16 TEMPORARY TRAFFIC CONTROL DEVICES
10-1.17 CONSTRUCTION AREA SIGNS
10-1.18 MAINTAINING TRAFFIC
10-1.19 TRAFFIC CONTROL SYSTEMS
10-1.20 TEMPORARY PAVEMENT DELINEATION
10-1.21 PORTABLE CHANGEABLE MESSAGE SIGNS
10-1.22 EXISTING HIGHWAY FACILITIES
10-1.23 SAWCUTTING AND DEMOLITION
10-1.24 CLEARING AND GRUBBING
10-1.25 EARTHWORK
10-1.26 AB SHOULDER BACKING
10-1.27 AGGREGATE BASE
10-1.28 COLD PLANE AC PAVEMENT
10-1.29 HOT MIX ASPHALT(LEVELING)
10-1.30 HOT MIX ASPHALT (OVERLAY)
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
10-1.31 SIGNS…………………………………………………………………
10-1.32 STRIPING ……………………………………
10-1.33 PAVEMENT MARKINGS ……………………………………
10-1.34 MATERIALS TESTING AND QUALITY CONTROL PLAN………………………………………… .45
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
STANDARD PLANS LIST
The Standard Plan sheets applicable to this contract include, but are not limited to those indicated below.
Applicable Revised Standard Plans (RSPs) and New Standard Plans (NSPs) indicated below are included in the project plans as Standard Plan sheets, and attached in Appendix A for convenience.
LEFT TURN LANE IMPROVEMENT PLANS
C1 Title Sheet C2 Typical Cross Sections C3 CR31 Plan and Profile C4 CR31 Plan and Profile C5 CR31 Signing and Striping Plan C6 Construction Details C7 Traffic Control Plan
PAVEMENT MARKERS, TRAFFIC LINES, AND PAVEMENT
MARKINGS
RSP A20A Pavement Markers and Traffic Lines, Typical Details RSP A20B Pavement Markers and Traffic Lines, Typical Details RSP A20D Pavement Markers and Traffic Lines, Typical Details A24A Pavement Markings – Arrows A24D Pavement Markings - Words A24E Pavement Markings – Words, Limit and Yield Lines
EXCAVATION AND BACKFILL
A62A Excavation and Backfill – Miscellaneous Details
OBJECT MARKERS, DELINEATORS, CHANNELIZERS AND
BARRICADES
A73C Delineators, Channelizers and Barricades
TEMPORARY TRAFFIC CONTROL SYSTEMS
RSP T9 Traffic Control System Tables For Lane and Ramp Closures
RSP T11 Traffic Control System for Lane Closure on Multilane Conventional Highways
T17 Traffic Control System for Moving Lane Closure on Two Lane Highways
Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
SECTION 9. DESCRIPTION OF WORK
9-1.01 DESCRIPTION OF WORK
The project is located on County Road 31 at the intersection with the Sacred Oaks Healing Center in Yolo County. The work generally includes, but is not limited to, widening of existing roadway section, placement of new aggregate base, pavement grinding, place HMA leveling courses, HMA paving, shoulder backing, striping, and traffic control.
SECTION 10. CONSTRUCTION DETAILS SECTION
DIVISION II - 10-1 GENERAL
All Section References are made to the 2015 Caltrans Standard Specifications.
10-1.01 SEQUENCE OF WORK
Temporary Traffic Control Conduct a preconstruction operational status check of the existing traffic management system elements and each element's communication status with Yolo County before starting job site activities. Conduct the status check with the Department of Indian Health Service (IHS) Contracting Officer Representative (COR) and Yolo County's traffic operations' electrical representatives. The status check must include existing traffic management system elements not shown and elements that may not be affected by your work activities.
The County’s traffic operations' representatives will provide you a certified list of:
1. Existing traffic management system elements and their locations within the project limits
2. Fully functioning elements
3. Nonoperational elements
Excavation If a difference in excess of 0.15 foot exists between the elevation of the existing pavement and the elevation of an excavation within 5 feet of the left edge or within 8 feet of the right edge of the traveled way at the end of each working day, place and compact material against the vertical cut adjacent to the traveled way.
During the excavation, you may use native material for this purpose except you must use structural material once you start placing the structural section. Place the material to the top of the existing pavement and taper at a slope of 4:1 (horizontal:vertical) or flatter to the bottom of the excavation. Do not use treated base for the taper.
Water Usage Section 10-4 includes general specifications for using water for construction activities.
The COR encourages you to conserve water in all construction activities.
The COR notifies you of any (1) water shortage or (2) mandate from a local water authority to ration water.
Within 10 calendar days of the notification, submit a water conservation plan. The plan must include:
1. List of construction activities that require water
2. Measures you will implement for each activity to conserve water
3. Method for curing concrete other than the water method if included in the work
4. Dust palliative you will use for dust control
Dust Control Section 10-5 includes general specifications for controlling dust resulting from the work.
Prevent and alleviate dust by:
1. Applying a dust palliative under section 18
2. Applying temporary soil stabilization under Section 13-5
3. Managing material stockpiles under section 13-4.03C(3)
Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
Watering Section 10-6 includes specifications for developing a water supply, furnishing water, and applying water.
Developing a water supply includes developing a supply of water and furnishing pipes or other equipment needed to convey the water to the water application equipment.
Water may be potable or nonpotable. Nonpotable water must be either recycled water or nonpotable water developed from other sources.
The sources and discharge of recycled water must comply with the water-recycling criteria of the CDPH and the requirements of the appropriate RWQCB. Obtain either a waste discharge permit or a waiver from the appropriate RWQCB for each water source. Submit a copy of the permit or waiver before using the water in the work.
Nonpotable water must not be conveyed in tanks or drain pipes that will be used to convey potable water.
Nonpotable water supplies and potable water supplies must not be connected. Nonpotable water supply, tanks, pipes, and other conveyances of nonpotable water must be labeled Nonpotable Water / Do Not Drink.
Each water storage tank and distribution system must be equipped with positive shut-off valves.
Keep at least 1 mobile unit with a capacity of at least 1,000 gal the job site at all times for applying water unless all water is applied through pipes or another authorized method.
For compacting embankment material, subbase, base, and surfacing material and for dust control, apply water with equipment that will apply it uniformly.
For compaction, you may use a chemical additive if authorized.
Full compensation for conforming to the requirements of this section, not otherwise provided for shall be considered as included in the prices paid for the various contract items of work involved.
10-1.02 NOTIFICATION
The Contractor shall notify the COR 48 hours prior to the beginning of work at each location.
The Contractor shall notify all agencies which may be affected by the construction as well as businesses and residences adjacent to project. Notification shall be in writing at least 72 hours prior to construction.
The notice shall include the project limits, starting date, scheduled date of completion, Contractor contact person and Contractor telephone number. A copy of the notification to agencies and businesses shall be delivered to the COR prior to the beginning of work. The agencies to be notified shall include, but not be limited to:
Yolo County Communications 35 North Cottonwood Woodland, CA 95695 (530)666-8923
California Highway Patrol Woodland Office Attn: Field Supervisor
(530) 662-4685
(530) 662-8549 (fax)
California Highway Patrol Dispatch
Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
Attn: Dispatch Supervisor
(916) 861-1300
Davis Joint Unified School District 526 B Street Davis, CA 95616
(530) 757-5300
Winters Joint Unified School District 909 West Grant Ave.
Winters, CA 95694
(530) 795-6100
(530) 795-6114 (fax)
Yolo Bus 352 Industrial Way Woodland, CA 95776 (530)666-2877
Davis Waste Removal Co. Inc. 2727 2nd street Davis, CA 95617 (530)756-4646
Davis Fire Department 530 Fifth Street Davis, CA 95620
(530) 757-5684
West Plainfield Fire Department 240901 County Road 95 Davis, CA 95616
(530) 756-0212
US Postal Service-Davis 2020 5th Street Davis, CA 95618
(530) 752-0428
Yolo County Airport 25170 Aviation Ave.
Davis, CA 95616
(530) 759-8766
Yolo County Farm Bureau Attn: Denise Sagara PO Box 1556 Woodland, CA 95776
(530) 662-6316
Access to Businesses and Residences: The Contractor shall provide access to agricultural operations, businesses, and residences within and along the construction zones at all times during construction.
In the event that any road or portion of the said road will be inaccessible to emergency traffic, the Contractor shall also notify Yolo County Communications Dispatch immediately prior to said closure and
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California immediately after reopening.
Failure to comply with the provisions for notification shall result in the suspension of all work until the provisions have been met.
Full compensation for conforming to the requirements of this Provision shall be considered as included in the prices paid for the other items of work and no additional compensation will be allowed therefor.
10-1.03 PROJECT SCHEDULE
Contractor shall be required to submit a construction schedule using a Gantt chart. Format shall be either in Microsoft Project or Primavera P6. The schedule shall include sufficient detail to apprise IHSof all major construction activities, including mobilization, environmental provisions, traffic control phasing, excavation activities, surveying and staking, grinding, asphalt placement, striping, etc.
Full compensation for conforming to the requirements of this section, not otherwise provided for shall be
10-1.04 PRODUCT REQUIREMENTS
Contractor shall furnish construction materials and products as required by the technical requirements of the contract. If product substitutions are proposed, the Contractor shall submit an initial products list within 30 calendar days after commencement of work. If exceptions are requested, IHS and Yolo County will review the proposed substitutions and will respond in writing accordingly.
10-1.05 PROJECT RECORD DOCUMENTS (As-Builts)
The Contractor shall provide As-Builts, showing all work products, measurements and details using AutoCAD format. Deviations from the Construction Documents shall be clearly documented.
Full compensation for conforming to the requirements of this section, not otherwise provided for shall be
10-1.06 SUBMITTAL PROCEDURES
Contractor shall secure an Internet-based submittal processing service. This service shall provide the means to enable digital exchange of all submittals, notify the COR of all uploads, track submittal review status, include other project documentation (RFIs, ASIs, As-Builts, Quality Control documentation, etc.) A service equal to Submittal Exchange will be accepted.
Full compensation for conforming to the requirements of this section, not otherwise provided for shall be
10-1.07 HOURS OF WORK
On weekdays the Contractor shall restrict his hours of work to the period between one-half hour after sunrise and one-half hour before sunset, but in no case shall work begin before 6:30 a.m. and end after 7:00 p.m. On weekends and holidays the Contractor shall restrict his hours of work to the period between 9:00 and 6:00 p.m., provided the County approves such work. The Contractor shall make a request to the COR at least 48 hours in advance of the Contractor's intent to work on weekends or holidays.
Provided County inspection staff is available to work on weekends and holidays, the COR may approve such a request.
10-1.08 TEMPORARY FACILITIES
The Contractor shall provide for all temporary facilities necessary to oversee operations during construction, and as required to complete the Scope of Work. This shall include, but not be limited to
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California construction trailer, temporary utilities, fuel storage/distribution, temporary equipment storage, temporary lighting, sanitation facilities, etc.
Full compensation for conforming to the requirements of this section, not otherwise provided for shall be considered as included in the prices paid for the various contract items of work involved.
10-1.09 EXISTING FACILITIES
Attention is directed to Section 15, "Existing Facilities," of the Caltrans Standard Specifications and these project Specifications.
Attention is directed to the existence of certain underground facilities that may require special precautions be taken by the Contractor to protect the health, safety and welfare of workers and of the public. Facilities requiring special precautions include, but are not limited to: conductors of petroleum products, oxygen, chlorine, and toxic or flammable gases; natural gas in pipelines greater than 6 inches in diameter or pipelines operating at pressures greater than 60 pounds per square inch (gage); underground electric supply system conductors or cables, with potential to ground of more than 300 V, either directly buried or in a duct or conduit which do not have concentric grounded or other effectively grounded metal shields or sheaths.
The Contractor shall notify the COR and the appropriate regional notification center for operators of subsurface installations at least 2 calendar days, but not more than 14 calendar days, prior to performing any excavation or other work close to any underground pipeline, conduit, duct, wire or other structure.
Contact information for the Northern California notification center is provided below:
Notification Center Telephone Number
Underground Service Alert-Northern California
(USA)
811 or
1-800-227-2600
The Contractor will be required to work around public utility facilities and other improvements that are to remain in place within the construction, and he will be held liable to the owners of such facilities or improvements for any damage to such facilities or interference with service resulting from his operations.
Full compensation for conforming to the requirements of this section, not otherwise provided for shall be
10-1.10 TEMPORARY ENVIRONMENTAL CONTROLS
The Contractor shall be required to comply with all environmental requirements as stipulated by the State of California, and in accordance with the Environmental Assessment, prepared by Indian Health Service (provided as an attachment to the solicitation). Contractor shall take special note of the provisions regarding the Swainson’s Hawk habitat, where Eucalyptus Trees are impacted by construction.
10-1.11 CLOSEOUT PROCEDURES
At the conclusion of construction, IHS and Yolo County shall perform inspections of the work to determine completeness and compliance with the Contract Documents. The Contractor shall notify IHS two weeks in advance so that the Government can schedule travel and other arrangements to facilitate the final inspection. IHS will prepare the Certificate of Substantial Completion after inspection, or will notify the Contractor of items that must be completed or corrected (IHS’s Substantial Completion Punch List) before the certificate will be issued. The Certificate of Substantial Completion confirms transfer of ownership to Yolo County, initiation of one-year warranty, transfer of maintenance responsibilities to Yolo County, and an end date for liquidated damages.
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
10-1.12 MOBILIZATION
This work consists of preparatory work that must be performed or costs incurred before starting work on the various items on the job site. This includes but is not limited to staging, equipment storage, security, etc. Note that this does not imply that Indian Health Service (IHS) is providing a designated staging area for project. Contractor shall make arrangements for staging area.
Measurement and Payment
The contract lump sum price paid for “Mobilization” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in mobilization as specified in the Caltrans Standard Specifications and as directed by IHS.
10-1.13 CONSTRUCTION STAKING
This work shall consist of furnishing and setting construction stakes and markers by the Contractor to establish the lines and grades required for the completion of the work as shown on the plans and as specified in the Caltrans Standard Specifications and these Specifications and as necessary for the COR to check lines, grades, alignment and elevations. This work shall also include staking and temporary marking of the right of way lines to ensure construction personnel and equipment do not encroach upon adjacent lands or damage adjacent agricultural crops.
All procedures, methods, and typical stake markings shall be in accordance with Chapter 12, Construction Surveys, of the California Department of Transportation publication entitled “Surveys Manual.”
Construction stakes and marks shall be furnished and set with accuracy adequate to assure that the completed work conforms to the lines, grades, and sections shown on the plans.
Horizontal alignment and the coordinates of centerlines and layout lines for the edge of pavement and the sawcut lines will be furnished to the Contractor at written request for use in performing the construction staking. Control points for the work are shown on the plans.
All computations necessary to establish the exact position of the work from control points shall be made by the Contractor. All computations, survey notes, and other records necessary to accomplish the work shall be neat, legible, and accurate. Copies of such computations, notes, and other records shall be furnished to the COR prior to beginning work that requires their use.
Construction stakes and markings shall be removed from the site of the work when no longer needed.
Upon completion of construction staking and prior to acceptance of the contract, all computations, survey notes and other data used to accomplish the work shall be furnished to the COR and shall become the property of IHS.
Measurement and Payment
The contract lump sum price paid for “Construction Staking” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in performing construction staking, as shown on the plans, as specified in the Caltrans Standard Specifications and as directed by the COR.
10-1.14 WATER POLLUTION CONTROL
Summary Section 13-2 includes specifications for preparing a water pollution control program.
Preparing a water pollution control program includes developing and implementing the WPCP, providing a WPC manager, conducting WPC training, and monitoring, inspecting and correcting WPC practices.
If the COR determines that the project qualifies for an erosivity waiver, the conditions for the waiver are specified in the Caltrans Standard Specifications. The erosivity waiver and R-factor are described in the
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009-DWQ, NPDES No. CAS000002).
Submittals Within 7 calendar days after Contract approval, submit 2 copies of your WPCP. You may assign a QSP other than the WPC manager to develop the WPCP.
The WPCP must:
1. Show the location of disturbed soil areas, water bodies, and water conveyances
2. Describe the work involved in the installation, maintenance, repair, and removal of temporary WPC practices
3. Show the locations and types of WPC practices that will be used for:
3.1. Stormwater and nonstormwater in Contractor-support facilities outside the job site but related to work activities, including:
3.1.1. Staging areas
3.1.2. Storage yards
3.1.3. Access roads
3.2. Activities or mobile activities related to all NPDES permits
4. Show the locations and types of temporary WPC practices that will be used in the work for each type of construction phase
5. Show the locations and types of WPC practices that will be installed permanently under the Contract
6. Include a schedule showing when:
6.1. Work activities will be performed that could cause the discharge of pollutants into stormwater
6.2. WPC practices, including soil stabilization and sediment control, associated with each construction phase will be implemented
7. Include a copy of each permit obtained by the COR, such as the Department of Fish and Wildlife permits, US Army Corps of Engineers permits, RWQCB 401 certifications, aerially deposited lead variance from DTSC, aerially deposited lead variance notification, and RWQCB waste discharge requirements for reuse of aerially deposited lead
Allow 10 calendar days for review.
After the COR authorizes the WPCP, submit an electronic copy on a read-only CD, DVD, or other COR-authorized data storage device and 3 printed copies of the authorized WPCP.
If a RWQCB requires review of the authorized WPCP, the review is specified in the Caltrans Standard Special Provisions and the COR submits the authorized WPCP to the RWQCB for review and comment.
If the COR orders changes to the WPCP based on the RWQCB's comments, submit a revised WPCP within 5 calendar days.
Do not start job site activities until the WPCP is authorized.
Submit a revised WPCP if:
1. Changes in work activities could affect the discharge of pollutants
2. WPC practices are added as change order work
3. WPC practices are added at your discretion
4. Changes in the quantity of disturbed soil are substantial
5. Objectives for reducing or eliminating pollutants in stormwater discharges have not been achieved
6. Project receives a written notice or order from the RWQCB or any other regulatory agency
Construction Manage work activities such that you reduce the discharge of pollutants to surface waters, groundwaters, and municipal-separate storm sewer systems.
Monitor and inspect WPC practices at the job site.
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
Notify the COR within 6 hours whenever you:
1. Identify discharges into receiving waters or drainage systems that are causing or could cause water pollution
2. Receive a written notice or order for the project from the RWQCB or any other regulatory agency
Continue WPCP implementation during any suspension of work activities.
You must submit a SWPPP and pay all associated costs if you do any of the following:
1. Disturb 1 ac or more of soil on a project without an erosivity waiver
2. Disturb more than 5 ac of soil on a project with an erosivity waiver
3. Fail to comply with the schedule for soil-disturbing activities for a project with an erosivity waiver and the delay voids the erosivity waiver
Measurement and Payment
The contract lump sum price paid for “Water Pollution Control” shall include full compensation for furnishing all labor, equipment, and materials, and for doing all the work involved in preparing the WPCP, including providing a WPC manager, conducting water pollution control training, and monitoring, inspecting and correcting water pollution control practices, as shown on the plans, as specified in the Caltrans Standard Specifications and as directed by the COR.
Payments for Water Pollution Control shall be made as follows:
A. 25% of the contract lump sum price will be paid with the first monthly progress payment, provided water pollution control measures are satisfactorily installed in accordance with the WPCP.
B. 50% of the contract lump sum price will be paid in proportion to number of elapsed calendar days during the progress pay period, as compared to the total number of calendar days allowed.
C. 25% of the contract lump sum will be paid with the final pay estimate, provided the water pollution control work has been satisfactorily completed, removed and disposed.
10-1.15 CONSTRUCTION SITE MANAGEMENT
Summary Section 13-4 includes specifications for performing job site management work.
Job site management work includes spill prevention and control, material management, waste management, nonstormwater management, and dewatering activities.
Temporary linear sediment barriers must comply with section 13-10.
Definitions minor spill: Spill of oil, gasoline, paint, or other materials in such small quantities that can easily be controlled by a first responder upon discovery of the spill.
semisignificant spill: Spill of oil, gasoline, paint, or other materials in quantities that can be controlled by a first responder with help from other personnel.
significant or hazardous spill: Spill of oil, gasoline, paint, or other materials in quantities that cannot be controlled by job site personnel.
Submittals At least 15 calendar days before the start of dewatering activities, submit a dewatering and discharge work plan. The dewatering and discharge work plan must include:
1. Title sheet and table of contents
2. Description of dewatering and discharge activities detailing the locations, quantity of water, equipment, and discharge point
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
3. Estimated schedule for dewatering and the discharge start and end dates of intermittent and continuous activities
4. Discharge alternatives, such as dust control or percolation
5. Visual monitoring procedures with inspection log
6. Copy of the approval to discharge into a sanitary sewer system
For material used or stored within the job site, submit the following documents as informational submittals:
1. SDS at least 10 calendar days before material is used or stored
2. Monthly inventory records
Submit approval from the local health agency, city, county, and sewer district before discharging from a sanitary or septic system directly into a sanitary sewer system.
Submit a discharge notification upon discovery of a spill or discharge of materials into a body of water.
Construction Implement effective housekeeping practices for handling, storing, using, and disposing of materials to prevent pollution. Limit potential pollutants at their source before they come in contact with stormwater.
Spill Prevention and Control Keep material or waste storage areas clean, well organized, and equipped with enough cleanup supplies for the material being stored.
Implement spill and leak prevention procedures for chemicals and hazardous substances stored on the job site. If you spill or your equipment or materials leak chemicals or hazardous substances at the job site, you are responsible for all associated cleanup costs and related liability.
Prevent spills from entering stormwater runoff before and during cleanup activities. Do not bury the spill or wash it with water. Immediately report spills to the WPC manager.
As soon as it is safe, contain and clean up spills of petroleum materials and sanitary and septic waste substances listed in 40 CFR, parts 110, 117, and 302. Comply with Section 14-11 for a spill or leak that produces hazardous waste.
Minor Spills Clean up a minor spill as follows:
1. Contain the spread of the spill.
2. Recover the spilled material using absorbents.
3. Clean the contaminated area.
4. Promptly dispose of the contaminated material and absorbents.
Semisignificant Spills Immediately clean up a semisignificant spill as follows:
1. Contain the spread of the spill.
2. On a paved or other impervious surface, encircle and recover the spilled material with absorbents.
3. On soil, construct an earthen dike and dig up the contaminated soil for disposal.
4. During precipitation, cover the spill with 10-mil plastic sheeting or other material to prevent contamination of the runoff.
5. Promptly dispose of the contaminated material and absorbents.
Significant or Hazardous Spills Immediately notify the COR and qualified personnel of a significant or hazardous spill. Handle the spill as follows:
1. Do not attempt to clean up the spill until qualified personnel have arrived.
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
2. Obtain the immediate services of a spill contractor or hazardous material team.
3. Notify local emergency response teams by dialing 911 and county officials by using the emergency phone numbers retained at the job site.
4. Notify the California State Warning Center at (800) 852-7550.
5. Notify the National Response Center at (800) 424-8802 regarding spills of Federal reportable quantities under 40 CFR 110, 117, and 302.
6. Notify other agencies as appropriate, including:
6.1. Fire department
6.2. Public works department
6.3. US Coast Guard
6.4. California Highway Patrol
6.5. City police or county sheriff's department
6.6. DTSC
6.7. Department of Conservation, Division of Oil, Gas, and Geothermal Resources
6.8. Cal/OSHA
6.9. RWQCB
Material Management Minimize or eliminate discharge of material into the air, storm drain systems, and receiving waters while taking delivery of, using, or storing the following materials:
1. Hazardous chemicals, including acids, lime, glues, adhesives, paints, solvents, and curing compounds
2. Soil stabilizers and binders
3. Fertilizers
4. Detergents
5. Plaster
6. Petroleum materials, including fuel, oil, and grease
7. Asphalt and concrete components
8. Pesticides and herbicides
Employees trained in emergency spill cleanup procedures must be present during the unloading of hazardous materials or chemicals.
Minimize the use of hazardous materials if practicable.
Perform each of the following activities at least 100 feet from a concentrated flow of stormwater, a drainage course, or an inlet wherever it is performed (1) within the floodplain or (2) at least 50 feet outside the floodplain:
1. Stockpiling materials
2. Storing pile-driving equipment and liquid waste containers
3. Washing vehicles and equipment in outside areas
4. Fueling and maintaining vehicles and equipment
Material Storage Store materials in their original containers with the original labels maintained in legible condition.
Immediately replace damaged or illegible labels.
Comply with section 14-11.03 for the storage of liquids, petroleum materials, and substances listed in 40 CFR 110, 117, and 302.
Store bagged or boxed material on pallets. Protect bagged or boxed material from wind and rain during non–working days and whenever precipitation is forecasted.
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
Stockpile Management Minimize stockpiling of materials at the job site.
Do not allow soil, sediment, or other debris from stockpiles to enter storm drains, open drainages, or watercourses.
Manage stockpiles by implementing WPC practices on:
1. Active stockpiles before a forecasted storm event
2. Inactive stockpiles according to the WPCP or SWPPP schedule
Cover active and inactive soil stockpiles with soil stabilization material or a temporary cover and surround them with a linear sediment barrier.
Cover stockpiles of concrete and asphalt concrete rubble, HMA, AB, or AS with a temporary cover and surround them with a linear sediment barrier.
Place stockpiles of pressure-treated wood on pallets and cover them with an impermeable material.
Place stockpiles of cold mix asphalt concrete on an impervious surface and cover them with an impermeable material. Protect the stockpile from stormwater run-on and runoff.
Repair or replace linear sediment barriers and covers as needed to keep them functioning properly. If sediment accumulates to 1/3 of the linear sediment barrier's height, remove the accumulated sediment.
Waste Management The Contractor shall prepare a Waste Management Plan within 30 calendar days after commencement of work. This plan shall include a summary of actions the Contractor will take to properly handle and dispose of construction waste. To the maximum extent practicable, recycling efforts are encouraged.
Manage solid waste under Section 14-10.
Manage hazardous waste under Section 14-11.
Paint Waste Clean water-based and oil-based paint from brushes or equipment within a contained area to prevent contamination of soil, receiving waters, or storm drain systems. Handle and dispose of paints, thinners, solvents, residues, and sludges that cannot be recycled or reused as hazardous waste under Section 14-11.
When thoroughly dry, dispose of dry latex paint, paint cans, used brushes, rags, absorbent materials, and drop cloths as solid waste under Section 14-10.
Concrete Waste Prevent the discharge of concrete and asphalt concrete waste into storm drain systems and receiving waters.
Collect concrete waste, including grout, dust and debris from demolition, saw cutting, coring, grinding, or grooving, simultaneously with the waste-producing activity.
Sanitary and Septic Waste Do not bury or discharge wastewater from a sanitary or septic system within the highway. A sanitary facility discharging into a sanitary sewer system must be properly connected and free from leaks. Place a portable sanitary facility at least 50 feet away from storm drains, receiving waters, and flow lines.
Comply with local health agency regulations if using an on-site disposal system.
Liquid Waste Prevent job-site liquid waste from entering storm drain systems and receiving waters. Liquid wastes include:
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
1. Drilling slurries or fluids
2. Grease- and oil-free wastewater and rinse water
3. Dredgings, including liquid waste from cleaning drainage systems
4. Liquid waste running off a surface, including wash and rinse water
5. Other nonstormwater liquids not covered by separate permits
Store liquid waste in structurally sound, leak-proof containers, such as roll-off bins or portable tanks.
Provide enough liquid waste containers with enough volume to prevent overflow, spills, and leaks.
Store containers at least 50 feet from moving vehicles and equipment.
Remove and dispose of deposited solids from sediment traps under section 14-10 unless another method is authorized.
Liquid waste may require testing to determine hazardous material content before disposal.
Dispose of drilling fluids and residue.
If an authorized location is available within the job site, fluids and residue exempt under 23 CA Code of Regs § 2511(g) may be dried by evaporation in a leak-proof container. Dispose of the remaining solid waste under Section 14-10.
Nonstormwater Management Use water for work activities such that erosion and the discharge of pollutants into storm drain systems and receiving waters are prevented. Obtain authorization before washing anything at the job site with water that could discharge into a storm drain system or receiving waters. Immediately report discharges.
Sweep and vacuum paved areas. Do not wash paved areas with water.
Direct runoff water, including water from the repair of a water line, from the job site to areas where it can infiltrate into the ground. Do not allow spilled water to escape the areas used to fill water trucks. Manage run-on to minimize contact with job site water.
Illicit Connection and Illegal Discharge Detection and Reporting Before starting work and daily thereafter, inspect the job site and its perimeter for the following evidence of illicit connections, illegal discharges, and dumping:
1. Debris or trash piles
2. Staining or discoloration on pavement or soils
3. Pungent odors coming from drainage systems
4. Discoloration or an oily sheen on water
5. Stains and residue in ditches, channels, or drain boxes
6. Abnormal water flow during dry weather
7. Excessive sediment deposits
8. Nonstandard drainage junction structures
9. Broken concrete or other disturbances at or near junction structures
If evidence of an illegal connection, discharge, or dumping is discovered, immediately notify the COR. Do not take further action unless ordered. Assume that unlabeled or unidentifiable material is hazardous.
Vehicle and Equipment Cleaning Limit vehicle and equipment cleaning or washing at the job site except for the safety and protection of the equipment and as needed to comply with PLACs. Notify the COR before cleaning vehicles and equipment
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California at the job site with soap, solvents, or steam. Contain and recycle or dispose of resulting waste under Section 14-11 or Section 13-4.03D(5), whichever is applicable. Do not use diesel to clean vehicles or equipment.
Minimize the use of solvents.
Clean or wash vehicles and equipment in a structure equipped with disposal facilities. You may wash vehicles in an outside area if the area is:
1. Paved with concrete or asphalt concrete
2. Surrounded by a containment berm
3. Equipped with a sump to collect and dispose of wash water
Use as little water as practicable when washing vehicles and equipment. Hoses must be equipped with a positive shutoff valve.
Discharge the liquid from wash racks to a recycling system or to another authorized system. Remove liquids and sediment as necessary.
Vehicle and Equipment Fueling and Maintenance If practicable, perform maintenance on vehicles and equipment off-site.
If fueling or maintenance must be performed at the job site, obtain authorization for an assigned area or areas for these activities before using them. Minimize mobile fueling and maintenance activities. Perform fueling and maintenance activities on level ground in areas protected from stormwater run-on and runoff.
Use containment berms or dikes around fueling and maintenance areas. Keep enough absorbents and spill kits in the fueling or maintenance area and on fueling trucks to handle potential spills. Dispose of spill-cleanup material and kits immediately after use. Use drip pans or absorbent pads during fueling or maintenance.
Do not leave fueling or maintenance areas unattended during fueling and maintenance activities. Fueling nozzles must be equipped with (1) an automatic shutoff control and (2) vapor recovery where required by the Air Quality Management District. Secure nozzles in an upright position when not in use. Do not top off fuel tanks.
Recycle or properly dispose of used batteries and tires.
If leaks cannot be repaired immediately, remove the vehicle or equipment from the job site.
Material and Equipment Used Over Water Place drip pans and absorbent pads under vehicles and equipment used over water. Keep enough spill-cleanup material with the vehicles and equipment to handle potential spills. Place drip pans or plastic sheeting under vehicles and equipment on docks, barges, or other surfaces over water whenever the vehicles or equipment will be idle for more than 1 hour.
Install watertight curbs or toe boards on barges, platforms, docks, or other surfaces over water to contain material, debris, and tools. Secure any material or debris to prevent spills or discharge into the water due to wind.
Report discharges to receiving waters immediately upon discovery.
Structure Removal Over or Adjacent to Water Do not allow demolished material to enter storm drain systems and receiving waters. Use authorized covers and platforms to collect debris. Use attachments on equipment to catch debris during small demolition activities. Empty debris-catching devices daily and handle debris under section 13-4.03D.
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
Paving, Sealing, Saw Cutting, Grooving, and Grinding Activities Prevent the following materials from entering storm drain systems and receiving waters:
1. Cementitious material
2. Asphaltic material
3. Aggregate or screenings
4. Saw cutting, grooving, and grinding residue
5. Pavement chunks
6. Shoulder backing
7. Methacrylate resin
8. Sandblasting residue
Cover drainage inlets and use linear sediment barriers to protect downhill receiving waters until paving, saw cutting, grooving, and grinding activities are completed and excess material has been removed. Cover drainage inlets and manholes during the application of seal coat, tack coat, slurry seal, or fog seal.
Whenever precipitation is forecasted, limit paving, saw cutting, and grinding to places where runoff can be captured.
Do not start seal coat, tack coat, slurry seal, or fog seal activities when precipitation is forecasted during the application and curing period.
Do not grind or groove pavement during precipitation.
Use a vacuum to remove slurry immediately after it is produced. Do not allow the slurry to run onto lanes open to traffic or off the pavement.
Collect the residue from grooving and grinding activities with a vacuum attachment on the grinding machine. Do not leave the residue on the pavement or allow it to flow across the pavement.
You may stockpile material removed from existing roadways under Section 13-4.03C(3) if authorized.
Do not coat asphalt trucks and equipment with substances that contain soap, foaming agents, or toxic chemicals.
When paving equipment is not in use, park the paving equipment over drip pans or plastic sheeting with absorbent material to catch drips.
Thermoplastic Striping and Pavement Markers Do not preheat, transfer, or load thermoplastic within 50 feet of drainage inlets or receiving waters.
Do not unload, transfer, or load bituminous material for pavement markers within 50 feet of drainage inlets or receiving waters.
Collect and dispose of bituminous material from the roadway after removing markers.
Sweeping Sweep by hand or mechanical methods, such as vacuuming. Do not use mechanical kick brooms.
Sweep paved roads at construction entrance and exit locations and paved areas within the job site:
1. During clearing and grubbing activities
2. During earthwork activities
3. During trenching activities
4. During pavement-structure construction activities
5. When vehicles are entering and leaving the job site
6. After soil-disturbing activities
7. After observing off-site tracking of material
Monitor paved areas and roadways within the project. Sweep within:
1. 1 hour if sediment or debris is observed during activities requiring sweeping
2. 24 hours if sediment or debris is observed during activities not requiring sweeping
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
Remove collected material, including sediment, from paved shoulders, drain inlets, curbs and dikes, and other drainage areas. You may stockpile collected material at the job site. Dispose of collected material at least once per week if stockpiled.
You may dispose of sediment within the job site collected during sweeping activities. Protect the disposal areas against erosion.
Keep dust to a minimum during street sweeping activities. Use water or a vacuum whenever dust generation is excessive or sediment pickup is ineffective.
Dewatering Dewatering consists of discharging accumulated stormwater, groundwater, or surface water from excavations or temporary containment facilities.
Perform dewatering work as specified for the work items involved, such as a temporary ATS or dewatering and discharge.
If dewatering and discharging activities are not specified for a work item and you perform dewatering activities:
1. Conduct dewatering activities under the Caltrans' Field Guide for Construction Site Dewatering.
2. Ensure any dewatering discharge does not cause erosion, scour, or sedimentary deposits that could impact natural bedding materials.
3. Discharge the water within the project limits. Dispose of the water if it cannot be discharged within project limits due to site constraints or contamination.
4. Do not discharge stormwater or nonstormwater that has an odor, discoloration other than sediment, an oily sheen, or foam on the surface. Immediately notify the COR upon discovering any such condition.
Full compensation for “Construction Site Management” is included in the contract lump sum price paid for “Water Pollution Control” and no separate payment will be made therefor.
10-1.16 TEMPORARY TRAFFIC CONTROL DEVICES
Flagging, signs, and temporary traffic control devices furnished, installed, maintained, and removed when no longer required shall conform to the provisions in Section 12-3, "Temporary Traffic Control Devices," of the Caltrans Standard Specifications and these Specifications.
Summary
Section 12-3.01 includes general specifications for providing temporary traffic control devices.
Providing temporary traffic control devices includes installing, placing, maintaining, repairing, replacing, and removing temporary traffic control devices.
Do not use different types of channelizing devices on the same alignment. The types include plastic drums, portable delineators, channelizers, tubular markers, traffic cones, and Type I and Type II barricades.
Definitions
Category 1 temporary traffic control devices: Small devices weighing less than 100 lb certified as crashworthy by crash testing or crash testing of similar devices. Category 1 temporary traffic control devices include traffic cones, plastic traffic drums, portable delineators, and channelizers.
Category 2 temporary traffic control devices: Small devices weighing less than 100 lb that are not expected to produce significant changes in vehicular velocity but could cause harm to impacting vehicles. Category 2 temporary traffic control devices include barricades and portable sign supports.
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
Category 3 temporary traffic control devices: Devices weighing 100 lb or more that are expected to produce significant changes in the vehicular velocity of impacting vehicles. Category 3 temporary traffic control devices include crash cushions, impact attenuator vehicles, temporary railing, temporary barrier, and end treatments for temporary railings and barriers.
orange: Orange, red-orange, fluorescent orange, or fluorescent red-orange.
useable shoulder area: Any longitudinal paved or unpaved contiguous surface adjacent to the traveled way with:
1. Enough weight-bearing capacity to support temporary traffic control devices, such as flashing arrow signs, PCMSs, and impact attenuator vehicles
2. Slope not greater than 6:1 (horizontal:vertical)
Submittals
If requested, submit the following as informational submittals:
1. Self-certification for crashworthiness of Category 1 temporary traffic control devices at least 5 calendar days before starting any work using the devices or within 2 calendar days after the request if the devices are already in use. Either you or the manufacturer must perform the self-certification. Include the following information:
1.1. Date
1.2. Federal aid number for a federal-aid contract
1.3. Contract number, district, county, route, and post miles of the project limits
1.4. Company name, street address, city, state, and zip code of the certifying vendor
1.5. Printed name, signature, and title of the certifying person
1.6. Types of Category 1 temporary traffic control devices
2. List of proposed Category 2 temporary traffic control devices at least 5 calendar days before starting any work using the devices or within 2 calendar days after the request if the devices are already in use.
Obtain a standard form for self-certification from the COR.
Submit a sample of the type of portable delineator that you will be using before placing the delineators on the job site.
Materials
The condition of temporary traffic control devices must comply with the most current edition of the American Traffic Safety Services Association publication Quality Guidelines for Temporary Traffic Control Devices and Features.
Category 2 temporary traffic control devices must be on FHWA's list of acceptable crashworthy Category 2 hardware for work zones. For this list, go to FHWA's Safety Program website.
Category 2 temporary traffic control devices must be labeled with the FHWA acceptance letter code and the name of the manufacturer. The label must be legible and permanently affixed to the temporary traffic control device by the manufacturer.
Category 3 temporary traffic control devices must be on the Authorized Material List for highway safety features.
Retroreflectivity for the following materials must comply with Table 2A-3, "Minimum Maintained
Attachment J01 Specifications - Roadwork Construction of the County Road 31 (CR-31), Left Turn Lane in Yolo County, California
Retroreflectivity Levels," of the California MUTCD and be on the Authorized Material List for signing and delineation materials:
1. Retroreflective sheeting for barricades
2. Retroreflective bands for portable delineators
3. Retroreflective sheeting for construction area signs
4. Retroreflective sheeting for channelizers
5. Reflectors for Type K temporary railing
6. Retroreflective…