HHRTS CDRLs A001-B011.pdf
PDF 3 MB Posted
- Attached to
- Handheld Radio Tests (HHRTS) Federal contract opportunity
- Solicitation number
- M67854-22-R-5105
- Issued by
- United States Marine Corps
About this file
This is a solicitation for a single-award, indefinite delivery/indefinite quantity contract to manufacture, integrate, test, produce, provide, and deliver a Handheld Radio Test Set (HHRTS) and associated technical documentation. The United States Marine Corps intends to award a five-year IDIQ contract to a single vendor for both systems. Interested parties must register in the System for Award Management and respond to the solicitation by the specified due date. The solicitation seeks the HHRTS and documentation including engineering drawings, manuals, training materials, and program management reports. The North American Industry Classification code is 334515 for instrument manufacturing for measuring and testing electricity and electrical signals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DOD 4120.24.pdf | ||
| DI-SAFT-80102C.pdf | ||
| HHRTS CDRLs A001 through B011 updated.pdf | ||
| M67854-22-R-5105 P00001.pdf | ||
| Questions and Answers.xlsx | XLSX spreadsheet | |
| Provisioning Performance Schedule.docx | DOCX document | |
| M67854-22-R-5105 RFP.pdf | ||
| Attachment 3 PPQ.pdf | ||
| Attachment 2 Performance Specification.pdf | ||
| Attachment 1 HHRTS SOW TMCR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________
TM- _________
OTHER ________X_____
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A001
2. TITLE OF DATA ITEM
CONFERENCE AGENDA
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-ADMN-81249A
5. CONTRACT REFERENCE
SOW PARA 3.1.1, 3.1.2, and 3.2.5.1
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE BLK 16 See BLK 16 b. COPIES
8. APP CODE C – SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A N/A SEE BLK 16 Reg Repro
16. REMARKS PROJECT
1 1
OFFICER
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEET LOGISTICIAN 1 1
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
ENGINEER 1 1
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS
DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL PURPOSES
AS DETERMINED [20 May 2022]. OTHER REQUESTS FOR THIS DOCUMENT SHALL
EQUIPMENT
SPECIALIST
BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND, PM
SUPPLY & MAINTENANCE SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-
6050.
BLK 10 – ONE CONFERENCE AGENDA PER MEETING AS REQUIRED.
BLK 12 - SUBMIT 5 DAYS PRIOR TO CONFERENCE.
BLK 13 - SPECIFIED DATE WILL BE DETERMINED AFTER GOVERNMENT
ACCEPTANCE OF DRAFT AGENDA.
BLK 14 - ELECTRONIC COPY SHALL BE BY E-MAIL IN MICROSOFT
OFFICE/WORD FORMAT. FOR ADDRESSEE INFORMATION SEE CONTRACT
SUMMARY POINTS OF CONTACT SECTION IV. CONTRACT DATA
REQUIREMENTS LIST.
15. TOTAL 4 4
G. PREPARED BY
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __1__ of __38__ Pages
7 Sept 2022
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
OTHER ________X____
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A002
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-ADMN-81250A
5. CONTRACT REFERENCE
SOW PARA 3.1.1, 3.1.2, 3.2.5.1
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE BLK 16 SEE BLK 16 b. COPIES
a. ADDRESSEE
Draft
A N/A SEE BLK 16 Reg Repro
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEET LOGISTICIAN 1 1
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
ENGINEER 1 1
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS
DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL PURPOSES
AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS DOCUMENT SHALL
EQUIPMENT
BLK 10 – ONE SET OF CONFERENCE MINUTES PER OCCURRENCE.
BLK 12 - SUBMIT 5 DAYS POST CONFERENCE.
ACCEPTANCE OF DRAFT MINUTES.
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __2__ of __38__ Pages
Form Approved
OMB No. 0704-0188
Public reportingburden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN yourform to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A003
2. TITLE OF DATA ITEM
MONTHLY STATUS REPORT
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-80368A
5. CONTRACT REFERENCE
SOW PARA 3.2.5.1
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT MONTHLY SEE BLK 16 b. COPIES
A SEE BLK 16 SEE BLK 16 Reg Repr o
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER LOGISTICIAN 1 1
SHEET OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
ENGINEER 1 1
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THI
DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL PURPOSES
AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS DOCUMENT SHALL
EQUIPMENT
BLK 11 – DATE OF FIRST SUBMISSION SHALL BE THE END OF THE FIRST
MONTH AFTER CONTRACT AWARD. EX: IF AWARDED ON THE FIRST OF THE
MONTH, SUBMISSIONS WILL BE DUE THE LAST DAY OF THE MONTH.
BLK 12 – DATE OF FIRST SUBMISSION SHALL BE 30 (OR 31 DEPENDING ON THE
MONTH) DAYS AFTER CONTRACT AWARD.
BLK 13 – SUBSEQUENT SUBMISSION SHALL BE THE END OF EVERY MONTH.
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __3__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO.
A004
2. TITLE OF DATA ITEM
HAZARDOUS MATERIAL MANAGEMENT PROGRAM PLAN
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-SAFT-80102B
5. CONTRACT REFERENCE
SOW PARA 3.5.3
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ONCE SEE BLK 16 b. COPIES
A N/A SEE BLK 16 Reg Repr o
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEE LOGISTICIAN 1 1
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
ENGINEER 1 1
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THI
DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL PURPOSES
AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS DOCUMENT SHALL
6050.
BLK 12 - THE CONTRACTOR SHALL SUBMIT WITHIN 44 WORKING DAYS OF
CONTRACT AWARD.
ACCEPTANCE.
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __4__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER _______X______ _ _
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A005
2. TITLE OF DATA ITEM
FAILURE SUMMARY AND ANALYSIS REPORT
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-SESS-80255A
5. CONTRACT REFERENCE
SOW PARA 3.6.1
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
8. APP CODE C - SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
o
16. REMARKS LOGISTICIAN 1 1
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER
ENGINEER 1 1
EQUIPMENT
SPECIALIST
SHEET OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
THIS DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL
PURPOSES AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS
COMMAND, PM SUPPLY & MAINTENANCE SYSTEMS, 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
DESTRUCTION NOTICE: DESTROY BY ANY METHOD THAT WILL PREVENT
DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THIS DOCUMENT.
BLK 12 – DRAFT SHALL BE DELIVERED AT POST AWARD CONFERENCE.
BLK 14 - SUBMISSION SHALL BE PROVIDED IN BOTH PRINTED AND
ELECTRONIC FORMATS. THE ELECTRONIC FORMAT SHALL BE IN EDITABLE
PORTABLE DOCUMENT FORMAT (PDF). FOR ADDRESSEE INFORMATION SEE
CONTRACT SUMMARY POINTS OF CONTACT SECTION IV. CONTRACT DATA
15. TOTAL 3 3
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __5__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER_____X______
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A006
2. TITLE OF DATA ITEM
SOFTWARE VERSION DESCRIPTION
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-IPSC-81442A
5. CONTRACT REFERENCE
SOW PARA 3.8.1
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ SEE BLK 16 b. COPIES o
BLK 4 - CONTRACTOR FORMAT IS ACCEPTABLE.
ENGINEER 1 1
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEE
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
PROJECT
COORDINATOR
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THI
DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL PURPOSES
AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BLK 12 - DELIVER WITH INITIAL SVD UPDATE.
BLK 13 - UPDATED SVD WILL BE SUBMITTED WITH EACH SOFTWARE RELEASE.
BLK 14 –FOR ADDRESSEE INFORMATION SEE CONTRACT SUMMARY POINTS OF
CONTACT SECTION IV. CONTRACT DATA REQUIREMENTS LIST.
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __6__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER__X_____
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A007
2. TITLE OF DATA ITEM
SOFTWARE DESIGN DESCRIPTION
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-IPSC-81435A
5. CONTRACT REFERENCE
SOW PARA 3.8.2
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT AS REQ SEE BLK 16 b. COPIES
8. APP CODE C – SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
o
16. REMARKS
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEET OF THE
DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION AUTHORIZED TO U.S.
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS DOCUMENT IS REQUIRED FOR
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS
SYSTEMS COMMAND, PM SUPPLY & MAINTENANCE SYSTEMS, 2200 LESTER STREET,
BLK 12 – DELIVER WITHIN 44 WORKING DAYS AFTER CONTRACT AWARD.
BLK 13 – UPDATED SDD WILL BE SUBMITTED IF THERE IS A CHANGE TO THE OVERALL
SYSTEM SOFTWARE DESIGN.
BLK 14 – FOR ADDRESSEE INFORMATION SEE CONTRACT SUMMARY POINTS OF
PROJECT
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __7__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TOP ____X_____ TM- _________ OTHER __________ _ _ _ _
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A008
2. TITLE OF DATA ITEM
PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-SESS-81000F
5. CONTRACT REFERENCE
SOW PARA 3.9.1
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD ONCE SEE BLK 16 b. COPIES
8. APP CODE C. - SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
A N/A N/A Reg Repr
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS DOCUMENT IS REQUIRED FOR
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS
BLOCK 12 – THE CONTRACTOR SHALL SUBMIT THE FINAL DRAWING PACKAGE WITHIN
44 WORKING DAYS OF CONTRACT AWARD.
BLOCK 14 – THE FINAL DRAWINGS SHALL BE DELIVERED VIA CD/DVD. FOR ADDRESSEE
INFORMATION SEE CONTRACT SUMMARY POINTS OF CONTACT SECTION IV. CONTRACT
DATA REQUIREMENTS LIST.
ENGINEER 1 1
EQUIPMENT
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __8__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER_________X______________
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A009
2. TITLE OF DATA ITEM
OEM TECHNICAL MANUAL(s)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-80527D
5. CONTRACT REFERENCE
SOW PARA 3.10.1.1
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
A N/A
SEE BLK 16
Reg Repr
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS DOCUMENT IS REQUIRED FOR
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS
DESTRUCTION NOTICE: DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF
CONTENTS OR RECONSTRUCTION OF THIS DOCUMENT.
BLK 12 - THE DRAFT OEM TM SHALL BE DELIVERED WITHIN TIMELINES AGREED UPON
DURING THE POST AWARD MEETING.
BLK 13 –THE FINAL OEM TM SPECIFIED DATE WILL BE DETERMINED AFTER GOVERNMENT
ACCEPTANCE OF THE DRAFT.
BLK 14 - SUBMISSION SHALL BE PROVIDED IN BOTH PRINTED AND ELECTRONIC FORMATS.
THE ELECTRONIC FORMAT SHALL BE IN EDITABLE PORTABLE DOCUMENT FORMAT (PDF).
FOR ADDRESSEE INFORMATION SEE CONTRACT SUMMARY POINTS OF CONTACT SECTION
IV. CONTRACT DATA REQUIREMENTS LIST.
LOGISTICIAN – ELECTRONIC :
PROJECT OFFICER – ELECTRONIC AND HARD COPIES
EQUIPMENT SPECIALIST - ELECTRONIC
LOGISTICIAN 1 1
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __9__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please
DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER_________X______________
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A010
2. TITLE OF DATA ITEM
INITIAL TECHNICA L MANUAL OUTLINE
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 3.10.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX SEE BLK 16 SEE BLK 16 b. COPIES
8. APP CODE C - SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS DOCUMENT IS REQUIRED FOR
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS
BLK 10 – THE INITIAL TM OUTLINE SHALL BE SUBMITTED ONCE, UNLESS SIGNIFICANT
REWORK IS REQUIRED.
BLK 12 – THE DRAFT INITIAL TM OUTLINE SHALL BE SUBMITTED WITHIN 10 DAYS OF THE
POST AWARD MEETING TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE
TRANSFER WEBSITE DEPENDING ON THE SIZE OF THE DELIVERABLE.
BLK 13 - THE FINAL INITIAL TM OUTLINE SHALL BE RE-SUBMITTED TO ADDRESS ANY
COMMENTS FROM THE PROGRAM OFFICE WITHIN 10 DAYS OF THE APPROVED DRAFT VIA
E-MAIL OR DOD-APPROVED FILE TRANSFER WEBSITE DEPENDING ON THE SIZE OF THE
DELIVERABLE.
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __10__ of _38___ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- ___X______ OTHER_________________
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A011
2. TITLE OF DATA ITEM
PRELIMINA RY DRAFT TECHNICAL MANUAL
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 3.10.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX SEE BLK 16 SEE BLK 16 b. COPIES
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS DOCUMENT IS REQUIRED FOR
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS
BLK 10 – THE PRELIMINARY DRAFT TM OUTLINE SHALL BE SUBMITTED ONCE, UNLESS
SIGNIFICANT REWORK IS REQUIRED.
BLK 12 – THE DRAFT PRELIMINARY DRAFT TM SHALL BE SUBMITTED WITHIN 60 DAYS OF
THE CONTRACT AWARD.
BLK 13 - THE FINAL PRELIMINARY DRAFT TM SHALL BE RE-SUBMITTED TO ADDRESS ANY
COMMENTS FROM THE PROGRAM OFFICE WITHIN 10 DAYS OF THE APPROVED DRAFT VIA
E-MAIL OR DOD-APPROVED FILE TRANSFER WEBSITE DEPENDING ON THE SIZE OF THE
DELIVERABLE
BLK 14 – FOR ADDRESSEE INFORMATION SEE CONTRACT SUMMARY POINTS OF CONTACT
SECTION IV. CONTRACT DATA REQUIREMENTS LIST.
PROJECT
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __11__ of _38___ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- ___X______ OTHER __________ _ _ _ _
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A012
2. TITLE OF DATA ITEM
DRAFT TECHNICAL MANUAL
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-81675
5. CONTRACT REFERENCE
SOW PARA 3.10.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
A N/A
SEE BLK 16
Reg Repr
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS DOCUMENT IS REQUIRED FOR
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS
BLK 12 – THE DRAFT TM SHALL BE SUBMITTED WITHIN 90 DAYS OF THE CONTRACT
AWARD.
BLK 13 - SPECIFIED DATE WILL BE DETERMINED AFTER GOVERNMENT ACCEPTANCE.
BLK 14 – TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE TRANSFER
WEBSITE DEPENDING ON THE SIZE OF THE DELIVERABLE. FOR ADDRESSEE
INFORMATION SEE CONTRACT SUMMARY POINTS OF CONTACT SECTION IV. CONTRACT
DATA REQUIREMENTS LIST.
PROJECT
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __12__ of _38___ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please
DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- ___X______ OTHER____________________ _
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A013
2. TITLE OF DATA ITEM
FINAL DRAFT TECHNICA L MANUAL (FDTM)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-81675
5. CONTRACT REFERENCE
SOW PARA 3.10.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS DOCUMENT IS REQUIRED FOR
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS
BLK 12 – THE DRAFT FINAL DRAFT TM SHALL BE SUBMITTED WITHIN 10 WORKING DAYS
OF THE TM VERIFICATION.
BLK 13 - SPECIFIED DATE WILL BE DETERMINED AFTER GOVERNMENT ACCEPTANCE.
BLK 14 – TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE TRANSFER
INFORMATION SEE CONTRACT SUMMARY POINTS OF CONTACT SECTION IV. CONTRACT
DATA REQUIREMENTS LIST.
PROJECT
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __13__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- ___X______ OTHER _________ _ _ _ __
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A014
2. TITLE OF DATA ITEM
SIGN-OFF COPY TECHNICAL MANUAL (SOCTM)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-81675
5. CONTRACT REFERENCE
SOW PARA 3.10.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS DOCUMENT IS REQUIRED FOR
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS
BLK 12 – THE DRAFT SIGN-OFF COPY TECHNICAL MANUAL SHALL BE SUBMITTED TO THE
GOVERNMENT 15 WORKING DAYS AFTER THE GOVERNMENT SUBMITS THE FINAL DRAFT
TECHNICAL MANUAL (FDTM) REVIEW AND APPROVAL.
BLK 13 - FINAL SIGN-OFF COPY TECHNICAL MANUAL (SOCTM) DATE WILL BE
DETERMINED AFTER GOVERNMENT ACCEPTANCE.
BLK 14 - TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE TRANSFER
INFORMATION SEE CONTRACT SUMMARY POINTS OF CONTACT SECTION IV. CONTRACT
DATA REQUIREMENTS LIST.
PROJECT
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __14__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TM- ___X______
OTHER _________
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A015
2. TITLE OF DATA ITEM
FINAL REPRODUCIBLE
COPY (FRC) – TECHNICA L MANUAL
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-81675
5. CONTRACT REFERENCE
SOW PARA 3.10.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES o
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEE LOGISTICIAN 1 1
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THI
DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL PURPOSES
EQUIPMENT
AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BLK 12 – THE FINAL REPRODUCIBLE COPY (FRC) - TECHNICAL MANUAL (TM)
SHALL BE DELIVERED TO THE GOVERNMENT 10 WORKING DAYS AFTER THE
GOVERNMENT SUBMITS THE SOCTM APPROVAL WITH PM SIGNATURE.
BLK 14 – TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE
TRANSFER WEBSITE, DEPENDING ON THE SIZE OF THE DELIVERABLE. FOR
ADDRESSEE INFORMATION SEE CONTRACT SUMMARY POINTS OF CONTACT
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __15__ of _38___ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TM- ___X______
OTHER __________
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A016
2. TITLE OF DATA ITEM
VENDOR TRAINING PRODUCTS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 3.10.2.2
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES o
16. REMARKS LOGISTICIAN 1 1
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER MPT LEAD 2 2
SHEET OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
THIS DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL
PURPOSES AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS
COMMAND, PM SUPPLY & MAINTENANCE SYSTEMS, 2200 LESTER STREET,
BLK 12 – DRAFT VENDOR TRAINING PRODUCTS SHALL BE DELIVERED WITHIN
TIMELINES AGREED UPON DURING THE POST AWARD MEETING.
BLK 13 - THE FINAL VENDOR TRAINING PRODUCTS SHALL BE DELIVERED AT A
SPECIFIED DATE AFTER GOVERNMENT ACCEPTANCE.
BLK 14 - SUBMISSION SHALL BE VIA PRINTED AND ELECTRONIC FORMATS.
ELECTRONIC FORMAT SHALL BE IN EDITABLE PORTABLE DOCUMENT FORMAT
(PDF). FOR ADDRESSEE INFORMATION SEE CONTRACT SUMMARY POINTS OF
LOGISTICIAN - ELECTRONIC
MPT LEAD - BOTH FORMATS
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __16__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER ________X____ _ _ __
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A017
2. TITLE OF DATA ITEM
LESSON PLANS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-PSSS-81523D
5. CONTRACT REFERENCE
SOW PARA 3.10.2.2.4
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ASREQ SEE BLK 16 b. COPIES
BLK 4 - THE LESSON PLANS SHALL BE DEVELOPED IAW NAVMC 1553.1A
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THI
DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL PURPOSES
AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND, PM
BLK 12 - THE DRAFT LESSON PLANS SHALL BE DELIVERED WITHIN TIMELINES
AGREED UPON DURING THE POST AWARD MEETING.
BLK 13 - THE FINAL LESSON PLANS SHALL BE DELIVERED WITHIN TIMELINES
BLK 14 - SUBMISSION SHALL BE VIA ELECTRONIC MAIL (E-MAIL) AND PAPER-
BASED FORMAT. THE SUBMISSION SHALL BE PREPARED AND DELIVERED IN
CURRENT MICROSOFT OFFICE SUITE. FOR ADDRESSEE INFORMATION SEE
MPT LEAD – BOTH FORMATS
MPT LEAD 2 2
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __17__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
OTHER
________X____
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A018
2. TITLE OF DATA ITEM
STUDENT OUTLINES
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 3.10.2.2.5
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONE TIME SEE BLK 16 b. COPIES o
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEET OF THE MPT LEAD 2 2
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THIS DOCUMENT IS REQUIRED FOR
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO: COMMANDER, MARINE CORPS
SYSTEMS COMMAND, PM SUPPLY & MAINTENANCE SYSTEMS, 2200 LESTER STREET,
BLK 12 - THE DRAFT STUDENT OUTLINES SHALL BE DELIVERED WITHIN TIMELINES
BLK 13 - THE FINAL STUDENT OUTLINES SHALL BE DELIVERED WITHIN TIMELINES
BLK 14 - SUBMISSION SHALL BE VIA ELECTRONIC MAIL (E-MAIL) AND PAPER-BASED
FORMAT. THE SUBMISSION SHALL BE PREPARED AND DELIVERED IN CURRENT
MICROSOFT OFFICE SUITE. FOR ADDRESSEE INFORMATION SEE CONTRACT SUMMARY
POINTS OF CONTACT SECTION IV. CONTRACT DATA REQUIREMENTS LIST.
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __18__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER ________X____ _ _ __
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A019
2. TITLE OF DATA ITEM
MEDIA
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-SESS-81526B
5. CONTRACT REFERENCE
SOW PARA 3.10.2.2.6
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
BLK 4 – LESSON MEDIA WILL BE IN MOCROSOFT OFFICE POWERPOINT FORMAT.
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THI
DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL PURPOSES
AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND, PM
BLK 12 - THE DRAFT MEDIA SHALL BE DELIVERED WITHIN TIMELINES AGREED
UPON DURING THE POST AWARD MEETING.
BLK 13 - THE FINAL MEDIA SHALL BE DELIVERED WITHIN TIMELINES AGREED
UPON DURING THE POST AWARD MEETING.
BLK 14 - SUBMISSION SHALL BE VIA ELECTRONIC MAIL (E-MAIL) AND PAPER-
BASED FORMAT. THE SUBMISSION SHALL BE PREPARED AND DELIVERED IN
CURRENT MICROSOFT OFFICE SUITE. FOR ADDRESSEE INFORMATION SEE
MPT LEAD 2 2
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __19__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
________X_____
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A020
2. TITLE OF DATA ITEM
PERFORMANCE EVALUATIONS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 3.10.2.2.7
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
8. APP CODE C - SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
o
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEET OF THE MPT LEAD 2 2
ADMINISTRATIVE OR OPERATIONAL PURPOSES AS DETERMINED [20 MAY 2022]. OTHER
BLK 12 - THE WRITTEN AND PERFORMANCE EVALUATIONS SHALL BE DELIVERED WITHIN
TIMELINES AGREED UPON DURING THE POST AWARD MEETING.
BLK 13 - THE GOVERNMENT SHALL HAVE 60 DAYS TO REVIEW THE WRITTEN AND
PERFORMANCE EVALUATIONS. THE CONTRACTOR SHALL HAVE 30 DAYS TO CORRECT
AND RESUBMIT THE WRITTEN AND PERFORMANCE EVALUATIONS FOR FINAL
GOVERNMENT REVIEW AND APPROVAL.
BLK 14 - SUBMISSION SHALL BE VIA THE TECHNICAL MANUAL SHALL BE PROVIDED IN
BOTH PRINTED AND ELECTRONIC FORMATS. THE ELECTRONIC FORMAT SHALL BE IN
EDITABLE PORTABLE DOCUMENT FORMAT (PDF). FOR ADDRESSEE INFORMATION SEE
CONTRACT SUMMARY POINTS OF CONTACT SECTION IV. CONTRACT DATA
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __20__ of _38___ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A021
2. TITLE OF DATA ITEM
TRAINING DELIVERY REQUIREM ENTS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 3.10.2.2.8
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
A N/A N/A Reg Repr o
MPT LEAD 1 1
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. THI
DOCUMENT IS REQUIRED FOR ADMINISTRATIVE OR OPERATIONAL PURPOSES
AS DETERMINED [20 MAY 2022]. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND, PM
BLK 12 – I&KPT SHALL BE HELD AT TWENTYNINE PALMS, CA, AFTER THE
COMPLETION OF ALL TRAINING PRODUCTS. COURSE CONDUCT DATES SHALL
BE DETERMINED BY THE PROGRAM OFFICE.
BLK 14 - SUBMISSION OF TRAINING PRODUCTS SHALL BE IN HARD COPY
FORMAT PER STUDENT AT THE TIME OF THE EVENT. A STUDENT ROSTER SHALL
BE SUBMITTED VIA ELECTRONIC MAIL (E-MAIL) FORMAT AT THE CONCLUSION
OF THE EVENT. THE SUBMISSION SHALL BE PREPARED AND DELIVERED IN
CURRENT MICROSOFT OFFICE SUITE. FOR ADDRESSEE INFORMATION SEE
15. TOTAL 2 2
Joshua C. Thompson
H. DATE
20 June 2022
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __21__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER ________X_____ _ _ _
D. SYSTEM / ITEM
HHRTS
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A022
2. TITLE OF DATA ITEM
VULNERA BILITY SCAN COMPLIANCE (VSC) REPORT
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-MGMT-81842
5. CONTRACT REFERENCE
SOW PARA 3.11.2
6. REQUIRING OFFICER
MARCORSYSCOM (PM-SMS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ONCE SEE BLK 16 b. COPIES
8. APP CODE F – SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
BLK 9 - “DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS
DIRECTED BY PROGRAM MANAGER SMS, CODE PMM-151.4 [20 MAY 2022].
BLK 12 - DELIVER DRAFT ON COMPLETION OF PERFORMANCE TESTING.
AC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .