HHES Modular Classroom Plans.pdf

PDF 354 KB Posted

Attached to
Highland Hills Elementary Painting Project 2026-02
Solicitation number
S-P30001-00016285
Issued by
Union County, Oregon

About this file

This file contains modular classroom floor plans prepared by Blazer Industries, Inc. for Highland Hills Elementary School in Hermiston, Oregon. The plans depict a 28 x 64 foot modular unit designed for classroom use, showing detailed floor layouts and elevation views for all four walls (Walls A, C, 1, and 2). The document includes technical specifications for air barrier fastening systems and endwall construction details. The plans were drawn by AJB on March 27, 2014, with approval for construction noted on February 25, 2014. The document indicates customer changes were incorporated as of March 3, 2014, with an expiration date of June 30, 2014. The modular unit classification is listed as "OR. GOLD," suggesting Oregon state standards compliance.

The floor plans serve as supporting documentation for the Highland Hills Elementary Painting Project 2026-02, which addresses interior and exterior painting requirements for the school facility. These architectural drawings establish the physical specifications and wall configurations that define the scope of the painting work, including identification of all interior and exterior surfaces requiring preparation and paint application. The plans provide bidders with essential baseline information regarding building dimensions, wall elevations, and structural elements necessary for accurate cost estimation and material planning for the comprehensive painting project scheduled for completion by August 1, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHWHWHWH

FLOOR PLAN

COPYRIGHT 2014, BLAZER INDUSTRIES, INC.

THIS MATERIAL IS THE EXCLUSIVE PROPERTY

OF BLAZER INDUSTRIES, INC. AND SHALL

NOT BE REPRODUCED, USED, OR DISCLOSED

TO OTHERS EXCEPT AS AUTHORIZED BY THE

WRITTEN PERMISSION OF BLAZER INDUSTRIES.

DATE REVISION BY

Drawn By:

Job No:

File Copy:

Approved for Const:

Issue Date:

INDUSTRIES, INC.

P.O. BOX 489 Aumsville, OR 97325-0489 www.blazerind.com

18048

AJB

3-27-14

Highland Hills Elementary Pacific Mobile 14 BLMP-12 Hermiston, OR

MODULAR

28 x 64

OR. GOLD

2-25-14 ENGINEERING AJB

3-3-14 CUSTOMER CHANGES AJB

EXPIRES: 6/30/2014

E

N

G

I N

E

E

R

J U L Y 15 , 1 9 9 7

AIR BARRIER NOTES:

432014

ENDWALL FASTENING:

WALL "A" ELEVATION

WALL "C" ELEVATION

WALL '2' ELEVATIONWALL '1' ELEVATION

COPYRIGHT 2014, BLAZER INDUSTRIES, INC.

THIS MATERIAL IS THE EXCLUSIVE PROPERTY

OF BLAZER INDUSTRIES, INC. AND SHALL

NOT BE REPRODUCED, USED, OR DISCLOSED

TO OTHERS EXCEPT AS AUTHORIZED BY THE

WRITTEN PERMISSION OF BLAZER INDUSTRIES.

DATE REVISION BY

Drawn By:

Job No:

File Copy:

Approved for Const:

Issue Date:

INDUSTRIES, INC.

P.O. BOX 489 Aumsville, OR 97325-0489 www.blazerind.com

18048

AJB

3-27-14

Highland Hills Elementary Pacific Mobile 14 BLMP-12 Hermiston, OR

MODULAR

28 x 64

OR. GOLD

2-25-14

ENGINEERING

AJB

3-3-14 CUSTOMER CHANGES AJB

EXPIRES: 6/30/2014

E

N

G

I N

E

E

R

J U L Y 15 , 1 9 9 7

432014

File details come from the government source that posted it. Updated .