HHES Modular Classroom Plans.pdf
PDF 354 KB Posted
- Solicitation number
- S-P30001-00016285
- Issued by
- Union County, Oregon
About this file
This file contains modular classroom floor plans prepared by Blazer Industries, Inc. for Highland Hills Elementary School in Hermiston, Oregon. The plans depict a 28 x 64 foot modular unit designed for classroom use, showing detailed floor layouts and elevation views for all four walls (Walls A, C, 1, and 2). The document includes technical specifications for air barrier fastening systems and endwall construction details. The plans were drawn by AJB on March 27, 2014, with approval for construction noted on February 25, 2014. The document indicates customer changes were incorporated as of March 3, 2014, with an expiration date of June 30, 2014. The modular unit classification is listed as "OR. GOLD," suggesting Oregon state standards compliance.
The floor plans serve as supporting documentation for the Highland Hills Elementary Painting Project 2026-02, which addresses interior and exterior painting requirements for the school facility. These architectural drawings establish the physical specifications and wall configurations that define the scope of the painting work, including identification of all interior and exterior surfaces requiring preparation and paint application. The plans provide bidders with essential baseline information regarding building dimensions, wall elevations, and structural elements necessary for accurate cost estimation and material planning for the comprehensive painting project scheduled for completion by August 1, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHWHWHWH
FLOOR PLAN
COPYRIGHT 2014, BLAZER INDUSTRIES, INC.
THIS MATERIAL IS THE EXCLUSIVE PROPERTY
OF BLAZER INDUSTRIES, INC. AND SHALL
NOT BE REPRODUCED, USED, OR DISCLOSED
TO OTHERS EXCEPT AS AUTHORIZED BY THE
WRITTEN PERMISSION OF BLAZER INDUSTRIES.
DATE REVISION BY
Drawn By:
Job No:
File Copy:
Approved for Const:
Issue Date:
INDUSTRIES, INC.
P.O. BOX 489 Aumsville, OR 97325-0489 www.blazerind.com
18048
AJB
3-27-14
Highland Hills Elementary Pacific Mobile 14 BLMP-12 Hermiston, OR
MODULAR
28 x 64
OR. GOLD
2-25-14 ENGINEERING AJB
3-3-14 CUSTOMER CHANGES AJB
EXPIRES: 6/30/2014
E
N
G
I N
E
E
R
J U L Y 15 , 1 9 9 7
AIR BARRIER NOTES:
432014
ENDWALL FASTENING:
WALL "A" ELEVATION
WALL "C" ELEVATION
WALL '2' ELEVATIONWALL '1' ELEVATION
COPYRIGHT 2014, BLAZER INDUSTRIES, INC.
THIS MATERIAL IS THE EXCLUSIVE PROPERTY
OF BLAZER INDUSTRIES, INC. AND SHALL
NOT BE REPRODUCED, USED, OR DISCLOSED
TO OTHERS EXCEPT AS AUTHORIZED BY THE
WRITTEN PERMISSION OF BLAZER INDUSTRIES.
DATE REVISION BY
Drawn By:
Job No:
File Copy:
Approved for Const:
Issue Date:
INDUSTRIES, INC.
P.O. BOX 489 Aumsville, OR 97325-0489 www.blazerind.com
18048
AJB
3-27-14
Highland Hills Elementary Pacific Mobile 14 BLMP-12 Hermiston, OR
MODULAR
28 x 64
OR. GOLD
2-25-14
ENGINEERING
AJB
3-3-14 CUSTOMER CHANGES AJB
EXPIRES: 6/30/2014
E
N
G
I N
E
E
R
J U L Y 15 , 1 9 9 7
432014
File details come from the government source that posted it. Updated .