Heartland Lower Cedar 25-26 Batch and Build Project - Construction Plans Summary

This document comprises detailed construction plans prepared by I & S Group, Inc. for the Iowa Department of Agriculture & Land Stewardship's Division of Soil Conservation and Water Quality for the Heartland Lower Cedar 25-26 Batch and Build Project in Cedar and Muscatine County, Iowa. The project involves construction of three denitrifying bioreactors and seventeen saturated buffer structures across eight sites (Sites 22, 24, 25, 26, 28, 31, 32, and 34), incorporating water control structures, drainage tile systems, geotextile fabric, woodchips, perforated and non-perforated HDPE piping, and riprap. Specific work includes excavation, earthwork, topsoil management, tile installation, water control structure placement, anti-seep collar installation, animal guards, buffer seeding, and site restoration. The construction schedule is strict, with Site 32 requiring commencement on June 16, 2026, as it will be showcased as a conservation practice demonstration. A pre-bid conference is scheduled for April 23, 2026, at 10:00 AM CDT at Belle Plaine Community Library, though attendance is encouraged but not mandatory. Written questions must be submitted by 3:00 PM CDT on April 30, 2026, and sealed bids are due by 3:00 PM CDT on May 6, 2026, with public bid opening via teleconference at the same time.

The estimated project cost ranges from $210,000 to $240,000. Bidders must submit a bid bond equal to ten percent of the bid amount and, upon selection, provide a Performance/Payment Bond equal to one hundred percent of the contract price. All contractors must be registered with the Iowa Division of Labor and the Iowa Department of Inspections, Appeals, and Licensing, with non-Iowa corporations required to provide proof of authorization to do business in Iowa prior to contract execution. The construction plans reference compliance with the 2024 Natural Resources Conservation Service (NRCS) Conservation Practice 604 (Saturated Buffer) standards for Muscatine County projects and Conservation Practice 605 (Denitrifying Bioreactor) standards for Cedar County projects. Technical questions should be directed to Spencer Pech, P.E., at spencer.pech@isginc.com, with copies to Emalyn Polz at emalyn.polz@iowaagriculture.gov or (515) 322-9073. The procurement documents contain no identified set-asides or restrictions limiting responses to particular categories of organizations, nor do they identify incumbent vendors or current contractors.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

32609-TITLE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

TI

TL

E-

SI

TE

.D W

G

SA

VE

D B

Y:

E

R

IN

.D W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SITE 22

MUSCATINE COUNTY, IOWA

HEARTLAND CO-OP BATCH AND BUILD

ISG PROJECT # 25-32609

PROJECT LOCATION

B.M. ELEVATION=684.16

BM2:

NORTHING:

EASTING:

LOCATION MAP

N

S

W E

12/23/2025

25-32609

A.01 TITLE

---- ---- A.01

A.01

CONSTRUCTION PLANS

MUSCATINE COUNTY IOWA

TITLE

EMD

EMD

SDP

PROJECT INDEX:

OWNER:

WATERSHED COORDINATOR:

HEARTLAND CO-OP

PROJECT

ADDRESS / LOCATION:

, T78N, R4W

WAPSINONOC TWP

MUSCATINE COUNTY, IOWA 52776

578827.1757 2235968.3550

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

TOPOGRAPHIC SURVEY

THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS

OF DATA COLLECTED IN MARCH 2025 BY

HEARTLAND CO-OP.

PROJECT GENERAL NOTES

GIS DISCLAIMER:

INFORMATION FOR THE BOUNDARY / LOT LINES, AND UNDERGROUND UTILITIES SHOWN WAS DERIVED FROM DIGITAL DATABASES AND IS FOR INFORMATIONAL PURPOSES ONLY. DATA MAY NOT HAVE BEEN

PREPARED FOR, OR BE SUITABLE FOR: LEGAL, ENGINEERING, OR SURVEYING PURPOSES.

PROJECT DATUM

HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE

NORTH AMERICAN DATUM OF 1983 (NAD83), SOUTH ZONE, ON THE

IOWA STATE PLANE COORDINATE SYSTEM, IN U.S. SURVEY FEET.

ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH AMERICAN

VERTICAL DATUM OF 1988 (NAVD 88).

RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND

VERTICAL COORDINATES FOR THIS PROJECT.

1. ALL WORK SHALL CONFORM TO THE CONTRACT

DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO,

THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT

MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY

CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL

DISCIPLINES AND ALL ADDENDA, MODIFICATIONS, AND

CLARIFICATIONS ISSUED BY ARCHITECT/ENGINEER.

2. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL

SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN

COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT

AND COMPLETE COORDINATION OF ALL WORK.

3. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED

DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY

DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION

OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.

4. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR

CONDITIONS REQUIRING INFORMATION OR CLARIFICATION

BEFORE PROCEEDING WITH THE WORK.

5. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE

PROFILES AND TYPE OF DETAILING REQUIRED

THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE

SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE

SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT

CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER

BEFORE PROCEEDING WITH THE WORK.

6. ALL MANUFACTURED ARTICLES, MATERIALS, AND

EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED,

ERECTED, CLEANED, AND CONDITIONED ACCORDING TO

MANUFACTURERS' INSTRUCTIONS. IN CASE OF

DISCREPANCIES BETWEEN MANUFACTURERS'

INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY

ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE

WORK.

7. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED

FROM EACH OTHER TO AVOID GALVANIC CORROSION.

8. THE LOCATION AND TYPE OF ALL EXISTING UTILITIES

SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION

ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST

OF THE KNOWLEDGE OF I & S GROUP, INC. (ISG). NO

WARRANTY OR GUARANTEE IS IMPLIED. THE

CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS, AND

ELEVATIONS OF ALL EXISTING UTILITIES PRIOR TO

CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY

NOTIFY ENGINEER OF ANY DISCREPANCIES OR

VARIATIONS FROM PLAN.

9. THE CONTRACTOR IS TO CONTACT "IOWA ONE CALL" FOR

UTILITY LOCATIONS A MINIMUM OF 2 BUSINESS DAYS

PRIOR TO ANY EXCAVATION / CONSTRUCTION

(1-800-292-8989).

PROJECT MANAGER: OWEN OELTJENBRUNS

EMAIL: OWEN.OELTJENBRUNS@ISGINC.COM

217 EAST 2nd STREET

SUITE 110

DES MOINES, IA 50309

PHONE: 515.243.9143

DES MOINES OFFICE

MANAGING OFFICE:

I & S GROUP, INC. (ISG)

Printed or typed name

(signature) (date)

License number

SEAL

WIO A

LI

C E

NS

ED

PROFESS IONAL ENGI NEER

I hereby certify that this engineering document was prepared by me or under direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

My license renewal date is December 31, Pages or sheets covered by this seal:

SPENCER

DEAN PECH

P28161

SPENCER DEAN PECH

P28161

ALL SHEETS

ENGINEER OF RECORD: SPENCER PECH

EMAIL: SPENCER.PECH@ISGINC.COM

SPECIFICATIONS REFERENCE

ALL CONSTRUCTION SHALL COMPLY WITH THE COUNTY OF

MUSCATINE COUNTY REQUIREMENTS AND WITH THE 2024

EDITION OF THE NATURAL RESOURCES CONSERVATION

SERVICE CONSERVATION PRACTICE 604 (SATURATED BUFFER),

UNLESS DIRECTED OTHERWISE.

HTTPS://EFOTG.SC.EGOV.USDA.GOV/API/CPSFILE/34855/604_IA_CPS

_SATURATED_BUFFER_2024

SCALE IN FEET

2000 4000

NO BENCHMARK DESCRIPTION PROVIDED IN

SURVEY DATA

12/23/2025

SHEET INDEX

Sheet Number Sheet Title

A.01 TITLE

A.02 SITE OVERVIEW

B.01 DETAILS

B.02 DETAILS

C.01 ESTIMATE REFERENCE, QUANTITIES & CONSTRUCTION NOTES

D.01 SB. M.1.3.7 PLAN & PROFILE

D.02 SB. M.1.3.7 PLAN & PROFILE

D.03 SB. M.1.3.7 PLAN & PROFILE

D.04 SB M.1.3.7 PLAN & PROFILE

D.05 SB. M.1.3.7 PLAN & PROFILE

D.06 SB. M.2 PLAN & PROFILE

D.07 SB. M.2 PLAN & PROFILE

D.08 SB M.2 PLAN & PROFILE

D.09 SB. M.4 PLAN & PROFILE

D.10 BUFFER EXTENSION

E.01 EXISTING TILE PROFILES

https://isgrp.sharepoint.com/:b:/r/sites/Watercooler/Firm/2024%20Legal%20Name%20By%20State%20Handout.pdf?csf=1&web=1&e=W3JLIo

32609-TITLE-SITE22

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

TI

TL

E-

SI

TE

.D

D B

Y:

E

R

IN

.D W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- A.02

A.02 SITE OVERVIEW

25-32609

12/23/2025

A.02

IOWAMUSCATINE COUNTY

SDP

EMD

EMD

SITE OVERVIEW

I HAVE REVIEWED AND AGREE WITH THE CONTENTS OF THE

PLAN AND SPECIFICATIONS AS PREPARED.

LANDOWNER SIGNATURE DATE

CONTRACTOR IS RESPONSIBLE FOR CALLING IOWA ONE CALL

ONE CALL TICKET NO.

IF A CULTURAL RESOURCE IS IDENTIFIED DURING

CONSTRUCTION, WORK WILL STOP IMMEDIATELY AND THE

LOCAL NRCS FIELD OFFICE WILL BE NOTIFIED.

I CERTIFY THAT THIS PRACTICE HAS BEEN CONSTRUCTED IN

ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.

CONTRACTORS SIGNATURE DATE

ENGINEER'S REP. SIGNATURE DATE

SITE ACCESS

SB M.1.3.7

DISPERSION LENGTH: 2147 LF

TREATED ACRES: 37

WCS (TYP)

EXISTING TILE (TYP)

-78-04

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

SB M.4

DISPERSION LENGTH: 414 LF

TREATED ACRES: 77.6

SB. M.2

DISPERSION LENGTH: 1029 LF

TREATED ACRES: 47

SCALE IN FEET

150 300

TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, JUDGEMENT,

BELIEF, THE PLANS MEET APPLICABLE NRCS STANDARDS.

ENGINEER'S SIGNATURE DATE

SURVEY BENCHMARKS*

DESCRIPTION NORTHING EASTING ELEVATION

BM1: 577068.5123 2237283.8660 676.37

BM2: 578827.1757 2235968.3550 684.16

*ENGINEER TO PROVIDE FINAL BENCHMARKS AND CONTROL POINTS FOR CONSTRUCTION

*NO BENCHMARK DESCRIPTION PROVIDED IN SURVEY DATA

M1

M2

M3

M4

M7

BENCHMARK: BM1

BENCHMARK: BM2

IA NRCS JOB CLASS II

M5

M6

12/23/2025

ACRES REMOVED FROM PRODUCTION: 4.55

32609-DETAILS-SITE22

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

D

ET

AI

LS

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- B.01

B.01 DETAILS

25-32609

12/23/2025

B.01

EMD

EMD

DETAILS

OPTION 1 WCS SPECIFIC:

1. FLASH BOARDS SHALL BE PVC.

2. ALL RIVETS SHALL BE STAINLESS STEEL.

3. FLASHBOARD CHANNEL SHALL BE ANODIZED ALUMINUM.

4. FLASHBOARDS WILL REMAIN IN STRUCTURE DURING INSTALLATION.

5. FLASHBOARDS SHALL BE LUBRICATED UPON REMOVAL.

OPTION 2 WCS SPECIFIC:

1. RISER PIPE TO BE CUT FROM BOTTOM. PIPE HANDLE (BOLT) TO REMAIN WITH RISER.

WCS GENERAL NOTES:

1. TOOL TO REMOVE FLASHBOARDS/ACTUATE VALVE IS TO REMAIN IN WCS

FOLLOWING INSTALLATION.

2. FOR INLET ADAPTER, MAX SIZE IS TWO SIZES DOWN FROM STRUCTURE SIZE (I.E. 8"

ADAPTER ON 12" STRUCTURE.

3. CHECK TO ENSURE THE STRUCTURE IS LEVEL PRIOR TO BACKFILLING. PLACE THE

BACKFILL MATERIAL AROUND THE STRUCTURE IN 6" LIFTS AND COMPACT BACKFILL

BY HAND ONLY. DO NOT USE POWERED EQUIPMENT TO COMPACT THE BACKFILL.

4. WATER CONTROL STRUCTURES WILL HAVE A MINIMUM OF 20' NONPERFORATED

PIPE BETWEEN WATER CONTROL STRUCTURE AND DITCH.

5. ONE ANTISEEP COLLAR WILL BE INSTALLED ON THE 20' OF NONPERFORATED PIPE

BETWEEN THE WATER CONTROL STRUCTURE AND DITCH.

6. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION OF

WATERTIGHT TEE, INCLUDING MINIMUM ANGLE OF SEPARATION.

7. WATER TIGHT TEE, QUANTITY, AND INSTALLATION METHOD DEPENDENT ON WCS

MANUFACTURER.

8. FINAL CONFIGURATION OF WATER CONTROL STRUCTURES WILL BE DETERMINED BY

AVAILABILITY FROM THE MANUFACTURER.

9. COMPONENTS OF WATER CONTROL STRUCTURES MAY BE PRICED SEPARATELY

DEPENDING ON THE SUPPLIER.

NRCS NOTES*:

1. WATER CONTROL STRUCTURE (WCS) MATERIALS AND INSTALLATION SHALL BE IN

CONFORMANCE WITH IOWA NRCS PRACTICE STANDARD 604 (SATURATED BUFFER).

2. CONNECTING PIPE MATERIALS AND INSTALLATION SHALL BE IN CONFORMANCE

WITH CS IA-45; IA-46, TILE DRAINS FOR LAND DRAINAGE; IA-51, CORRUGATED METAL

PIPE CONDUITS; OR IA-52, STEEL PIPE CONDUITS.

3. WCS SHALL BE FABRICATED OF PVC WITH INTEGRAL UPSTREAM AND DOWNSTREAM

WATER-TIGHT COUPLING CONNECTIONS, CORROSION-RESISTANT STOP BOARDS,

ALUMINUM EXTRUSIONS AND STAINLESS STEEL FASTENERS AND APPURTENANCES.

ACCEPTABLE MODELS INCLUDE AGRI DRAIN, NYLOPLAST, OR APPROVED EQUAL.

4. WCS SHALL PROVIDE FLOW CAPACITY EQUAL TO OR GREATER THAN THAT OF

ADJACENT PIPE UNDER EXPECTED FLOW CONDITIONS.

5. STOP BOARDS SHALL PROVIDE A WATER-TIGHT SEAL UNDER 4 FT OF PRESSURE

HEAD (MIN.).

6. IN SITUATIONS WHERE WATER LEVELS HIGHER THAN MAXIMUM DESIGN ELEVATION

WOULD IMPACT NEIGHBORING PROPERTIES OR OTHER ASPECTS OF THE SITE

DESIGN, CONSIDER A CUSTOM-ORDER BOX WHICH LIMITS EXTENT OF STOP BOARD

TRACKS TO THE MAXIMUM DESIGN WEIR ELEVATION.

7. STOP BOARD REMOVAL TOOL SHALL BE PROVIDED.

8. AS AN ALTERNATIVE TO A STOP BOARD STRAIGHT WEIR STRUCTURE, A CIRCULAR

INNER STANDPIPE MAY BE PROVIDED WHICH MEETS THE DESIGN FLOW

REQUIREMENTS, WITH APPROVAL OF THE ENGINEER (NYLOPLAST STANDPIPE WCS

OR EQUAL).

9. ALL CONNECTIONS SHALL BE WATER-TIGHT.

10. STRUCTURE LID SHALL BE PROVIDED WITH LOCKING MECHANISM.

11. BACKFILL AROUND THE WCS SHALL MEET THE REQUIREMENTS OF CS IA-45. NORMAL

STOP BOARD OPERATION SHALL BE VERIFIED FOLLOWING BACKFILL.

12. MARK LOCATION OF EACH STRUCTURE USING POST OR MANUFACTURED MARKER

FLAG FOR SAFETY IN THE FIELD

3" GATE VALVE

OUTLET FITTING

RISER PIPE TO CONTROL

WATER LEVEL CUT WITH

BOTTOM AS WASTE

DRAIN BASIN

BLIND TEE

PVC LID WITH ROPE

HANDLE(S) LOCKING ROD

WATER FLOW WATER FLOW

DRAIN BASIN

STRUCTURE PIPE TO CONTROL

WATER LEVEL

3" GATE VALVE

WATER FLOWWATER FLOW

WATER TIGHT TEE BELOW WEIR

FIELD INSTALLATION (TYP.)

WATER TIGHT TEE BELOW WEIR

FIELD INSTALLATION (TYP.)

BED WITH 6" OF 1.5" AGGREGATE

FLOW FLOW

WATER TIGHT FITTING

FOR UPSTREAM

CONNECTING PIPE

BED WITH 6" OF 1.5" AGGREGATE

1' TYP

LID TO BE FURNISHED WITH STRUCTURE

WATER TIGHT FITTING FOR

DISPERSION LINE WATER TIGHT FITTING

FOR DOWNSTREAM

CONNECTING PIPE

ALL FLASH BOARDS SHALL BE FITTED

WITH LIFTING HOOKS AND EDPM SEAL

(NOT SHOWN)

EXTRA FLASH BOARDS TO BE

PULLED ABOVE SET WEIR ELEVATION

FOR STORAGE

FLASH BOARD GUIDE CHANNEL

OPTION 1

WATER CONTROL STRUCTURE DETAIL

NTS

OPTION 2

WATER CONTROL STRUCTURE DETAIL

NTS

EXISTING GROUND, TYP

BELL ADAPTOR CONNECTS WATER

CONTROL STRUCTURE TO

DISPERSION LINE

SECURING CLAMP

RUBBER SLEEVE

GAP ACCOMMODATES

WALL OF

WATER CONTROL

STRUCTURE

WATER TIGHT LATERAL TEE FITTING

NTS

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

*FROM USDA-NRCS IA-1530 STANDARD DRAWING

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

D

ET

AI

LS

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- B.02

B.02 DETAILS

25-32609

12/23/2025

B.02

EMD

EMD

DETAILS

FL

OW

FLOW

WATER TIGHT

COUPLER

WATER TIGHT

COUPLER

WATER TIGHT

COUPLERFL

OW

FLOW

PREFABRICATED TEE

INCIDENTAL TO WCS

INSTALLATION

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

3-CHAMBER WATER CONTROL STRUCTURE

ALTERNATE CONFIGURATION

NTS

2-CHAMBER WATER CONTROL STRUCTURE

ALTERNATE CONFIGURATION

NTS

FL

OW

WATER TIGHT

COUPLER

WATER TIGHT

COUPLERFL

OW

FLOW

PREFABRICATED TEE

INCIDENTAL TO WCS

INSTALLATION

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

TILE OUTLET

NTS

2' (± 1')

4' (± 2')

CMP

EXISTING DRAIN TILE

2' MAX

EX. GROUND (TYP)

PLACE CMP OVER TILE A MINIMUM OF 6".

ENCASE JOINT IN 4" x 12" CONCRETE COLLAR.

THIS IS INCIDENTAL TO CMP PIPE WORK

DESIGN BOTTOM ELEVATION

EXTEND TILE TO CMP AS NEEDED WITH TILE MATERIAL APPROVED BY ENGINEER

CE

NT

ER

LIN

E

OP

EN

D

ITC

HWHERE APPLICABLE PLACE ENGINEER APPROVED

PIPE MATERIAL OVER TILE. ENCASE JOINT IN 4" x 12"

CONCRETE COLLAR

6" MIN INSTALL ANIMAL GUARD.

THIS IS INCIDENTAL TO TILE

OUTLET INSTALLATION

WATER CONTROL STRUCTURE

ANTI-SEEP COLLAR

NEW CMP DIAMETER

SHALL BE SMALLEST STANDARD SIZE THAT WILL FIT OVER TILE

WCS 1

6'x6" 3-CHAMBER

NTS

WCS 2

6'x6" 3-CHAMBER

NTS

FL

OW6 INCH WATER

TIGHT COUPLER

6 INCH WATER

TIGHT COUPLER

6 INCH WATER

TIGHT COUPLERFL

OW

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

FLOW

6 INCH WATER

TIGHT COUPLER

FLOW

WCS 4

6'x8" 2-CHAMBER

NTS

FL

OW8 INCH WATER

TIGHT COUPLER

8 INCH WATER

TIGHT COUPLERFL

OW

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

6 INCH WATER

TIGHT COUPLER

FLOW

FLOW FLOW

ANIMAL GUARD DETAIL

NTS

WCS 7

6'x6" 2-CHAMBER

NTS

WCS 3

6'x6" 3-CHAMBER

NTS

FL

OW6 INCH WATER

TIGHT COUPLER

6 INCH WATER

TIGHT COUPLERFL

OW

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

FLOW

6 INCH WATER

TIGHT COUPLER

6 INCH WATER

TIGHT COUPLER

FLOW

TO WCS DM7

FL

OW6 INCH WATER

TIGHT COUPLER

6 INCH WATER

TIGHT COUPLER

6 INCH WATER

TIGHT COUPLERFL

OW

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

FLOW

TO WCS DM3

6 INCH WATER

TIGHT COUPLER

FLOW

TO WCS DM1

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

FL

OW6 INCH WATER

TIGHT COUPLER

6 INCH WATER

TIGHT COUPLERFL

OW

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

FLOW

6 INCH WATER

TIGHT COUPLER

TO WCS DM3

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

D

ET

AI

LS

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- C.01

C.01 ESTIMATE REFERENCE, QUANTITIES & CONSTRUCTION NOTES

25-32609

12/23/2025

C.01

EMD

EMD

ESTIMATE

REFERENCE,

QUANTITIES &

CONSTRUCTION

NOTES

EARTHWORK:

1.) UTILITIES. CONTRACTOR MUST CALL IOWA ONE CALL (1-800-292-8989) AT LEAST 48 HOURS (EXCLUDING WEEKENDS AND HOLIDAYS) PRIOR TO EXCAVATION BEING STARTED. CONTRACTOR IS TO IMMEDIATELY NOTIFY OWNER OF APPARENT CONFLICTS OF EXISTING UTILITIES WITH THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ANY UTILITIES ENCOUNTERED ON THE JOB SITE.

2.) TOPSOIL. FOR ALL OPEN TRENCH AND STRUCTURE EXCAVATIONS, CONTRACTOR IS REQUIRED TO STRIP AND SEGREGATE THE TOP TWELVE (12) INCHES OF TOPSOIL FROM SUBSOIL BY PLACING TOPSOIL ON ONE SIDE OF THE TRENCH AND REMAINING SPOIL ON OPPOSITE SIDE. STOCK PILES ARE TO BE PLACED SO AS NOT TO BLOCK FLOWS IN DRAINAGE WAYS. USE TOPSOIL FOR THE TOP ONE (1) FOOT OF BACKFILL FOR TRENCHES AND STRUCTURES. CONTRACTOR IS REQUIRED TO DESCRIBE TO THE ENGINEER HOW TOPSOIL WILL BE MANAGED AT THE PRE-CONSTRUCTION

CONFERENCE.

3.) SPOILS. UNLESS OTHERWISE NOTED, EXCAVATED SPOILS NOT USED FOR BACKFILL SHALL BE SPREAD EVENLY IN CONSTRUCTION AREA AS TO

NOT IMPEDE DRAINAGE. ALL EFFORTS SHALL BE MADE TO KEEP TOPSOIL ON TOP.

4.) CROP PROTECTION. CONTRACTOR IS DIRECTED TO LIMIT DAMAGES TO CROPS IN THE ACCESS AND WORK AREAS AS CAN BE ACCOMPLISHED

WITHOUT MATERIALLY SLOWING THE WORK PROGRESS.

TILE INSTALLATION:

1.) WORK LIMITS. CONSTRUCTION SHALL BE LIMITED TO THE TOP OF BANK OR 50' EACH SIDE OF THE DISTRIBUTION LINE. THE SWATH SHALL NOT DISTURB ANY NON-AGRICULTURAL PRIVATE PROPERTY. DISTURBANCE MUST BE RESEEDED WHERE NECESSARY.

2.) ACCESS. ACCESS TO SITE SHALL BE COORDINATED WITH LANDOWNER PRIOR TO MOBILIZATION.

3.) TILE INVESTIGATION. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING TILE LOCATION AND ELEVATION PRIOR TO

CONSTRUCTION AND SHALL NOTIFY ENGINEER (ISG) OF ANY DISCREPANCIES.

4.) FIELD TILE CONNECTIONS. CONNECTIONS TO EXISTING TILES SHALL BE MADE AND ENCASED IN A PORTLAND CEMENT CONCRETE COLLAR AT

LEAST 12" WIDE AND 4" THICK AND CONTINUOUS AROUND THE JOINTS.

5.) PIPE/TILE WORK. UNLESS SPECIFICALLY NOTED, ALL PROPOSED TILE IS REQUIRED TO BE 6" HDPE PERFORATED SINGLE WALL. REFER TO SPECIFICATIONS FOR PROPER INSTALLATION REQUIREMENTS. IF OTHER TILE LINES ARE FOUND TO BE CROSSING THE PROPOSED DISTRIBUTION LINE, A MINIMUM 20' OF NON-PERFORATED SINGLE WALL HDPE WITH FITTINGS SHALL BE PLACED WITH THE CENTER OF THE 20' SECTION OVER THE CROSSING TILE. IF TILE IS INSTALLED WITH AN OPEN TRENCH, THE TRENCH IS TO HAVE A CONCAVE-SHAPE BOTTOM.

6.) SAFETY. CONTRACTOR IS COMPLETELY RESPONSIBLE FOR SAFETY ON THE WORK SITE, INCLUDING THE BRACING OF, SHORING OF, SHAPING OF, AND/OR USE OF A TRENCH BOX IN THE EXCAVATIONS. THIS INCLUDES KNOWLEDGE AND COMPLIANCE WITH ALL RULES AND REGULATIONS INTENDED TO PROTECT THE HEALTH AND SAFETY OF THE CONTRACTORS, ENGINEERS, AND OWNER'S PERSONNEL. ALL TRENCHING SHALL BE

DONE ACCORDING TO O.S.H.A. STANDARDS FOR PROTECTION OF LIFE.

7.) WORKMANSHIP. CONTRACTOR SHALL PERFORM WORK IN A CRAFTSMAN LIKE MANNER AND LEAVE THE SITE IN PRESENTABLE CONDITION.

8.) TILE CONNECTIONS. ALL TILE CONNECTIONS ARE INCIDENTAL TO PIPE INSTALLATION UNLESS OTHERWISE NOTED ON THE PLANS.

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

SB.DM.1.3.7 (1)

0+00

9.

4.

0+25

9.

4.

0+50

9.

4.

0+75

9.

4.

1+00

9.

4.

1+25

9.

4.

1+50

9.

4.

1+75

9.

4.

2+00

9.

4.

2+25

9.

4.

2+50

9.

4.

2+75

9.

4.

3+00

8.

4.

3+25

8.

4.

3+50

8.

4.

3+75

8.

4.

4+00

8.

3.

4+25

8.

3.

4+50

8.

3.

4+75

8.

3.

674.37 0+00

INSTALL 6" TILE END CAP, WATER TIGHT

6" PERFORATED HDPE TILE

573 LF @ 0.10%

STA: 0+00 TO 5+73

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

PROPOSED FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - PROPOSED FLOWLINE

SET WEIR ELEVATION (TYP)

32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SCALE IN FEET

20 40

---- ---- D.01

D.01 SB.DM.1.3.7 PLAN & PROFILE

25-32609

12/23/2025

D.01

EMD

EMD

SB. .1.3.7 PLAN &

PROFILE

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

TOP OF BANK (TYP)

BUFFER EXTENTS (TYP)

SB. M.2

SEE SHEETS

D.06-D.08

SB. M.1.3.7

SB.DM.1.3.7 (2)

5+25

7.

3.

5+50

8.

3.

5+75

8.

3.

6+00

8.

3.

6+25

8.

3.

6+50

8.

3.

6+75

8.

3.

7+00

8.

3.

7+25

8.

3.

7+50

7.

3.

7+75

7.

3.

8+00

7.

3.

8+25

7.

3.

8+50

7.

3.

8+75

7.

3.

9+00

7.

3.

9+25

7.

3.

9+50

7.

3.

9+75

7.

3.

10+00

7.

3.

WCS M1

6' WATER CONTROL STRUCTURE

GROUND ELEVATION: 678.11'

WEIR 1 CREST ELEVATION: 676.60'

WEIR 2 CREST ELEVATION: 675.00'

DISPERSION LINE INVERT: 673.80'

ESTIMATED TILE FL ELEVATION: 673.80'

6" PERFORATED HDPE TILE

573 LF @ 0.10%

STA: 0+00 TO 5+73

6" PERFORATED HDPE TILE

1,017 LF @ 0.17%

STA: 5+73 TO 15+91

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

PROPOSED FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - PROPOSED FLOWLINE

SET WEIR ELEVATION (TYP)

SURFACE ELEVATION ESTIMATED

THROUGH THIS AREA, FIELD VERIFY 32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SCALE IN FEET

20 40

---- ---- D.02

D.02 SB.DM.1.3.7 PLAN & PROFILE

25-32609

12/23/2025

D.02

EMD

EMD

SB. .1.3.7 PLAN &

PROFILE

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

SOIL BORING LOCATION (TYP)

TOP OF BANK (TYP)

BUFFER EXTENTS (TYP)WCS M1

MARK WITH FIBERGLASS FLAG

REPLACE 20 LF OF EXISTING 6" PIPE WITH 6" NON-PERFORATED

HDPE @ EXISTING GRADE

M1

6" CPT

GULLY/ ROCK PILE

M2

6" CPT

37 LF OF 6" NON-PERFORATED HDPE

WITH ANTI-SEEP DEVICE @ EXISTING GRADE

REPLACE 20 LF OF EXISTING 6" PIPE WITH 8" CMP

AND ANIMAL GUARD @ EXISTING GRADE

REFER TO DETAIL

SB. M.2

SEE SHEETS D.06-D.08

SB M.1.3.7

11 12

SB.DM.1.3.7 (3)

10+50

7.

3.

10+75

7.

2.

11+00

7.

2.

11+25

7.

2.

11+50

7.

2.

11+75

7.

2.

12+00

7.

2.

12+25

7.

2.

12+50

7.

2.

12+75

7.

2.

13+00

6.

2.

13+25

6.

2.

13+50

6.

2.

13+75

6.

2.

14+00

6.

2.

14+25

6.

2.

14+50

6.

2.

14+75

6.

2.

15+00

6.

2.

15+25

6.

2.

6" PERFORATED HDPE TILE

1,017 LF @ 0.17%

STA: 5+73 TO 15+91

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

PROPOSED FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - PROPOSED FLOWLINE

SET WEIR ELEVATION (TYP)

32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SCALE IN FEET

20 40

---- ---- D.03

D.03 SB.DM.1.3.7 PLAN & PROFILE

25-32609

12/23/2025

D.03

EMD

EMD

SB. .1.3.7 PLAN &

PROFILE

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.GULLY

SOIL BORING LOCATION (TYP)

BUFFER EXTENTS (TYP)

TOP OF BANK (TYP)

M3

6" CPT

SB. M.1.3.7

SB. M.2

SEE SHEETS D.06-D.08

BUFFER SEEDING ONLY

SB M.4

SEE SHEET D.09

16 17 18 19

' 65

SB.DM.1.3.7 (4)

15+75

6.

2.

16+00

5.

2.

16+25

5.

2.

16+50

5.

2.

16+75

5.

1.

17+00

5.

1.

17+25

6.

1.

17+50

6.

1.

17+75

5.

1.

18+00

5.

1.

18+25

6.

1.

18+50

6.

1.

18+75

5.

1.

19+00

5.

1.

19+25

5.

1.

19+50

5.

1.

19+75

5.

1.

20+00

5.

1.

20+25

5.

1.

20+50

5.

1.

WCS M3

6' WATER CONTROL STRUCTURE

GROUND ELEVATION: 675.21'

WEIR 1 CREST ELEVATION: 675.00'

WEIR 2 CREST ELEVATION: 673.60'

DISPERSION LINE INVERT: 672.00'

ESTIMATED TILE FL ELEVATION: 672.00'

6" PERFORATED HDPE TILE

1,017 LF @ 0.17%

STA: 5+73 TO 15+91

6" NON-PERFORATED HDPE TILE

60 LF @ 0.19%

STA: 15+91 TO 16+50

6" PERFORATED HDPE TILE

497 LF @ 0.20%

STA: 16+50 TO 21+47

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

PROPOSED FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - PROPOSED FLOWLINE

SET WEIR ELEVATION (TYP)

32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SCALE IN FEET

20 40

---- ---- D.04

D.04 SB.DM.1.3.7 PLAN & PROFILE

25-32609

12/23/2025

D.04

EMD

EMD

SB. .1.3.7 PLAN &

PROFILE

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

SOIL BORING LOCATION (TYP)

M4

8" CPT

WATER WAY (TYP)

M5

6" CMP

M6

6" CMP

TOP OF BANK (TYP)

BUFFER EXTENTS (TYP)

M3

6" CPT WCS M3

MARK WITH FIBERGLASS FLAG

REPLACE 20 LF OF EXISTING 6" PIPE WITH 6"

NON-PERFORATED HDPE @ EXISTING GRADE

70 LF OF 6" NON-PERFORATED HDPE

WITH ANTI-SEEP DEVICE @ EXISTING GRADE

REPLACE 20 LF OF EXISTING 6" PIPE WITH 8" CMP

AND ANIMAL GUARD @ EXISTING GRADE

REFER TO DETAIL

SB M.1.3.7

SB M.4

SEE SHEET D.09

20 21

21 >>

SB.DM.1.3.7 (5)

20+50

5.

1.

20+75

5.

1.

21+00

5.

1.

21+25

5.

1.

21+50 21+75

WCS M7

6' WATER CONTROL STRUCTURE

GROUND ELEVATION: 675.61'

WEIR 1 CREST ELEVATION: 673.60'

DISPERSION LINE INVERT: 671.00'

ESTIMATED TILE FL ELEVATION: 671.00'

6" PERFORATED HDPE TILE

497 LF @ 0.20%

STA: 16+50 TO 21+47

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

PROPOSED FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - PROPOSED FLOWLINE

SET WEIR ELEVATION (TYP)

32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SCALE IN FEET

20 40

---- ---- D.05

D.05 SB.DM.1.3.7 PLAN & PROFILE

25-32609

12/23/2025

D.05

EMD

EMD

SB. .1.3.7 PLAN &

PROFILE

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

TOP OF BANK (TYP)

BUFFER EXTENTS (TYP)

SOIL BORING LOCATION (TYP)

M6

6" CMP

WCS M7

MARK WITH FIBER GLASS FLAG

REPLACE 20 LF OF EXISTING 4" PIPE WITH 6"

NON-PERFORATED HDPE @ EXISTING GRADE

47 LF OF 6" NON-PERFORATEED HDPE WITH

ANTI-SEEP DEVICE @ EXISTING GRADE

REPLACE 20 LF OF EXISTING 4" PIPE WITH 8" CMP

AND ANIMAL GUARD @ EXISTING GRADE

REFER TO DETAIL

SB M.1.3.7

M7

4" CPT

1 2

38'

0+00

9.

5.

0+25

9.

5.

0+50

9.

4.

0+75

9.

4.

1+00

9.

4.

1+25

9.

4.

1+50

9.

4.

1+75

9.

4.

2+00

9.

4.

2+25

9.

4.

2+50

9.

4.

2+75

8.

4.

3+00

9.

4.

3+25

9.

4.

3+50

9.

4.

3+75

9.

4.

4+00

8.

4.

4+25

8.

4.

4+50

8.

4.

4+75

8.

4.

WCS M2

6' WATER CONTROL STRUCTURE

GROUND ELEVATION: 678.83'

WEIR 1 CREST ELEVATION: 677.50'

WEIR 2 CREST ELEVATION: 676.00'

DISPERSION LINE INVERT: 674.04'

ESTIMATED TILE FL ELEVATION: 674.04'

6" PERFORATED HDPE TILE

581 LF @ 0.07%

STA: 4+49 TO 10+29

6" PERFORATED HDPE TILE

154 LF @ 0.23%

STA: 2+95 TO 4+49

6" PERFORATED HDPE TILE

250 LF @ 0.23%

STA: 0+00 TO 2+50 6" NON-PERFORATED HDPE TILE

44 LF @ 0.23%

STA: 2+50 TO 2+95

675.05 0+00

INSTALL 6"

TILE END CAP,

WATER TIGHT

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

PROPOSED FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - PROPOSED FLOWLINE

SET WEIR ELEVATION (TYP)

SURFACE ELEVATION

ESTIMATED THROUGH

THIS AREA, FIELD VERIFY

32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SCALE IN FEET

20 40

---- ---- D.06

D.06 SB.DM.2 PLAN & PROFILE

25-32609

12/23/2025

D.06

EMD

EMD

SB. .2 PLAN &

PROFILE

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

SOIL BORING LOCATION (TYP)

BUFFER EXTENTS (TYP)

M1

6" CPT

TOP OF BANK (TYP)

M2

6" CPT

WCS M2

MARK WITH FIBER GLASS FLAG

REPLACE 20 LF OF EXISTING 6" PIPE WITH

6" NON-PERFORATED HDPE @ EXISTING GRADE

REPLACE 20 LF OF EXISTING 6" PIPE WITH 8" CMP

AND ANIMAL GUARD @ EXISTING GRADE

REFER TO DETAIL

32 LF OF 6" NON-PERFORATED HDPE

WITH ANTI-SEEP DEVICE @ EXISTING GRADE

SB. M.1.3.7

SEE SHEETS D.01-D.05

SB M.2 GULLY/ ROCK PILE

9 10

5+00

8.

4.

5+25

8.

4.

5+50

8.

4.

5+75

8.

4.

6+00

8.

4.

6+25

8.

4.

6+50

8.

4.

6+75

8.

4.

7+00

8.

4.

7+25

8.

4.

7+50

7.

4.

7+75

7.

4.

8+00

7.

4.

8+25

7.

4.

8+50

7.

4.

8+75

7.

4.

9+00

7.

4.

9+25

7.

4.

9+50

7.

4.

9+75

7.

4.

6" PERFORATED HDPE TILE

581 LF @ 0.07%

STA: 4+49 TO 10+29

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

PROPOSED FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - PROPOSED FLOWLINE

SET WEIR ELEVATION (TYP)

32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SCALE IN FEET

20 40

---- ---- D.07

D.07 SB.DM.2 PLAN & PROFILE

25-32609

12/23/2025

D.07

EMD

EMD

SB. .2 PLAN &

PROFILE

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

TOP OF BANK (TYP)

BUFFER EXTENTS (TYP)

SB. M.1.3.7

SEE SHEETS D.01-D.05

SB. M.2

9 10

9+25

7.

4.

9+50

7.

4.

9+75

7.

4.

10+00

7.

4.

10+25

7.

4.

10+50

6" PERFORATED HDPE TILE

581 LF @ 0.07%

STA: 4+49 TO 10+29

674.42 10+29

INSTALL 6"

TILE END CAP,

WATER TIGHT

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

PROPOSED FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - PROPOSED FLOWLINE

SET WEIR ELEVATION (TYP)

32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SCALE IN FEET

20 40

---- ---- D.08

D.08 SB.DM.2 PLAN & PROFILE

25-32609

12/23/2025

D.08

EMD

EMD

SB. .2 PLAN &

PROFILE

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

GULLY FLOWLINE (TYP)

SOIL BORING LOCATION (TYP)

TOP OF BANK (TYP)

BUFFER EXTENTS (TYP)

SB M.2

SB. M.1.3.7

SEE SHEETS D.01-D.05

SB. M.4

SEE SHEET D.09

M3

6" CPT

BUFFER SEEDING ONLY

>>0

1 2

4 4

0+00

7.

3.

0+25

7.

3.

0+50

7.

3.

0+75

7.

3.

1+00

7.

2.

1+25

7.

2.

1+50

7.

2.

1+75

7.

2.

2+00

7.

2.

2+25

7.

2.

2+50

6.

2.

2+75

6.

2.

3+00

6.

2.

3+25

6.

2.

3+50

6.

2.

3+75

6.

2.

4+00

6.

2.

4+25

6" PERFORATED HDPE TILE

414 LF @ 0.33%

STA: 0+00 TO 4+14

WCS M4

6' WATER CONTROL STRUCTURE

GROUND ELEVATION: 676.18'

WEIR 1 CREST ELEVATION: 675.00'

DISPERSION LINE INVERT: 671.95'

ESTIMATED TILE FL ELEVATION: 671.95'

673.31 0+00

INSTALL 6"

TILE END CAP,

WATER TIGHT

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

PROPOSED FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - PROPOSED FLOWLINE

SET WEIR ELEVATION (TYP)

32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SCALE IN FEET

20 40

---- ---- D.09

D.09 SB.DM.4 PLAN & PROFILE

25-32609

12/23/2025

D.09

EMD

EMD

SB. .4 PLAN &

PROFILE

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

BUFFER EXTENTS (TYP)

TOP OF BANK (TYP) SOIL BORING LOCATION (TYP)

M3

6" CPT

M4

8" CPT

WCS M4

MARK WITH FIBER GLASS FLAGREPLACE 20 LF OF EXISTING 8" PIPE

WITH 8" NON-PERFORATED HDPE @ EXISTING GRADE

40 LF OF 8" NON-PERFORATED HDPE WITH

ANTI-SEEP DEVICE @ EXISTING GRADE

REPLACE 20 LF OF EXISTING 8" PIPE

WITH 10" CMP AND ANIMAL GUARD

@ EXISTING GRADE

REFER TO DETAIL

WATER WAY (TYP)

M5

6" CMP

SB. M.4

SB M.1.3.7

SEE SHEETS D.01-D.05

BUFFER SEEDING

ONLY

EDGE OF FIELD (TYP)

32609-BUFFER PLAN-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

BU

FF

ER

P

LA

N

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- D.10

D.10 BUFFER EXTENSION

25-32609

12/23/2025

D.10

EMD

EMD

BUFFER

EXTENSION

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

SCALE IN FEET

100 200

SEEDING LEGEND

SYMBOL DESCRIPTION UNITS QUANTITY

BUFFER INITIATIVE SEEDING AC 4.82

*SEEDING AREA ESTIMATED BASED ON AERIALS

AVERAGE 30 FT WIDTH FROM TOP OF BANK

BUFFER EXTENTS (TYP)

WATERWAY (TYP)

TOP OF BANK (TYP)

BUFFER INITIATIVE SEEDING

1 TILE

0+00

4.

3.

0+25

9.

3.

0+50

8.

3.

0+75

7.

3.

1+00

7.

3.

1+25

7.

4.

1+50

8.

4.

1+75

8.

4.

2 TILE

0+00

4.

3.

0+25

6.

3.

0+50

8.

3.

0+75

9.

4.

1+00

9.

5.

1+25

9.

5.

1+50

9.

5.

1+75

9.

5.

2+00

9.

5.

3 TILE

0+00

1.

1.

0+25

4.

1.

0+50

6.

1.

0+75

5.

1.

1+00

5.

2.

1+25

5.

2.

1+50

5.

2.

1+75

6.

1.

2+00

6.

1.

4 TILE

0+00

1.

1.

0+25

6.

1.

0+50

6.

1.

0+75

6.

2.

1+00

6.

2.

1+25

6.

2.

1+50

6.

2.

1+75

6.

2.

2+00

6.

2.

5 TILE

0+00

0.

0.

0+25

3.

1.

0+50

5.

2.

0+75

5.

2.

1+00

5.

2.

1+25

5.

2.

1+50

5.

2.

1+75

5.

2.

6 TILE

0+00

1.

0.

0+25

6.

1.

0+50

6.

1.

0+75

6.

1.

1+00

6.

2.

1+25

6.

2.

1+50

7.

2.

1+75

7.

2.

7 TILE

0+00

0.

0.

0+25

5.

0.

0+50

5.

0.

0+75

5.

1.

PROFILE VIEW LEGEND

NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION

EXISTING GROUND

EXISTING FLOWLINE

.0

.00 CXXX.X - EXISTING GROUND L

XXX.XX - EXISTING FLOWLINE

EXISTING GROUND

EXISTING TILE FLOW LINE

EXISTING GROUND

EXISTING GROUND

EXISTING GROUND

EXISTING GROUND

EXISTING GROUND

EXISTING GROUND

EXISTING TILE FLOW LINE

EXISTING TILE FLOW LINE

EXISTING TILE FLOW LINE

EXISTING TILE FLOW LINE

EXISTING TILE FLOW LINE

EXISTING TILE FLOW LINE

32609-PROFILE-SITE22

DATE

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- M

IL

LA

G E

BR

O

S\

9-

PR

O

FI

LE

-S

IT

E2 2.

D W

G S

AV

ED

B Y:

E R

IN

.D

W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- E.01

E.01 EXISTING TILE PROFILES

25-32609

12/23/2025

E.01

EMD

EMD

EXISTING TILE

PROFILES

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

32609-TITLE-SITE24

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- P

C W

\3

-T

IT

LE

-S

IT

E2 4.

D

D B

Y:

E

R

IN

.D W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

SITE 24

MUSCATINE COUNTY, IOWA

HEARTLAND CO-OP BATCH AND BUILD

ISG PROJECT # 25-32609

PROJECT LOCATION

B.M. ELEVATION=651.49

TOPOGRAPHIC SURVEY

THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS

OF DATA COLLECTED IN MARCH 2025 BY

HEARTLAND CO-OP.

LOCATION MAP

PROJECT DATUM

HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE

NORTH AMERICAN DATUM OF 1983 (NAD83), SOUTH ZONE, ON THE

IOWA STATE PLANE COORDINATE SYSTEM, IN U.S. SURVEY FEET.

ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH

AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).

RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND

VERTICAL COORDINATES FOR THIS PROJECT.

SPECIFICATIONS REFERENCE

ALL CONSTRUCTION SHALL COMPLY WITH THE COUNTY OF

MUSCATINE COUNTY REQUIREMENTS AND WITH THE 2024

EDITION OF THE NATURAL RESOURCES CONSERVATION

SERVICE CONSERVATION PRACTICE 604 (SATURATED BUFFER),

UNLESS DIRECTED OTHERWISE.

HTTPS://EFOTG.SC.EGOV.USDA.GOV/API/CPSFILE/34855/604_IA_CPS_SATURATED_BUFFER_2024

N

S

W E

12/23/2025

25-32609

A.01 TITLE

---- ---- A.01

A.01

CONSTRUCTION PLANS

TITLE

EMD

EMD

SDP

PROJECT INDEX:

OWNER:

WATERSHED COORDINATOR:

HEARTLAND CO-OP

PROJECT

ADDRESS / LOCATION:

T78N, R4W

WAPSINONOC TWP

MUSCATINE COUNTY, IOWA 52776

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

PROJECT GENERAL NOTES

GIS DISCLAIMER:

INFORMATION FOR THE BOUNDARY / LOT LINES, AND UNDERGROUND UTILITIES SHOWN WAS DERIVED FROM DIGITAL DATABASES AND IS FOR INFORMATIONAL PURPOSES ONLY. DATA MAY NOT HAVE BEEN

PREPARED FOR, OR BE SUITABLE FOR: LEGAL, ENGINEERING, OR SURVEYING PURPOSES.

1. ALL WORK SHALL CONFORM TO THE CONTRACT

DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO,

THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT

MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY

CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL

DISCIPLINES AND ALL ADDENDA, MODIFICATIONS, AND

CLARIFICATIONS ISSUED BY ARCHITECT/ENGINEER.

2. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL

SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN

COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT

AND COMPLETE COORDINATION OF ALL WORK.

3. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED

DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY

DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION

OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.

4. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR

CONDITIONS REQUIRING INFORMATION OR CLARIFICATION

BEFORE PROCEEDING WITH THE WORK.

5. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE

PROFILES AND TYPE OF DETAILING REQUIRED

THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE

SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE

SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT

CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER

BEFORE PROCEEDING WITH THE WORK.

6. ALL MANUFACTURED ARTICLES, MATERIALS, AND

EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED,

ERECTED, CLEANED, AND CONDITIONED ACCORDING TO

MANUFACTURERS' INSTRUCTIONS. IN CASE OF

DISCREPANCIES BETWEEN MANUFACTURERS'

INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY

ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE

WORK.

7. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED

FROM EACH OTHER TO AVOID GALVANIC CORROSION.

8. THE LOCATION AND TYPE OF ALL EXISTING UTILITIES

SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION

ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST

OF THE KNOWLEDGE OF I & S GROUP, INC. (ISG). NO

WARRANTY OR GUARANTEE IS IMPLIED. THE

CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS, AND

ELEVATIONS OF ALL EXISTING UTILITIES PRIOR TO

CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY

NOTIFY ENGINEER OF ANY DISCREPANCIES OR

VARIATIONS FROM PLAN.

9. THE CONTRACTOR IS TO CONTACT "IOWA ONE CALL" FOR

UTILITY LOCATIONS A MINIMUM OF 2 BUSINESS DAYS

PRIOR TO ANY EXCAVATION / CONSTRUCTION

(1-800-292-8989).

217 EAST 2nd STREET

SUITE 110

DES MOINES, IA 50309

PHONE: 515.243.9143

DES MOINES OFFICE

MANAGING OFFICE:

I & S GROUP, INC. (ISG)

Printed or typed name

(signature) (date)

License number

SEAL

WIO A

I hereby certify that this engineering document was prepared by me or under direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

My license renewal date is December 31, Pages or sheets covered by this seal:

SPENCER

DEAN PECH

P28161

SPENCER DEAN PECH

P28161

SCALE IN FEET

5000 10000

SHEET INDEX

2022-

ENGINEER OF RECORD: SPENCER PECH

EMAIL: SPENCER.PECH@ISGINC.COM

PROJECT MANAGER: OWEN OELTJEN BRUNS

EMAIL: OWEN.OELTJENBRUNS@ISGINC.COM

12/23/25

ALL SHEETS

A.01 .TITLE

A.02 SITE OVERVIEW

B.01 DETAILS

B.02 DETAILS

C.01 ESTIMATE REFERENCE, QUANTITIES & CONSTRUCTION NOTES

D.01 SB. .1.2 PLAN & PROFILE

D.02 SB. .1.2 PLAN & PROFILE

D.03 BUFFER EXTENSION

E.01 EXISTING TILE PROFILES

BM1:IN FENCE

NORTHING: 562817.0620

EASTING: 2230202.4387

@IOWA§

ONE CALL

HEARTLAND

CO-OP BATCH

AND BUILD

SITE 24 PCW

MUSCATINE COUNTY IOWA

https://isgrp.sharepoint.com/:b:/r/sites/Watercooler/Firm/2024%20Legal%20Name%20By%20State%20Handout.pdf?csf=1&web=1&e=W3JLIo

32609-TITLE-SITE24

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- P

C W

\3

-T

IT

LE

-S

IT

E2 4.

D

D B

Y:

E

R

IN

.D W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- A.02

A.02 SITE OVERVIEW

25-32609

12/23/2025

EMD

EMD

SITE OVERVIEW

I HAVE REVIEWED AND AGREE WITH THE CONTENTS OF THE

PLAN AND SPECIFICATIONS AS PREPARED.

LANDOWNER SIGNATURE DATE

CONTRACTOR IS RESPONSIBLE FOR CALLING IOWA ONE CALL

ONE CALL TICKET NO.

IF A CULTURAL RESOURCE IS IDENTIFIED DURING

CONSTRUCTION, WORK WILL STOP IMMEDIATELY AND THE

LOCAL NRCS FIELD OFFICE WILL BE NOTIFIED.

I CERTIFY THAT THIS PRACTICE HAS BEEN CONSTRUCTED IN

ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.

CONTRACTORS SIGNATURE DATE

ENGINEER'S REP. SIGNATURE DATE

SITE ACCESS

SB. W.1.2

DISPERSION LENGTH: 790 LF

TREATED ACRES: 99.4

WCS (TYP)

EXISTING TILE (TYP)

-78-04

SITE 24 PCW

LLC

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, JUDGEMENT,

BELIEF, THE PLANS MEET APPLICABLE NRCS STANDARDS.

ENGINEER'S SIGNATURE DATE

SURVEY BENCHMARKS*

DESCRIPTION NORTHING EASTING ELEVATION

BM1: IN FENCE 562817.0620 2230202.4387 651.49

*ENGINEER TO PROVIDE FINAL BENCHMARKS AND CONTROL POINTS FOR CONSTRUCTION

BENCHMARK: BM1

W1 W2

SCALE IN FEET

170 340

IA NRCS JOB CLASS II

12/23/25

ACRES REMOVED FROM PRODUCTION: 1.03

32609-DETAILS-SITE 24

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- P

C W

\3

-D

ET

AI

LS

-S

IT

E

.D

W G

S

AV

ED

B

Y:

E

R

IN

.D W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- B.01

B.01 DETAILS

25-32609

12/23/2025

EMD

EMD

DETAILS

OPTION 1 WCS SPECIFIC:

1. FLASH BOARDS SHALL BE PVC.

2. ALL RIVETS SHALL BE STAINLESS STEEL.

3. FLASHBOARD CHANNEL SHALL BE ANODIZED ALUMINUM.

4. FLASHBOARDS WILL REMAIN IN STRUCTURE DURING INSTALLATION.

5. FLASHBOARDS SHALL BE LUBRICATED UPON REMOVAL.

OPTION 2 WCS SPECIFIC:

1. RISER PIPE TO BE CUT FROM BOTTOM. PIPE HANDLE (BOLT) TO REMAIN WITH RISER.

WCS GENERAL NOTES:

1. TOOL TO REMOVE FLASHBOARDS/ACTUATE VALVE IS TO REMAIN IN WCS

FOLLOWING INSTALLATION.

2. FOR INLET ADAPTER, MAX SIZE IS TWO SIZES DOWN FROM STRUCTURE SIZE (I.E. 8"

ADAPTER ON 12" STRUCTURE.

3. CHECK TO ENSURE THE STRUCTURE IS LEVEL PRIOR TO BACKFILLING. PLACE THE

BACKFILL MATERIAL AROUND THE STRUCTURE IN 6" LIFTS AND COMPACT BACKFILL

BY HAND ONLY. DO NOT USE POWERED EQUIPMENT TO COMPACT THE BACKFILL.

4. WATER CONTROL STRUCTURES WILL HAVE A MINIMUM OF 20' NONPERFORATED

PIPE BETWEEN WATER CONTROL STRUCTURE AND DITCH.

5. ONE ANTISEEP COLLAR WILL BE INSTALLED ON THE 20' OF NONPERFORATED PIPE

BETWEEN THE WATER CONTROL STRUCTURE AND DITCH.

6. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION OF

WATERTIGHT TEE, INCLUDING MINIMUM ANGLE OF SEPARATION.

7. WATER TIGHT TEE, QUANTITY, AND INSTALLATION METHOD DEPENDENT ON WCS

MANUFACTURER.

8. FINAL CONFIGURATION OF WATER CONTROL STRUCTURES WILL BE DETERMINED BY

AVAILABILITY FROM THE MANUFACTURER.

9. COMPONENTS OF WATER CONTROL STRUCTURES MAY BE PRICED SEPARATELY

DEPENDING ON THE SUPPLIER.

NRCS NOTES*:

1. WATER CONTROL STRUCTURE (WCS) MATERIALS AND INSTALLATION SHALL BE IN

CONFORMANCE WITH IOWA NRCS PRACTICE STANDARD 604 (SATURATED BUFFER).

2. CONNECTING PIPE MATERIALS AND INSTALLATION SHALL BE IN CONFORMANCE

WITH CS IA-45; IA-46, TILE DRAINS FOR LAND DRAINAGE; IA-51, CORRUGATED METAL

PIPE CONDUITS; OR IA-52, STEEL PIPE CONDUITS.

3. WCS SHALL BE FABRICATED OF PVC WITH INTEGRAL UPSTREAM AND DOWNSTREAM

WATER-TIGHT COUPLING CONNECTIONS, CORROSION-RESISTANT STOP BOARDS,

ALUMINUM EXTRUSIONS AND STAINLESS STEEL FASTENERS AND APPURTENANCES.

ACCEPTABLE MODELS INCLUDE AGRI DRAIN, NYLOPLAST, OR APPROVED EQUAL.

4. WCS SHALL PROVIDE FLOW CAPACITY EQUAL TO OR GREATER THAN THAT OF

ADJACENT PIPE UNDER EXPECTED FLOW CONDITIONS.

5. STOP BOARDS SHALL PROVIDE A WATER-TIGHT SEAL UNDER 4 FT OF PRESSURE

HEAD (MIN.).

6. IN SITUATIONS WHERE WATER LEVELS HIGHER THAN MAXIMUM DESIGN ELEVATION

WOULD IMPACT NEIGHBORING PROPERTIES OR OTHER ASPECTS OF THE SITE

DESIGN, CONSIDER A CUSTOM-ORDER BOX WHICH LIMITS EXTENT OF STOP BOARD

TRACKS TO THE MAXIMUM DESIGN WEIR ELEVATION.

7. STOP BOARD REMOVAL TOOL SHALL BE PROVIDED.

8. AS AN ALTERNATIVE TO A STOP BOARD STRAIGHT WEIR STRUCTURE, A CIRCULAR

INNER STANDPIPE MAY BE PROVIDED WHICH MEETS THE DESIGN FLOW

REQUIREMENTS, WITH APPROVAL OF THE ENGINEER (NYLOPLAST STANDPIPE WCS

OR EQUAL).

9. ALL CONNECTIONS SHALL BE WATER-TIGHT.

10. STRUCTURE LID SHALL BE PROVIDED WITH LOCKING MECHANISM.

11. BACKFILL AROUND THE WCS SHALL MEET THE REQUIREMENTS OF CS IA-45. NORMAL

STOP BOARD OPERATION SHALL BE VERIFIED FOLLOWING BACKFILL.

12. MARK LOCATION OF EACH STRUCTURE USING POST OR MANUFACTURED MARKER

FLAG FOR SAFETY IN THE FIELD

*FROM USDA-NRCS IA-1530 STANDARD DRAWING

3" GATE VALVE

OUTLET FITTING

RISER PIPE TO CONTROL

WATER LEVEL CUT WITH

BOTTOM AS WASTE

DRAIN BASIN

BLIND TEE

PVC LID WITH ROPE

HANDLE(S) LOCKING ROD

WATER FLOW WATER FLOW

DRAIN BASIN

STRUCTURE PIPE TO CONTROL

WATER LEVEL

3" GATE VALVE

WATER FLOWWATER FLOW

WATER TIGHT TEE BELOW WEIR

FIELD INSTALLATION (TYP.)

WATER TIGHT TEE BELOW WEIR

FIELD INSTALLATION (TYP.)

BED WITH 6" OF 1.5" AGGREGATE

FLOW FLOW

WATER TIGHT FITTING

FOR UPSTREAM

CONNECTING PIPE

BED WITH 6" OF 1.5" AGGREGATE

1' TYP

LID TO BE FURNISHED WITH STRUCTURE

WATER TIGHT FITTING FOR

DISPERSION LINE WATER TIGHT FITTING

FOR DOWNSTREAM

CONNECTING PIPE

ALL FLASH BOARDS SHALL BE FITTED

WITH LIFTING HOOKS AND EDPM SEAL

(NOT SHOWN)

EXTRA FLASH BOARDS TO BE

PULLED ABOVE SET WEIR ELEVATION

FOR STORAGE

FLASH BOARD GUIDE CHANNEL

OPTION 1

WATER CONTROL STRUCTURE DETAIL

NTS

OPTION 2

WATER CONTROL STRUCTURE DETAIL

NTS

EXISTING GROUND, TYP

BELL ADAPTOR CONNECTS WATER

CONTROL STRUCTURE TO

DISPERSION LINE

SECURING CLAMP

RUBBER SLEEVE

GAP ACCOMMODATES

WALL OF

WATER CONTROL

STRUCTURE

WATER TIGHT LATERAL TEE FITTING

NTS

SITE 24 PCW

LLC

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- P

C W

\3

-D

ET

AI

LS

-S

IT

E

.D

W G

S

AV

ED

B

Y:

E

R

IN

.D W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- B.02

B.02 DETAILS

25-32609

12/23/2025

EMD

EMD

DETAILS

SITE 24 PCW

LLC

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

FL

OW

FLOW

WATER TIGHT

COUPLER

WATER TIGHT

COUPLER

WATER TIGHT

COUPLERFL

OW

FLOW

PREFABRICATED TEE

INCIDENTAL TO WCS

INSTALLATION

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

3-CHAMBER WATER CONTROL STRUCTURE

ALTERNATE CONFIGURATION

NTS

2-CHAMBER WATER CONTROL STRUCTURE

ALTERNATE CONFIGURATION

NTS

FL

OW

WATER TIGHT

COUPLER

WATER TIGHT

COUPLERFL

OW

FLOW

PREFABRICATED TEE

INCIDENTAL TO WCS

INSTALLATION

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

TILE OUTLET

NTS

2' (± 1')

4' (± 2')

CMP

EXISTING DRAIN TILE

2' MAX

EX. GROUND (TYP)

PLACE CMP OVER TILE A MINIMUM OF 6".

ENCASE JOINT IN 4" x 12" CONCRETE COLLAR.

THIS IS INCIDENTAL TO CMP PIPE WORK

DESIGN BOTTOM ELEVATION

EXTEND TILE TO CMP AS NEEDED WITH TILE MATERIAL APPROVED BY ENGINEER

CE

NT

ER

LIN

E

OP

EN

D

ITC

HWHERE APPLICABLE PLACE ENGINEER APPROVED

PIPE MATERIAL OVER TILE. ENCASE JOINT IN 4" x 12"

CONCRETE COLLAR

6" MIN INSTALL ANIMAL GUARD.

THIS IS INCIDENTAL TO TILE

OUTLET INSTALLATION

WATER CONTROL STRUCTURE

ANTI-SEEP COLLAR

NEW CMP DIAMETER

SHALL BE SMALLEST STANDARD SIZE THAT WILL FIT OVER TILE

ANIMAL GUARD DETAIL

NTS

WCS 1

6'x8" 2-CHAMBER

NTS

FL

OW8 INCH WATER

TIGHT COUPLER

8 INCH WATER

TIGHT COUPLERFL

OW

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

FLOW

TO WCS W2

8 INCH WATER

TIGHT COUPLER

WCS 2

6'x8" 2-CHAMBER

NTS

FL

OW8 INCH WATER

TIGHT COUPLER

8 INCH WATER

TIGHT COUPLERFL

OW

FL

OW

GASKETED STOP BOARDS

WITH LIFTING HOOKS

FLOW FLOW

6 INCH WATER

TIGHT COUPLER

8 INCH WATER

TIGHT COUPLER

USE EXISTING OUTLET PIPES AS CONSTRUCTED

REVISION SCHEDULE

DESCRIPTION BY

SHEET

TITLE

PROJECT

PROJECT NO.

FILE NAME

DESIGNED BY

ORIGINAL ISSUE DATE

DRAWN BY

CLIENT PROJECT NO.

REVIEWED BY

D W

G L

O C

AT

IO

N

S:

\P

R O

JE

C

TS

\3

P R

O J\

0-

9\

H

EA

R

TL

AN

D C

O O

P

EO

F

BA

TC

H

-W

ES

T

LI

BE

R

TY

IA

\3

P

R O

D U

C

TI

O N

F

IL

ES

\3

C

IV

IL

D \P

R O

D U

C

TI

O N

D W

G S\

SI

TE

- P

C W

\3

-D

ET

AI

LS

-S

IT

E

.D

W G

S

AV

ED

B

Y:

E

R

IN

.D W

EN

G

ER

SHEET NOT VALID UNLESS THIS TEXT IS COLOR.

---- ---- C.01

C.01 ESTIMATE REFERENCE, QUANTITIES & CONSTRUCTION NOTES

25-32609

12/23/2025

EMD

EMD

ESTIMATE

REFERENCE,

QUANTITIES &

CONSTRUCTION

NOTES

SITE 24 PCW

LLC

HEARTLAND

CO-OP BATCH

AND BUILD

THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,

INC. AND MAY NOT BE USED, COPIED OR DUPLICATED

WITHOUT PRIOR WRITTEN CONSENT.

© 2024 I & S GROUP, INC.

EARTHWORK:

1.) UTILITIES. CONTRACTOR MUST CALL IOWA ONE CALL (1-800-292-8989) AT LEAST 48 HOURS (EXCLUDING WEEKENDS AND HOLIDAYS) PRIOR TO EXCAVATION BEING STARTED. CONTRACTOR IS TO IMMEDIATELY NOTIFY OWNER OF APPARENT CONFLICTS OF EXISTING UTILITIES WITH THE WORK. THE CONTRACTOR IS

RESPONSIBLE FOR PROTECTION OF ANY UTILITIES ENCOUNTERED ON THE JOB SITE.

2.) TOPSOIL. FOR ALL OPEN TRENCH AND STRUCTURE EXCAVATIONS, CONTRACTOR IS REQUIRED TO STRIP AND SEGREGATE THE TOP TWELVE (12) INCHES OF TOPSOIL FROM SUBSOIL BY PLACING TOPSOIL ON ONE SIDE OF THE TRENCH AND REMAINING SPOIL ON OPPOSITE SIDE. STOCK PILES ARE TO BE PLACED SO AS NOT TO BLOCK FLOWS IN DRAINAGE WAYS. USE TOPSOIL FOR THE TOP ONE (1) FOOT OF BACKFILL FOR TRENCHES AND STRUCTURES. CONTRACTOR IS REQUIRED TO DESCRIBE TO THE ENGINEER HOW TOPSOIL WILL BE MANAGED AT THE PRE-CONSTRUCTION CONFERENCE.

3.) SPOILS. UNLESS OTHERWISE NOTED, EXCAVATED SPOILS NOT USED FOR BACKFILL SHALL BE SPREAD EVENLY IN CONSTRUCTION AREA AS TO NOT IMPEDE

DRAINAGE. ALL EFFORTS SHALL BE MADE TO KEEP TOPSOIL ON TOP.

4.) CROP PROTECTION. CONTRACTOR IS DIRECTED TO LIMIT DAMAGES TO CROPS IN THE ACCESS AND WORK AREAS AS CAN BE ACCOMPLISHED WITHOUT

MATERIALLY SLOWING THE WORK PROGRESS.

TILE INSTALLATION:

1.) WORK LIMITS.