Heartland Lower Cedar 25-26 Batch and Build Project - Construction Plans Summary
This document comprises detailed construction plans prepared by I & S Group, Inc. for the Iowa Department of Agriculture & Land Stewardship's Division of Soil Conservation and Water Quality for the Heartland Lower Cedar 25-26 Batch and Build Project in Cedar and Muscatine County, Iowa. The project involves construction of three denitrifying bioreactors and seventeen saturated buffer structures across eight sites (Sites 22, 24, 25, 26, 28, 31, 32, and 34), incorporating water control structures, drainage tile systems, geotextile fabric, woodchips, perforated and non-perforated HDPE piping, and riprap. Specific work includes excavation, earthwork, topsoil management, tile installation, water control structure placement, anti-seep collar installation, animal guards, buffer seeding, and site restoration. The construction schedule is strict, with Site 32 requiring commencement on June 16, 2026, as it will be showcased as a conservation practice demonstration. A pre-bid conference is scheduled for April 23, 2026, at 10:00 AM CDT at Belle Plaine Community Library, though attendance is encouraged but not mandatory. Written questions must be submitted by 3:00 PM CDT on April 30, 2026, and sealed bids are due by 3:00 PM CDT on May 6, 2026, with public bid opening via teleconference at the same time.
The estimated project cost ranges from $210,000 to $240,000. Bidders must submit a bid bond equal to ten percent of the bid amount and, upon selection, provide a Performance/Payment Bond equal to one hundred percent of the contract price. All contractors must be registered with the Iowa Division of Labor and the Iowa Department of Inspections, Appeals, and Licensing, with non-Iowa corporations required to provide proof of authorization to do business in Iowa prior to contract execution. The construction plans reference compliance with the 2024 Natural Resources Conservation Service (NRCS) Conservation Practice 604 (Saturated Buffer) standards for Muscatine County projects and Conservation Practice 605 (Denitrifying Bioreactor) standards for Cedar County projects. Technical questions should be directed to Spencer Pech, P.E., at spencer.pech@isginc.com, with copies to Emalyn Polz at emalyn.polz@iowaagriculture.gov or (515) 322-9073. The procurement documents contain no identified set-asides or restrictions limiting responses to particular categories of organizations, nor do they identify incumbent vendors or current contractors.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32609-TITLE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
TI
TL
E-
SI
TE
.D W
G
SA
VE
D B
Y:
E
R
IN
.D W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SITE 22
MUSCATINE COUNTY, IOWA
HEARTLAND CO-OP BATCH AND BUILD
ISG PROJECT # 25-32609
PROJECT LOCATION
B.M. ELEVATION=684.16
BM2:
NORTHING:
EASTING:
LOCATION MAP
N
S
W E
12/23/2025
25-32609
A.01 TITLE
---- ---- A.01
A.01
CONSTRUCTION PLANS
MUSCATINE COUNTY IOWA
TITLE
EMD
EMD
SDP
PROJECT INDEX:
OWNER:
WATERSHED COORDINATOR:
HEARTLAND CO-OP
PROJECT
ADDRESS / LOCATION:
, T78N, R4W
WAPSINONOC TWP
MUSCATINE COUNTY, IOWA 52776
578827.1757 2235968.3550
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
TOPOGRAPHIC SURVEY
THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS
OF DATA COLLECTED IN MARCH 2025 BY
HEARTLAND CO-OP.
PROJECT GENERAL NOTES
GIS DISCLAIMER:
INFORMATION FOR THE BOUNDARY / LOT LINES, AND UNDERGROUND UTILITIES SHOWN WAS DERIVED FROM DIGITAL DATABASES AND IS FOR INFORMATIONAL PURPOSES ONLY. DATA MAY NOT HAVE BEEN
PREPARED FOR, OR BE SUITABLE FOR: LEGAL, ENGINEERING, OR SURVEYING PURPOSES.
PROJECT DATUM
HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE
NORTH AMERICAN DATUM OF 1983 (NAD83), SOUTH ZONE, ON THE
IOWA STATE PLANE COORDINATE SYSTEM, IN U.S. SURVEY FEET.
ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH AMERICAN
VERTICAL DATUM OF 1988 (NAVD 88).
RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND
VERTICAL COORDINATES FOR THIS PROJECT.
1. ALL WORK SHALL CONFORM TO THE CONTRACT
DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO,
THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT
MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY
CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL
DISCIPLINES AND ALL ADDENDA, MODIFICATIONS, AND
CLARIFICATIONS ISSUED BY ARCHITECT/ENGINEER.
2. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL
SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN
COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT
AND COMPLETE COORDINATION OF ALL WORK.
3. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED
DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY
DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION
OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
4. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR
CONDITIONS REQUIRING INFORMATION OR CLARIFICATION
BEFORE PROCEEDING WITH THE WORK.
5. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE
PROFILES AND TYPE OF DETAILING REQUIRED
THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE
SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE
SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT
CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER
BEFORE PROCEEDING WITH THE WORK.
6. ALL MANUFACTURED ARTICLES, MATERIALS, AND
EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED,
ERECTED, CLEANED, AND CONDITIONED ACCORDING TO
MANUFACTURERS' INSTRUCTIONS. IN CASE OF
DISCREPANCIES BETWEEN MANUFACTURERS'
INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY
ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE
WORK.
7. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED
FROM EACH OTHER TO AVOID GALVANIC CORROSION.
8. THE LOCATION AND TYPE OF ALL EXISTING UTILITIES
SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION
ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST
OF THE KNOWLEDGE OF I & S GROUP, INC. (ISG). NO
WARRANTY OR GUARANTEE IS IMPLIED. THE
CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS, AND
ELEVATIONS OF ALL EXISTING UTILITIES PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY
NOTIFY ENGINEER OF ANY DISCREPANCIES OR
VARIATIONS FROM PLAN.
9. THE CONTRACTOR IS TO CONTACT "IOWA ONE CALL" FOR
UTILITY LOCATIONS A MINIMUM OF 2 BUSINESS DAYS
PRIOR TO ANY EXCAVATION / CONSTRUCTION
(1-800-292-8989).
PROJECT MANAGER: OWEN OELTJENBRUNS
EMAIL: OWEN.OELTJENBRUNS@ISGINC.COM
217 EAST 2nd STREET
SUITE 110
DES MOINES, IA 50309
PHONE: 515.243.9143
DES MOINES OFFICE
MANAGING OFFICE:
I & S GROUP, INC. (ISG)
Printed or typed name
(signature) (date)
License number
SEAL
WIO A
LI
C E
NS
ED
PROFESS IONAL ENGI NEER
I hereby certify that this engineering document was prepared by me or under direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
My license renewal date is December 31, Pages or sheets covered by this seal:
SPENCER
DEAN PECH
P28161
SPENCER DEAN PECH
P28161
ALL SHEETS
ENGINEER OF RECORD: SPENCER PECH
EMAIL: SPENCER.PECH@ISGINC.COM
SPECIFICATIONS REFERENCE
ALL CONSTRUCTION SHALL COMPLY WITH THE COUNTY OF
MUSCATINE COUNTY REQUIREMENTS AND WITH THE 2024
EDITION OF THE NATURAL RESOURCES CONSERVATION
SERVICE CONSERVATION PRACTICE 604 (SATURATED BUFFER),
UNLESS DIRECTED OTHERWISE.
HTTPS://EFOTG.SC.EGOV.USDA.GOV/API/CPSFILE/34855/604_IA_CPS
_SATURATED_BUFFER_2024
SCALE IN FEET
2000 4000
NO BENCHMARK DESCRIPTION PROVIDED IN
SURVEY DATA
12/23/2025
SHEET INDEX
Sheet Number Sheet Title
A.01 TITLE
A.02 SITE OVERVIEW
B.01 DETAILS
B.02 DETAILS
C.01 ESTIMATE REFERENCE, QUANTITIES & CONSTRUCTION NOTES
D.01 SB. M.1.3.7 PLAN & PROFILE
D.02 SB. M.1.3.7 PLAN & PROFILE
D.03 SB. M.1.3.7 PLAN & PROFILE
D.04 SB M.1.3.7 PLAN & PROFILE
D.05 SB. M.1.3.7 PLAN & PROFILE
D.06 SB. M.2 PLAN & PROFILE
D.07 SB. M.2 PLAN & PROFILE
D.08 SB M.2 PLAN & PROFILE
D.09 SB. M.4 PLAN & PROFILE
D.10 BUFFER EXTENSION
E.01 EXISTING TILE PROFILES
https://isgrp.sharepoint.com/:b:/r/sites/Watercooler/Firm/2024%20Legal%20Name%20By%20State%20Handout.pdf?csf=1&web=1&e=W3JLIo
32609-TITLE-SITE22
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
TI
TL
E-
SI
TE
.D
D B
Y:
E
R
IN
.D W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- A.02
A.02 SITE OVERVIEW
25-32609
12/23/2025
A.02
IOWAMUSCATINE COUNTY
SDP
EMD
EMD
SITE OVERVIEW
I HAVE REVIEWED AND AGREE WITH THE CONTENTS OF THE
PLAN AND SPECIFICATIONS AS PREPARED.
LANDOWNER SIGNATURE DATE
CONTRACTOR IS RESPONSIBLE FOR CALLING IOWA ONE CALL
ONE CALL TICKET NO.
IF A CULTURAL RESOURCE IS IDENTIFIED DURING
CONSTRUCTION, WORK WILL STOP IMMEDIATELY AND THE
LOCAL NRCS FIELD OFFICE WILL BE NOTIFIED.
I CERTIFY THAT THIS PRACTICE HAS BEEN CONSTRUCTED IN
ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
CONTRACTORS SIGNATURE DATE
ENGINEER'S REP. SIGNATURE DATE
SITE ACCESS
SB M.1.3.7
DISPERSION LENGTH: 2147 LF
TREATED ACRES: 37
WCS (TYP)
EXISTING TILE (TYP)
-78-04
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
SB M.4
DISPERSION LENGTH: 414 LF
TREATED ACRES: 77.6
SB. M.2
DISPERSION LENGTH: 1029 LF
TREATED ACRES: 47
SCALE IN FEET
150 300
TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, JUDGEMENT,
BELIEF, THE PLANS MEET APPLICABLE NRCS STANDARDS.
ENGINEER'S SIGNATURE DATE
SURVEY BENCHMARKS*
DESCRIPTION NORTHING EASTING ELEVATION
BM1: 577068.5123 2237283.8660 676.37
BM2: 578827.1757 2235968.3550 684.16
*ENGINEER TO PROVIDE FINAL BENCHMARKS AND CONTROL POINTS FOR CONSTRUCTION
*NO BENCHMARK DESCRIPTION PROVIDED IN SURVEY DATA
M1
M2
M3
M4
M7
BENCHMARK: BM1
BENCHMARK: BM2
IA NRCS JOB CLASS II
M5
M6
12/23/2025
ACRES REMOVED FROM PRODUCTION: 4.55
32609-DETAILS-SITE22
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
D
ET
AI
LS
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- B.01
B.01 DETAILS
25-32609
12/23/2025
B.01
EMD
EMD
DETAILS
OPTION 1 WCS SPECIFIC:
1. FLASH BOARDS SHALL BE PVC.
2. ALL RIVETS SHALL BE STAINLESS STEEL.
3. FLASHBOARD CHANNEL SHALL BE ANODIZED ALUMINUM.
4. FLASHBOARDS WILL REMAIN IN STRUCTURE DURING INSTALLATION.
5. FLASHBOARDS SHALL BE LUBRICATED UPON REMOVAL.
OPTION 2 WCS SPECIFIC:
1. RISER PIPE TO BE CUT FROM BOTTOM. PIPE HANDLE (BOLT) TO REMAIN WITH RISER.
WCS GENERAL NOTES:
1. TOOL TO REMOVE FLASHBOARDS/ACTUATE VALVE IS TO REMAIN IN WCS
FOLLOWING INSTALLATION.
2. FOR INLET ADAPTER, MAX SIZE IS TWO SIZES DOWN FROM STRUCTURE SIZE (I.E. 8"
ADAPTER ON 12" STRUCTURE.
3. CHECK TO ENSURE THE STRUCTURE IS LEVEL PRIOR TO BACKFILLING. PLACE THE
BACKFILL MATERIAL AROUND THE STRUCTURE IN 6" LIFTS AND COMPACT BACKFILL
BY HAND ONLY. DO NOT USE POWERED EQUIPMENT TO COMPACT THE BACKFILL.
4. WATER CONTROL STRUCTURES WILL HAVE A MINIMUM OF 20' NONPERFORATED
PIPE BETWEEN WATER CONTROL STRUCTURE AND DITCH.
5. ONE ANTISEEP COLLAR WILL BE INSTALLED ON THE 20' OF NONPERFORATED PIPE
BETWEEN THE WATER CONTROL STRUCTURE AND DITCH.
6. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION OF
WATERTIGHT TEE, INCLUDING MINIMUM ANGLE OF SEPARATION.
7. WATER TIGHT TEE, QUANTITY, AND INSTALLATION METHOD DEPENDENT ON WCS
MANUFACTURER.
8. FINAL CONFIGURATION OF WATER CONTROL STRUCTURES WILL BE DETERMINED BY
AVAILABILITY FROM THE MANUFACTURER.
9. COMPONENTS OF WATER CONTROL STRUCTURES MAY BE PRICED SEPARATELY
DEPENDING ON THE SUPPLIER.
NRCS NOTES*:
1. WATER CONTROL STRUCTURE (WCS) MATERIALS AND INSTALLATION SHALL BE IN
CONFORMANCE WITH IOWA NRCS PRACTICE STANDARD 604 (SATURATED BUFFER).
2. CONNECTING PIPE MATERIALS AND INSTALLATION SHALL BE IN CONFORMANCE
WITH CS IA-45; IA-46, TILE DRAINS FOR LAND DRAINAGE; IA-51, CORRUGATED METAL
PIPE CONDUITS; OR IA-52, STEEL PIPE CONDUITS.
3. WCS SHALL BE FABRICATED OF PVC WITH INTEGRAL UPSTREAM AND DOWNSTREAM
WATER-TIGHT COUPLING CONNECTIONS, CORROSION-RESISTANT STOP BOARDS,
ALUMINUM EXTRUSIONS AND STAINLESS STEEL FASTENERS AND APPURTENANCES.
ACCEPTABLE MODELS INCLUDE AGRI DRAIN, NYLOPLAST, OR APPROVED EQUAL.
4. WCS SHALL PROVIDE FLOW CAPACITY EQUAL TO OR GREATER THAN THAT OF
ADJACENT PIPE UNDER EXPECTED FLOW CONDITIONS.
5. STOP BOARDS SHALL PROVIDE A WATER-TIGHT SEAL UNDER 4 FT OF PRESSURE
HEAD (MIN.).
6. IN SITUATIONS WHERE WATER LEVELS HIGHER THAN MAXIMUM DESIGN ELEVATION
WOULD IMPACT NEIGHBORING PROPERTIES OR OTHER ASPECTS OF THE SITE
DESIGN, CONSIDER A CUSTOM-ORDER BOX WHICH LIMITS EXTENT OF STOP BOARD
TRACKS TO THE MAXIMUM DESIGN WEIR ELEVATION.
7. STOP BOARD REMOVAL TOOL SHALL BE PROVIDED.
8. AS AN ALTERNATIVE TO A STOP BOARD STRAIGHT WEIR STRUCTURE, A CIRCULAR
INNER STANDPIPE MAY BE PROVIDED WHICH MEETS THE DESIGN FLOW
REQUIREMENTS, WITH APPROVAL OF THE ENGINEER (NYLOPLAST STANDPIPE WCS
OR EQUAL).
9. ALL CONNECTIONS SHALL BE WATER-TIGHT.
10. STRUCTURE LID SHALL BE PROVIDED WITH LOCKING MECHANISM.
11. BACKFILL AROUND THE WCS SHALL MEET THE REQUIREMENTS OF CS IA-45. NORMAL
STOP BOARD OPERATION SHALL BE VERIFIED FOLLOWING BACKFILL.
12. MARK LOCATION OF EACH STRUCTURE USING POST OR MANUFACTURED MARKER
FLAG FOR SAFETY IN THE FIELD
3" GATE VALVE
OUTLET FITTING
RISER PIPE TO CONTROL
WATER LEVEL CUT WITH
BOTTOM AS WASTE
DRAIN BASIN
BLIND TEE
PVC LID WITH ROPE
HANDLE(S) LOCKING ROD
WATER FLOW WATER FLOW
DRAIN BASIN
STRUCTURE PIPE TO CONTROL
WATER LEVEL
3" GATE VALVE
WATER FLOWWATER FLOW
WATER TIGHT TEE BELOW WEIR
FIELD INSTALLATION (TYP.)
WATER TIGHT TEE BELOW WEIR
FIELD INSTALLATION (TYP.)
BED WITH 6" OF 1.5" AGGREGATE
FLOW FLOW
WATER TIGHT FITTING
FOR UPSTREAM
CONNECTING PIPE
BED WITH 6" OF 1.5" AGGREGATE
1' TYP
LID TO BE FURNISHED WITH STRUCTURE
WATER TIGHT FITTING FOR
DISPERSION LINE WATER TIGHT FITTING
FOR DOWNSTREAM
CONNECTING PIPE
ALL FLASH BOARDS SHALL BE FITTED
WITH LIFTING HOOKS AND EDPM SEAL
(NOT SHOWN)
EXTRA FLASH BOARDS TO BE
PULLED ABOVE SET WEIR ELEVATION
FOR STORAGE
FLASH BOARD GUIDE CHANNEL
OPTION 1
WATER CONTROL STRUCTURE DETAIL
NTS
OPTION 2
WATER CONTROL STRUCTURE DETAIL
NTS
EXISTING GROUND, TYP
BELL ADAPTOR CONNECTS WATER
CONTROL STRUCTURE TO
DISPERSION LINE
SECURING CLAMP
RUBBER SLEEVE
GAP ACCOMMODATES
WALL OF
WATER CONTROL
STRUCTURE
WATER TIGHT LATERAL TEE FITTING
NTS
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
*FROM USDA-NRCS IA-1530 STANDARD DRAWING
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
D
ET
AI
LS
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- B.02
B.02 DETAILS
25-32609
12/23/2025
B.02
EMD
EMD
DETAILS
FL
OW
FLOW
WATER TIGHT
COUPLER
WATER TIGHT
COUPLER
WATER TIGHT
COUPLERFL
OW
FLOW
PREFABRICATED TEE
INCIDENTAL TO WCS
INSTALLATION
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
3-CHAMBER WATER CONTROL STRUCTURE
ALTERNATE CONFIGURATION
NTS
2-CHAMBER WATER CONTROL STRUCTURE
ALTERNATE CONFIGURATION
NTS
FL
OW
WATER TIGHT
COUPLER
WATER TIGHT
COUPLERFL
OW
FLOW
PREFABRICATED TEE
INCIDENTAL TO WCS
INSTALLATION
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
TILE OUTLET
NTS
2' (± 1')
4' (± 2')
CMP
EXISTING DRAIN TILE
2' MAX
EX. GROUND (TYP)
PLACE CMP OVER TILE A MINIMUM OF 6".
ENCASE JOINT IN 4" x 12" CONCRETE COLLAR.
THIS IS INCIDENTAL TO CMP PIPE WORK
DESIGN BOTTOM ELEVATION
EXTEND TILE TO CMP AS NEEDED WITH TILE MATERIAL APPROVED BY ENGINEER
CE
NT
ER
LIN
E
OP
EN
D
ITC
HWHERE APPLICABLE PLACE ENGINEER APPROVED
PIPE MATERIAL OVER TILE. ENCASE JOINT IN 4" x 12"
CONCRETE COLLAR
6" MIN INSTALL ANIMAL GUARD.
THIS IS INCIDENTAL TO TILE
OUTLET INSTALLATION
WATER CONTROL STRUCTURE
ANTI-SEEP COLLAR
NEW CMP DIAMETER
SHALL BE SMALLEST STANDARD SIZE THAT WILL FIT OVER TILE
WCS 1
6'x6" 3-CHAMBER
NTS
WCS 2
6'x6" 3-CHAMBER
NTS
FL
OW6 INCH WATER
TIGHT COUPLER
6 INCH WATER
TIGHT COUPLER
6 INCH WATER
TIGHT COUPLERFL
OW
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
FLOW
6 INCH WATER
TIGHT COUPLER
FLOW
WCS 4
6'x8" 2-CHAMBER
NTS
FL
OW8 INCH WATER
TIGHT COUPLER
8 INCH WATER
TIGHT COUPLERFL
OW
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
6 INCH WATER
TIGHT COUPLER
FLOW
FLOW FLOW
ANIMAL GUARD DETAIL
NTS
WCS 7
6'x6" 2-CHAMBER
NTS
WCS 3
6'x6" 3-CHAMBER
NTS
FL
OW6 INCH WATER
TIGHT COUPLER
6 INCH WATER
TIGHT COUPLERFL
OW
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
FLOW
6 INCH WATER
TIGHT COUPLER
6 INCH WATER
TIGHT COUPLER
FLOW
TO WCS DM7
FL
OW6 INCH WATER
TIGHT COUPLER
6 INCH WATER
TIGHT COUPLER
6 INCH WATER
TIGHT COUPLERFL
OW
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
FLOW
TO WCS DM3
6 INCH WATER
TIGHT COUPLER
FLOW
TO WCS DM1
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
FL
OW6 INCH WATER
TIGHT COUPLER
6 INCH WATER
TIGHT COUPLERFL
OW
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
FLOW
6 INCH WATER
TIGHT COUPLER
TO WCS DM3
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
D
ET
AI
LS
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- C.01
C.01 ESTIMATE REFERENCE, QUANTITIES & CONSTRUCTION NOTES
25-32609
12/23/2025
C.01
EMD
EMD
ESTIMATE
REFERENCE,
QUANTITIES &
CONSTRUCTION
NOTES
EARTHWORK:
1.) UTILITIES. CONTRACTOR MUST CALL IOWA ONE CALL (1-800-292-8989) AT LEAST 48 HOURS (EXCLUDING WEEKENDS AND HOLIDAYS) PRIOR TO EXCAVATION BEING STARTED. CONTRACTOR IS TO IMMEDIATELY NOTIFY OWNER OF APPARENT CONFLICTS OF EXISTING UTILITIES WITH THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ANY UTILITIES ENCOUNTERED ON THE JOB SITE.
2.) TOPSOIL. FOR ALL OPEN TRENCH AND STRUCTURE EXCAVATIONS, CONTRACTOR IS REQUIRED TO STRIP AND SEGREGATE THE TOP TWELVE (12) INCHES OF TOPSOIL FROM SUBSOIL BY PLACING TOPSOIL ON ONE SIDE OF THE TRENCH AND REMAINING SPOIL ON OPPOSITE SIDE. STOCK PILES ARE TO BE PLACED SO AS NOT TO BLOCK FLOWS IN DRAINAGE WAYS. USE TOPSOIL FOR THE TOP ONE (1) FOOT OF BACKFILL FOR TRENCHES AND STRUCTURES. CONTRACTOR IS REQUIRED TO DESCRIBE TO THE ENGINEER HOW TOPSOIL WILL BE MANAGED AT THE PRE-CONSTRUCTION
CONFERENCE.
3.) SPOILS. UNLESS OTHERWISE NOTED, EXCAVATED SPOILS NOT USED FOR BACKFILL SHALL BE SPREAD EVENLY IN CONSTRUCTION AREA AS TO
NOT IMPEDE DRAINAGE. ALL EFFORTS SHALL BE MADE TO KEEP TOPSOIL ON TOP.
4.) CROP PROTECTION. CONTRACTOR IS DIRECTED TO LIMIT DAMAGES TO CROPS IN THE ACCESS AND WORK AREAS AS CAN BE ACCOMPLISHED
WITHOUT MATERIALLY SLOWING THE WORK PROGRESS.
TILE INSTALLATION:
1.) WORK LIMITS. CONSTRUCTION SHALL BE LIMITED TO THE TOP OF BANK OR 50' EACH SIDE OF THE DISTRIBUTION LINE. THE SWATH SHALL NOT DISTURB ANY NON-AGRICULTURAL PRIVATE PROPERTY. DISTURBANCE MUST BE RESEEDED WHERE NECESSARY.
2.) ACCESS. ACCESS TO SITE SHALL BE COORDINATED WITH LANDOWNER PRIOR TO MOBILIZATION.
3.) TILE INVESTIGATION. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING TILE LOCATION AND ELEVATION PRIOR TO
CONSTRUCTION AND SHALL NOTIFY ENGINEER (ISG) OF ANY DISCREPANCIES.
4.) FIELD TILE CONNECTIONS. CONNECTIONS TO EXISTING TILES SHALL BE MADE AND ENCASED IN A PORTLAND CEMENT CONCRETE COLLAR AT
LEAST 12" WIDE AND 4" THICK AND CONTINUOUS AROUND THE JOINTS.
5.) PIPE/TILE WORK. UNLESS SPECIFICALLY NOTED, ALL PROPOSED TILE IS REQUIRED TO BE 6" HDPE PERFORATED SINGLE WALL. REFER TO SPECIFICATIONS FOR PROPER INSTALLATION REQUIREMENTS. IF OTHER TILE LINES ARE FOUND TO BE CROSSING THE PROPOSED DISTRIBUTION LINE, A MINIMUM 20' OF NON-PERFORATED SINGLE WALL HDPE WITH FITTINGS SHALL BE PLACED WITH THE CENTER OF THE 20' SECTION OVER THE CROSSING TILE. IF TILE IS INSTALLED WITH AN OPEN TRENCH, THE TRENCH IS TO HAVE A CONCAVE-SHAPE BOTTOM.
6.) SAFETY. CONTRACTOR IS COMPLETELY RESPONSIBLE FOR SAFETY ON THE WORK SITE, INCLUDING THE BRACING OF, SHORING OF, SHAPING OF, AND/OR USE OF A TRENCH BOX IN THE EXCAVATIONS. THIS INCLUDES KNOWLEDGE AND COMPLIANCE WITH ALL RULES AND REGULATIONS INTENDED TO PROTECT THE HEALTH AND SAFETY OF THE CONTRACTORS, ENGINEERS, AND OWNER'S PERSONNEL. ALL TRENCHING SHALL BE
DONE ACCORDING TO O.S.H.A. STANDARDS FOR PROTECTION OF LIFE.
7.) WORKMANSHIP. CONTRACTOR SHALL PERFORM WORK IN A CRAFTSMAN LIKE MANNER AND LEAVE THE SITE IN PRESENTABLE CONDITION.
8.) TILE CONNECTIONS. ALL TILE CONNECTIONS ARE INCIDENTAL TO PIPE INSTALLATION UNLESS OTHERWISE NOTED ON THE PLANS.
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
SB.DM.1.3.7 (1)
0+00
9.
4.
0+25
9.
4.
0+50
9.
4.
0+75
9.
4.
1+00
9.
4.
1+25
9.
4.
1+50
9.
4.
1+75
9.
4.
2+00
9.
4.
2+25
9.
4.
2+50
9.
4.
2+75
9.
4.
3+00
8.
4.
3+25
8.
4.
3+50
8.
4.
3+75
8.
4.
4+00
8.
3.
4+25
8.
3.
4+50
8.
3.
4+75
8.
3.
674.37 0+00
INSTALL 6" TILE END CAP, WATER TIGHT
6" PERFORATED HDPE TILE
573 LF @ 0.10%
STA: 0+00 TO 5+73
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
PROPOSED FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - PROPOSED FLOWLINE
SET WEIR ELEVATION (TYP)
32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SCALE IN FEET
20 40
---- ---- D.01
D.01 SB.DM.1.3.7 PLAN & PROFILE
25-32609
12/23/2025
D.01
EMD
EMD
SB. .1.3.7 PLAN &
PROFILE
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
TOP OF BANK (TYP)
BUFFER EXTENTS (TYP)
SB. M.2
SEE SHEETS
D.06-D.08
SB. M.1.3.7
SB.DM.1.3.7 (2)
5+25
7.
3.
5+50
8.
3.
5+75
8.
3.
6+00
8.
3.
6+25
8.
3.
6+50
8.
3.
6+75
8.
3.
7+00
8.
3.
7+25
8.
3.
7+50
7.
3.
7+75
7.
3.
8+00
7.
3.
8+25
7.
3.
8+50
7.
3.
8+75
7.
3.
9+00
7.
3.
9+25
7.
3.
9+50
7.
3.
9+75
7.
3.
10+00
7.
3.
WCS M1
6' WATER CONTROL STRUCTURE
GROUND ELEVATION: 678.11'
WEIR 1 CREST ELEVATION: 676.60'
WEIR 2 CREST ELEVATION: 675.00'
DISPERSION LINE INVERT: 673.80'
ESTIMATED TILE FL ELEVATION: 673.80'
6" PERFORATED HDPE TILE
573 LF @ 0.10%
STA: 0+00 TO 5+73
6" PERFORATED HDPE TILE
1,017 LF @ 0.17%
STA: 5+73 TO 15+91
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
PROPOSED FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - PROPOSED FLOWLINE
SET WEIR ELEVATION (TYP)
SURFACE ELEVATION ESTIMATED
THROUGH THIS AREA, FIELD VERIFY 32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SCALE IN FEET
20 40
---- ---- D.02
D.02 SB.DM.1.3.7 PLAN & PROFILE
25-32609
12/23/2025
D.02
EMD
EMD
SB. .1.3.7 PLAN &
PROFILE
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
SOIL BORING LOCATION (TYP)
TOP OF BANK (TYP)
BUFFER EXTENTS (TYP)WCS M1
MARK WITH FIBERGLASS FLAG
REPLACE 20 LF OF EXISTING 6" PIPE WITH 6" NON-PERFORATED
HDPE @ EXISTING GRADE
M1
6" CPT
GULLY/ ROCK PILE
M2
6" CPT
37 LF OF 6" NON-PERFORATED HDPE
WITH ANTI-SEEP DEVICE @ EXISTING GRADE
REPLACE 20 LF OF EXISTING 6" PIPE WITH 8" CMP
AND ANIMAL GUARD @ EXISTING GRADE
REFER TO DETAIL
SB. M.2
SEE SHEETS D.06-D.08
SB M.1.3.7
11 12
SB.DM.1.3.7 (3)
10+50
7.
3.
10+75
7.
2.
11+00
7.
2.
11+25
7.
2.
11+50
7.
2.
11+75
7.
2.
12+00
7.
2.
12+25
7.
2.
12+50
7.
2.
12+75
7.
2.
13+00
6.
2.
13+25
6.
2.
13+50
6.
2.
13+75
6.
2.
14+00
6.
2.
14+25
6.
2.
14+50
6.
2.
14+75
6.
2.
15+00
6.
2.
15+25
6.
2.
6" PERFORATED HDPE TILE
1,017 LF @ 0.17%
STA: 5+73 TO 15+91
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
PROPOSED FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - PROPOSED FLOWLINE
SET WEIR ELEVATION (TYP)
32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SCALE IN FEET
20 40
---- ---- D.03
D.03 SB.DM.1.3.7 PLAN & PROFILE
25-32609
12/23/2025
D.03
EMD
EMD
SB. .1.3.7 PLAN &
PROFILE
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.GULLY
SOIL BORING LOCATION (TYP)
BUFFER EXTENTS (TYP)
TOP OF BANK (TYP)
M3
6" CPT
SB. M.1.3.7
SB. M.2
SEE SHEETS D.06-D.08
BUFFER SEEDING ONLY
SB M.4
SEE SHEET D.09
16 17 18 19
' 65
SB.DM.1.3.7 (4)
15+75
6.
2.
16+00
5.
2.
16+25
5.
2.
16+50
5.
2.
16+75
5.
1.
17+00
5.
1.
17+25
6.
1.
17+50
6.
1.
17+75
5.
1.
18+00
5.
1.
18+25
6.
1.
18+50
6.
1.
18+75
5.
1.
19+00
5.
1.
19+25
5.
1.
19+50
5.
1.
19+75
5.
1.
20+00
5.
1.
20+25
5.
1.
20+50
5.
1.
WCS M3
6' WATER CONTROL STRUCTURE
GROUND ELEVATION: 675.21'
WEIR 1 CREST ELEVATION: 675.00'
WEIR 2 CREST ELEVATION: 673.60'
DISPERSION LINE INVERT: 672.00'
ESTIMATED TILE FL ELEVATION: 672.00'
6" PERFORATED HDPE TILE
1,017 LF @ 0.17%
STA: 5+73 TO 15+91
6" NON-PERFORATED HDPE TILE
60 LF @ 0.19%
STA: 15+91 TO 16+50
6" PERFORATED HDPE TILE
497 LF @ 0.20%
STA: 16+50 TO 21+47
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
PROPOSED FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - PROPOSED FLOWLINE
SET WEIR ELEVATION (TYP)
32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SCALE IN FEET
20 40
---- ---- D.04
D.04 SB.DM.1.3.7 PLAN & PROFILE
25-32609
12/23/2025
D.04
EMD
EMD
SB. .1.3.7 PLAN &
PROFILE
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
SOIL BORING LOCATION (TYP)
M4
8" CPT
WATER WAY (TYP)
M5
6" CMP
M6
6" CMP
TOP OF BANK (TYP)
BUFFER EXTENTS (TYP)
M3
6" CPT WCS M3
MARK WITH FIBERGLASS FLAG
REPLACE 20 LF OF EXISTING 6" PIPE WITH 6"
NON-PERFORATED HDPE @ EXISTING GRADE
70 LF OF 6" NON-PERFORATED HDPE
WITH ANTI-SEEP DEVICE @ EXISTING GRADE
REPLACE 20 LF OF EXISTING 6" PIPE WITH 8" CMP
AND ANIMAL GUARD @ EXISTING GRADE
REFER TO DETAIL
SB M.1.3.7
SB M.4
SEE SHEET D.09
20 21
21 >>
SB.DM.1.3.7 (5)
20+50
5.
1.
20+75
5.
1.
21+00
5.
1.
21+25
5.
1.
21+50 21+75
WCS M7
6' WATER CONTROL STRUCTURE
GROUND ELEVATION: 675.61'
WEIR 1 CREST ELEVATION: 673.60'
DISPERSION LINE INVERT: 671.00'
ESTIMATED TILE FL ELEVATION: 671.00'
6" PERFORATED HDPE TILE
497 LF @ 0.20%
STA: 16+50 TO 21+47
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
PROPOSED FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - PROPOSED FLOWLINE
SET WEIR ELEVATION (TYP)
32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SCALE IN FEET
20 40
---- ---- D.05
D.05 SB.DM.1.3.7 PLAN & PROFILE
25-32609
12/23/2025
D.05
EMD
EMD
SB. .1.3.7 PLAN &
PROFILE
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
TOP OF BANK (TYP)
BUFFER EXTENTS (TYP)
SOIL BORING LOCATION (TYP)
M6
6" CMP
WCS M7
MARK WITH FIBER GLASS FLAG
REPLACE 20 LF OF EXISTING 4" PIPE WITH 6"
NON-PERFORATED HDPE @ EXISTING GRADE
47 LF OF 6" NON-PERFORATEED HDPE WITH
ANTI-SEEP DEVICE @ EXISTING GRADE
REPLACE 20 LF OF EXISTING 4" PIPE WITH 8" CMP
AND ANIMAL GUARD @ EXISTING GRADE
REFER TO DETAIL
SB M.1.3.7
M7
4" CPT
1 2
38'
0+00
9.
5.
0+25
9.
5.
0+50
9.
4.
0+75
9.
4.
1+00
9.
4.
1+25
9.
4.
1+50
9.
4.
1+75
9.
4.
2+00
9.
4.
2+25
9.
4.
2+50
9.
4.
2+75
8.
4.
3+00
9.
4.
3+25
9.
4.
3+50
9.
4.
3+75
9.
4.
4+00
8.
4.
4+25
8.
4.
4+50
8.
4.
4+75
8.
4.
WCS M2
6' WATER CONTROL STRUCTURE
GROUND ELEVATION: 678.83'
WEIR 1 CREST ELEVATION: 677.50'
WEIR 2 CREST ELEVATION: 676.00'
DISPERSION LINE INVERT: 674.04'
ESTIMATED TILE FL ELEVATION: 674.04'
6" PERFORATED HDPE TILE
581 LF @ 0.07%
STA: 4+49 TO 10+29
6" PERFORATED HDPE TILE
154 LF @ 0.23%
STA: 2+95 TO 4+49
6" PERFORATED HDPE TILE
250 LF @ 0.23%
STA: 0+00 TO 2+50 6" NON-PERFORATED HDPE TILE
44 LF @ 0.23%
STA: 2+50 TO 2+95
675.05 0+00
INSTALL 6"
TILE END CAP,
WATER TIGHT
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
PROPOSED FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - PROPOSED FLOWLINE
SET WEIR ELEVATION (TYP)
SURFACE ELEVATION
ESTIMATED THROUGH
THIS AREA, FIELD VERIFY
32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SCALE IN FEET
20 40
---- ---- D.06
D.06 SB.DM.2 PLAN & PROFILE
25-32609
12/23/2025
D.06
EMD
EMD
SB. .2 PLAN &
PROFILE
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
SOIL BORING LOCATION (TYP)
BUFFER EXTENTS (TYP)
M1
6" CPT
TOP OF BANK (TYP)
M2
6" CPT
WCS M2
MARK WITH FIBER GLASS FLAG
REPLACE 20 LF OF EXISTING 6" PIPE WITH
6" NON-PERFORATED HDPE @ EXISTING GRADE
REPLACE 20 LF OF EXISTING 6" PIPE WITH 8" CMP
AND ANIMAL GUARD @ EXISTING GRADE
REFER TO DETAIL
32 LF OF 6" NON-PERFORATED HDPE
WITH ANTI-SEEP DEVICE @ EXISTING GRADE
SB. M.1.3.7
SEE SHEETS D.01-D.05
SB M.2 GULLY/ ROCK PILE
9 10
5+00
8.
4.
5+25
8.
4.
5+50
8.
4.
5+75
8.
4.
6+00
8.
4.
6+25
8.
4.
6+50
8.
4.
6+75
8.
4.
7+00
8.
4.
7+25
8.
4.
7+50
7.
4.
7+75
7.
4.
8+00
7.
4.
8+25
7.
4.
8+50
7.
4.
8+75
7.
4.
9+00
7.
4.
9+25
7.
4.
9+50
7.
4.
9+75
7.
4.
6" PERFORATED HDPE TILE
581 LF @ 0.07%
STA: 4+49 TO 10+29
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
PROPOSED FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - PROPOSED FLOWLINE
SET WEIR ELEVATION (TYP)
32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SCALE IN FEET
20 40
---- ---- D.07
D.07 SB.DM.2 PLAN & PROFILE
25-32609
12/23/2025
D.07
EMD
EMD
SB. .2 PLAN &
PROFILE
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
TOP OF BANK (TYP)
BUFFER EXTENTS (TYP)
SB. M.1.3.7
SEE SHEETS D.01-D.05
SB. M.2
9 10
9+25
7.
4.
9+50
7.
4.
9+75
7.
4.
10+00
7.
4.
10+25
7.
4.
10+50
6" PERFORATED HDPE TILE
581 LF @ 0.07%
STA: 4+49 TO 10+29
674.42 10+29
INSTALL 6"
TILE END CAP,
WATER TIGHT
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
PROPOSED FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - PROPOSED FLOWLINE
SET WEIR ELEVATION (TYP)
32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SCALE IN FEET
20 40
---- ---- D.08
D.08 SB.DM.2 PLAN & PROFILE
25-32609
12/23/2025
D.08
EMD
EMD
SB. .2 PLAN &
PROFILE
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
GULLY FLOWLINE (TYP)
SOIL BORING LOCATION (TYP)
TOP OF BANK (TYP)
BUFFER EXTENTS (TYP)
SB M.2
SB. M.1.3.7
SEE SHEETS D.01-D.05
SB. M.4
SEE SHEET D.09
M3
6" CPT
BUFFER SEEDING ONLY
>>0
1 2
4 4
0+00
7.
3.
0+25
7.
3.
0+50
7.
3.
0+75
7.
3.
1+00
7.
2.
1+25
7.
2.
1+50
7.
2.
1+75
7.
2.
2+00
7.
2.
2+25
7.
2.
2+50
6.
2.
2+75
6.
2.
3+00
6.
2.
3+25
6.
2.
3+50
6.
2.
3+75
6.
2.
4+00
6.
2.
4+25
6" PERFORATED HDPE TILE
414 LF @ 0.33%
STA: 0+00 TO 4+14
WCS M4
6' WATER CONTROL STRUCTURE
GROUND ELEVATION: 676.18'
WEIR 1 CREST ELEVATION: 675.00'
DISPERSION LINE INVERT: 671.95'
ESTIMATED TILE FL ELEVATION: 671.95'
673.31 0+00
INSTALL 6"
TILE END CAP,
WATER TIGHT
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
PROPOSED FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - PROPOSED FLOWLINE
SET WEIR ELEVATION (TYP)
32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SCALE IN FEET
20 40
---- ---- D.09
D.09 SB.DM.4 PLAN & PROFILE
25-32609
12/23/2025
D.09
EMD
EMD
SB. .4 PLAN &
PROFILE
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
BUFFER EXTENTS (TYP)
TOP OF BANK (TYP) SOIL BORING LOCATION (TYP)
M3
6" CPT
M4
8" CPT
WCS M4
MARK WITH FIBER GLASS FLAGREPLACE 20 LF OF EXISTING 8" PIPE
WITH 8" NON-PERFORATED HDPE @ EXISTING GRADE
40 LF OF 8" NON-PERFORATED HDPE WITH
ANTI-SEEP DEVICE @ EXISTING GRADE
REPLACE 20 LF OF EXISTING 8" PIPE
WITH 10" CMP AND ANIMAL GUARD
@ EXISTING GRADE
REFER TO DETAIL
WATER WAY (TYP)
M5
6" CMP
SB. M.4
SB M.1.3.7
SEE SHEETS D.01-D.05
BUFFER SEEDING
ONLY
EDGE OF FIELD (TYP)
32609-BUFFER PLAN-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
BU
FF
ER
P
LA
N
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- D.10
D.10 BUFFER EXTENSION
25-32609
12/23/2025
D.10
EMD
EMD
BUFFER
EXTENSION
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
SCALE IN FEET
100 200
SEEDING LEGEND
SYMBOL DESCRIPTION UNITS QUANTITY
BUFFER INITIATIVE SEEDING AC 4.82
*SEEDING AREA ESTIMATED BASED ON AERIALS
AVERAGE 30 FT WIDTH FROM TOP OF BANK
BUFFER EXTENTS (TYP)
WATERWAY (TYP)
TOP OF BANK (TYP)
BUFFER INITIATIVE SEEDING
1 TILE
0+00
4.
3.
0+25
9.
3.
0+50
8.
3.
0+75
7.
3.
1+00
7.
3.
1+25
7.
4.
1+50
8.
4.
1+75
8.
4.
2 TILE
0+00
4.
3.
0+25
6.
3.
0+50
8.
3.
0+75
9.
4.
1+00
9.
5.
1+25
9.
5.
1+50
9.
5.
1+75
9.
5.
2+00
9.
5.
3 TILE
0+00
1.
1.
0+25
4.
1.
0+50
6.
1.
0+75
5.
1.
1+00
5.
2.
1+25
5.
2.
1+50
5.
2.
1+75
6.
1.
2+00
6.
1.
4 TILE
0+00
1.
1.
0+25
6.
1.
0+50
6.
1.
0+75
6.
2.
1+00
6.
2.
1+25
6.
2.
1+50
6.
2.
1+75
6.
2.
2+00
6.
2.
5 TILE
0+00
0.
0.
0+25
3.
1.
0+50
5.
2.
0+75
5.
2.
1+00
5.
2.
1+25
5.
2.
1+50
5.
2.
1+75
5.
2.
6 TILE
0+00
1.
0.
0+25
6.
1.
0+50
6.
1.
0+75
6.
1.
1+00
6.
2.
1+25
6.
2.
1+50
7.
2.
1+75
7.
2.
7 TILE
0+00
0.
0.
0+25
5.
0.
0+50
5.
0.
0+75
5.
1.
PROFILE VIEW LEGEND
NOTE: AS VIEWED IN THE DIRECTION OF INCREASING STATION
EXISTING GROUND
EXISTING FLOWLINE
.0
.00 CXXX.X - EXISTING GROUND L
XXX.XX - EXISTING FLOWLINE
EXISTING GROUND
EXISTING TILE FLOW LINE
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
EXISTING TILE FLOW LINE
EXISTING TILE FLOW LINE
EXISTING TILE FLOW LINE
EXISTING TILE FLOW LINE
EXISTING TILE FLOW LINE
EXISTING TILE FLOW LINE
32609-PROFILE-SITE22
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- M
IL
LA
G E
BR
O
S\
9-
PR
O
FI
LE
-S
IT
E2 2.
D W
G S
AV
ED
B Y:
E R
IN
.D
W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- E.01
E.01 EXISTING TILE PROFILES
25-32609
12/23/2025
E.01
EMD
EMD
EXISTING TILE
PROFILES
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
32609-TITLE-SITE24
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- P
C W
\3
-T
IT
LE
-S
IT
E2 4.
D
D B
Y:
E
R
IN
.D W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
SITE 24
MUSCATINE COUNTY, IOWA
HEARTLAND CO-OP BATCH AND BUILD
ISG PROJECT # 25-32609
PROJECT LOCATION
B.M. ELEVATION=651.49
TOPOGRAPHIC SURVEY
THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS
OF DATA COLLECTED IN MARCH 2025 BY
HEARTLAND CO-OP.
LOCATION MAP
PROJECT DATUM
HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE
NORTH AMERICAN DATUM OF 1983 (NAD83), SOUTH ZONE, ON THE
IOWA STATE PLANE COORDINATE SYSTEM, IN U.S. SURVEY FEET.
ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND
VERTICAL COORDINATES FOR THIS PROJECT.
SPECIFICATIONS REFERENCE
ALL CONSTRUCTION SHALL COMPLY WITH THE COUNTY OF
MUSCATINE COUNTY REQUIREMENTS AND WITH THE 2024
EDITION OF THE NATURAL RESOURCES CONSERVATION
SERVICE CONSERVATION PRACTICE 604 (SATURATED BUFFER),
UNLESS DIRECTED OTHERWISE.
HTTPS://EFOTG.SC.EGOV.USDA.GOV/API/CPSFILE/34855/604_IA_CPS_SATURATED_BUFFER_2024
N
S
W E
12/23/2025
25-32609
A.01 TITLE
---- ---- A.01
A.01
CONSTRUCTION PLANS
TITLE
EMD
EMD
SDP
PROJECT INDEX:
OWNER:
WATERSHED COORDINATOR:
HEARTLAND CO-OP
PROJECT
ADDRESS / LOCATION:
T78N, R4W
WAPSINONOC TWP
MUSCATINE COUNTY, IOWA 52776
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
PROJECT GENERAL NOTES
GIS DISCLAIMER:
INFORMATION FOR THE BOUNDARY / LOT LINES, AND UNDERGROUND UTILITIES SHOWN WAS DERIVED FROM DIGITAL DATABASES AND IS FOR INFORMATIONAL PURPOSES ONLY. DATA MAY NOT HAVE BEEN
PREPARED FOR, OR BE SUITABLE FOR: LEGAL, ENGINEERING, OR SURVEYING PURPOSES.
1. ALL WORK SHALL CONFORM TO THE CONTRACT
DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO,
THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT
MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY
CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL
DISCIPLINES AND ALL ADDENDA, MODIFICATIONS, AND
CLARIFICATIONS ISSUED BY ARCHITECT/ENGINEER.
2. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL
SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN
COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT
AND COMPLETE COORDINATION OF ALL WORK.
3. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED
DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY
DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION
OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
4. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR
CONDITIONS REQUIRING INFORMATION OR CLARIFICATION
BEFORE PROCEEDING WITH THE WORK.
5. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE
PROFILES AND TYPE OF DETAILING REQUIRED
THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE
SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE
SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT
CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER
BEFORE PROCEEDING WITH THE WORK.
6. ALL MANUFACTURED ARTICLES, MATERIALS, AND
EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED,
ERECTED, CLEANED, AND CONDITIONED ACCORDING TO
MANUFACTURERS' INSTRUCTIONS. IN CASE OF
DISCREPANCIES BETWEEN MANUFACTURERS'
INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY
ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE
WORK.
7. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED
FROM EACH OTHER TO AVOID GALVANIC CORROSION.
8. THE LOCATION AND TYPE OF ALL EXISTING UTILITIES
SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION
ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST
OF THE KNOWLEDGE OF I & S GROUP, INC. (ISG). NO
WARRANTY OR GUARANTEE IS IMPLIED. THE
CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS, AND
ELEVATIONS OF ALL EXISTING UTILITIES PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY
NOTIFY ENGINEER OF ANY DISCREPANCIES OR
VARIATIONS FROM PLAN.
9. THE CONTRACTOR IS TO CONTACT "IOWA ONE CALL" FOR
UTILITY LOCATIONS A MINIMUM OF 2 BUSINESS DAYS
PRIOR TO ANY EXCAVATION / CONSTRUCTION
(1-800-292-8989).
217 EAST 2nd STREET
SUITE 110
DES MOINES, IA 50309
PHONE: 515.243.9143
DES MOINES OFFICE
MANAGING OFFICE:
I & S GROUP, INC. (ISG)
Printed or typed name
(signature) (date)
License number
SEAL
WIO A
I hereby certify that this engineering document was prepared by me or under direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
My license renewal date is December 31, Pages or sheets covered by this seal:
SPENCER
DEAN PECH
P28161
SPENCER DEAN PECH
P28161
SCALE IN FEET
5000 10000
SHEET INDEX
2022-
ENGINEER OF RECORD: SPENCER PECH
EMAIL: SPENCER.PECH@ISGINC.COM
PROJECT MANAGER: OWEN OELTJEN BRUNS
EMAIL: OWEN.OELTJENBRUNS@ISGINC.COM
12/23/25
ALL SHEETS
A.01 .TITLE
A.02 SITE OVERVIEW
B.01 DETAILS
B.02 DETAILS
C.01 ESTIMATE REFERENCE, QUANTITIES & CONSTRUCTION NOTES
D.01 SB. .1.2 PLAN & PROFILE
D.02 SB. .1.2 PLAN & PROFILE
D.03 BUFFER EXTENSION
E.01 EXISTING TILE PROFILES
BM1:IN FENCE
NORTHING: 562817.0620
EASTING: 2230202.4387
@IOWA§
ONE CALL
HEARTLAND
CO-OP BATCH
AND BUILD
SITE 24 PCW
MUSCATINE COUNTY IOWA
https://isgrp.sharepoint.com/:b:/r/sites/Watercooler/Firm/2024%20Legal%20Name%20By%20State%20Handout.pdf?csf=1&web=1&e=W3JLIo
32609-TITLE-SITE24
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- P
C W
\3
-T
IT
LE
-S
IT
E2 4.
D
D B
Y:
E
R
IN
.D W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- A.02
A.02 SITE OVERVIEW
25-32609
12/23/2025
EMD
EMD
SITE OVERVIEW
I HAVE REVIEWED AND AGREE WITH THE CONTENTS OF THE
PLAN AND SPECIFICATIONS AS PREPARED.
LANDOWNER SIGNATURE DATE
CONTRACTOR IS RESPONSIBLE FOR CALLING IOWA ONE CALL
ONE CALL TICKET NO.
IF A CULTURAL RESOURCE IS IDENTIFIED DURING
CONSTRUCTION, WORK WILL STOP IMMEDIATELY AND THE
LOCAL NRCS FIELD OFFICE WILL BE NOTIFIED.
I CERTIFY THAT THIS PRACTICE HAS BEEN CONSTRUCTED IN
ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
CONTRACTORS SIGNATURE DATE
ENGINEER'S REP. SIGNATURE DATE
SITE ACCESS
SB. W.1.2
DISPERSION LENGTH: 790 LF
TREATED ACRES: 99.4
WCS (TYP)
EXISTING TILE (TYP)
-78-04
SITE 24 PCW
LLC
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, JUDGEMENT,
BELIEF, THE PLANS MEET APPLICABLE NRCS STANDARDS.
ENGINEER'S SIGNATURE DATE
SURVEY BENCHMARKS*
DESCRIPTION NORTHING EASTING ELEVATION
BM1: IN FENCE 562817.0620 2230202.4387 651.49
*ENGINEER TO PROVIDE FINAL BENCHMARKS AND CONTROL POINTS FOR CONSTRUCTION
BENCHMARK: BM1
W1 W2
SCALE IN FEET
170 340
IA NRCS JOB CLASS II
12/23/25
ACRES REMOVED FROM PRODUCTION: 1.03
32609-DETAILS-SITE 24
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- P
C W
\3
-D
ET
AI
LS
-S
IT
E
.D
W G
S
AV
ED
B
Y:
E
R
IN
.D W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- B.01
B.01 DETAILS
25-32609
12/23/2025
EMD
EMD
DETAILS
OPTION 1 WCS SPECIFIC:
1. FLASH BOARDS SHALL BE PVC.
2. ALL RIVETS SHALL BE STAINLESS STEEL.
3. FLASHBOARD CHANNEL SHALL BE ANODIZED ALUMINUM.
4. FLASHBOARDS WILL REMAIN IN STRUCTURE DURING INSTALLATION.
5. FLASHBOARDS SHALL BE LUBRICATED UPON REMOVAL.
OPTION 2 WCS SPECIFIC:
1. RISER PIPE TO BE CUT FROM BOTTOM. PIPE HANDLE (BOLT) TO REMAIN WITH RISER.
WCS GENERAL NOTES:
1. TOOL TO REMOVE FLASHBOARDS/ACTUATE VALVE IS TO REMAIN IN WCS
FOLLOWING INSTALLATION.
2. FOR INLET ADAPTER, MAX SIZE IS TWO SIZES DOWN FROM STRUCTURE SIZE (I.E. 8"
ADAPTER ON 12" STRUCTURE.
3. CHECK TO ENSURE THE STRUCTURE IS LEVEL PRIOR TO BACKFILLING. PLACE THE
BACKFILL MATERIAL AROUND THE STRUCTURE IN 6" LIFTS AND COMPACT BACKFILL
BY HAND ONLY. DO NOT USE POWERED EQUIPMENT TO COMPACT THE BACKFILL.
4. WATER CONTROL STRUCTURES WILL HAVE A MINIMUM OF 20' NONPERFORATED
PIPE BETWEEN WATER CONTROL STRUCTURE AND DITCH.
5. ONE ANTISEEP COLLAR WILL BE INSTALLED ON THE 20' OF NONPERFORATED PIPE
BETWEEN THE WATER CONTROL STRUCTURE AND DITCH.
6. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION OF
WATERTIGHT TEE, INCLUDING MINIMUM ANGLE OF SEPARATION.
7. WATER TIGHT TEE, QUANTITY, AND INSTALLATION METHOD DEPENDENT ON WCS
MANUFACTURER.
8. FINAL CONFIGURATION OF WATER CONTROL STRUCTURES WILL BE DETERMINED BY
AVAILABILITY FROM THE MANUFACTURER.
9. COMPONENTS OF WATER CONTROL STRUCTURES MAY BE PRICED SEPARATELY
DEPENDING ON THE SUPPLIER.
NRCS NOTES*:
1. WATER CONTROL STRUCTURE (WCS) MATERIALS AND INSTALLATION SHALL BE IN
CONFORMANCE WITH IOWA NRCS PRACTICE STANDARD 604 (SATURATED BUFFER).
2. CONNECTING PIPE MATERIALS AND INSTALLATION SHALL BE IN CONFORMANCE
WITH CS IA-45; IA-46, TILE DRAINS FOR LAND DRAINAGE; IA-51, CORRUGATED METAL
PIPE CONDUITS; OR IA-52, STEEL PIPE CONDUITS.
3. WCS SHALL BE FABRICATED OF PVC WITH INTEGRAL UPSTREAM AND DOWNSTREAM
WATER-TIGHT COUPLING CONNECTIONS, CORROSION-RESISTANT STOP BOARDS,
ALUMINUM EXTRUSIONS AND STAINLESS STEEL FASTENERS AND APPURTENANCES.
ACCEPTABLE MODELS INCLUDE AGRI DRAIN, NYLOPLAST, OR APPROVED EQUAL.
4. WCS SHALL PROVIDE FLOW CAPACITY EQUAL TO OR GREATER THAN THAT OF
ADJACENT PIPE UNDER EXPECTED FLOW CONDITIONS.
5. STOP BOARDS SHALL PROVIDE A WATER-TIGHT SEAL UNDER 4 FT OF PRESSURE
HEAD (MIN.).
6. IN SITUATIONS WHERE WATER LEVELS HIGHER THAN MAXIMUM DESIGN ELEVATION
WOULD IMPACT NEIGHBORING PROPERTIES OR OTHER ASPECTS OF THE SITE
DESIGN, CONSIDER A CUSTOM-ORDER BOX WHICH LIMITS EXTENT OF STOP BOARD
TRACKS TO THE MAXIMUM DESIGN WEIR ELEVATION.
7. STOP BOARD REMOVAL TOOL SHALL BE PROVIDED.
8. AS AN ALTERNATIVE TO A STOP BOARD STRAIGHT WEIR STRUCTURE, A CIRCULAR
INNER STANDPIPE MAY BE PROVIDED WHICH MEETS THE DESIGN FLOW
REQUIREMENTS, WITH APPROVAL OF THE ENGINEER (NYLOPLAST STANDPIPE WCS
OR EQUAL).
9. ALL CONNECTIONS SHALL BE WATER-TIGHT.
10. STRUCTURE LID SHALL BE PROVIDED WITH LOCKING MECHANISM.
11. BACKFILL AROUND THE WCS SHALL MEET THE REQUIREMENTS OF CS IA-45. NORMAL
STOP BOARD OPERATION SHALL BE VERIFIED FOLLOWING BACKFILL.
12. MARK LOCATION OF EACH STRUCTURE USING POST OR MANUFACTURED MARKER
FLAG FOR SAFETY IN THE FIELD
*FROM USDA-NRCS IA-1530 STANDARD DRAWING
3" GATE VALVE
OUTLET FITTING
RISER PIPE TO CONTROL
WATER LEVEL CUT WITH
BOTTOM AS WASTE
DRAIN BASIN
BLIND TEE
PVC LID WITH ROPE
HANDLE(S) LOCKING ROD
WATER FLOW WATER FLOW
DRAIN BASIN
STRUCTURE PIPE TO CONTROL
WATER LEVEL
3" GATE VALVE
WATER FLOWWATER FLOW
WATER TIGHT TEE BELOW WEIR
FIELD INSTALLATION (TYP.)
WATER TIGHT TEE BELOW WEIR
FIELD INSTALLATION (TYP.)
BED WITH 6" OF 1.5" AGGREGATE
FLOW FLOW
WATER TIGHT FITTING
FOR UPSTREAM
CONNECTING PIPE
BED WITH 6" OF 1.5" AGGREGATE
1' TYP
LID TO BE FURNISHED WITH STRUCTURE
WATER TIGHT FITTING FOR
DISPERSION LINE WATER TIGHT FITTING
FOR DOWNSTREAM
CONNECTING PIPE
ALL FLASH BOARDS SHALL BE FITTED
WITH LIFTING HOOKS AND EDPM SEAL
(NOT SHOWN)
EXTRA FLASH BOARDS TO BE
PULLED ABOVE SET WEIR ELEVATION
FOR STORAGE
FLASH BOARD GUIDE CHANNEL
OPTION 1
WATER CONTROL STRUCTURE DETAIL
NTS
OPTION 2
WATER CONTROL STRUCTURE DETAIL
NTS
EXISTING GROUND, TYP
BELL ADAPTOR CONNECTS WATER
CONTROL STRUCTURE TO
DISPERSION LINE
SECURING CLAMP
RUBBER SLEEVE
GAP ACCOMMODATES
WALL OF
WATER CONTROL
STRUCTURE
WATER TIGHT LATERAL TEE FITTING
NTS
SITE 24 PCW
LLC
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- P
C W
\3
-D
ET
AI
LS
-S
IT
E
.D
W G
S
AV
ED
B
Y:
E
R
IN
.D W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- B.02
B.02 DETAILS
25-32609
12/23/2025
EMD
EMD
DETAILS
SITE 24 PCW
LLC
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
FL
OW
FLOW
WATER TIGHT
COUPLER
WATER TIGHT
COUPLER
WATER TIGHT
COUPLERFL
OW
FLOW
PREFABRICATED TEE
INCIDENTAL TO WCS
INSTALLATION
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
3-CHAMBER WATER CONTROL STRUCTURE
ALTERNATE CONFIGURATION
NTS
2-CHAMBER WATER CONTROL STRUCTURE
ALTERNATE CONFIGURATION
NTS
FL
OW
WATER TIGHT
COUPLER
WATER TIGHT
COUPLERFL
OW
FLOW
PREFABRICATED TEE
INCIDENTAL TO WCS
INSTALLATION
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
TILE OUTLET
NTS
2' (± 1')
4' (± 2')
CMP
EXISTING DRAIN TILE
2' MAX
EX. GROUND (TYP)
PLACE CMP OVER TILE A MINIMUM OF 6".
ENCASE JOINT IN 4" x 12" CONCRETE COLLAR.
THIS IS INCIDENTAL TO CMP PIPE WORK
DESIGN BOTTOM ELEVATION
EXTEND TILE TO CMP AS NEEDED WITH TILE MATERIAL APPROVED BY ENGINEER
CE
NT
ER
LIN
E
OP
EN
D
ITC
HWHERE APPLICABLE PLACE ENGINEER APPROVED
PIPE MATERIAL OVER TILE. ENCASE JOINT IN 4" x 12"
CONCRETE COLLAR
6" MIN INSTALL ANIMAL GUARD.
THIS IS INCIDENTAL TO TILE
OUTLET INSTALLATION
WATER CONTROL STRUCTURE
ANTI-SEEP COLLAR
NEW CMP DIAMETER
SHALL BE SMALLEST STANDARD SIZE THAT WILL FIT OVER TILE
ANIMAL GUARD DETAIL
NTS
WCS 1
6'x8" 2-CHAMBER
NTS
FL
OW8 INCH WATER
TIGHT COUPLER
8 INCH WATER
TIGHT COUPLERFL
OW
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
FLOW
TO WCS W2
8 INCH WATER
TIGHT COUPLER
WCS 2
6'x8" 2-CHAMBER
NTS
FL
OW8 INCH WATER
TIGHT COUPLER
8 INCH WATER
TIGHT COUPLERFL
OW
FL
OW
GASKETED STOP BOARDS
WITH LIFTING HOOKS
FLOW FLOW
6 INCH WATER
TIGHT COUPLER
8 INCH WATER
TIGHT COUPLER
USE EXISTING OUTLET PIPES AS CONSTRUCTED
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
H
EA
R
TL
AN
D C
O O
P
EO
F
BA
TC
H
-W
ES
T
LI
BE
R
TY
IA
\3
P
R O
D U
C
TI
O N
F
IL
ES
\3
C
IV
IL
D \P
R O
D U
C
TI
O N
D W
G S\
SI
TE
- P
C W
\3
-D
ET
AI
LS
-S
IT
E
.D
W G
S
AV
ED
B
Y:
E
R
IN
.D W
EN
G
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- C.01
C.01 ESTIMATE REFERENCE, QUANTITIES & CONSTRUCTION NOTES
25-32609
12/23/2025
EMD
EMD
ESTIMATE
REFERENCE,
QUANTITIES &
CONSTRUCTION
NOTES
SITE 24 PCW
LLC
HEARTLAND
CO-OP BATCH
AND BUILD
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
EARTHWORK:
1.) UTILITIES. CONTRACTOR MUST CALL IOWA ONE CALL (1-800-292-8989) AT LEAST 48 HOURS (EXCLUDING WEEKENDS AND HOLIDAYS) PRIOR TO EXCAVATION BEING STARTED. CONTRACTOR IS TO IMMEDIATELY NOTIFY OWNER OF APPARENT CONFLICTS OF EXISTING UTILITIES WITH THE WORK. THE CONTRACTOR IS
RESPONSIBLE FOR PROTECTION OF ANY UTILITIES ENCOUNTERED ON THE JOB SITE.
2.) TOPSOIL. FOR ALL OPEN TRENCH AND STRUCTURE EXCAVATIONS, CONTRACTOR IS REQUIRED TO STRIP AND SEGREGATE THE TOP TWELVE (12) INCHES OF TOPSOIL FROM SUBSOIL BY PLACING TOPSOIL ON ONE SIDE OF THE TRENCH AND REMAINING SPOIL ON OPPOSITE SIDE. STOCK PILES ARE TO BE PLACED SO AS NOT TO BLOCK FLOWS IN DRAINAGE WAYS. USE TOPSOIL FOR THE TOP ONE (1) FOOT OF BACKFILL FOR TRENCHES AND STRUCTURES. CONTRACTOR IS REQUIRED TO DESCRIBE TO THE ENGINEER HOW TOPSOIL WILL BE MANAGED AT THE PRE-CONSTRUCTION CONFERENCE.
3.) SPOILS. UNLESS OTHERWISE NOTED, EXCAVATED SPOILS NOT USED FOR BACKFILL SHALL BE SPREAD EVENLY IN CONSTRUCTION AREA AS TO NOT IMPEDE
DRAINAGE. ALL EFFORTS SHALL BE MADE TO KEEP TOPSOIL ON TOP.
4.) CROP PROTECTION. CONTRACTOR IS DIRECTED TO LIMIT DAMAGES TO CROPS IN THE ACCESS AND WORK AREAS AS CAN BE ACCOMPLISHED WITHOUT
MATERIALLY SLOWING THE WORK PROGRESS.
TILE INSTALLATION:
1.) WORK LIMITS.