RFP_HC1047-14-R-4006.pdf
PDF 1 MB Posted
- Solicitation number
- HC1047-14-R-4006
- Issued by
-
Defense Information Systems Agency
About this file
RFP HC1047-14-R-4006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_Amendment_HC1047-14-R-4006-0004.pdf | ||
| Attachment_7_-_SF1408.pdf | ||
| RFP_AMD_0003.pdf | ||
| Attachment_3_-_Cost-Price_Worksheet_02062014.xls | XLS spreadsheet | |
| RFP_AMD_0002.pdf | ||
| Attachment_6_-_EPL_Worksheet.xls | XLS spreadsheet | |
| RFP_AMD_0001.pdf | ||
| HC1047-14-R-4006_Questions_and_Answers_02052014_(2).xls | XLS spreadsheet | |
| Attachment_2_-_Past_Performance_References.doc | DOC document | |
| Attachment_3_-_Cost-Price_Worksheet.xls | XLS spreadsheet | |
| Attachment_4_-_DD_254.pdf | ||
| Attachment_5_-_Cross_Reference_Matrix.doc | DOC document | |
| Attachment_1_-_Past_Performance_Questionnaire.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISA/CONTRACTS-NCR
P.O. BOX 549
FT. MEADE MD 20755
301-677-5285
703-681-0346
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
$25.5M
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
HC1047-14-R-4006 22-Jan-2014
b. TELEPHONE NUMBER
301-225-4052
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 24 Feb 2014
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
HC1047
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE HC1047 16. ADMINISTERED BY
DISA/CTO
HELEN HAREWOOD
6910 COOPER AVE
FORT MEADE MD 20755
TEL: 301-225-9483 FAX:
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
WALTER F. HOLT
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
541511
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: 100 % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
HC1047-14-R-4006
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months Contract Management
FFP
IAW PWS dated 13 Dec 13, provide the necessary personnel needed to support
PWS Task 1 and all subtask.
FOB: Destination
NET AMT
0002 Cost Engineering Support
CPFF
PWS Task 2 and all subtask. Invoices shall be submitted monthly.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0003 Cost Technology Piloting and Demonstration
CPFF
Support IAW PWS dated 13 Dec 13, provide the necessary personnel needed to support PWS Task 3 and all subtask. Invoices shall be submitted monthly.
0004 12 Months Program Control Technical Support
FFP
PWS Task 4. Invoices shall be submitted monthly.
0005 Cost System Engineering and Integration
CPFF
support PWS Task 5 and all subtask. Invoices shall be submitted monthly.
0006 Cost Mission Assurance Systems Engineering
CPFF
(OPTIONAL) Support IAW PWS dated 13 Dec 13, provide the necessary personnel needed to support PWS Task 6 and all subtask. Invoices shall be submitted monthly.
0007 Cost Travel
COST
Travel in support of the DISA mission. All travel must be pre-approved by the
COR/TM prior to incurring the cost. The contractor shall be authorized to invoice on a monthly basis. Travel shall be in accordance with Joint Travel Regulations and FAR subpart 31.205-46.
1001 12 Months OPTION Contract Management
FFP
1002 Cost OPTION Engineering Support
CPFF
1003 Cost OPTION Technology Piloting and Demonstration
CPFF
1004 12 Months OPTION Program Control Technical Support
FFP
1005 Cost OPTION System Engineering and Integration
CPFF
1006 Cost OPTION Mission Assurance Systems Engineering
CPFF
(OPTIONAL) Support IAW PWS dated 13 Dec 13, provide the necessary
1007 Cost OPTION Travel
COST
Travel in support of the DISA mission. All travel must be pre-approved by the
COR/TM prior to incurring the cost. The contractor shall be authorized to invoice on a monthly basis. Travel shall be in accordance with Joint Travel Regulations
2001 12 Months OPTION Contract Management
FFP
2002 Cost OPTION Engineering Support
CPFF
2003 Cost OPTION Technology Piloting and Demonstration
CPFF
2004 12 Months OPTION Program Control Technical Support
FFP
2005 Cost OPTION System Engineering and Integration
CPFF
2006 Cost OPTION Mission Assurance Systems Engineering
CPFF
(OPTIONAL) Support IAW PWS dated 13 Dec 13, provide the necessary
2007 Cost OPTION Travel
COST
Travel in support of the DISA mission. All travel must be pre-approved by the
COR/TM prior to incurring the cost. The contractor shall be authorized to invoice on a monthly basis. Travel shall be in accordance with Joint Travel Regulations
3001 12 Months OPTION Contract Management
FFP
3002 Cost OPTION Engineering Support
CPFF
3003 Cost OPTION Technology Piloting and Demonstration
CPFF
3004 12 Months OPTION Program Control Technical Support
FFP
3005 Cost OPTION System Engineering and Integration
CPFF
3006 Cost OPTION Mission Assurance Systems Engineering
CPFF
(OPTIONAL) Support IAW PWS dated 13 Dec 13, provide the necessary
3007 Cost OPTION Travel
COST
Travel in support of the DISA mission. All travel must be pre-approved by the
COR/TM prior to incurring the cost. The contractor shall be authorized to invoice on a monthly basis. Travel shall be in accordance with Joint Travel Regulations
4001 12 Months OPTION Contract Management
FFP
4002 Cost OPTION Engineering Support
CPFF
4003 Cost OPTION Technology Piloting and Demonstration
CPFF
4004 12 Months OPTION Program Control Technical Support
FFP
4005 Cost OPTION System Engineering and Integration
CPFF
4006 Cost OPTION Mission Assurance Systems Engineering
CPFF
(OPTIONAL) Support IAW PWS dated 13 Dec 13, provide the necessary
4007 Cost OPTION Travel
COST
Travel in support of the DISA mission. All travel must be pre-approved by the
COR/TM prior to incurring the cost. The contractor shall be authorized to invoice on a monthly basis. Travel shall be in accordance with Joint Travel Regulations
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
As of 21 January 2014
Contract Number: TBD
Task Order Number: TBD
1. Contracting Officer Representative (COR):
a. Primary COR:
Name:
Organization:
Department of Defense Activity
Address Code (DODAAC):
Address:
Phone No.:
Fax Number:
E-Mail Address:
b. Alternate COR:
Name:
Organization:
DODAAC:
Address:
2. Task Order Title: Advanced Enterprise Information Technology and Architecture (AEITA) Support
3. Background
The Defense Information Systems Agency (DISA) faces growing challenges in the areas of Technology
Management and Information Assurance. The latest DISA Campaign Plan calls for significant improvements in DISA’s abilities to address these critical areas. The DISA Chief Technology Officer
(CTO) facilitates the rapid transfer of advanced technology from research and experimentation stages through pilot operations to deployment and full-scale implementation within DISA and Department of
Defense (DoD) Defense Information Infrastructure (DII) and mission or enterprise software and platform capabilities. The organization coordinates or facilitates coordination of the rapid insertion of this advanced technology into leading edge pilot services for the joint forces and multi-services command, control, communications, computers, and intelligence (C4I) systems and software. The CTO’s office serves as a vehicle for implementing long-range technology strategy among DISA, Combatant
Commanders (COCOM), Services, and coalition and mission partners. The Advanced Enterprise
Information Technology and Architecture (AEITA) will address DISA’s technology management challenge in carrying out its research and development mission. The Office of the Chief Technology
Officer (OCTO) needs to leverage advanced technology to develop next-generation information assurance architectures and solutions for the Global Information Grid (GIG).
4. Objectives: The objective is to provide the OCTO with technical expertise in the areas of security architectures, assessment of emerging security-related technologies, and planning of security-related technology migration strategies.
5. Scope: This effort will require technology expertise to define the Advanced Enterprise Information
Technology and Architecture (AEITA) processes, design and field the AEITA infrastructure, and to provide technical expertise to support technology assessment activities. The Advanced Enterprise
Information Technology and Architecture (AEITA) will address DISA’s technology management challenge in carrying out its research and development mission. The scope of this PWS is to provide comprehensive support in several areas to include: systems engineering and engineering management;
senior level computer science support, program strategy, transformation planning, and technology pilot and demonstration support. The requirement will support CTO, PEO-C2C, and MAE.
6. Performance Requirements:
6.1. Task 1: Management (CTO, PEO-C2C, and MAE)
The contractor shall perform and provide the task management, technical management and program management activities necessary to manage cost, schedule, and performance throughout the life of the contract.
6.1.1 Subtask 1 – Contract Management Plan
The contractor shall prepare and provide a Contract Management Plan describing the technical approach, organizational resources, and management controls to be employed to meet the cost, schedule and performance throughout contract execution. This plan shall include the contractor’s planned billing dates.
Deliverables: Contract Management Plan
6.1.2 Subtask 2 – Monthly Progress Reporting
The contractor shall provide a Monthly Status Report (MSR) and projected requirements of funds, staff-hours, and work completion for evaluation of the contractor’s progress based on the PWS tasks and subtasks. At a minimum, this data shall include: (1) A description of activities and deliverables during the current month for the contract. The descriptions shall include problem definitions and recommendations for program resolutions. More emphasis shall be given to risk management activities;
(2) Cumulative planned and cumulative actual hours, cumulative travel and cumulative actual dollars by task; and cumulative actual labor price by subtask; cumulative actual staff hours by subtask and by individual (including location) for the reporting period; (3) Trips, technical visits, and related results for the reporting period; and (4) Planned and actual billing dates. Monthly meetings will be held to review and discuss Interim Progress Review (IPR) Report content; (5) Technical Management – the contractor shall provide engineering support for the technical analysis, technology assessment and evaluation, technology planning and insertion, project planning and technical outreach activities. This shall include transition planning and prototyping and piloting coordination required to ensure relevancy to Warfighter needs and technical and functional soundness.
Deliverables: Monthly Invoice
Monthly Status Report
Monthly Interim Progress Review (IPR) Report via Power Point Slides
Monthly Interim Progress Review (IPR) Meeting
Monthly Interim Progress Report
6.2. Task 2: Engineering Support (CTO/TO1)
The contractor shall provide, systems engineering support services to DISA in defining, planning, implementing, and executing the Advanced Enterprise Information and Technology (AEITA) Support.
6.2.1 Subtask 1 – Strategic Technology Analysis, Engineering and Planning
The contractor shall provide technical support for targeted and focused technical studies and analyses that support the Agency’s technology strategies and implementations; provide support in the development of the DISA strategic objectives related to technology planning and management, technology and research coordination, and innovation initiatives; provide support to develop and mature the methodologies and processes for technology evaluation, technology strategic planning, and for technology management infrastructure operations; provide the below deliverables to support the CTO in reviewing the effectiveness of the Agency’s technology management processes. The work to be performed under this subtask is up to the Top Secret level and will require Sensitive Compartmented
Information (SCI) access eligibility.
Deliverables: Technology and Innovation Policy and Process Definition, Evaluation and Review, and Recommendations
Metrics and Definition Analysis
6.2.2 Subtask 2 – Technology Management Framework Engineering
The contractor shall provide technical support for planning, hosting and operations of the DISA
Technology Information Repository (DTIR), which supports AEITA operations, identification of technical approaches for implementing the DTIR, development and testing support of DTIR solutions conducted by other government and contract organizations, and support of the hosting and operations of the DTIR. The contractor shall also prepare and document DTIR requirements in coordination with the government, monitor use of the DTIR to gather information about its effectiveness and usability, and use the resulting information to feedback into the DTIR development activity.
Deliverables: DTIR Strategic Planning, Requirements Definition, and Design Architecture
Products
DTIR Functional Demonstrations
DTIR Innovation Sourcebook
DTIR User Guidance
6.2.3 Subtask 3 – Technology Evaluation and Assessment (TS-SCI)
The contractor shall support the OCTO by conducting technology evaluations and assessments in coordination with the Contracting Officer’s Representative (COR) in accordance with operational priorities in the DISA Technology Watch List. The contractor shall conduct technical evaluations, experiments, pilots, or assessments in the areas of biometric technologies, command and control technologies, communications and networking technologies, data and data management technologies, engineering and test support technologies, enterprise computing technologies, cloud computing technologies, mobility technologies and information assurance technologies. The contractor shall prepare the related technical evaluation and assessment reports. The work to be performed under this subtask is up to the Top Secret level and will require Sensitive Compartmented Information (SCI) access eligibility.
Deliverables:
Standards based Cloud Initiative
Mobility Initiative
Evaluation Assessment Report
6.3. Task 3: Technology Piloting and Demonstration Support (CTO/TO2)
The contractor shall provide systems engineering support services to define, execute, and transition innovative technologies in conjunction with Technology Piloting and Joint Concept Technology
Demonstrations (JCTD). This includes: technology piloting support; concept demonstration support; and customer service and network optimization.
6.3.1 Subtask 1 – Technology Piloting Support (TS-SCI)
The contractor shall provide expert and technical support to conduct technical studies, data collection, identification, analysis and evaluation of technology pilots. The contractor shall provide evaluation criteria to assess and evaluate cyber security and innovation pilots during technology identification, plan, design, engineering, and implementation. The cyber security pilot technologies may include managing mobile device services with sensors and software and code checking (static and dynamic code checking).
The innovation pilot technologies may include data communication between countries, big data, mobile device near field communications, and allowing users to access and retrieve information from various domains and networks. The work to be performed under this subtask is up to the Top Secret level and will require Sensitive Compartmented Information (SCI) access eligibility.
Deliverables: Technical Reports
Reference Materials
Network Analysis Findings and Recommendations White Paper
Trip Reports and Briefing Charts
6.3.2 Subtask 2 – Concept Demonstration Support
The contractor shall provide expert and technical support to conduct technical studies, data collection, identification, analysis and evaluation of Joint Concept Technology Demonstrations
(JCTDs). The contractor shall provide technical support and evaluation criteria to assess and evaluate concept demonstration identification, plan, design, engineering, and implementation. The
JCTDs may include social media and creating visualization of data in one application from disparate sources of data. The JCTDs can integrate suite of SOA web-services hosted in DISA enterprise data centers using attributed based access control, common data modeling, data mashups, messaging, and widget frameworks used in exposing and visualizing data based on DoD Net-Centric Data & Services
Strategy. The JCTDs require extensive knowledge of net-centric enterprise services, DoD data and services strategy, service oriented architecture concepts, data center architecture and production and infrastructure management, and networks. The work to be performed under this subtask is up to the
Top Secret level and will require Sensitive Compartmented Information (SCI) access eligibility.
Deliverables: JCTD Concept Briefings
JCTD Management Plans
JCTD Technology Transition Plans
Meeting Minutes/Trip Reports
6.3.3 Subtask 3 – Customer Service and Network Optimization
The contractor shall identify, assess, and resolve customer service and network optimization issues with
Global Information Grid GIG, Wide Area Network (WAN), and Local Area Network (LAN). The initiatives shall include cloud computing Infrastructure as a Service (IaaS), Platform as a Service (PaaS), Security as a Service (SaaS), data center standardization (latest technologies in compute, storage, and network), network optimization, and service improvement.
Deliverables: Technical Reports
Reference Materials
Network Analysis Findings and Recommendations White Paper
Trip Reports and Briefing Charts
6.4 Task 4 – Program Control Technical Support (PEO-C2C/SE&I)
The contractor shall perform program control to include project planning, scheduling, and facilitating meetings. The contractor shall support meeting attendance and provide requisite briefings at meetings, conferences, and working groups as needed with both internal and external organizations. The contractor shall provide management support for the generation, update and maintenance of relevant fiscal year budget briefings and spend plans. The contractor shall provide scheduling support through the preparation and maintenance of an Integrated Master Schedule (IMS). The contractor shall provide support for risk assessment and management activities of all tasked efforts and document them in quarterly risk assessment/status briefs. The contractor shall provide support needed for meetings in support of task activities such as scheduling, meeting agendas, meeting minutes, action items, setting up
Defense Connect Online (DCO) sessions, and setting up conference call-in lines. The contractor shall provide administrative support to include Action Information Management System (AIMS) suspense tracking and coordination, administration of relevant Defense Enterprise Portal Service (DEPS) and
SharePoint folders and folder content, and similar relevant administrative systems, applications, and repositories.
Deliverables: Briefing Slides
Spend Plan
Integrated Master Schedule (IMS)
Meeting Minutes and Agenda
6.5 Task 5: Systems Engineering and Integration Support (PEO-C2C/SE&I)
The contractor shall provide technical support to DISA’s Systems Engineering and Integration Office in the areas of program and administrative management, acquisition strategy and concepts, and systems engineering process refinements. The contractor shall perform a variety of systems engineering activities including planning, preparing, and executing state-of-the-art systems engineering concepts and strategies.
The contractor shall provide systems engineering and technical support in a variety of problem areas including the specific problem areas identified in the Subtasks below.
6.5.1 Subtask 1 – Acquisition Strategies and Concepts
The contractor shall provide management assistance focused on future capabilities strategies and concepts relevant to the application of DoDI 5000.02 and Component Acquisition Executive (CAE)
Guideline 004 using Agile Development/Agile Testing principles and methods. The contractor shall provide inputs/updates to the DISA Campaign Plan; prepare briefing presentations; and develop Concept
Papers/White Papers, Acquisition Strategies, and Concepts of Operation (CONOPS). Activities accomplished in support of this task shall be reported in the MSR.
Concept Papers
Acquisition Strategy
CONOPS
6.5.2 Subtask 2 – Systems Engineering Process Refinement
The contractor shall provide support for the update and refinement of the Systems Engineering (SE)
Process based on the practical lessons learned from its successful application to multiple applications and
Initiatives. The contractor shall provide advice and assistance in applying the SE Process to relevant capabilities and shall maintain the currency and accuracy of the SE Process briefing slides and any affected templates of that process briefing slide deck. Activities accomplished in support of this task shall be reported in the MSR.
6.6 Task 6: Mission Assurance Systems Engineering Support (MAE)
The contractor shall provide technical support to DISA’s Office of the Mission Assurance Executive
(MAE) in the areas of networks, platforms, clouds, computing environments, pilots, demonstrations, and services. The types of support may include but are not limited to requirements, architecture, system engineering, design, prototyping, piloting, and implementation with the emphasis on Mission Assurance
(MA), Information Assurance (IA), security, and resiliency. The networks include the classified
SIPRNet, unclassified NIPRNet, and public Internet. The scope of networks covers Local Area
Networks (LAN), Wide Area Networks (WAN), Virtual Private Networks (VPN), Cross-Domain
Solutions (CDS), commercial and DoD clouds, and interoperability between different types of networks.
The support includes planning of new security architectures, review assessment and piloting of emerging security-related technologies, and planning of security-related technology migration strategies.
6.6.1Subtask.1 – Secure Information Sharing (TS-SCI)
The contractor shall provide support in MA, IA, security, and resiliency in the areas of Defense
Enterprise Email (DEE), Defense Enterprise SharePoint Service, Active Directory Engineering, Identity
Management and Access Control, NIPRNet Systems Engineering, SIPRNet Network Security
Engineering, Trusted Network Engineering, Security Research and Development (R&D) Outreach, Secure Information Sharing, Secure Cloud Computing, and Security Process Engineering. The work to be performed under this subtask is up to the Top Secret level and will require Sensitive Compartmented
Information (SCI) access eligibility.
Deliverables: Architecture Products such as Microsoft Word documents and PowerPoint drawings, briefings, and relevant email updates
Design Products such as Microsoft Word documents and PowerPoint drawings, briefings, and relevant email updates
IA Data Sharing Specifications
Security Technical Implementation Guidelines (STIG)
6.6.2 Subtask 2 – Identity Management and Access Control
The contractor shall provide support in MA, IA, security, and resiliency for the migration from
LAN/platform-centric networks and computing environments to WAN/services-centric networks and computing environments.
Design Products such as Microsoft Word documents and PowerPoint drawings, briefings, and relevant email updates
6.6.3 Subtask 3 – NIPRNET Systems Engineering (TS-SCI)
The contractor shall support the MAE Office with the DISA’s Defense Enterprise Computing
Centers (DECC) efforts in technology refresh, modernization and standardization from the perspectives of MA, IA, security, and resiliency. The contractor shall assist with the DECC modernization and Joint Information Enterprise (JIE) related tasks. The work to be performed under this subtask is up to the Top Secret level and will require Sensitive Compartmented Information
(SCI) access eligibility.
Technical Solutions
6. 6.4Subtask 4 – SIPRNET Network Security Engineering (TS-SCI)
The contractor shall provide support to the MA Office in evolving the SIRPNET architecture and services from the perspectives of IA, security, and resiliency. The work to be performed under this subtask is up to the Top Secret level and will require Sensitive Compartmented Information (SCI) access eligibility.
Design Products such as Microsoft Word documents and PowerPoint drawings, briefings, and relevant email updates
6.6.5 Subtask 5 – Security Process Engineering (TS-SCI)
The contractor shall provide technical support on specific IA and security tasks, e.g., risk assessment, Continuity of Operations (COOP), contingency planning, firewall design, and/or others as needed.
The work to be performed under this subtask is up to the Top Secret level and will require Sensitive
Compartmented Information (SCI) access eligibility.
Deliverables: IA Security briefings and email updates
7. Performance Standards:
Performance Standard Acceptable Quality Level
(AQL)
Method of Surveillance
Subtask 6.1.1 Contract
Management Plan will be delivered on time and
Materials contain required information and are delivered on time 100% of the time.
Periodic inspection of deliverable products and services.
IAW the PWS Revisions that occur are minor and are resolved in a satisfactory manner.
Subtask 6.1.3 IPR Report will be on time and IAW the PWS
Materials contain required information and are delivered on time 100% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Periodic inspection of deliverable products and services.
Subtask 6.2.1 Technology and innovation Policy and
Process Definition, Evaluation and Review, and Recommendations will be on time and IAW the PWS
Reports are delivered on time at least 90% of the time. Revisions that occur are minor and are resolved in a satisfactory manner.
Quarterly inspection of deliverables.
Subtask 6.2.2 DTIR
Functional
Demonstrations will be on time and IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Quarterly inspection of deliverables.
Subtask 6.2.2 DTIR User
Guide will be on time and
IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.2.3 DTIR
Technology
Artifacts/Content
Adjudication will be on time and IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.2.3 Technology
Evaluation/Assessment
Artifacts and Reports will be on time and IAW the
PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.3.1 Tech
Piloting Technical
Reports will be delivered on time and IAW the
PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.3.1 Tech
Piloting Reference
Materials contain required information and are delivered on
Random inspection of deliverable
Materials will be delivered on time and
IAW the PWS time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Subtask 6.3.1 Tech
Piloting Network Analysis
Findings and White
Papers will be delivered on time and IAW the
PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.3.1 Tech
Piloting Trip Reports and
Briefing Charts will be delivered on time and
IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.3.2 JCTD
Concept Briefings will be delivered on time and
IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.3.2 JCTD
Management Plans will be delivered on time and
IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.3.2 JCTD
Technology Transition
Plans will be delivered on time and IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.3.2 JCTD
Meeting Minutes and Trip
Reports will be delivered on time and IAW the
PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6.6.1 Secure
Information Sharing
Architecture Products will be delivered on time and
IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable
Subtask 6.6.1 Secure Materials contain required Random inspection of deliverable
Information Sharing
Design Products will be delivered on time and
IAW the PWS information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
products and services.
Subtask 6. 6.1 Secure
Information Sharing IA
Data Sharing
Specifications will be delivered on time and
IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6. 6.1 Secure
Information Sharing
STIG will be delivered on time and IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6. 6.2 Identity
Management and Access
Control Architecture
Products will be delivered on time and IAW the
PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6. 6.2 Identity
Management and Access
Control Design Products will be delivered on time and IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6. 6.3 NIPRNET
Systems Engineering
Architecture Products will be delivered on time and
IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6. 6.3 NIPRNET
Systems Engineering
Technical Solutions will be delivered on time and
IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable
Subtask 6. 6.4 SIPRNET Materials contain required Random inspection of deliverable
Systems Engineering
Architecture Products will be delivered on time and
IAW the PWS information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
products and services.
Subtask 6. 6.4 SIPRNET
Systems Engineering
Design Products will be delivered on time and
IAW the PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable products and services.
Subtask 6. 6.5 Process
Engineering IA Security briefings and email updates will be delivered on time and IAW the
PWS
Materials contain required information and are delivered on time at least 90% of the time.
Revisions that occur are minor and are resolved in a satisfactory manner.
Random inspection of deliverable
8. Incentives:
Both positive and negative performance ratings shall be recorded in the Contractor Performance
Assessment Reporting System (CPARS). The COR and PM will hold monthly reviews with the contractor to discuss deliverables, cost and schedules. Timely submission of invoices and deliverables are required in order to maintain and continue the work involved with this task. All deliverables will be inspected, tested and evaluated for completeness, functionality and utility. During each meeting the
Contractor will provide detailed analyses of all ongoing, completed, and planned efforts. Based on the review of this information, the Government can then determine how to continue forward with the efforts, evolving requirements, and enabling the Contractor to develop their role on the effort.
9. Place of Performance:
Unclassified work to be accomplished under this PWS shall be done at both the contractor’s facilities and at DISA, Ft. Meade, MD 20755. Work under this PWS that will require Sensitive Compartmented
Information (SCI) access shall be performed at DISA, Ft. Meade, MD 20755. Office space will be provided at DISA’s location for this classified work. The space will be allocated via approved Space
Waiver(s) per task(s).
Local travel within the Ft. Meade and within the National Capital Region is required. Travel outside the local area may be required. All travel must be approved, in advance and in writing by the government
COR. Site visits may be required to Government and industry facilities in CONUS and in support of various security activities and government or industry working groups or conferences. Travel and reimbursement shall be in accordance with the Joint Travel Regulation and its prevailing rates.
Travel is possible to the CONUS locations shown in the Travel table below.
Travel
Task 6.2 No. of Persons No. of Trips Duration
SPAWAR 2-3 4 2-3 Days
San Francisco 1 3 2-3 Days
Boston 1 1 2-3 Days
Task 6.3 No. of Persons No. of Trips Duration
Oklahoma City 1 1 3 Days
Ogden 1 1 3 Days
San Antonio 1 1 3 Days
Alabama 1 1 3 Days
San Jose 1 2 4 Days
Task 6.4 No. of Persons No. of Trips Duration
Boston, MA 1 1 5 -7 Days
Las Vegas, NV 1 1 5-7 Days
Miami, FL 1 1 5-7 Days
San Diego, CA 1 1 5-7 Days
Charleston, SC 1 1 5-7 Days
Task 6. 6 No. of Persons No. of Trips Duration
Optional Optional Optional
Alternate Place of Performance - Contingency Only. Contractor employees may be required to work at home, another approved activity within the local travel area or at the contractor's facility in cases of unforeseen conditions or contingencies (e.g., pandemic conditions, exercises, etc.). Any equipment such as laptops or phones provided to Contractor personnel shall be returned at the termination of the engagement or at another time mutually agreeable to both parties. Contracting Officer Representative
(COR) approval is required. Contractor shall prepare all deliverables and other contract documentation utilizing contractor resources. To the extent possible, the contractor shall use best efforts to provide the same level of support as stated in the SOW/PWS. In the event the services are impacted, reduced, compromised, etc., the Contracting Officer or the contractor may request an equitable adjustment.
10. Period of Performance:
The period of performance is one base year, and four one year option periods.
11. Delivery and Payment Schedule:
All days are calendar days, except where otherwise noted. All deliveries shall be made in softcopy to the
Defense Enterprise Portal Service (DEPS) repositories as designated by the COR. The Government reserves the option to request hardcopy deliverables. All deliverables are in contractor format, in coordination with the COR. Standard distribution applies unless otherwise noted.
PWS
Task#
Deliverable
Title
Format Due Date Distribution/Copi es
Frequency and
Remarks
6.1.1 Contract
Mgmt. Plan
Contractor determined format (approved by COR)
5 calendar days after contract award date
(initial).
One copy to COR and copy to
Contracting
Officer
Initial – 5 calendar days after contract award.
6.1.2 Monthly
Status Report
(MSR)
Contractor determined format (approved by COR) th of each month.
Uploaded to
WAWF and soft copy to COR via
DEPS
Monthly on th
6.1.2 IPR Slides Contractor
determined format (approved by COR)
5 calendar days before Monthly
IPR Meeting
One copy to COR Monthly
6.1.3 Monthly IPR
Report
Contractor determined format (approved by COR)
Within one week after end of each month(based on award date) and coordinated with
COR.
One copy to COR Monthly
(coordinatio n with
COR)
6.2.1 Policy and
Process
Contractor determined format (approved by COR)
2 calendar weeks after
Government request
One copy to PM and COR
1 -5 per month
6.2.1 Metrics
Analysis and
Definition
Contractor determined format (approved by COR)
2 calendar weeks after
Government request
One copy to PM and COR
1-5 per month
6.2.2 Strategic
Planning, Requirements
Definition, and Design
Architecture
Products
Contractor determined format (approved by COR)
2 calendar weeks after
Government request
One copy to PM and COR
1 -5 per month
6.2.2 Demonstratio
n
Contractor determined format (approved by COR)
2 calendar weeks after
Government request
One copy to PM and COR
1 -5 per month
6.2.2 Sourcebook Contractor
determined format (approved by COR)
2 calendar weeks after
Government request
One copy to PM and COR
1 - 5 per month
6.2.2 User
Guidance
Contractor determined format (approved by COR)
2 calendar weeks after
Government request
One copy to PM and COR
1 - 5 per month
6.2.3 Evaluation/As
sessment and
Reports
Contractor determined format (approved by COR)
2 calendar weeks after
Government request
One copy to PM and COR
1 -5 per month
6.2.3 Cloud
Initiative
Contractor determined
2 calendar weeks after
One copy to PM and COR
1 -5 per format (approved by COR)
Government request month
6.2.3 Mobility
Initiative
Contractor determined format (approved by COR)
2 calendar weeks after
Government request
1 -5 per month
6.3.1 Technical
Reports
Contractor determined format (approved by COR & PM)
10 business days after
Government request
One copy to PM and COR
1 - 3 per month
6.3.1 Reference
Materials
Contractor determined format (approved by COR & PM)
10 business days after
Government request
One copy to PM and COR
1 - 3 per month
6.3.1 Analysis
Findings and
White Paper
Contractor determined format (approved by COR & PM)
10 business days after
Government request
One copy to PM and COR
1 -3 per month
6.3.1 Trip Reports
and Briefing
Charts
Contractor determined format (approved by COR & PM)
5 business days after travel completion
One copy to PM and COR
1 - 3 per month
6.3.2 Concept
Briefings
Contractor determined format (approved by COR & PM)
10 business days after
Government request
One copy to PM and COR
1 - 3 per month
6.3.2 Management
Plans
Contractor determined format (approved by COR & PM)
10 business days after
Government request
One copy to PM and COR
1 - 3 per month
6.3.2 Transition
Plans
Contractor determined format (approved by COR & PM)
10 business days after
Government request
1 - 3 per
6.3.2 Meeting
Minutes/Trip
Reports
Contractor determined format (approved by COR & PM)
5 business days after travel completion
One copy to PM and COR
1 - 3 per month
6.3.3 Technical
Reports
Contractor determined format (approved by COR & PM)
10 business days after
Government request
One copy to PM and COR
1 - 3 per month
6.3.3 Reference
Materials
Contractor determined format (approved by COR & PM)
10 business days after
Government request
One copy to PM and COR
1 - 3 per month
6.3.3 Analysis
Findings and
Contractor determined
10 business days after
One copy to PM and COR
1 - 3 per
White Paper format (approved by COR & PM)
Government request
6.3.3 Trip Reports
and Briefing
Charts
Contractor determined format (approved by COR & PM)
5 business days after travel completion
One copy to PM and COR
1 - 3 per month
6.4 Briefing
Slides
Format determined by
Project Manager
(PM)
Draft - 3 calendar days after government request. Final –
3 days prior to briefing.
One copy to PM and COR
1 - 3 per month
6.4.1 Spend Plan Format
determined by
Project Manager
(PM)
Draft - 3 days after government request
Final - 7 days after government request
Updates -5 calendar days after government request
One copy to PM and COR
Updates
Estimate 1 or 2 per
Quarter
NTE 6 per
Year
6.4 Integrated
Master
Schedule
(IMS)
Format determined by
Project Manager
(PM)
5 calendar days after government request. Updates
- Weekly
Updates -
Weekly
6.4 Meeting
Minutes and
Agenda
Format determined by
Project Manager
(PM)
Agenda – two days before meeting.
Meeting Minutes
- 5 calendar days after meeting
One copy to PM and COR
Weekly
6.5.1 Briefing
Slides
Format determined by
Project Manager
(PM)
Draft - 3 calendar days after government request
Final – 3 days prior to briefing
One copy to PM and COR
1 – 3 per month
6.5.1 Concept
Papers
Contractor determined format (approved by COR & PM)
Draft - 7calendar days after government request. Final –
14 calendar days after government request.
One copy to PM and COR
Estimate 1 or 2 per
Quarter
NTE 6 per
Year
6.5.1 Acquisition
Strategy
Contractor determined
Draft - 7 calendar days
One copy to PM and COR
Estimate 1 or 2 updates by COR & PM) after government request
Final – 14 calendar days after government request.
Updates - 5 calendar days after government request per Quarter
NTE 6 per
Year
6.5.1 CONOPS Contractor
determined format (approved by COR & PM)
Draft - 7 calendar days after government request
Final – 14 calendar days after government
One copy to PM and COR
Estimate 1 or 2 per
Quarter
NTE 8 per
Year
6.5.2 Briefing
Slides
Format determined by
Project Manager
(PM)
Draft - 3 calendar days after government request
Final – 3 days prior to briefing
One copy to PM and COR
Estimate 1 per month
NTE 3 per month
6. 6.1 Architecture
Products
Contractor determined format (approved by COR & PM)
10 calendar days before due date.
Final – according to schedule.
One copy to PM and COR
Estimate 1 per month
NTE 3 per month
6. 6.1 Design
Products
Contractor determined format (approved by COR & PM)
10 calendar days before due date.
Final – according to schedule.
One copy to PM and COR
Estimate 1 per month
NTE 3 per month
6. 6.1 Data Sharing
Specifications
Contractor determined format (approved by COR & PM)
10 calendar days before due date.
Final – according to schedule.
One copy to PM and COR
Estimate 1 per month
NTE 3 per month
6. 6.1 STIGs
Contractor determined format (approved by COR & PM)
10 calendar days before due date.
Final – according to schedule.
One copy to PM and COR
Estimate 1 per month
NTE 3 per month
6. 6.2 Architecture
Products
Contractor determined format (approved by COR & PM)
10 calendar days before due date.
Final – according to schedule.
One copy to PM and COR
Estimate 1 per month
NTE 3 per month
6. 6.2 Design
Products
Contractor determined format (approved by COR & PM)
10 calendar days before due date.
Final – according to schedule.
One copy to PM and COR
Estimate 1 per month
NTE 3 per month
6. 6.3 Architecture
Contractor 10 calendar days One copy to PM Estimate 1
Products determined by COR & PM) before due date.
Final – according to schedule.
and COR per month
NTE 3 per month
6. 6.3 Design
Products
Contractor determined format (approved by COR & PM)
10 calendar days before due date.
Final – according to schedule.
One copy to PM and COR
Estimate 1 per month
NTE 3 per month
6. 6.4 Architecture
Products
Contractor determined format (approved by COR & PM)
10 calendar days before due date.
Final – according to schedule.
One copy to PM and COR
Estimate 1 per month
NTE 3 per month
6. 6.4 Design
Products
Contractor determined format (approved by COR & PM)
10 calendar days before due date.
Final – according to schedule.
One copy to PM and COR
Estimate 1 per month
NTE 3 per
6.7.5
IA Security briefings and email updates
Contractor determined format (approved by COR & PM)
Daily and weekly consulting with
Government
One copy to PM and COR
Estimate 1 per week
NTE 5 per week
11.1 Payment Schedule.
The Contractor is authorized to invoice monthly for these severable services. In the case of cost reimbursement CLINs, the amount shall be all allowable costs. In the case of fixed-price CLINs, that amount shall be the monthly unit price. Payment (and the application of the Prompt Payment Act) will depend upon delivery and acceptance of the deliverables set forth above, as well as delivery and acceptance of the severable services performed each month.
12. Security:
The work to be performed and products to be delivered under this contract shall be accomplished in accordance with the Contract Security Classification Specification, DD Form 254, pertaining to this contract. The contract shall conscientiously follow the security guidance provided in the DD form 254, the Classification Guide, and other guidance that may be established in writing by the Contracting
Officer’s Representative (COR).
12.1. Security Clearance
This section shall be considered a supplement to Block 13 of the Government provided DD 254, Contract
Classification and Specification.
All personnel require security clearance at least at the SECRET level. All individuals will be U.S.
citizens. The Contractor shall follow the standards established in DOD 5200.2-R, DOD Personnel
Security Program. All unclassified portions of such data and information shall be defined as sensitive information and be protected under Public Law 100-225.
The work to be performed under this contract is up to the Top Secret level and will require Sensitive
Compartmented Information (SCI) access eligibility for the following tasks:
Task 2: Engineering Support (CTO)
6.2.3 Subtask 3 – Technology Evaluation and Assessment
Task 3: Technology Piloting and Demonstration Support (CTO)
6.3.1 Subtask 1 – Technology Piloting Support
Task 6: Information Assurance Systems Engineering Support (MAE)
6.6.1 Subtask.1 – Secure Information Sharing
6.6.3 Subtask 3 – NIPRNET Systems Engineering
6.6.4 Subtask 4 – SIPRNET Network Security Engineering
6.6.5 Subtask 5 – Security Process Engineering
12.2. Security Clearance and Information Technology (IT) Level
Security Clearance and Information Technology (IT) Level. All personnel performing on this contract must be U.S. citizens. At least one full-time IT-I contractor shall be on this contract;
all others much be certifiable at IT-II. There are two levels of personnel security requirements under this contract:
IT-I (privileged level systems access) requires a final Top Secret security clearance and final
IT-I eligibility when performance starts. Immediately upon hire at least one information engineer will require Sensitive Compartmented Information (SCI) access eligibility adjudicated by the Defense Intelligence Agency (DIA) to perform their duties. SCI Processing for SCI eligibility will be coordinated with the supporting Government Security Manager and will begin immediately upon start of duty performance under this contract.
The contractor’s project manager requires a minimum interim Secret security clearance and interim IT-II eligibility when performance starts. The remaining contractor personnel require a minimum interim Secret security clearance and IT-II eligibility when performance starts.
12.3. Investigation Requirements
All personnel requiring SCI, Top Secret or IT-I eligibility under this contract must undergo a favorably adjudicated Single Scope Background Investigation (SSBI) as a minimum investigation.
The SSBI will be maintained current within 5-years and requests for Special Background Periodic
Review (SBPR) will be initiated 6-months prior to the 5-year anniversary date of the previous SSBI or SBPR.
12.3.1. Clearances
Contract employees that are not immediately eligible for at least interim…