Attachment_3_-_Cost-Price_Worksheet.xls

XLS spreadsheet 269 KB Posted

Attached to
Advanced Enterprise Information Technology and Architecture (AEITA) Support
Solicitation number
HC1047-14-R-4006
Issued by

About this file

Attachment 3 - Cost-Price Worksheet

View the file

Other files

File Type Posted
RFP_Amendment_HC1047-14-R-4006-0004.pdf PDF
Attachment_7_-_SF1408.pdf PDF
RFP_AMD_0003.pdf PDF
Attachment_3_-_Cost-Price_Worksheet_02062014.xls XLS spreadsheet
RFP_AMD_0002.pdf PDF
Attachment_6_-_EPL_Worksheet.xls XLS spreadsheet
RFP_AMD_0001.pdf PDF
HC1047-14-R-4006_Questions_and_Answers_02052014_(2).xls XLS spreadsheet
Attachment_2_-_Past_Performance_References.doc DOC document
Attachment_4_-_DD_254.pdf PDF
Attachment_5_-_Cross_Reference_Matrix.doc DOC document
RFP_HC1047-14-R-4006.pdf PDF
Attachment_1_-_Past_Performance_Questionnaire.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

Offeror Name:
Solicitation/Task Order:
Prime Offeror (if other than the Prime):
The Summary Tab shall contain a roll up of total costs for each Contract Year proposed, summed to achieve the total proposed contract value, including profit or fee, as applicable.
Offeror shall complete the following set of Cost / Price Worksheets, with information supplied, varying, according to contract type. For example, if the Offeror is
proposing fully loaded labor rates, indirect rates specific to labor shall be provided only on the Rate Sheet tab, and eliminated from CY1 through Option to Extend tabs.
Include all formulas.
Offeror should add additional tabs, as appropriate, to reflect 3rd level Work Breakdown Structure for each Contract Year, if applicable. Costs on subordinate tabs should roll up to the summary costs
for line items shown on the Base, etc. worksheet tabs.
OFFERORS NOTE: Workbook tabs are provided for your ENCORE II GOVERNMENT SITE RATES and ENCORE II CONTRACTOR SITE RATES. Be sure to provide both schedules corresponding to the
Contract Years of this effort.
THESE TEMPLATES ARE A MODEL ONLY. OFFEROR MAY PROVIDE COST DATA IN THEIR OWN FORMAT; HOWEVER, SUBMISSIONS CONTAINING INCOMPLETE DATE, OR DATA INSUFFICIENT
TO ENABLE THE GOVERNMENT TO CONDUCT APPROPRIATE COST AND PRICING ANALYSIS MAY BE DEEMED NON RESPONSIVE OR DEFICIENT AND PRECLUDE OFFEROR'S PROPOSAL
FROM CONSIDERATION FOR AWARD.

COST - PRICE SUMMARY

Offeror Name:
Solicitation/Task Order:
Prime Offeror (if other than the Prime):
SummaryTotal
Base Year$5.00
Option Year 1$5.00
Option Year 2$5.00
Option Year 3$5.00
Option Year 4$5.00
6 Month Extension of Services$5.00
TOTAL$30.00

CLIN STRUCTURE

CLIN STRUCTURE SUMMARY
BASE YEAR
CLIN NumberDescriptionPWS Task Area(s)Contract TypeUnitAmount
0001Contract ManagementSubtasks 6.1.1 through 6.1.2FFP12 Months$ - 0
0002Engineering SupportSubtasks 6.2.1 through 6.2.3CPFF12 Months$ - 0
0003Technology Piloting and Demonstration SupportSubtasks 6.3.1 through 6.3.3CPFF12 Months$ - 0
0004Program Control Technical SupportSubtasks 6.4FFP12 Months$ - 0
0005Systems Engineering and Integration SupportSubtasks 6.5.1 through 6.5.2CPFF12 Months$ - 0
0006Mission Assurance Systems Engineering SupportSubtasks 6.6.1 through 6.6.5CPFF12 Months$ - 0
0007ODC TravelCOST$ 5.00
TOTAL BASE YEAR:$ 5.00
OPTION YEAR 1
CLIN NumberDescriptionPWS Task Area(s)Contract TypeUnitAmount
1001Contract ManagementSubtasks 6.1.1 through 6.1.2FFP12 Months$ - 0
1002Engineering SupportSubtasks 6.2.1 through 6.2.3CPFF12 Months$ - 0
1003Technology Piloting and Demonstration SupportSubtasks 6.3.1 through 6.3.3CPFF12 Months$ - 0
1004Program Control Technical SupportSubtasks 6.4FFP12 Months$ - 0
1005Systems Engineering and Integration SupportSubtasks 6.5.1 through 6.5.2CPFF12 Months$ - 0
1006Mission Assurance Systems Engineering SupportSubtasks 6.6.1 through 6.6.5CPFF12 Months$ - 0
1007ODC TravelCOST$ 5.00
TOTAL OPTION YEAR 1:$ 5.00
OPTION YEAR 2
CLIN NumberDescriptionPWS Task Area(s)Contract TypeUnitAmount
2001Contract ManagementSubtasks 6.1.1 through 6.1.2FFP12 Months$ - 0
2002Engineering SupportSubtasks 6.2.1 through 6.2.3CPFF12 Months$ - 0
2003Technology Piloting and Demonstration SupportSubtasks 6.3.1 through 6.3.3CPFF12 Months$ - 0
2004Program Control Technical SupportSubtasks 6.4FFP12 Months$ - 0
2005Systems Engineering and Integration SupportSubtasks 6.5.1 through 6.5.2CPFF12 Months$ - 0
2006Mission Assurance Systems Engineering SupportSubtasks 6.6.1 through 6.6.5CPFF12 Months$ - 0
2007ODC TravelCOST$ 5.00
TOTAL OPTION YEAR 2:$ 5.00
OPTION YEAR 3
CLIN NumberDescriptionPWS Task Area(s)Contract TypeUnitAmount
3001Contract ManagementSubtasks 6.1.1 through 6.1.2FFP12 Months$ - 0
3002Engineering SupportSubtasks 6.2.1 through 6.2.3CPFF12 Months$ - 0
3003Technology Piloting and Demonstration SupportSubtasks 6.3.1 through 6.3.3CPFF12 Months$ - 0
3004Program Control Technical SupportSubtasks 6.4FFP12 Months$ - 0
3005Systems Engineering and Integration SupportSubtasks 6.5.1 through 6.5.2CPFF12 Months$ - 0
3006Mission Assurance Systems Engineering SupportSubtasks 6.6.1 through 6.6.5CPFF12 Months$ - 0
3007ODC TravelCOST$ 5.00
TOTAL OPTION YEAR 3:$ 5.00
OPTION YEAR 4
CLIN NumberDescriptionPWS Task Area(s)Contract TypeUnitAmount
4001Contract ManagementSubtasks 6.1.1 through 6.1.2FFP12 Months$ - 0
4002Engineering SupportSubtasks 6.2.1 through 6.2.3CPFF12 Months$ - 0
4003Technology Piloting and Demonstration SupportSubtasks 6.3.1 through 6.3.3CPFF12 Months$ - 0
4004Program Control Technical SupportSubtasks 6.4FFP12 Months$ - 0
4005Systems Engineering and Integration SupportSubtasks 6.5.1 through 6.5.2CPFF12 Months$ - 0
4006Mission Assurance Systems Engineering SupportSubtasks 6.6.1 through 6.6.5CPFF12 Months$ - 0
4007ODC TravelCOST$ 5.00
TOTAL OPTION YEAR 4:$ 5.00
6 MONTH EXTENSION
CLIN NumberDescriptionPWS Task Area(s)Contract TypeUnitAmount
5001Contract ManagementSubtasks 6.1.1 through 6.1.2FFP6 Months$ - 0
5002Engineering SupportSubtasks 6.2.1 through 6.2.3CPFF6 Months$ - 0
5003Technology Piloting and Demonstration SupportSubtasks 6.3.1 through 6.3.3CPFF6 Months$ - 0
5004Program Control Technical SupportSubtasks 6.4FFP6 Months$ - 0
5005Systems Engineering and Integration SupportSubtasks 6.5.1 through 6.5.2CPFF6 Months$ - 0
5006Mission Assurance Systems Engineering SupportSubtasks 6.6.1 through 6.6.5CPFF6 Months$ - 0
5007ODC TravelCOST$ 5.00
TOTAL 6 MONTH EXTENSION:$ 5.00

CONSOLIDATED

Cost/Price Worksheet Template
Offeror Name:
Solicitation/Task Order:
Period of Performance:
CONSOLIDATED
Direct LaborHours/BaseRateTotal
Labor Category 128806$0.00
Labor Category 20$0.00
Labor Category 30$0.00
Labor Category 40$0.00
Labor Category 50$0.00
Labor Category 60$0.00
Labor Category 70$0.00
Labor Category 80$0.00
Labor Category 90$0.00
Subtotal Direct Labor28806$0.00
Fringe$0.00$0.00
Overhead$0.00$0.00
Subtotal Labor Cost$0.00
Material$0.00
Subcontractor CostsHours/BaseRate
Subcontractor A0$0.00
Subcontractor B0$0.00
Subcontractor C0$0.00
Subcontractor N0$0.00
Subtotal Subcontractor Costs0$0.00
Material and Subcontractor Handling$0.00$0.00
Travel/ODCs30$30.00
G&A$0.00$0.00
Subtotal Cost before COM and FEE$30.00
COMBaseFactor
Overhead Pool A$0.00$0.00
Overhead Pool B$0.00$0.00
Overhead Pool C$0.00$0.00
Overhead Pool D$0.00$0.00
Subtotal COM
BaseRate
Fee/Profit$30.00$0.00
Total Cost Plus Fee28806$30.00

Base YR

Cost / Price Worksheet Template
Offeror Name:
Solicitation/Task Order:
Period of Performance:
Base YearBase YearBase YearBase YearBase YearBase YearBase YearBase Year
CLIN 0001FFPCLIN 0002CPFFCLIN 0003CPFFCLIN 0004FFPCLIN 0005CPFFCLIN 0006CPFFCLIN 0007TravelTOTAL
Direct LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotal
Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 11$ - 0$0.00Labor Category 11$ - 0$0.00Labor Category 11$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 15763$ - 0$0.00
Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00
Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00
Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00
Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00
Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00
Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00
Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00
Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00
Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor1$0.00Subtotal Direct Labor1$0.00Subtotal Direct Labor1$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor5763$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00
Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00
Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00
Material$0.00Material$0.00Material$0.00$0.00$0.00$0.00Material$0.00Material$0.00
Subcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHours
Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A0$0.00
Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B0$0.00
Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C0$0.00
Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N0$0.00
Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00
Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$5.00Travel0$5.00
G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00
Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$5.00Subtotal Cost before COM and FEE$5.00
COMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactor
Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00
Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00
Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00
Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00
Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/ProfitNANA$0.00Fee/Profit$5.000$0.00
Total Cost Plus Profit/Fee1920$0.00Total Cost Plus Profit/Fee1920$0.00Total Cost Plus Profit/Fee1920$0.00Total Cost Plus Profit/Fee1$0.00Total Cost Plus Profit/Fee1$0.00Total Cost Plus Profit/Fee1$0.00Total Cost Plus Profit/Fee0$5.00Total Cost Plus Profit/Fee5763$5.00

Option YR 1

Cost / Price Worksheet Template
Offeror Name:
Solicitation/Task Order:
Period of Performance:
Option YR 1Option YR 1Option YR 1Option YR 1Option YR 1Option YR 1Option YR 1Option YR 1
CLIN 1001FFPCLIN 1002CPFFCLIN 1003CPFFCLIN 1004FFPCLIN 1005CPFFCLIN 1006CPFFCLIN 1007TravelTOTAL
Direct LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotal
Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 11$ - 0$0.00Labor Category 11$ - 0$0.00Labor Category 11$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 15763$ - 0$0.00
Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00
Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00
Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00
Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00
Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00
Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00
Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00
Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00
Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor1$0.00Subtotal Direct Labor1$0.00Subtotal Direct Labor1$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor5763$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00
Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00
Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00
Material$0.00Material$0.00Material$0.00$0.00$0.00$0.00Material$0.00Material
Subcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHours
Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A0$0.00
Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B0$0.00
Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C0$0.00
Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N0$0.00
Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00
Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$5.00Travel0$5.00
G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00
Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$5.00Subtotal Cost before COM and FEE$5.00
COMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactor
Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00
Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00
Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00
Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00
Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/ProfitNANA$0.00Fee/Profit$5.000$0.00
Total Cost Plus Profit/Fee1920$0.00Total Cost Plus Profit/Fee1920$0.00Total Cost Plus Profit/Fee1920$0.00Total Cost Plus Profit/Fee1$0.00Total Cost Plus Profit/Fee1$0.00Total Cost Plus Profit/Fee1$0.00Total Cost Plus Profit/Fee0$5.00Total Cost Plus Profit/Fee5763$5.00

Option YR 2

Cost / Price Worksheet Template
Offeror Name:
Solicitation/Task Order:
Period of Performance:
OY 2OY 2OY 2OY 2OY 2OY 2OY 2OY 2
CLIN 2001FFPCLIN 2002CPFFCLIN 2003CPFFCLIN 2004FFPCLIN 2005CPFFCLIN 2006CPFFCLIN 2007TravelTOTAL
Direct LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotal
Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 15760.0$ - 0$0.00
Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20.0$ - 0$0.00
Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30.0$ - 0$0.00
Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40.0$ - 0$0.00
Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50.0$ - 0$0.00
Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60.0$ - 0$0.00
Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70.0$ - 0$0.00
Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80.0$ - 0$0.00
Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90.0$ - 0$0.00
Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor5760.0$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00
Base
Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00
Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00
Material$0.00Material$0.00Material$0.00$0.00$0.00$0.00Material$0.00Material$0.00
Subcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHours
Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A0$0.00
Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B0$0.00
Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C0$0.00
Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N0$0.00
Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00
Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$5.00Travel0$5.00
G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00
Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$5.00Subtotal Cost before COM and FEE$5.00
COMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactor
Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00
Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00
Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00
Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00
Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/ProfitNANA$0.00Fee/Profit$5.000$0.00
Total Cost Plus Fee1920$0.00Total Cost Plus Fee1920$0.00Total Cost Plus Fee1920$0.00Total Cost Plus Fee0$0.00Total Cost Plus Fee0$0.00Total Cost Plus Fee0$0.00Total Cost Plus Fee0$5.00Total Cost Plus Fee5760$5.00

Option YR 3

Cost / Price Worksheet Template
Offeror Name:
Solicitation/Task Order:
Period of Performance:
OY 3OY 3OY 3OY 3OY 3OY 3OY 3OY 3
CLIN 3001FFPCLIN 3002CPFFCLIN 3003CPFFCLIN 3004FFPCLIN 3005CPFFCLIN 3006CPFFCLIN 3007TravelTOTAL
Direct LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotal
Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 15760$ - 0$0.00
Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00
Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00
Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00
Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00
Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00
Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00
Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00
Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00
Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor5760$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00Fringe$0.000$0.00
Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00Overhead$0.000.0$0.00
Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00
Material$0.00Material$0.00Material$0.00$0.00$0.00$0.00Material$0.00Material$0.00
Subcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHours
Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A0$0.00
Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B0$0.00
Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C0$0.00
Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N0$0.00
Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00
Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$5.00Travel0$5.00
G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00
Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$5.00Subtotal Cost before COM and FEE$5.00
COMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactor$0.00
Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00
Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00
Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00
Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00
Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/ProfitNANA$0.00Fee/Profit$5.000$0.00
Total Cost Plus Fee1920$0.00Total Cost Plus Fee1920$0.00Total Cost Plus Fee1920$0.00Total Cost Plus Fee0$0.00Total Cost Plus Fee0$0.00Total Cost Plus Fee0$0.00Total Cost Plus Fee0$5.00Total Cost Plus Fee5760$5.00

Option YR 4

Cost / Price Worksheet Template
Offeror Name:
Solicitation/Task Order:
Period of Performance:
OY 4OY 4OY 4OY 4OY 4OY 4OY 4OY 4
CLIN 4001FFPCLIN 4002CPFFCLIN 4003CPFFCLIN 4004FFPCLIN 4005CPFFCLIN 4006CPFFCLIN 4007TravelTOTAL
Direct LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotalDirect LaborHoursRateTotal
Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 11920$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 10$ - 0$0.00Labor Category 15760$ - 0$0.00
Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 2$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00Labor Category 20$ - 0$0.00
Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 3$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00Labor Category 30$ - 0$0.00
Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 4$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00Labor Category 40$ - 0$0.00
Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 5$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00Labor Category 50$ - 0$0.00
Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 6$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00Labor Category 60$ - 0$0.00
Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 7$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00Labor Category 70$ - 0$0.00
Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 8$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00Labor Category 80$ - 0$0.00
Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 9$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00Labor Category 90$ - 0$0.00
Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor1920$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor0$0.00Subtotal Direct Labor5760$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fringe$0.000.00$0.00Fringe$0.000.00$0.00Fringe$0.000.00$0.00Fringe$0.000.00$0.00Fringe$0.000.00$0.00Fringe$0.000.00$0.00Fringe$0.000.00$0.00Fringe$0.000.00$0.00
Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00Overhead$0.000.00$0.00
Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00Subtotal Labor Cost$0.00
Material$0.00Material$0.00Material$0.00$0.00$0.00$0.00Material$0.00Material$0.00
Subcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHoursRateSubcontractor CostsHours
Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A$0.00Subcontractor A0.00$0.00
Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B$0.00Subcontractor B0.00$0.00
Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C$0.00Subcontractor C0.00$0.00
Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N$0.00Subcontractor N0.00$0.00
Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0$0.00Subtotal Subcontractor Costs0.00$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00Material and Subcontractor Handling$0.000$0.00
Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$0.00Travel$5.00Travel0$5.00
G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00G&A$0.000$0.00
Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$0.00Subtotal Cost before COM and FEE$5.00Subtotal Cost before COM and FEE$5.00
COMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactorCOMBaseFactor$0.00
Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00Overhead Pool A$0.000$0.00
Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00Overhead Pool B$0.000$0.00
Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00Overhead Pool C$0.000$0.00
Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00Overhead Pool D$0.000$0.00
Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00Subtotal COM$0.00
BaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRateBaseRate
Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/Profit$0.000$0.00Fee/ProfitNANA$0.00Fee/Profit$5.000$0.00
Total Cost Plus Fee1920$0.00Total Cost Plus Fee1920$0.00Total Cost Plus Fee1920$0.00Total Cost Plus Fee0$0.00Total Cost Plus Fee0$0.00Total Cost Plus Fee0$0.00Total Cost Plus Fee0$5.00Total Cost Plus Fee5760$5.00

Six Month Extension Option

Cost / Price Worksheet Template
Offeror Name:
Solicitation/Task Order:
Period of Performance:
6 mos ext6 mos ext6 mos ext6 mos ext6 mos ext6 mos ext6 mos ext6 mos ext
CLIN 5001FFPCLIN 5002CPFFCLIN 5003CPFFCLIN 5004FFPCLIN 5005CPFFCLIN 5006CPFFCLIN 5007TravelTOTAL

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .