Attachment_5_-_Cross_Reference_Matrix.doc

DOC document 64 KB Posted

Attached to
Advanced Enterprise Information Technology and Architecture (AEITA) Support
Solicitation number
HC1047-14-R-4006
Issued by

About this file

Attachment 5 - Cross Reference Matrix

View the file

Other files

File Type Posted
RFP_Amendment_HC1047-14-R-4006-0004.pdf PDF
Attachment_7_-_SF1408.pdf PDF
RFP_AMD_0003.pdf PDF
Attachment_3_-_Cost-Price_Worksheet_02062014.xls XLS spreadsheet
RFP_AMD_0002.pdf PDF
Attachment_6_-_EPL_Worksheet.xls XLS spreadsheet
RFP_AMD_0001.pdf PDF
HC1047-14-R-4006_Questions_and_Answers_02052014_(2).xls XLS spreadsheet
Attachment_2_-_Past_Performance_References.doc DOC document
Attachment_3_-_Cost-Price_Worksheet.xls XLS spreadsheet
Attachment_4_-_DD_254.pdf PDF
RFP_HC1047-14-R-4006.pdf PDF
Attachment_1_-_Past_Performance_Questionnaire.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

CROSS REFERENCE MATRIX (DEC 2010)

(a) The purpose of the cross reference matrix is to show critical interrelationships and dependencies among the Work Breakdown Schedule (WBS), Statement of Objective (SOO), Contract Line Items (CLINs), Contract Data Requirements List (CDRL) and Information to Offerors (ITOs). The matrix ensures that all requirements are addressed, requirements do not conflict and solicitation sections are internally consistent.

(b) Cross Referencing. To the greatest extent possible, each proposal volume shall be written on a stand-alone basis so that its contents may be evaluated with a minimum of cross referencing to other volumes of the proposal. Information required for proposal evaluation which is not found in its designated volume will be assumed to have been omitted from the proposal.

(1) Cross referencing within a proposal volume is ONLY permitted where its use would conserve space without impairing clarity. Otherwise, cross referencing within a proposal volume is not permitted.

(2) The offeroe shall fill out the cross reference matrix at Attachment 5 of this ITO

Indicating the proposal reference information as it relates to the ITO, SOW/SOO/PWS, CLIN numbers, and CDRL references found therein. The offeror shall provide a cross reference matrix indicating, by ITO, SOW/SOO/PWS, and/or specification paragraph number, the corresponding proposal paragraph in that section which addresses the referenced item.

(c) Cross Reference Matrix for Prospective Offerors: See paragraph (b) of this provision regarding instructions for completion of the solicitation Cross Reference Matrix. If this matrix conflicts with any other requirement, direction or provision of this solicitation, the other reference shall take precedence over this matrix. Additionally, to the extent this matrix discloses details as to the extent or manner by which the Government intends to evaluate offeror’s proposals for award, Section M references in the matrix are for information purposes only and the Government shall be obligated to evaluate proposals solely in conformance with the provisions of the Section M of the solicitation. An example of the format is shown below:

SOLICITATION CROSS REFERENCE MATRIX

REQ.

DOC.

WORK

REQ

WBS

LEVEL

CLIN
Section

L Section M

Proposal
SOW
CDRL
IMP
SOO
3.2.2
Design B
2
0001

N/A

3.3.3
Build A
2
0002
3.B.2

A001

(End of provision)