DESS Question-Answer - FINAL 2012_06_19 1700.pdf
PDF 577 KB Posted
- Attached to
- Defense Information Systems Agency Information Technology Enterprise Support Services (DESS) Federal contract opportunity
- Solicitation number
- HC1047-12-R-4013
- Issued by
- Defense Information Systems Agency
About this file
Final RFP Questions Answers (21 Jun 12). This document is posted to correct formatting issues on Page 16 of the original Final RFP Q A document. The formatting of the original Q A document also posted on 21 Jun 12 made questions T-090 through T-094 illegible.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP # HC1047-12-R-4013
Questions & Answers
Question
Technical / Management
Questions / Comments RFP Reference Government Response
RFP
Change
Required
(Y/N)
Location of
Change
T-001
Section 5, subsection “SECURITY REQUIREMENTS” implies ALL “pre-established labor categories” require TOP SECRET clearance. It also clearly states that Task Orders may have other specific requirements declared on a Task Order DD254. For the Operations Task Order are we required to bid ALL
TS cleared staff?
PWS Section 5.
ADMINISTRATIVE
REQUIREMENTS
For the Operations Task Order, all infrastructure operation/maintenance staff will require Top Secret clearance. Additionally, all personnel assigned to Information Assurance tasks and subtasks must comply with the requirements of the DoD 8500 series.
Currently, approximately 30-35% of the staff performing the work represented in the
Operations Task Order require Top Secret clearance.
For the Sample Task Orders, the Security
Requirements section within each task order will specify the clearance levels of tasks and subtasks.
Yes
Task
Order
0001, Para 12
T-002
Labor categories are provided that have multiple qualification grades, i.e.
1. Associate – Intermediate – Lead
2. Junior – Master – Senior
3. Senior – Principal
4. Level II – Level III.
However no qualifications are provided in terms of education, years of experience, or certifications.
Does the Government want each offeror to develop and propose associated qualifications for these multi-level labor category grades as well for each of the single-grade labor categories, or will the
Government provide them?
RFP Attachment
15: DESS Labor
Categories with
Descriptions
The Government will provide the appropriate qualifications for labor categories.
Yes
Attachm ent 15
T-003
Why is cabling included in TO1 and not in TO7, Network Infrastructure and the cabling requirements therein limited to Bldg 123 at Ft. Detrick? Shouldn’t cabling and other infrastructure support be provided in a consistent manner across the entire Enterprise?
TO 1, TO7
The cabling component for TO1 is for existing infrastructure, maintenance, and upgrade.
Also, refer to T-148.
No N/A
T-004
The KPIs identified in Appendix B – Service Level
Agreements (SLA) of the cited reference are numbered 6.2, 6.3, and 6.4. This numbering is not consistent with the numbering used for the SLAs in the other Task Orders. Should the KPIs be renumbered as 1.1, 1.2, … , 2.1, … , 3.1, … as for the other Task Orders?
Section J, Attach
Yes, the numbering has been corrected. Yes
Attachm ent 2
T-005
The cited attachment is the ITOC Responsibility
Matrix. This document is similar to the RACI CHART v1 provided as one of the enclosures in Attachment
26, Operations Task Order Historical Data. While similar, there are differences in the two documents
(e.g., Transition Plan contractor responsibilities, Tier
II service responsibilities, and Change Management responsibilities). Which of these two documents is correct?
Section J, Attach
Verbiage in Attachment 24 ITOC Responsibility
Matrix will be revised to be consistent with the
Operations Task Order. The RACI Chart within
Attachment 26 will be removed.
Yes Attachm ent 24
T-006
The cited attachment provides Historical Data for the
Operations Task Order. Similar data is not provided for the other six Sample Task Orders. It is requested that comparable historical data be provided for these other Task Orders.
Section J, Attach
Historical data for the Sample Task Orders may not be an accurate representation of the requirement based on the number of Agency reorganizations, the BRAC re-location, and anticipated future changes in the mission landscape. Any available information which would provide context to the technical requirement will be provided if and when the requirement is competed under the DESS IDIQ.
Refer to Sec L. 6.2.2.7 for additional information. In addition, the Government is providing current FTE counts for Sample Task
Yes ents 2-6
Orders 0002 - 0006.
T-007
In the Approved Software Listing contained within this attachment, some of the entries are shown in a red font. What is the significance of the different color font?
Section J, Attach
There is no difference. The fonts have been standardized.
Yes
Attachm ent 26
T-008
Task 4 – Cable Plant Management Support 6.4.1.3 states “As directed by the Government, initially populate and maintain, as changes are made, all
DISA IT Enterprise site cable plant infrastructures in the DISA IT Enterprise SITEWARE application.” Please supply additional details and information about DISA
IT Enterprise SITEWARE application.
Attachment 1 –
Operations Task
Order Task 4 –
Cable Plant
Management
Support 6.4.1.3
NDI CMS SiteWareMOM Version V1. Refer to the NDI website regarding SITEWARE MoM:
http://www.ndiinc.com/siteware/home.
No N/A
T-009
Task 6 – Audio Visual and Video Teleconference
(VTC) Services Support. There is no information about the current VTC architecture in either the PWS or Attachment 1 – Operations Task Order. Please supply information about the VTC architecture so we may respond to Task 6 within Task Order 1.
Attachment 1 –
Operations Task
Order Task 6 –
Audio Visual and
Video
Teleconference
(VTC) Services
Support
All available background and historical data for
Task Order 0001 at the Government’s disposal has been provided in Attachments 21 - 29.
No N/A
T-010
TO Item 6.2.4.8 DSCM Event Management SOP.
There is no SOP for Event Management in
Attachment 29. Would the government please supply this SOP?
Appendix A – List of
Deliverables/Deli verables Table
TO Item 6.2.4.8
The title of this SOP is Master Event
Management and it is provided in Attachment
29.
No N/A
T-011
TO Item 6.2.4.11 Network Monitoring and Event
Management SOP. There is no SOP for Event
Management in Attachment 29. Would the government please supply this SOP?
Appendix A – List of
Deliverables/Deli verables Table
TO Item 6.2.4.11
The title of this SOP is Master Event
Management and it is provided in Attachment
29.
No N/A
T-012 STO 3, Section 5 – Scope, Paragraph 2, states that embedded Knowledge Engineers (KE) will be placed
Questions to STO
3 – Enterprise
All major Agency directorates (e.g. ESD, SPI, GO, etc) will be supported. DISA cannot within various Directorates. What Directorates will the KEs be required to support? What is the anticipated reporting relationship between the OCIO and the Directorates the KE is supporting? What are the day to day activities KE’s will support?
Knowledge address the remainder of the questions as
DISA’s knowledge management capability and associated infrastructure is in its infancy and the adoption of the tool (e.g. SharePoint 2010) has not been fully implemented. The
Government is seeking new and innovative approaches to satisfy the requirements as stated.
T-013
In support of STO 3, what SharePoint configuration and or development software tools will be made available (i.e. SharePoint Designer, InfoPath, etc)?
Questions to STO
3 – Enterprise
DISA is in the process of implementing MS
SharePoint 2010. The tools that will be made available in the future are not yet known.
No N/A
T-014
STO 3, Section 5 – Scope, Paragraph 2, states
“Knowledge Based System” and “process mapping” are important components in implementing KM for the Agency. What role will ITSMO play as the Agency moves forward with implementing KM-centric business practices into its daily operations?
Questions to STO
3 – Enterprise
The role of the ITSMO in the Agency is evolving.
The Agency has yet to determine the extent of the relationship between the ITSMO and the knowledge engineers. Also refer to T-012.
No N/A
T-015
STO 3, Task 6.3.6 mentions the following: “Configure and design a Business Collaboration Platform and framework to support the expansion of Microsoft
SharePoint 2010.” What is meant by the term
“expansion”? What legacy systems are planned to migrate to SharePoint, and what is the associated migration timeline?
Questions to STO
3 – Enterprise
Expansion refers to the migration of legacy systems (e.g. business, financial, and human resource systems) into the SharePoint environment. No timeline has been identified.
Refer to T-012.
No N/A
T-016
Is the/will the location/room be certified for top secret data level processing prior to analysis of the network infrastructure?
TO 0007 Refer to T-148. No N/A
T-017
Task Order 1 has 7 task areas many of which seem to overlap with the focus areas of the other Task
Orders. Can Government please explain if there is an overlap of task areas between Task Order 1 and the rest of Task Orders or is the scope of work different from the first Task Order?
Task Order 0001
- 0007
The scope of work in Task Order 0001 and the
Sample Task Orders are similar in nature;
however, Task Order 0001 is specific to the operational support required by the CIO’s ITOC
(CI7). The Sample Task Orders are representative of work currently performed within the DISA CIO Directorate. The Sample
Task Orders will not be awarded with the contract, but it is anticipated that this work may be competed and awarded during the contract period of performance.
T-018 Who owns and who manages Tier II and Tier III resources (are they CSC resources)
Section 3
Background and
Section 5.2 -
Refer to Attachment 24. No N/A
T-019 When does the HDI and ISO 20000 Certification need to be done by and by whom?
Section 4
Objectives
The HDI and ISO 20000 certifications are objectives, not requirements.
No N/A
T-020 Will the SD be using the current SOP? Section 6.2 Refer to the Deliverables Table of the
Operations Task Order (Attachment 1).
No N/A
T-021 What are the monitoring tools? Refer to Attachment 26. No N/A
T-022 What type of clearance required for Monitoring?
Clearance required for Monitoring is consistent with the classification level of the information being monitored.
No N/A
T-023
Need details for the Tier I, Tier II and Tier III trend analysis reports. We need the report specifications -who responsible for them
Section 6.2.1.10 Refer to the Deliverables Table of the
Operations Task Order (Attachment 1).
No N/A
T-024 What is the Knowledge Mgmt and Evergreen Process Section 6.2.1.11 Question is not consistent with the given reference.
No N/A
T-025 Who will conduct the training on all existing tools
(i.e. Remedy, monitoring, Knowledge, RIDs, ICE etc) The Government is not providing training. No N/A
T-026 Are all the Service Desk Incident and Service Request and Monitoring reports for SLA's and Operational Appendix B
Service Desk Incident and Service Request are predominately automated. Monitoring is
Reports currently being produced? What reports are automated and which are manually generated?
predominately manual. However, the
Government is seeking new and innovative approaches to satisfy the requirements as stated.
T-027
Need to receive documentation on 1 year history of
SLA achievements for Service Desk, Tier I, Tier II and
Tier III and Monitoring
The Government will not provide historical performance statistics data.
No N/A
T-028 SLA 1.9 - Do Monitoring Alerts automatically create a
Remedy Incident?
Appendix B No. No N/A
T-029 KPI 2.1 - What incidents are considered First Call
Resolvable?
Appendix B Currently, all incidents. No N/A
T-030
How many Service Desk and different Service Desk tools are there? Are reports integrated for operations and SLA's?
Currently, there is one service desk for the requirements identified in the Operations Task
Order.
No N/A
T-031 We need list of Incident Category Types Refer to the Master Incident Management SOP, Attachment 29.
No N/A
T-032 We need a list of Service Request Category Types
The current category types are:
ACTION TYPES:
UNSCHEDULED OUTAGE
ADMIN/USER SUPPORT
AUTHORIZED SERVICE INTERRUPTION
CHANGE REQUEST
HAZCON
INFORMATION
MAINTENANCE REQUEST
PROJECT
SPECIAL EVENT
SECURITY
WORK CENTER
DEGRADATION
SITE CONFIGURATION CHANGE
SITE UPGRADE
SERVICE 1:
APPLICATIONS
COMMUNICATIONS
JDCS MANAGEMENT SYSTEM
LOCAL SUPPORT
NETWORKING
SERVICE 2 (APPLICATIONS):
DMS-BLACK
SERVICE 2 (COMMUNICATIONS):
NETWORKS
SERVICE 2 (JDCS MANAGEMENT SYSTEM):
ARS
CMS
DB
GRGS-ISO
ICATS
INMS
JDCSV1
KM
OS
RMS
SECURITY
TMS
WEB
SERVICE 2 (LOCAL SUPPORT):
ACCESS MGMT
APPLICATION ISSUE
AUTHENTICATION ISSUE
BLACKBERRY ENTERPRISE EMAIL
CAC
CLEAR CUBE
DESKTOP/LAPTOP
EDGE
EMAIL SERVICES
ENVIRONMENTAL SERVICES
FAX
FILE SERVICES
INFORMATION REQUEST
INSTANT MESSAGING
NETWORK ACCESS
LOCAL AREA NETWORK
PRINT SERVICES
REMOTE ACCESS
SCAN SERVICES
SECURITY
SERVER SUPPORT
SIPR TOKEN
THIN CLIENT
WAN
WINDOWS 7
WWOLS-R
SERVICE 2 (NETWORKING):
DATA
TRANSPORT
T-033 We need total monthly incidents for ALL sites Available historical data has been provided in
Attachment 26.
No N/A
T-034 We need total monthly Service Requests All Sites Available historical data has been provided in
Attachment 26.
No N/A
T-035 Are all SOPs currently being practiced?
The Government will not provide historical performance statistics data.
No N/A
T-036 Who owns the Tier II Incident Managers? CSC? Refer to T-018. No N/A
T-037
We know we will factor in Tier I Master (Major)
Incident Managers and Tier I Incident Managers.
Question - should we factor in Tier II and Tier III
Incident managers based on SOP documentation?
SOP
The Government's acquisition strategy is to utilize a Performance Based Service
Acquisition (PBSA) approach. The
Government will focus on the outcome rather than a specific process and specific approach. Historical data and background information are provided at Attachments 21 -
29 to assist the Offeror with the development of their proposal for the required performance-based services.
T-038 Do we need to factor in Problem Manager and an
SLA Manager?
SOP Refer to T-037. No N/A
T-039
How many Tier I, Tier II, Tier III, Monitoring, Incident
Managers, Problem Managers, SLA Managers are currently engaged by role?
SOP Refer to T-037. No N/A
T-040 Are there any Service Request Managers or
Coordinators? How many by role SOP Refer to T-037. No N/A
T-041
RFP Attachment 26 has a file RIDS_2011 that looks like it covers all sites. The file 2011 Remedy Ticket
Report does not seem to cover all sites; what sites does it cover? The file Trouble Tickets_2011 looks like it duplicates the 2011 Remedy Trouble Report, is that true? What sites does it cover? Will the
Government provide data for other significant sites like Scott AFB, Ogden UT, San Antonio TX, Oklahoma
City OK, Chambersburg PA, Columbus OH?
RFP Attachment
26 has a file
RIDS_2011
The Remedy report is different than the RIDS file. Remedy reports are trouble tickets for incidents. RIDS reports are requirements requests.
Available historical data has been provided in
Attachment 26.
No N/A
T-042
Will the Government provide historical data for all the Sample Task Orders that reflects the historical level of effort and applicable Government tools, and other appropriate details, as it provided for Task
Order 1?
Attachment J
(List of
Documents, Exhibits, and
Other
Attachments):
Refer to T-006. No N/A
T-043
Will the Government provide a complete list of all the tools including version numbers that the
Government will provide to accomplish the work specified in Task Order as well as each of the Sample
Task Orders?
Attachment C
(PWS)
Tool information will be incorporated into
Attachment 26.
Yes ent 26
T-044 Will the Government provide the DISA IT Enterprise
Knowledge Management Plan?
Task Order 3 No. No N/A
T-045
For TO 4, could the Government provide a historical
LOE for application development and enhancement or an idea of number/scope of applications developed/enhancements completed per year?
Task Order 4 Refer to T-006. No N/A
T-046
Does the Government have a preferred Software
Development Lifecycle (SDLC)? If so, which approach?
Task Order 4 Refer to T-044. No N/A
T-047
There are two excel files: “Trouble Tickets_2011.xlsx” and “2011 Remedy tickets Report.xlsx.” Could the
Government please explain the differences in the data?
Sensitive
Documents Refer to T-041. No N/A
T-048
The RACI Matrix does not match the titles of the
Specific Task Areas defined in TO 1. The responsibilities seem to contradict what is in the TO.
Could the Government please clarify?
Sensitive
Documents Refer to T-005. No N/A
T-049
Can the Government please provide a breakdown of the assigned group categories defined in the file
“2011 Remedy Tickets Report.xlsx”?
Sensitive
Documents Refer to T-043. No N/A
T-050
The Government states, “However, some of the IT services (e.g., e-mail) are in the process of transitioning to the Agency’s Enterprise Services
Directorate (ESD).” Could the Government please clarify the vendor currently providing DISANet users’ e-mail? What is the status and schedule for transition? Could the Government please describe the anticipated support expected from the contractor?
Section 3.0
The Agency’s transition to Defense Enterprise
Email (DEE) is fully anticipated to be complete prior to the award of the DESS contract.
No N/A
T-051
Does the government currently utilize a CMDB tool?
If so, could the Government please describe the tool, the type, and how it is utilized across the enterprise?
Section 6.5.2 .2 Refer to Sec 6.5.2.6. The ITOC currently uses
Altiris and Alterpoint.
T-052 The Enterprise uses approximately 9 principal tool PWS, Section 2, Refer to T-043. No N/A suites to monitor its worldwide status. Could the
Government please provide more specifics regarding the 9 tool suites?
Paragraph 3, lines 3-4
T-053 When will the Government provide the existing architecture for DISANet to the offerors?
Refer to Attachments 27 and 28. No N/A
T-054
“Additionally, a significant amount of the work is performed by support teams traveling to the
Agency’s CONUS and OCONUS DoD locations.” Can the Government clarify the scope of the travel over the last two years—number of trips, number of people, duration, etc.?
PWS 2, Lines 7-8 The Government has provided estimated travel figures within each of the attached Task Orders.
No N/A
T-055
Can the Government revise RFP Section 6.1.1 to reflect requirement for a DESS Operations Support
Monthly Status Report?
RFP Attachment
#1, 6.1.1
Deliverable Table reference of monthly status report will be revised to reflect 6.1.2.
Yes
Attachm ent 1 -
Deliverab les Table
T-056
DISA currently uses Remedy, DEMI, and RITS for incident management, change management, and service request management. Will DISA entertain alternative solutions to these systems?
RITS 6.5.1.6.
DEMI 6.5.2.8
Based on the number of integrated business processes, the Government is not postured to transition away from these systems within the near term.
No N/A
T-057
Is the scope of the Tier II afterhours support inclusive of all service technologies (desktop, server, network) or confined only to Tier II desktop support?
Attachment 1,
6.2.2 (provide afterhours and
Weekend/Holida y Tier II Services
Yes, all services technologies. No N/A
T-058
The following tasks are designated at Tier III Services.
Should these be Tier II Services? Upgrade operating systems, install software applications, install new desktop/laptop workstations, reconfiguring existing
PCs/Laptops for new users, reimage existing
PCs/Laptops, and integrate desktop applications into
DISA IT Enterprise workstations
Attachment 1:
6.2.3.5
Within the DISA multi-tier model, these responsibilities fall within the Tier III domain.
No N/A
T-059 This section identifies that the contractor is required to perform critical/emergency Tier III system
Attachment 1:
6.2.3.8
In an outage situation, yes, it will be the contractor’s responsibility. However, server administration tasks with the example provided performing server reboots. Is this activity a contractor responsibility only for outage situations or does the government consider all server reboots a
Tier III function?
reboots associated with routine maintenance may or may not be a Tier II function depending on the circumstances.
T-060
Much of what is written in the TO describes DISA IT
Service Management initiatives and defines terms.
Support required is written in very general terms with very little specificity. Can there be a more specific description of required workload to enable a more accurate estimate of labor requirements?
Attachment 5 Refer to T-006. No N/A
T-061
Each sub-statement within this section appears to be asking for problem management solution support
(resolve technical problems) for a variety of different technology domains or areas (software packing, operating system images, mobility solutions, infrastructure services, etc). This is re-enforced in section 4 (Objectives) and section 5.6 which identifies an objective to engineer solutions to incidents, problems, and events. Is the extent of support the government desires limited to problem management resolution? If not, can the RFP be updated to identify the solution engineering support beyond engineering solutions for problems that the government desires.
TO 1 section
6.6.3 Enterprise
Technical
Solution
Development and
Implementation
Support
No. Support is not limited to problem management. The requirements are articulated in the PWS.
No N/A
T-062
Is there a period of time in which the government wants or expects the Service Desk to become HDI certified?
Page 33 Refer to T-019. No N/A
T-063 Will the winning bidder be required to supply personnel time to complete an HDI survey?
Page 33 Refer to T-019. No N/A
T-064
Will the contractor perform infrastructure integration analysis and troubleshooting for new
DISA IT Enterprise components in a lab environment
Attachment 1, 6.2.3.9, page 9 In a lab environment. No N/A or on the live network?
T-065
The fifth objectives states “Engineer and deploy solutions to Network, Server and Applications
Incidents, Problems and Events”. Does this mean the focus of engineering is to be on developing solutions for incidents, problems, and events with no focus on engineering new services? Is engineering new and/or enhanced services an expected workload.
TO1 Section 5, Objectives
Refer to specific taskings in Section 6 in the
PWS. .
No N/A
T-066 How many VIPs are there for priority support? What is the expected support for VIP?
There are currently approximately 50 VIPs based on the current guidelines regarding the definition of VIPs. Currently, there is a dedicated support team for these VIPs.
No N/A
T-067
Will the Government provide a listing of all the tools the Government is used to: 1) manage and monitor, management monitor and 2) maintain the images on the desktops.
Refer to T-043. No N/A
T-068 Will the Government distribute a copy of the change management policies and procedures?
Refer to Deliverables Table for the Operations
Task Order, Sec 6.6.4.1.
No N/A
T-069 Will the Government provide the name of the tools used for configuration management (CMDB)?
Refer to T-051. No N/A
T-070 Are there any OLAs between DISA complexes? No. No N/A
T-071
Is the cost to obtain the HDI/ISO certifications from an outside 3rd party to be included in the cost proposal? If so, does the Government want the HDI to be considered an ODC? Will the Government provide a timeline for when the HDI/ISO certifications are needed?
Refer to T-019. No N/A
T-072
Does the Government intend for the cable plant personnel to be certified? If so, what are the required certifications?
Task Order #1, Specific Task 5.4
There are no cable plant personnel certifications necessary to meet the requirement.
No N/A
T-073 Will the contractor have the flexibility to modify the work schedule to meet the business needs?
The contractor must meet all the performance requirements as identified in the PWS and
SLAs. The Government will focus on the outcome rather than a specific process, specific approach, or hours worked.
T-074 What are the hours an operator must be present for each of the video conference centers?
Page 4 Refer to T-073. No N/A
T-075
Which Remedy version does DISA own and which modules (Example: Incident, Asset Management, Help Desk, etc) do they use? Who currently maintains Remedy (development)?
The Government is currently using Remedy Ver.
6. Maintenance responsibilities are currently divided between Tier II and Tier III teams.
No N/A
T-076 How will the incoming contractor inherit the incumbent’s aging tickets?
The Government will assume responsibility for resolving the incumbent’s aging tickets. These aging tickets will not affect/impact the performance metrics of the incoming contractor.
No N/A
T-077
What is the scope of purchasing support that the contractor is required to perform? For example, will our Cable Plant personnel order network cables?
The contractor may be requested to procure products that are incidental to the services being performed.
No N/A
T-078 Would the Government provide historical travel data?
Refer to T-054. No N/A
T-079 Will the government be providing the Level of Effort information required per each Task Order?
Refer to T-006 & T-037. No N/A
T-080
In order to staff each Task Order reasonably, will the government provide historical FTEs needed for each of the Task Orders?
Refer to T-006 & T-037. No N/A
T-081 Is the incumbent contractor currently understaffed according to the level of work performed?
Refer to T-035. No N/A
T-082
Is the offeror required to perform Tier II services during normal working hours? Paragraph 6.2.2 indicates that the offeror is to provide Tier II support only after normal working hours. If the offeror is not to propose and quote Tier II support during normal working hours, under what contract will DISA obtain
Tier II support and how will these two contracts be integrated?
See Attachment
1, Paragraph
6.2.2
No, Tier II services will be performed by
Government personnel during normal working hours.
T-083
The offeror is to be penalized if callers abandon calls more than 6% or 10% of the time depending on the time of the call. Should the government be counting calls abandoned in less time than the 1.5 and 3.0 minute standard to respond to the call? If callers are not willing to wait the contractually specified duration it is not the contractor’s fault and these calls should be excluded from the penalty calculation.
See Attachment
1, Appendix B, KPI 1.2
The Government intends to enforce the SLAs as written.
No N/A
T-084
The method of calculation of penalties is not clear.
Please provide an example of how penalties will be imposed for failure to achieve KPIs such as 1.1, 1.2, 1.3, etc.
See Attachment
1, Appendix B, Remedy Column
Verbiage will be corrected in the Remedy
Column of Attachment 1, Appendix B.
Yes
Attachm ent 1, Appendix
B, Remedy
Column
T-085 Will the Government furnish all software needed to perform Task Order 1?
See Attachment
1, Paragraph 13.1
The Government will make available any software currently being used to perform the functions identified in the PWS.
No N/A
T-086
Will the government consider providing a “plug number” or a list of labor categories and hours to price for this Task 4, Cable Plant Management
Support, in Task Order 1?
See Attachment
1, Paragraph 6.4 No. No N/A
T-087
There are some duplication of requirements between Task Order 1 task areas and Sample Task
Orders. Would the Government agree that the
Proposal responses can make reference from one area to another?
General Refer to T-017. No N/A
T-088
Will the Government provide a list of Government
Furnished Property (Information/Equipment) for each support site location?
General Refer to RFP Attachments 21 – 29 for information regarding Government equipment.
No N/A
T-089
Will the Government provide the following data call information for each support site location?
a) Current or projected DSN and VOIP lines
General Refer to PWS, Task Orders, and Attachments for approximate number of total users.
b) Current or projected NIPR and SIPR users
c) Current or projected NIPR and SIPR ports
T-090
How is change management addressed? TSO/TSR, NCCM, etc
Does DESS use the NCCM for configuration management?
Does DESS use TSOs/TSRs for circuit actions?
General
Refer to T-068.
T-091
During the walk-through, we visited a “Service Desk” facility. Approximately how many service desks are located at DISA HQ Ft Meade?
General Refer to T-030. No N/A
T-092
Tasks to Be Performed, Task Area 1—Project
Management, DESS Program Management Plan
(PMP).
Does the government intend for the PMP to cover a high-level IDIQ management approach, with descriptions of approaches for managing the 8 high-level Task Areas of the PWS? This would thus exclude task order-level staffing plans, etc. The alternative would be for a task-level PMP for Task Order 1.
Please clarify the content of the PMP
PWS, Section C, Task Area 1 Refer to Sec L.6.2.2.5. No N/A
T-093
Within Volume II, should the offeror address the 8 high level Task Areas in a section separate from the
Task Orders? Or should the 8 high level Task Areas be addressed within the Task Order sections of Volume
II, i.e. Subfactors 2 and 3?
Pages 32 and 130 of 92
Section 4. Tasks to be Performed;
L.5.1
Table 5.1
Refer to L.6.2. No N/A
T-094
Task Area 3 – Service Desk
The PWS indicates that the contractor shall provide
24x7x365 Tier II Services to DISA IT Enterprise Service
Desk. However, in the Task Order #0001, Operational Support, Section 6.2.2, Page 8, the requirement is to provide After Hours and
Section C –
Paragraph 4
Task Area 3 –
Service Desk
The requirement for the Operations Task Order is after-hours/weekends/holiday Tier II support.
The verbiage as stated in the contract-level
PWS is accurate. 24x7x365 Tier II support may be required in future task orders.
Weekend/Government Holiday Tier II Services Desk support. Please clarify the requirement for Tier II support.
T-095
We’d like to understand the breadth/number of
Enterprise Services that are being considered under
Task Order 1 (e.g., Enterprise Email, etc…)?
Task Order 1, General
DISA is in the process of transitioning to
Enterprise E-Mail and Enterprise
SharePoint. DISA cannot forecast the number of future requirements.
No N/A
T-096 Which tool does DISA currently use for its configuration management database?
Task Order 1, task 5.2.2
(paragraph
6.5.2.2)
Refer to T-051. No N/A
T-097
Does the government have the Project Server infrastructure in place (e.g. servers, etc.); and what topology did they use (1, 2, or 3 tier)?
Task Order 1, Task 5.3 (para
6.5.3):
Yes. The Web, Applications Tiers, and Database
Tiers are each on their own server No N/A
T-098
Transition and Implementation of Enterprise
Services:
The RFP stated “The Contractor shall conduct analysis to enable the Government’s ability to make data driven decisions…”. If the Contractor will only conduct analysis, then who is responsible for the actual transition and implementation of Enterprise
Services?
Task Order 1
Section 5.7
The requirements associated with Sec 5.7 are detailed in Sec 6.7 of the Operations Task
Order.
No N/A
T-099
Would the government please clarify which
Microsoft certification/credential applies? Microsoft has no certification called “Master Scheduler” listed on their website.
Task Order 1, Page 17, Task 5, 6.5.3.4
The PMI-issued Scheduling Professional
Certifications (PMI-SP) Yes
Task
Order 1, Section
6.5.3.4 changed
T-100
DESS Enterprise Architecture Support:
The government titled task 6.5 as EA Governance, Framework, and management; however, the description paragraph describes Security Risk
Management Architecture tasks (which are covered in task 6.6). Request the government clarify its
Task Order 6, paragraphs 6.5 and 6.6, Verbiage will be corrected to clarify Section 6.5 and 6.6 of Task Order 6.
Yes
Task
Order 6.5 and 6.6 changed description of tasks 6.5 and 6.6 in order to assist bidders in accurately responding to their request for proposal.
T-101
Presuming that there is an incumbent performing the work in the Sample Task Order Network
Infrastructure Installation, could the Government provide the contract number for this sample task order?
Task Order 7
General Refer to T-148. No N/A
T-102
Will the Government provide work load data for each support site location?
a) Current or projected tickets (opened and closed)
b) Current or projected objects supported
c) Current or projected users
d) Current or project calls
Task Order 1
Task 2 Refer to Attachment 26. No N/A
T-103
Will the government please specify the education requirements and years of experience required for the labor categories?
Attachment 14b Refer to T-002. No N/A
T-104
Is the government requesting resumes for the
Operational Support Task Order? Are they part of the page count or should they be an attachment, if required? Page count?
Attachments 1-7;
G.3.a; ATT 15 No. Refer to K-053. No N/A
T-105 Where is the Enterprise Verification & Integration
Facility (EVIF) located?
ATT 1, Section
6.3.2.1
The EVIF is located in the DISA Ft Meade HQ lab building.
No N/A
T-106
How often does the Government anticipate that these inspections and visits will occur and what is their typical duration?
ATT 1, Section
6.3.5.3
Security Assistance Visits are typically less than one week in duration. CCRI’s typically occur every two years.
No N/A
T-107
Section 6.7.2 references “Table 3” and Subtask 6.7.1.
We could find no “Table 3”. Could the government provide the table or clarify, please?
ATT 6, Section
6.7.2 and 6.7.1
Verbiage will be corrected in Section 6.7.1 of
Attachment 6.
Yes
Attachm ent 6 , Section
6.7.1
Changed
T-108 What scanning tools are used to conduct network security scans and operational security? If such task
ATT 1, Section
6.3.4
The products used are COTS and GOTS products. However, for security reasons, the order is provided, will DISA provide the scanning tools or will it be the responsibility of the contractor?
Government will not provide the names of these tools. The Government will provide the contractor with access to these tools.
T-109
C.4 of the PWS lists task areas that include service desk, cable installation, and transition enterprise services that do not directly correspond to sample task orders. We understand this to mean that our team needs to be able to provide such services as individual tasks as well as components of other tasks—is this a correct understanding? Was there an intention to have these task areas of the PWS correlate directly to the sample tasks (if so, are there missing sample task orders?)
C.4; J list of attachments, ATT
14A for pricing
Refer to T-093. No N/A
T-110
Based on the PWS and Task Order requirements, and based on the sources sought notice that was issued by DISA in late 2011, we understood that ISO 20000 is a required certification for DESS contract. However the RFP does not mention ISO 20000. Is this omission intentional, or is ISO 20000 still considered important to the success of a large ITSM program like DESS?
L.1; Section C
(Performance
Work Statement)
Refer to T-019. No N/A
T-111
What current call tracking system is being used for
KM and IT Services workflow and work ticket management? What version, associated modules and software applications?
Attachment 3
DISA currently uses Borland Calibre, Remedy, and SharePoint 2010.
No N/A
T-112
The RFP appears to focus on OpenText and
SharePoint 2010 as primary tools. What Knowledge
Management or Document Management systems does DISA now use?
Attachment 3
DISA currently uses SharePoint 2010, Intellipedia, Vignette, and OpenText.
T-113 What is the current staffing level for the Operations task by task area?
RFP
Section C Task
Area 1
Refer to T-006 and T-037. No N/A
T-114 Please provide a list of the nine tool suites used by Attachment 1 Refer to T-043. No N/A
DISA. Page 4
Section C
T-115
What is the current average number of calls for Tier
1 -3 helpdesk by tier? Are any SLAs currently in place? If so, what are they?
RFP
Section C Task
Area 3 Service
Desk
Refer to Attachment 26. No N/A
T-116
Does DISA plan to implement any financial, operational (logistics/asset management), supply, and procurement software for shared or managed services? If so, what products?
RFP
Section C
References made are to the contract-level PWS.
PWS Section 4 states that “the Task Areas identified represent a high-level task summary of the work domains and associated supporting functions that are covered under the scope of this Performance Work Statement. Specific tasks and sub tasks will be detailed at the Task
Order level.”
No N/A
T-117 What is the current level of staffing at each of the remote sites to support Operations?
RFP
Section C
Refer to T-116. No N/A
T-118 Do all remote sites require 24x7 operations support?
RFP
Section C
Refer to T-116. No N/A
T-119 What labor categories and certifications will DISA map to in the DOD 8570?
RFP
Section C Task
Area 4
The labor categories identify the minimum education requirements for DESS. The DoD
8500 series, as implemented DoD-wide, identify certifications required for all
Information Assurance positions and are in addition to the specified educational requirements. Refer to T-116.
No N/A
T-120 The last paragraph is incomplete. Please provide the missing information.
RFP
Section C Task
Area 7
This question references old version of Draft
RFP. Refer to current PWS, Task Area 7.
T-121 Are there any specific educational requirements PWS Refer to T-002. No N/A
(degree, certifications, etc.) for Tier I, Tier II and Tier
III personnel? Which labor categories map to these personnel?
T-122
When you say ‘return a computer back to the established baseline’ does that always mean
‘reimage’ the machine? Are there spares to swap into place so that root cause analysis and problem management can occur prior to a reimage?
PWS
No. Spares are limited and controlled at the
Directorate level. Refer to T-116.
No N/A
T-123
“Numerous touch points between Contractor and
Government personnel” – Are there Operational
Level Agreements (OLAs in place between Tier I, Tier
II and Tier III? Are their Underpinning agreements/contracts in place between Tiers and any outside vendors?
PWS Page 3
OLAs exist today. The Government will not provide any information regarding proprietary business processes of the incumbent contractor.
No N/A
T-124
Is the main Tier I Help Desk centrally located at one physical site? Are Tier II and Tier III teams geographically dispersed at each of the CONUS and
OCONUS locations? How many Tier II and Tier III teams members are they and at what locations?
PWS Par. 1 Page
Refer to T-030 & T-116. No N/A
T-125
“However, some of the IT services (e.g., email) are in the process of transitioning to the Agency’s
Enterprise Services Directorate (ESD).” (Is that a physical or virtual operation and if physical, where is it located?)
PWS Par. 2 Page
Refer to T-050. No N/A
T-126 Are these people (VTC group) part of the Tier II or
Tier III group?
PWS Par. 3 Page
No. However, the Government is seeking new and innovative approaches to satisfy the requirements as stated.
No N/A
T-127
“However, DISA’s role as a global combat support agency requires an operational VTC capability on a
24/7 basis.” (Are these people on-call or physically present on a fixed or rotating schedule?)
PWS Par. 4 Pg.
4/5 Refer to T-037. No N/A
T-128 “Achieve HDI and ISO 20000 Certification in IT
Service Desk support” (What is the desired time PWS Par. 1 Pg. 5 Refer to T-019. No N/A frame for HDI and ISO 20000 certifications to be achieved? Is this for Tier I, Tier II and Tier III operations? Just at Ft. Meade or at what other locations? Has this operation already been funded and has HDI been engaged to perform these services? Does the HDI Auditor require a clearance to perform the audit?) Will the budget for these services be part of this bid or will this be an ODC against the contract during the 1st, 2nd and 3rd years
(first 18 months for first audit; 3rd/4th year for re-audit)?
T-129
“Additionally, a Monthly Status Reports (MSR) containing data to demonstrate the Contractor(s) performance against the SLA’s identified in Appendix
B, shall be provided to the Government.” Will this be for all functions of the contract (each area) or will the
Program Manager put together one fully encompassing report for the contract?
PWS 5.1, Page 5
The Monthly Status Report will be specific to each Task Order issued under the DESS contract.
Yes
Task
Order #1, Section
6.1.2
T-130
“The Contractor shall provide technical services to perform the mission of the DISA IT Enterprise Tier I, After-Hours Tier II, and Tier III Service Desk and
Network Monitoring functions. The tasks specified in this area designed to improve the performance and enhance the capabilities of DISA’s IT Enterprise
Service Desk to achieve Help Desk Institute (HDI) and
ISO 20000 Certification.” (Once again, in what time frame..i.e. during the first 18 months? What about the re-audit to re-certify since the HDI Audit is only good for 2 years; if this is a 5 year contract (one base and four options and the initial audit takes 12-14 months, the Certification will have to be renewed before the 5th year.) What about the ISO 20000 audit? Will the cost for that be built in to the bid or
PWS 5.2, Page 5 Refer to T-019. No N/A as an ODC? Will both audits run simultaneously?
T-131
“The Contractor(s) shall develop and execute a
Transition Plan detailing the Contractor’s plan to assume responsibility for the tasks identified in this
Task Order.” How long will the transition period be…30 days?
PWS 6.1.1 Page
Refer to Sec. L.6.2.2.6 of the RFP. No N/A
T-132
“Develop improvements/enhancements based on industry best practices (for example ITIL, eTOM and
HDI, etc.) to increase the accuracy and efficiency of the DISA IT Enterprise Tier I Incident Management
SOP.” Has this SOP already been written/ implemented?
PWS 6.2.1.2 Pg.
Refer to Attachment 29 and Deliverables Table of Task Order 1.
No N/A
T-133
“Serve as the Single Point of Contact (SPOC) on the
DISA IT Enterprise Service Desk for the coordination, execution/resolution, and optimization of Tier I
Incident Management capabilities.” What ITIL education/certification does current/future staff need to possess?
PWS 6.2.1.3 Pg.
Refer to Attachment 15 and T-037. No N/A
T-134
“Upon receipt of a fix notice from Tier II, request verification from the user that the problem is resolved and close the trouble tickets IAW the Tier I
Incident Management SOP when the fix has been verified by the user.” OLAs between Tiers to ensure that SLAs are met? Are there any SLA’s between tiers? Are there any SLA’s between Service Desk and outside vendors? What about between vendors and
Service Desk (Underpinning contracts)?
PWS 6.2.1.5 Pg.
Refer to T-123. No N/A
T-135
“Perform Tier I problem recording and classification
IAW the DISA IT Enterprise Tier I Incident
Management SOP.” What is the Tier 1 Incident
Management SOP?
PWS 6.2.1.7 Pg.
Refer to Attachment 29. No N/A
T-136
“Conduct technical analysis to develop a Weekly Tier
I Trend Analysis Report, base d on Government defined parameters, which identify the cause of increases and/or decreases.” (i.e., design changes, outages, events, and other network impact occurrences) in trouble ticket trends. Is this currently being produced? Sample available? What are the likes/dislikes about current report?
PWS 6.2.1.10 Pg
Refer to T-035. No N/A
T-137
“Populate and maintain the content of the DISA IT
Enterprise Knowledgebase (i.e., the known error database) self-help service.” What kind of
Knowledgebase tool is in use? Is it web-based? Who has access to it? Does it integrate with the CRM in use?
PWS 6.2.1.11 Pg
There are 2 on-line knowledge base engines in use:
1) RightAnswers Portal, Version 5.1.0, is a web-based portal that provides end-users access to a pre-populated database of common problems and fixes for the DISANet products. This database also contains tailored entries provided by the incumbent knowledge manager based on DISANet specific problems and fixes.
2) The embedded knowledge base provided by the Remedy Action Request system. This database is populated by technicians as fixes are identified to common problems and is accessible only by DISANet Technicians.
No N/A
T-138
“Provide After Hours and Weekend/Government
Holiday Tier II Services Desk Support to all DISA IT
Enterprise Service Technologies.” On site or via on-call rotation?
PWS 6.2.2 Page
Refer to T-073. No N/A
T-139
Provide Tier II Service Desk Support services, as directed by the Government].>, IAW the DISA IT
Enterprise Tier II Incident Management SOP, to end users and Field Office System Administrators. What kinds of skills/experience and certifications are required for Tier II personnel? How long have existing personnel been there? Is there any opportunity for contractors to pick up existing staff at transition?
PWS 6.2.2.1 Pg 9
Any experience/education requirements will be provided in Attachment 15.
No N/A
T-140
“Upgrade operating systems, install software applications,” What is the current operating system?
When is an upgrade anticipated?
PWS 6.2.3.5 Pg
DISA is in the process of transitioning/upgrading its unclassified desktop environment to the Windows 7 Service Pack 1 operating system. Additionally, DISA is currently evaluating a timeline for transitioning its classified desktop environment to Windows
7.
No N/A
T-141
“Perform critical/emergency Tier III system administration tasks (e.g., Performing server reboots), as directed by the Government, to keep systems running (e.g., maintain 24/7 availability).” Is there a scheduled weekend once per month for maintenance?
PWS 6.2.3.8 Pg
Recurring maintenance schedules vary according to the site of the server. Refer to T-
037.
No N/A
T-142
Labor Categories are not clear given the newly added
Task. When does the Government intend on providing this information as it impacts the pricing and overall scope of work defined and proposed to by prospective bidders
Refer to T-002. No N/A
T-143 What contract type will Task Order 001 be awarded as?
TO 0001 Refer to RFP Attachment 14A. No N/A
T-144 How many contractor FTE’s are currently employed on contract supporting DISANET?
TO 0001 Refer to T-037. No N/A
T-145 How many contractor FTE’s are currently performing in each of these task areas?
RFP, Task Area 1-
Refer to T-006 & T-037. No N/A
T-146
Service Desk; Are there specific DISA requirements for the Help Desk Institute (HDI) Certification mentioned?
RFP pg. 33, Task
Area 3 Refer to T-019. No N/A
T-147 What position(s) on TO 0001 will be considered key personnel?
TO 0001 Refer to K-053. No N/A
T-148
Please explain to what level of equipment is the customer requiring in the BOM? Should this BOM include IOS layer 2 and 3 products, equipment racks, power, UPS, computer Workstations, servers, or just layer 1 cable plant hardware?
Sample Task
0007, 6.1.2 Sample Task Order 0007 has been removed. Yes
Attachm ent 7
T-149
Is a separate architecture required for different system classification? One for NIPR, one for SIPR, and others; or a single integrated architecture?
Sample Task
0007, 6.1.2 Refer to T-148. No N/A
T-150 Is a Hardened or Simple Protective Distribution
System required in building 123?
Sample Task
0007, 6.1.2 Refer to T-148. No N/A
T-151
Will the Crypto devices be provided and to what extent will the contractor need to configure the devices.
Sample Task
0007, 6.2.3 Refer to T-148. No N/A
T-152 How many Crypto devices will need to be installed?
Sample Task
0007, 6.2.3 Refer to T-148. No N/A
T-153
The RFP calls for key personnel in section G.3.
Attachment 15, “DESS Labor Categories,” details seven different labor categories marked as key personnel. Should the Offeror provide resumes for all seven positions? If not, what labor categories should be considered key for the Task Order 1 response? If so, shall the resumes be included as an appendix in the Technical/Management Volume?
Section G.3;
Attachment 15;
L.5.2, Page
Limitations
Refer to K-053 and T-104. No N/A
T-154
Attachment 15 indicates that a Subject Matter Expert
(Labor Category 87) is key personnel. We assume resumes for key personnel are only required for Task
Attachment 15, DESS Labor
Categories
Refer to K-053. No N/A
Order 1 and contract-level staff. Can the government confirm that key personnel for sample task orders will not be required as part of this response?
T-155
Task Order 1 encompasses Task Areas 1, 3, 4, 5, 6, 7, 8 from the DESS contract-level Performance Work
Statement. Will the government please clarify the difference between responding to task areas 1, 3, 4, 5, 6, 7, 8 in the first Task and responses required in
Task Orders 2-7?
Attachment 1, Operations Task
Order
Refer to T-017. No N/A
T-156
For Task Order 1, Task 3 -DISA IT Enterprise
Information Assurance Support calls for the preparation and evaluation of documents and data in support of the DoD Information Assurance
Certification and Accreditation Process (DIACAP). For the purpose of correctly allocating labor, should we assume this support is limited to the IT systems that the CIO office has direct control over, and that the
DIACAP support at the component level is performed as a part of sample Task Order 2, Information
Assurance Support Services?
Attachment 1, Operations Task
Order, Section
6.3
Refer to T-017. No N/A
T-157 Is Sample Task 7 – Network a new task or incumbent task at DISA?
Sample Task
Order #7-
Network
Refer to T-148. No N/A
T-158 What is the Full Time Employee (FTE) count on
Operations and Sample Task orders?
Operations Task
Order and
Sample Task
Orders
Refer to T-037 & T-006 respectively. No N/A
T-159
The last two sentences in the first paragraph of PWS
Section 2 are essentially redundant with earlier sentences in the paragraph. Should they be deleted?
PWS
Section 2 Yes, verbiage will be revised. Yes
PWS
Section 2
T-160 Page 3 of the Task Order (first paragraph near the bottom states, “Information regarding current DISA
Page 3 of the
Operations Task
Refer to Attachment 29 and the Deliverables
Table of Task Order 1.
IT Enterprise Call Center/Help Desk procedures can be found in the attached DISA IT Enterprise SOPs.”
Can DISA provide Industry the DISA IT Enterprise
SOPs?
Order
T-161
There is a conflict between the Operations Task
Order and the RFP PWS. Operations Task Order,
6.2.2. states After Hours and weekend/ Government holiday coverage for Tier II, but the RFP PWS, page 8
Task Area 3 – Service Desk bullet 3 states, “provided
24x7x365 Tier II Services to DISA IT Enterprise Service
Desk. Is Industry to propose After Hours and weekend/ Government holiday coverage for Tier II of
24x7x365?
Operations Task
Order 6.2.2. and
RFP PWS page 8
Task Area 3 –
Service Desk
(bullet 3)
Refer to T-094. No N/A
T-162 What systems/platforms specifically are you looking for? NIPRNET/SIPRNET/JWICS etc.
Sample Task
Order 7 –
Network
Infrastructure
Installation
Refer to T-148. No N/A
T-163
For VOIP/VOSIP, are you wishing to use an enterprise solution or establish their own capability?
What capability does Ft. Detrick currently have and what support are they willing to provide?
Sample Task
Order 7 –
Network
Infrastructure
Installation
Refer to T-148. No N/A
T-164 How many VTC systems do you wish to have? Will all of the systems be secure?