About this file

This set of mechanical drawings and specifications outlines the requirements for a chilled water system upgrade project at MacDill Air Force Base in Florida. Key details include demolishing and removing two existing 250-ton chillers and associated pumps and piping. The project will provide and install two new 225-ton air-cooled chillers, new primary and secondary chilled water pumps, isolation valves, pressure and flow sensors, and cellular glass insulation for piping and equipment. The control system will be upgraded with a new chiller plant controller to enable constant primary and variable secondary chilled water distribution. Testing and balancing of the entire chilled water system is also specified.

The related federal contract opportunity is for air duct cleaning services at the Defense Information Systems Agency. No further product, service, or award details are provided in the solicitation summary.

View the file

Other files for this federal contract opportunity

Other files attached to Air Duct Cleaning, newest first.
File Type Posted
HC102823R0065 amend 2.docx DOCX document
HC102823R0065 HVAC System Cleaning Questions and answers.docx DOCX document
BLDG 3541 DISA Floor Plan.pdf PDF
DISACENT HVAC Diagram.pdf PDF
mechanical Binder1.pdf PDF
HC102823R0065 amend 1.docx DOCX document
Pre-Proposal Site Visit Request Instructions (HVAC System).doc DOC document
Pricing Worksheet.xlsx XLSX spreadsheet
HC102823R0065.docx DOCX document
Pre-Proposal Site Visit Request Instructions (HVAC System).doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL ABBREVIATIONSMECHANICAL LEGEND

MECHANICAL GENERAL NOTES

-CHILLED WATER SUPPLYCHWS

-CHILLED WATER RETURNCHWR

-CONDENSATE DRAINCD

-GATE VALVE

-BALL VALVE

-CALIBRATE BALANCING VALVE

-BUTTERFLY VALVE

-UNION

-STRAINER

-PSI REG.

-CHECK VALVE

-CONNECTION, BOTTOM

-CONNECTION, TOP

-ELBOW, TURNED UP

-ELBOW,TURNED DOWN

-REDUCER, CONCENTRIC

KITCHEN EXHAUST FAN

INSIDE DIAMETER

HERTZ (CYCLES PER SECOND)

MAXIMUM

NORMALLY OPEN

NOT APPLICABLE

NOT TO SCALE

OUTSIDE DIAMETER

OUTSIDE AIR

POUNDS PER SQUARE INCH GAUGE

POUNDS PER SQUARE INCH

THOUSAND BTU PER HOUR

TEMPERATURE

THERMOSTAT

WET BULB

VENT, VOLT

WATER PRESSURE DROP

RELATIVE HUMIDITY

HOURHR

AND AIR CONDITIONING

HEATING VENTILATINGHVAC

GALLONS PER MINUTE

HORSEPOWER, HEAT PUMP

HAND-OFF-AUTOMATIC

FEET PER SECOND

GALLONS PER HOUR

FLOOR DRAIN

FEET PER MINUTE

FAHRENHEIT

FEETFT

HOA

HP

GPH

GPM

FPM

FPS

F

FD

WPD

WB

V

CHILLED WATER SUPPLY & RETURN

ENERGY MANAGEMENT SYSTEM

DISCONNECT

ENTERING

ELEVATION

EFFICIENCY

ELEV

ENT

EMS

EFF

DN

DISC

DOWN

CLEAN OUT

DOMESTIC COLD WATER

CONDENSATE

BRITISH THERMAL UNIT

BACKFLOW PREVENTER

DEG

DCW

COND

CO

DEGREE

CHWS&R

BTU

BFP

TYP

TEMP

T

TYPICAL

RM

RH

ROOM

PSIG

PSI

NO

OA

OD

NTS

AUTOMATIC TEMPERATURE CONTROL

AAV AUTOMATIC AIR VENT

ABOVE FINISHED GRADE

ABOVE FINISHED FLOOR

BACK DRAFT DAMPER

AIR VENT

ACCESS PANEL

AIR PRESSURE DROP

AV

BOT

BDD

ATC

APD

AP

BOTTOM

AFF

AFG

MAX

NA

N

MIN

MBH

NORTH

MINIMUM

ID

KEF

IN INCH

HZ

GLYCOLGLY

GLYCOL WATER SUPPLYGWS

GLYCOL WATER RETURNGWR

KILOWATTKW

1. IF THE INTENT OF ARCHITECT/ ENGINEER WITH REGARD TO ANY DETAIL IS NOT CLEAR, OR IS CAPABLE OF MORE THAN ONE INTERPRETATION, SUCH MATTERS WILL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER IN WRITING BEFORE THE SUBMISSION OF BIDS, AND THE ARCHITECT/ ENGINEER SHALL MAKE CORRECTION OR EXPLANATION IN WRITING.

OTHERWISE, NO EXTRA CHARGE WILL BE ALLOWED FOR THE WORK OR MATERIAL WHICH THE ARCHITECT/ENGINEER WILL REQUIRE, PROVIDED THAT IT COMES WITHIN A REASONABLE INTERPRETATION OF THE DRAWINGS AND SPECIFICATIONS.

2. THE PLANS AND SPECIFICATIONS ARE INTENDED AS A GENERAL DESCRIPTION OF THE WORK TO BE PERFORMED. ALL ITEMS NOT SPECIFICALLY MENTIONED OR SHOWN, BUT NECESSARY FOR THE COMPLETION OF THE INSTALLATION, SHALL BE FURNISHED AND INSTALLED BY THIS CONTRACTOR. THIS CONTRACTOR SHALL THOROUGHLY ACQUAINT THEMSELVES WITH THE MECHANICAL, ARCHITECTURAL, STRUCTURAL AND ELECTRICAL PLANS BEFORE SUBMITTING THEIR FINAL BID. NO ADDITIONAL COMPENSATION WILL BE ALLOWED DUE TO THE CONTRACTOR'S FAILURE TO FAMILIARIZE THEMSELVES WITH

THE PLANS.

3. ALL WORK SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING CODE 2017 & FLORIDA MECHANICAL CODE 2017.

4. THE SIZE AND LOCATION OF EQUIPMENT INSTALLED UNDER DIVISION 23 MECHANICAL SHALL BE COORDINATED WITH OTHER

TRADES. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS

TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

5. PIPING TO MECHANICAL EQUIPMENT SHALL BE INSTALLED IN A MANNER THAT DOES NOT OBSTRUCT EQUIPMENT SERVICE

CLEARANCES.

6. COORDINATE WORK WITH ALL TRADES INCLUDING, BUT NOT LIMITED TO, STRUCTURAL, LIGHTING, POWER SYSTEMS, AND

PLUMBING EXISTING AND NEW WORK.

7. INTERRUPTION OF EXISTING SERVICES SHALL BE MINIMAL AND SHALL BE FULLY COORDINATED WITH THE OWNER AND ALL TRADES IN ADVANCE TO SCHEDULE ALL INTERRUPTIONS DURING NON-CRITICAL TIMES. OWNER SHALL BE PROVIDED WITH

THREE BUSINESS DAYS NOTICE PRIOR TO INTERRUPTION.

8. DISCONNECT SWITCHES REQUIRED FOR THE MECHANICAL EQUIPMENT SHALL BE PROVIDED BY DIVISION 26 ELECTRICAL

EXCEPT WHEN INDICATED ON SCHEDULE.

9. CHILLER SHALL BE INSTALLED ON A NEW STRUCTURAL SUPPORT; ITS THE CONTRACTORS RESPONSIBILITY TO COORDINATE ALL SUPPORT POINTS FROM SELECTED CHILLER WITH STRUCTURAL SUPPORT SYSTEM TO ENSURE THAT A TURN-KEY INSTALLATION IS PROVIDED AND THE STRUCTURE MEETS ALL SUPPORT REQUIREMENTS FOR THE NEW SELECTED CHILLER.

10. ALL EQUIPMENT SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION. SUPPORT ALL OBJECTS FROM STRUCTURE WITHOUT PENETRATING THE

CEILING.

11. ALL HVAC EQUIPMENT LOCATION & WEIGHT SHALL BE COORDINATED AND APPROVED BY THE STRUCTURAL ENGINEER, CONTRACTOR AND OWNER PRIOR TO PURCHASE AND INSTALLATION.

12. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CHILLED WATER PIPING.

13. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.

14. ALL PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS.

ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.

15. ALL CONTROL WIRING AND HARDWARE TO COMPLETE THE HVAC CONTROL SYSTEM SHALL BE FURNISHED AND INSTALLED

UNDER DIVISION 23 MECHANICAL OF THESE CONTRACT DOCUMENTS.

16. THE CONTRACTOR SHALL SUBMIT TO THE OWNER AND ENGINEER FOR REVIEW, A TEST AND BALANCE REPORT OF ALL

SYSTEMS. THE TESTING AND BALANCING SHALL BE PERFORMED BY A CERTIFIED TEST AND BALANCE COMPANY. TEST AND BALANCE SHALL BE UNDER CM CONTRACT AND BE COMPLETED AT SUBSTANTIAL COMPLETION DATE. REFER TO

SPECIFICATIONS FOR COMPLETE TEST AND BALANCE REQUIREMENTS.

17. PROVIDE ALL MANUFACTURER INSTALLATION AND MAINTENANCE MANUALS FOR EQUIPMENT INSTALLED FOR ENGINEER

REVIEW BEFORE RELEASE TO THE OWNER.

18. ALL PIPING SHALL BE PROPERLY SUPPORTED TO HANDLE THE WEIGHT OF THE PIPING, INSULATION, WATER WEIGHT, AND ATTACHED ACCESSORIES. SUPPORTS SHALL BE INSTALLED IN A MANNER THAT WOULD NOT REDUCE THE SERVICEABILITY

OF THE AIR HANDLING EQUIPMENT.

-POINT OF CONNECTION

-POINT OF DISCONNECTION

D at e D es cr ip tio n

D at e:

D ra w in g Fi le N am e:

D ra w n

B y:

M A

C D

IL

L

A

IR

F O

R C

E B

A S

E , F

LO

R

ID

A

Sheet No.

D es ig ne d B y:

A pp ro ve d B y:

R ev ie w ed B y:

M ar k A pp r.

6T H

C

IV

IL

E

N G

IN

E

E R

S Q

U A

D R

O N

Facility I.D.

C A

D D

L ea de r:

M ay

4,

- 9

:2 2a m b y m ar ke

Q :\P

R O

JE

C

T

FI

LE

S

\2

8\

-2

M

A

FB

B

C

E N

TC

O

M H

V A

C \A s B ui lts

\C A

D D

\M -1

.d w g

2018-264

AS BUILTS

21ofSheet

PR

OJ

EC

T

NO

. N

VZ

R

-0

CE

NT

CO

M

B

RE

PA

IR

H

VA

C

D

EC

GC

J

AS

B

UI

LT

S

JH

J

U N

M-100

M

EC

HA

NI

CA

L

JE

FF

RI

ES

JE

FF

RI

ES

DW

GN

AM

E

LE

GE

ND

S

NO

TE

S

CHWS CHWS CHWS CHWS CHWS CHWS

CHWR CHWR CHWR CHWR CHWR

CHWRCHWRCHWS

C H

W S

C H

W R

C H

W

SCHWR

D at e D es cr ip tio n

D at e:

D ra w in g Fi le N am e:

D ra w n

B y:

M A

C D

IL

L

A

IR

F O

R C

E B

A S

E , F

LO

R

ID

A

Sheet No.

D es ig ne d B y:

A pp ro ve d B y:

R ev ie w ed B y:

M ar k A pp r.

6T H

C

IV

IL

E

N G

IN

E

E R

S Q

U A

D R

O N

Facility I.D.

C A

D D

L ea de r:

M ay

4,

- 9

:2 2a m b y m ar ke

Q :\P

R O

JE

C

T

FI

LE

S

\2

8\

-2

M

A

FB

B

C

E N

TC

O

M H

V A

C \A s B ui lts

\C A

D D

\M -1

.d w g

2018-264

AS BUILTS

21ofSheet

PR

OJ

EC

T

NO

. N

VZ

R

-0

CE

NT

CO

M

B

RE

PA

IR

H

VA

C

D

EC

GC

J

AS

B

UI

LT

S

A C

J

U N

SCALE:

MECHANICAL DEMO SITE PLAN

1/32" = 1'-0"

N

NORTHMAG

KEYNOTES:

1 DEMOLISH AND REMOVE THE TWO

EXISTING 250 TON TRANE CHILLERS.

DEMOLISH AND REMOVE THE EXISTING

CHILLED WATER (CHW) PUMPS, INLET

STRAINERS, PUMP MULTIPURPOSE

VALVES, PRESSURE GAUGES, BUTTERFLY

ISOLATION VALVES, FLEX CONNECTORS

AND ALL PUMP CONTROL SENSORS AND

DEVICES (INCLUDING FLOW METER).

DEMOLISH AND REMOVE THE EXISTING

ALUMINUM JACKETING AND INSULATION

ON ALL THE CHILLED WATER PIPING,

EXPANSION TANK AND AIR SEPARATOR.

DEMOLISH AND REMOVE THE EXISTING

ISOLATION VALVES ON CHILLERS AND PUMPS.

PROTECT FOR REUSE ALL EXISTING CHILLED

WATER PIPING

PROTECT FOR REUSE THE EXISTING FGUA

MAKE-UP WATER ASSEMBLY

PROTECT FOR REUSE THE EXISTING

EXPANSION TANK, AIR SEPARATOR.

32032

FEET

1624 8

ENLARGED PLAN 1

M-101 M-401

B3541

SO

U

TH

B

O U

N D

AR

Y

BL

VD

CONDENSER ELECTRICAL

PANELS

PRIMARY

CHW PUMPS

GENERATOR

XFMR

XFMR

FIRE PUMP

3 5

6 7

1 SECONDARY CHW PUMPS 2

DECOUPLER PIPE

M-101

M

EC

HA

NI

CA

L

SI

TE

P

LA

N

JE

FF

RI

ES

JE

FF

RI

ES

M -1

MECHANICAL

ROOM

ELECT PANELS

CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS

CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR

GENERATOR

CONDENSER

CHWRCHWRCHWRCHWRCHWRCHWRCHWRCHWR

CHWSCHWS

CHWSCHWSCHWSCHWS

CHW

PUMP

AREA

CHILLERCHILLER

C H

W S

C H

W S

C H

W S

C H

W S

C H

W S

C H

W S

C H

W S

C H

W S

C H

W R

C H

W R

C H

W R

C H

W R

C H

W R

C H

W R

C H

W R

C H

W

RC

H W

S C

H W

S

CHWS

C

H W

S C

H W

S C

H W

S C

H W

S C

H W

S

C H

W R

C H

W R

CHWR

CHWR CHWR CHWR CHWR

ISOLATION VALVES

DECOUPLER

BYPASS

D at e D es cr ip tio n

D at e:

D ra w in g Fi le N am e:

D ra w n

B y:

M A

C D

IL

L

A

IR

F O

R C

E B

A S

E , F

LO

R

ID

A

Sheet No.

D es ig ne d B y:

A pp ro ve d B y:

R ev ie w ed B y:

M ar k A pp r.

6T H

C

IV

IL

E

N G

IN

E

E R

S Q

U A

D R

O N

Facility I.D.

C A

D D

L ea de r:

M ay

4,

- 9

:2 2a m b y m ar ke

Q :\P

R O

JE

C

T

FI

LE

S

\2

8\

-2

M

A

FB

B

C

E N

TC

O

M H

V A

C \A s B ui lts

\C A

D D

\M -4

.d w g

2018-264

AS BUILTS

21ofSheet

PR

OJ

EC

T

NO

. N

VZ

R

-0

CE

NT

CO

M

B

RE

PA

IR

H

VA

C

D

EC

GC

J

AS

B

UI

LT

S

KEYNOTES:

74PROVIDE AND INSTALL TWO (2) NEW 225

TON HIGH EFFICIENCY AIR COOLED

CHILLERS WITH FACTORY APPLIED

COATING ON THE CONDENSER COIL AND

INTERNAL CONTROL BOARDS.

PROVIDE AND INSTALL 1/4” PIPING,

ISOLATION VALVES, THERMOMETERS,

PRESSURE PORTS ON THE PIPING OF THE

SUPPLY AND RETURN OF THE CHILLER.

PROVIDE AN ISOLATION VALVE AT A

COMMON PRESSURE GAUGE. PROVIDE

AND INSTALL BUTTERFLY ISOLATION

VALVES AND FLEX CONNECTORS.

PROVIDE AND INSTALL TWO (2) NEW CHW

PUMPS PRIMARY PUMPS AND TWO NEW

SECONDARY PUMPS WITH INLET

STRAINERS, MULTIPURPOSE VALVES,

PRESSURE PORTS, BUTTERFLY ISOLATION

VALVES AND FLEX CONNECTORS ON THE

SUPPLY AND RETURN SIDE OF EACH

PUMP. PROVIDE ALL PUMP CONTROL

SENSORS/DEVICES

PROVIDE AND INSTALL NEW PROOF OF

FLOW SENSORS FOR THE CHILLED WATER

PUMPS.

PROVIDE AND INSTALL 1/4” PIPING WITH

ISOLATION VALVES ON THE SUPPLY AND

RETURN OF THE PUMPS ALONG WITH AN

ISOLATION VALVE AT A COMMON

PRESSURE GAUGE.

REUSE THE EXISTING VFDS AND PROVIDE

NEW PREMIUM EFFICIENCY INVERTER

DUTY PUMP MOTORS FOR ALL NEW

PUMPS.

PROVIDE AND INSTALL CELLULAR GLASS

INSULATION WITH ALUMINUM JACKETING

ON THE AIR SEPARATOR AND EXPANSION

TANK. PRIOR TO INSULATING THESE

DEVICES THE CONTRACTOR SHALL

PRE-TREAT AND REMOVE ALL RUST OR

CORROSION THEN EPOXY PRIME COAT

AND FINISH COAT ALL EQUIPMENT

SURFACES

PERFORM WATER TREATMENT TO

MAINTAIN WATER QUALITY AT

PRE-DEMOLITION LEVELS.

REUSE THE EXISTING CHEMICAL WATER

TREATMENT SHOT FEEDER SYSTEM WITH

NEW PIPING TAPS AND ISOLATION

VALVES.

PROVIDE AND INSTALL A FLOW SWITCH TO

THE DOWNSTREAM SIDE OF THE MAKE-UP

WATER ASSEMBLY.THIS SWITCH SHALL BE

PROGRAMMED TO PLACE THE CONTROL

SYSTEM IN ALARM WHEN EVER THE

FLOWS MORE THAN 12 GALLON PER

MINUTE.

PROVIDE A ONE YEAR WARRANTY ON ALL

MECHANICAL, ELECTRICAL, AND

CONTROLS LABOR AND PARTS.

EVALUATE AND REUSE CONTROLS,

WHERE APPLICABLE. INTEGRATE NEW

EQUIPMENT ONTO THE LOCAL CENTCOM

EMCS.

PROVIDE AND INSTALL A NEW CHILLER

PLANT CONTROLLER AND PROGRAM

SOFTWARE FOR A CONSTANT VOLUME

PRIMARY AND VARIABLE SECONDARY

CHW CONTROL DISTRIBUTION SYSTEM.

PROVIDE AND INSTALL ALL NEW CONTROL

SENSORS, TRANSDUCERS AND FLOW

METERS ON EXISTING PIPING.

PROVIDE A COMPLETE HYDRONIC TEST

AND BALANCING OF THE CHILLED WATER

SYSTEM.

10 13

3 5

8 9

11 12

14 15

1 11 12

2 2

3 5

8 9 14 15

M-401

M

EC

HA

NI

CA

L

EN

LA

RG

ED

SI

TE

P

LA

N

JE

FF

RI

ES

JE

FF

RI

ES

M -4

.d wg

1/4"Ø TUBING

FLEXIBLE PIPE CONNECTION

BUTTERFLY

FROM

AND WELL

SET @ 45 PSI

THERMOMETER

ASME RELIEF VALVE

GAUGE

FLANGE CONNECTION

TO

DRAIN VALVE

NOTE:

FLOW SWITCH SHALL BE

GAUGE COCK

MANUAL AIR VENTS AT

HIGH POINTS IN SYSTEM

CHILLER PIPING DIAGRAM

NOT TO SCALE

CHILLER MOUNTING DETAIL

NOT TO SCALE

CHILLER BASE RAIL

ON SUPPLY & RETURN

SUCTION DIFFUSER AND STRAINER

W/ ACCESS COVER; PIPE DRAIN TO

FLOOR DRAIN

EMCS SENSOR (TYP)

INSULATION BLOCK

2" DIA. PIPE

BUTTERFLY VALVE (TYP)

CONCRETE

END SUCTION PUMP DETAIL

NOT TO SCALE

PRESSURE GAUGE

INTREGAL TO CHILLER

PUMP

PRESSURE

GUAGE & WELL

PRESSURE

GUAGE & WELL

AND WELL

THERMOMETER

DDD

PUMP

No Scale

END SUCTION INSULATED PUMP COVER

ISOMETRIC VIEW

SECTION VIEW

HEAVY GAUGE ALUMINUM

ASSEMBLY FOR INSULATING

CHILLED WATER PUMP(S)

INSULATED CHILLED

WATER PIPING

INSULATED CHILLED

STRAINER

OPENING FOR PUMP

COUPLING GUARD.

INSULATED REMOVABLE COVER

W/ (2) ALUMINUM SNAP-LOCK

CLASPS BOTH SIDES FOR

ACCESS TO PUMP IMPELLER

BUTTERFLY VALVE

PRESSURE GAUGE

INSULATED PIPING UP TO

BUTTERFLY VALVE

OPENING FOR PUMP

COUPLING GUARD.

CONTINUOUS

GASKETING MATERIAL

HANDLES RIVETED TO

JACKET OF REMOVABLE

END COVER

2" INSULATING BLOCK

BEHIND HEAVY GAUGE

ALUMINUM COVER

HEAVY GAUGE

ALUMINUM JACKET

REMOVABLE

ALL ENDS TO BE

"U" BENT MIN. 2"

ANCHOR TO

VALVE (TYP)

WATER PIPING

BUILDING

TRIPLE-DUTY VALVE (PCHWP'S)

(PCHWP'S SUCTION ONLY)

SUPPORT

SUCTION DIFFUSER AND STRAINER

W/ ACCESS COVER; PIPE DRAIN TO

FLOOR DRAIN

2" DIA. PIPE

CONCRETE

SPLIT CASE PUMP DETAIL

NOT TO SCALE

ANCHOR TO

SUPPORT

COVER

REFER TO STRUCTURAL PLANS

INSTALL NEOPRENE

ALONG ENTIRE BASE

ISOLATION PADS

EMCS SENSOR (TYP)

BUTTERFLY VALVE (TYP)

(PCHWP'S SUCTION ONLY)

CHECK VALVE

W/ PORT VALVES

ON SUPPLY & RETURN

PRESSURE GAUGE

W/ PORT VALVES

D at e D es cr ip tio n

D at e:

D ra w in g Fi le N am e:

D ra w n

B y:

M A

C D

IL

L

A

IR

F O

R C

E B

A S

E , F

LO

R

ID

A

Sheet No.

D es ig ne d B y:

A pp ro ve d B y:

R ev ie w ed B y:

M ar k A pp r.

6T H

C

IV

IL

E

N G

IN

E

E R

S Q

U A

D R

O N

Facility I.D.

C A

D D

L ea de r:

M ay

4,

- 9

:2 2a m b y m ar ke

Q :\P

R O

JE

C

T

FI

LE

S

\2

8\

-2

M

A

FB

B

C

E N

TC

O

M H

V A

C \A s B ui lts

\C A

D D

\M -5

.d w g

2018-264

AS BUILTS

21ofSheet

PR

OJ

EC

T

NO

. N

VZ

R

-0

CE

NT

CO

M

B

RE

PA

IR

H

VA

C

D

EC

GC

J

AS

B

UI

LT

S

JH

J

U N

M-501

M

EC

HA

NI

CA

L

DE

TA

IL

S

JE

FF

RI

ES

JE

FF

RI

ES

DW

GN

AM

E

SEQUENCE OF OPERATIONS CONTROL SYSTEM ARCHITECTURE

CONTROL SYSTEM DIAGRAM

D at e D es cr ip tio n

D at e:

D ra w in g Fi le N am e:

D ra w n

B y:

M A

C D

IL

L

A

IR

F O

R C

E B

A S

E , F

LO

R

ID

A

Sheet No.

D es ig ne d B y:

A pp ro ve d B y:

R ev ie w ed B y:

M ar k A pp r.

6T H

C

IV

IL

E

N G

IN

E

E R

S Q

U A

D R

O N

Facility I.D.

C A

D D

L ea de r:

M ay

4,

- 9

:3 2a m b y m ar ke

Q :\P

R O

JE

C

T

FI

LE

S

\2

8\

-2

M

A

FB

B

C

E N

TC

O

M H

V A

C \A s B ui lts

\C A

D D

\M -5

.d w g

2018-264

AS BUILTS

21ofSheet

PR

OJ

EC

T

NO

. N

VZ

R

-0

CE

NT

CO

M

B

RE

PA

IR

H

VA

C

D

EC

GC

J

AS

B

UI

LT

S

JH

J

U N

M-502

M

EC

HA

NI

CA

L

CO

NT

RO

LS

JE

FF

RI

ES

JE

FF

RI

ES

DW

GN

D at e D es cr ip tio n

D at e:

D ra w in g Fi le N am e:

D ra w n

B y:

M A

C D

IL

L

A

IR

F O

R C

E B

A S

E , F

LO

R

ID

A

Sheet No.

D es ig ne d B y:

A pp ro ve d B y:

R ev ie w ed B y:

M ar k A pp r.

6T H

C

IV

IL

E

N G

IN

E

E R

S Q

U A

D R

O N

Facility I.D.

C A

D D

L ea de r:

M ay

4,

- 9

:2 2a m b y m ar ke

Q :\P

R O

JE

C

T

FI

LE

S

\2

8\

-2

M

A

FB

B

C

E N

TC

O

M H

V A

C \A s B ui lts

\C A

D D

\M -6

.d w g

2018-264

AS BUILTS

21ofSheet

PR

OJ

EC

T

NO

. N

VZ

R

-0

CE

NT

CO

M

B

RE

PA

IR

H

VA

C

D

EC

GC

J

AS

B

UI

LT

S

JH

J

U N

M-601

M

EC

HA

NI

CA

L

SP

EC

IF

IC

AT

IO

NS

JE

FF

RI

ES

JE

FF

RI

ES

DW

GN

M-100-M-100
Sheets and Views
M-100-M-100
M-101-M-101
Sheets and Views
M-101-M-101
M-401-M-401
Sheets and Views
M-401-M-401
M-501-M-501
Sheets and Views
M-501-M-501
M-502-M-502
Sheets and Views
M-502-M-502
M-601-M-601
Sheets and Views
M-601-M-601

File details come from the government source that posted it. Updated .