About this file
This set of mechanical drawings and specifications outlines the requirements for a chilled water system upgrade project at MacDill Air Force Base in Florida. Key details include demolishing and removing two existing 250-ton chillers and associated pumps and piping. The project will provide and install two new 225-ton air-cooled chillers, new primary and secondary chilled water pumps, isolation valves, pressure and flow sensors, and cellular glass insulation for piping and equipment. The control system will be upgraded with a new chiller plant controller to enable constant primary and variable secondary chilled water distribution. Testing and balancing of the entire chilled water system is also specified.
The related federal contract opportunity is for air duct cleaning services at the Defense Information Systems Agency. No further product, service, or award details are provided in the solicitation summary.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HC102823R0065 amend 2.docx | DOCX document | |
| HC102823R0065 HVAC System Cleaning Questions and answers.docx | DOCX document | |
| BLDG 3541 DISA Floor Plan.pdf | ||
| DISACENT HVAC Diagram.pdf | ||
| mechanical Binder1.pdf | ||
| HC102823R0065 amend 1.docx | DOCX document | |
| Pre-Proposal Site Visit Request Instructions (HVAC System).doc | DOC document | |
| Pricing Worksheet.xlsx | XLSX spreadsheet | |
| HC102823R0065.docx | DOCX document | |
| Pre-Proposal Site Visit Request Instructions (HVAC System).doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL ABBREVIATIONSMECHANICAL LEGEND
MECHANICAL GENERAL NOTES
-CHILLED WATER SUPPLYCHWS
-CHILLED WATER RETURNCHWR
-CONDENSATE DRAINCD
-GATE VALVE
-BALL VALVE
-CALIBRATE BALANCING VALVE
-BUTTERFLY VALVE
-UNION
-STRAINER
-PSI REG.
-CHECK VALVE
-CONNECTION, BOTTOM
-CONNECTION, TOP
-ELBOW, TURNED UP
-ELBOW,TURNED DOWN
-REDUCER, CONCENTRIC
KITCHEN EXHAUST FAN
INSIDE DIAMETER
HERTZ (CYCLES PER SECOND)
MAXIMUM
NORMALLY OPEN
NOT APPLICABLE
NOT TO SCALE
OUTSIDE DIAMETER
OUTSIDE AIR
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCH
THOUSAND BTU PER HOUR
TEMPERATURE
THERMOSTAT
WET BULB
VENT, VOLT
WATER PRESSURE DROP
RELATIVE HUMIDITY
HOURHR
AND AIR CONDITIONING
HEATING VENTILATINGHVAC
GALLONS PER MINUTE
HORSEPOWER, HEAT PUMP
HAND-OFF-AUTOMATIC
FEET PER SECOND
GALLONS PER HOUR
FLOOR DRAIN
FEET PER MINUTE
FAHRENHEIT
FEETFT
HOA
HP
GPH
GPM
FPM
FPS
F
FD
WPD
WB
V
CHILLED WATER SUPPLY & RETURN
ENERGY MANAGEMENT SYSTEM
DISCONNECT
ENTERING
ELEVATION
EFFICIENCY
ELEV
ENT
EMS
EFF
DN
DISC
DOWN
CLEAN OUT
DOMESTIC COLD WATER
CONDENSATE
BRITISH THERMAL UNIT
BACKFLOW PREVENTER
DEG
DCW
COND
CO
DEGREE
CHWS&R
BTU
BFP
TYP
TEMP
T
TYPICAL
RM
RH
ROOM
PSIG
PSI
NO
OA
OD
NTS
AUTOMATIC TEMPERATURE CONTROL
AAV AUTOMATIC AIR VENT
ABOVE FINISHED GRADE
ABOVE FINISHED FLOOR
BACK DRAFT DAMPER
AIR VENT
ACCESS PANEL
AIR PRESSURE DROP
AV
BOT
BDD
ATC
APD
AP
BOTTOM
AFF
AFG
MAX
NA
N
MIN
MBH
NORTH
MINIMUM
ID
KEF
IN INCH
HZ
GLYCOLGLY
GLYCOL WATER SUPPLYGWS
GLYCOL WATER RETURNGWR
KILOWATTKW
1. IF THE INTENT OF ARCHITECT/ ENGINEER WITH REGARD TO ANY DETAIL IS NOT CLEAR, OR IS CAPABLE OF MORE THAN ONE INTERPRETATION, SUCH MATTERS WILL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER IN WRITING BEFORE THE SUBMISSION OF BIDS, AND THE ARCHITECT/ ENGINEER SHALL MAKE CORRECTION OR EXPLANATION IN WRITING.
OTHERWISE, NO EXTRA CHARGE WILL BE ALLOWED FOR THE WORK OR MATERIAL WHICH THE ARCHITECT/ENGINEER WILL REQUIRE, PROVIDED THAT IT COMES WITHIN A REASONABLE INTERPRETATION OF THE DRAWINGS AND SPECIFICATIONS.
2. THE PLANS AND SPECIFICATIONS ARE INTENDED AS A GENERAL DESCRIPTION OF THE WORK TO BE PERFORMED. ALL ITEMS NOT SPECIFICALLY MENTIONED OR SHOWN, BUT NECESSARY FOR THE COMPLETION OF THE INSTALLATION, SHALL BE FURNISHED AND INSTALLED BY THIS CONTRACTOR. THIS CONTRACTOR SHALL THOROUGHLY ACQUAINT THEMSELVES WITH THE MECHANICAL, ARCHITECTURAL, STRUCTURAL AND ELECTRICAL PLANS BEFORE SUBMITTING THEIR FINAL BID. NO ADDITIONAL COMPENSATION WILL BE ALLOWED DUE TO THE CONTRACTOR'S FAILURE TO FAMILIARIZE THEMSELVES WITH
THE PLANS.
3. ALL WORK SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING CODE 2017 & FLORIDA MECHANICAL CODE 2017.
4. THE SIZE AND LOCATION OF EQUIPMENT INSTALLED UNDER DIVISION 23 MECHANICAL SHALL BE COORDINATED WITH OTHER
TRADES. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS
TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
5. PIPING TO MECHANICAL EQUIPMENT SHALL BE INSTALLED IN A MANNER THAT DOES NOT OBSTRUCT EQUIPMENT SERVICE
CLEARANCES.
6. COORDINATE WORK WITH ALL TRADES INCLUDING, BUT NOT LIMITED TO, STRUCTURAL, LIGHTING, POWER SYSTEMS, AND
PLUMBING EXISTING AND NEW WORK.
7. INTERRUPTION OF EXISTING SERVICES SHALL BE MINIMAL AND SHALL BE FULLY COORDINATED WITH THE OWNER AND ALL TRADES IN ADVANCE TO SCHEDULE ALL INTERRUPTIONS DURING NON-CRITICAL TIMES. OWNER SHALL BE PROVIDED WITH
THREE BUSINESS DAYS NOTICE PRIOR TO INTERRUPTION.
8. DISCONNECT SWITCHES REQUIRED FOR THE MECHANICAL EQUIPMENT SHALL BE PROVIDED BY DIVISION 26 ELECTRICAL
EXCEPT WHEN INDICATED ON SCHEDULE.
9. CHILLER SHALL BE INSTALLED ON A NEW STRUCTURAL SUPPORT; ITS THE CONTRACTORS RESPONSIBILITY TO COORDINATE ALL SUPPORT POINTS FROM SELECTED CHILLER WITH STRUCTURAL SUPPORT SYSTEM TO ENSURE THAT A TURN-KEY INSTALLATION IS PROVIDED AND THE STRUCTURE MEETS ALL SUPPORT REQUIREMENTS FOR THE NEW SELECTED CHILLER.
10. ALL EQUIPMENT SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION. SUPPORT ALL OBJECTS FROM STRUCTURE WITHOUT PENETRATING THE
CEILING.
11. ALL HVAC EQUIPMENT LOCATION & WEIGHT SHALL BE COORDINATED AND APPROVED BY THE STRUCTURAL ENGINEER, CONTRACTOR AND OWNER PRIOR TO PURCHASE AND INSTALLATION.
12. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CHILLED WATER PIPING.
13. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
14. ALL PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS.
ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.
15. ALL CONTROL WIRING AND HARDWARE TO COMPLETE THE HVAC CONTROL SYSTEM SHALL BE FURNISHED AND INSTALLED
UNDER DIVISION 23 MECHANICAL OF THESE CONTRACT DOCUMENTS.
16. THE CONTRACTOR SHALL SUBMIT TO THE OWNER AND ENGINEER FOR REVIEW, A TEST AND BALANCE REPORT OF ALL
SYSTEMS. THE TESTING AND BALANCING SHALL BE PERFORMED BY A CERTIFIED TEST AND BALANCE COMPANY. TEST AND BALANCE SHALL BE UNDER CM CONTRACT AND BE COMPLETED AT SUBSTANTIAL COMPLETION DATE. REFER TO
SPECIFICATIONS FOR COMPLETE TEST AND BALANCE REQUIREMENTS.
17. PROVIDE ALL MANUFACTURER INSTALLATION AND MAINTENANCE MANUALS FOR EQUIPMENT INSTALLED FOR ENGINEER
REVIEW BEFORE RELEASE TO THE OWNER.
18. ALL PIPING SHALL BE PROPERLY SUPPORTED TO HANDLE THE WEIGHT OF THE PIPING, INSULATION, WATER WEIGHT, AND ATTACHED ACCESSORIES. SUPPORTS SHALL BE INSTALLED IN A MANNER THAT WOULD NOT REDUCE THE SERVICEABILITY
OF THE AIR HANDLING EQUIPMENT.
-POINT OF CONNECTION
-POINT OF DISCONNECTION
D at e D es cr ip tio n
D at e:
D ra w in g Fi le N am e:
D ra w n
B y:
M A
C D
IL
L
A
IR
F O
R C
E B
A S
E , F
LO
R
ID
A
Sheet No.
D es ig ne d B y:
A pp ro ve d B y:
R ev ie w ed B y:
M ar k A pp r.
6T H
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
Facility I.D.
C A
D D
L ea de r:
M ay
4,
- 9
:2 2a m b y m ar ke
Q :\P
R O
JE
C
T
FI
LE
S
\2
8\
-2
M
A
FB
B
C
E N
TC
O
M H
V A
C \A s B ui lts
\C A
D D
\M -1
.d w g
2018-264
AS BUILTS
21ofSheet
PR
OJ
EC
T
NO
. N
VZ
R
-0
CE
NT
CO
M
B
RE
PA
IR
H
VA
C
D
EC
GC
J
AS
B
UI
LT
S
JH
J
U N
M-100
M
EC
HA
NI
CA
L
JE
FF
RI
ES
JE
FF
RI
ES
DW
GN
AM
E
LE
GE
ND
S
NO
TE
S
CHWS CHWS CHWS CHWS CHWS CHWS
CHWR CHWR CHWR CHWR CHWR
CHWRCHWRCHWS
C H
W S
C H
W R
C H
W
SCHWR
D at e D es cr ip tio n
D at e:
D ra w in g Fi le N am e:
D ra w n
B y:
M A
C D
IL
L
A
IR
F O
R C
E B
A S
E , F
LO
R
ID
A
Sheet No.
D es ig ne d B y:
A pp ro ve d B y:
R ev ie w ed B y:
M ar k A pp r.
6T H
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
Facility I.D.
C A
D D
L ea de r:
M ay
4,
- 9
:2 2a m b y m ar ke
Q :\P
R O
JE
C
T
FI
LE
S
\2
8\
-2
M
A
FB
B
C
E N
TC
O
M H
V A
C \A s B ui lts
\C A
D D
\M -1
.d w g
2018-264
AS BUILTS
21ofSheet
PR
OJ
EC
T
NO
. N
VZ
R
-0
CE
NT
CO
M
B
RE
PA
IR
H
VA
C
D
EC
GC
J
AS
B
UI
LT
S
A C
J
U N
SCALE:
MECHANICAL DEMO SITE PLAN
1/32" = 1'-0"
N
NORTHMAG
KEYNOTES:
1 DEMOLISH AND REMOVE THE TWO
EXISTING 250 TON TRANE CHILLERS.
DEMOLISH AND REMOVE THE EXISTING
CHILLED WATER (CHW) PUMPS, INLET
STRAINERS, PUMP MULTIPURPOSE
VALVES, PRESSURE GAUGES, BUTTERFLY
ISOLATION VALVES, FLEX CONNECTORS
AND ALL PUMP CONTROL SENSORS AND
DEVICES (INCLUDING FLOW METER).
DEMOLISH AND REMOVE THE EXISTING
ALUMINUM JACKETING AND INSULATION
ON ALL THE CHILLED WATER PIPING,
EXPANSION TANK AND AIR SEPARATOR.
DEMOLISH AND REMOVE THE EXISTING
ISOLATION VALVES ON CHILLERS AND PUMPS.
PROTECT FOR REUSE ALL EXISTING CHILLED
WATER PIPING
PROTECT FOR REUSE THE EXISTING FGUA
MAKE-UP WATER ASSEMBLY
PROTECT FOR REUSE THE EXISTING
EXPANSION TANK, AIR SEPARATOR.
32032
FEET
1624 8
ENLARGED PLAN 1
M-101 M-401
B3541
SO
U
TH
B
O U
N D
AR
Y
BL
VD
CONDENSER ELECTRICAL
PANELS
PRIMARY
CHW PUMPS
GENERATOR
XFMR
XFMR
FIRE PUMP
3 5
6 7
1 SECONDARY CHW PUMPS 2
DECOUPLER PIPE
M-101
M
EC
HA
NI
CA
L
SI
TE
P
LA
N
JE
FF
RI
ES
JE
FF
RI
ES
M -1
MECHANICAL
ROOM
ELECT PANELS
CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS
CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR CHWR
GENERATOR
CONDENSER
CHWRCHWRCHWRCHWRCHWRCHWRCHWRCHWR
CHWSCHWS
CHWSCHWSCHWSCHWS
CHW
PUMP
AREA
CHILLERCHILLER
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W S
C H
W R
C H
W R
C H
W R
C H
W R
C H
W R
C H
W R
C H
W R
C H
W
RC
H W
S C
H W
S
CHWS
C
H W
S C
H W
S C
H W
S C
H W
S C
H W
S
C H
W R
C H
W R
CHWR
CHWR CHWR CHWR CHWR
ISOLATION VALVES
DECOUPLER
BYPASS
D at e D es cr ip tio n
D at e:
D ra w in g Fi le N am e:
D ra w n
B y:
M A
C D
IL
L
A
IR
F O
R C
E B
A S
E , F
LO
R
ID
A
Sheet No.
D es ig ne d B y:
A pp ro ve d B y:
R ev ie w ed B y:
M ar k A pp r.
6T H
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
Facility I.D.
C A
D D
L ea de r:
M ay
4,
- 9
:2 2a m b y m ar ke
Q :\P
R O
JE
C
T
FI
LE
S
\2
8\
-2
M
A
FB
B
C
E N
TC
O
M H
V A
C \A s B ui lts
\C A
D D
\M -4
.d w g
2018-264
AS BUILTS
21ofSheet
PR
OJ
EC
T
NO
. N
VZ
R
-0
CE
NT
CO
M
B
RE
PA
IR
H
VA
C
D
EC
GC
J
AS
B
UI
LT
S
KEYNOTES:
74PROVIDE AND INSTALL TWO (2) NEW 225
TON HIGH EFFICIENCY AIR COOLED
CHILLERS WITH FACTORY APPLIED
COATING ON THE CONDENSER COIL AND
INTERNAL CONTROL BOARDS.
PROVIDE AND INSTALL 1/4” PIPING,
ISOLATION VALVES, THERMOMETERS,
PRESSURE PORTS ON THE PIPING OF THE
SUPPLY AND RETURN OF THE CHILLER.
PROVIDE AN ISOLATION VALVE AT A
COMMON PRESSURE GAUGE. PROVIDE
AND INSTALL BUTTERFLY ISOLATION
VALVES AND FLEX CONNECTORS.
PROVIDE AND INSTALL TWO (2) NEW CHW
PUMPS PRIMARY PUMPS AND TWO NEW
SECONDARY PUMPS WITH INLET
STRAINERS, MULTIPURPOSE VALVES,
PRESSURE PORTS, BUTTERFLY ISOLATION
VALVES AND FLEX CONNECTORS ON THE
SUPPLY AND RETURN SIDE OF EACH
PUMP. PROVIDE ALL PUMP CONTROL
SENSORS/DEVICES
PROVIDE AND INSTALL NEW PROOF OF
FLOW SENSORS FOR THE CHILLED WATER
PUMPS.
PROVIDE AND INSTALL 1/4” PIPING WITH
ISOLATION VALVES ON THE SUPPLY AND
RETURN OF THE PUMPS ALONG WITH AN
ISOLATION VALVE AT A COMMON
PRESSURE GAUGE.
REUSE THE EXISTING VFDS AND PROVIDE
NEW PREMIUM EFFICIENCY INVERTER
DUTY PUMP MOTORS FOR ALL NEW
PUMPS.
PROVIDE AND INSTALL CELLULAR GLASS
INSULATION WITH ALUMINUM JACKETING
ON THE AIR SEPARATOR AND EXPANSION
TANK. PRIOR TO INSULATING THESE
DEVICES THE CONTRACTOR SHALL
PRE-TREAT AND REMOVE ALL RUST OR
CORROSION THEN EPOXY PRIME COAT
AND FINISH COAT ALL EQUIPMENT
SURFACES
PERFORM WATER TREATMENT TO
MAINTAIN WATER QUALITY AT
PRE-DEMOLITION LEVELS.
REUSE THE EXISTING CHEMICAL WATER
TREATMENT SHOT FEEDER SYSTEM WITH
NEW PIPING TAPS AND ISOLATION
VALVES.
PROVIDE AND INSTALL A FLOW SWITCH TO
THE DOWNSTREAM SIDE OF THE MAKE-UP
WATER ASSEMBLY.THIS SWITCH SHALL BE
PROGRAMMED TO PLACE THE CONTROL
SYSTEM IN ALARM WHEN EVER THE
FLOWS MORE THAN 12 GALLON PER
MINUTE.
PROVIDE A ONE YEAR WARRANTY ON ALL
MECHANICAL, ELECTRICAL, AND
CONTROLS LABOR AND PARTS.
EVALUATE AND REUSE CONTROLS,
WHERE APPLICABLE. INTEGRATE NEW
EQUIPMENT ONTO THE LOCAL CENTCOM
EMCS.
PROVIDE AND INSTALL A NEW CHILLER
PLANT CONTROLLER AND PROGRAM
SOFTWARE FOR A CONSTANT VOLUME
PRIMARY AND VARIABLE SECONDARY
CHW CONTROL DISTRIBUTION SYSTEM.
PROVIDE AND INSTALL ALL NEW CONTROL
SENSORS, TRANSDUCERS AND FLOW
METERS ON EXISTING PIPING.
PROVIDE A COMPLETE HYDRONIC TEST
AND BALANCING OF THE CHILLED WATER
SYSTEM.
10 13
3 5
8 9
11 12
14 15
1 11 12
2 2
3 5
8 9 14 15
M-401
M
EC
HA
NI
CA
L
EN
LA
RG
ED
SI
TE
P
LA
N
JE
FF
RI
ES
JE
FF
RI
ES
M -4
.d wg
1/4"Ø TUBING
FLEXIBLE PIPE CONNECTION
BUTTERFLY
FROM
AND WELL
SET @ 45 PSI
THERMOMETER
ASME RELIEF VALVE
GAUGE
FLANGE CONNECTION
TO
DRAIN VALVE
NOTE:
FLOW SWITCH SHALL BE
GAUGE COCK
MANUAL AIR VENTS AT
HIGH POINTS IN SYSTEM
CHILLER PIPING DIAGRAM
NOT TO SCALE
CHILLER MOUNTING DETAIL
NOT TO SCALE
CHILLER BASE RAIL
ON SUPPLY & RETURN
SUCTION DIFFUSER AND STRAINER
W/ ACCESS COVER; PIPE DRAIN TO
FLOOR DRAIN
EMCS SENSOR (TYP)
INSULATION BLOCK
2" DIA. PIPE
BUTTERFLY VALVE (TYP)
CONCRETE
END SUCTION PUMP DETAIL
NOT TO SCALE
PRESSURE GAUGE
INTREGAL TO CHILLER
PUMP
PRESSURE
GUAGE & WELL
PRESSURE
GUAGE & WELL
AND WELL
THERMOMETER
DDD
PUMP
No Scale
END SUCTION INSULATED PUMP COVER
ISOMETRIC VIEW
SECTION VIEW
HEAVY GAUGE ALUMINUM
ASSEMBLY FOR INSULATING
CHILLED WATER PUMP(S)
INSULATED CHILLED
WATER PIPING
INSULATED CHILLED
STRAINER
OPENING FOR PUMP
COUPLING GUARD.
INSULATED REMOVABLE COVER
W/ (2) ALUMINUM SNAP-LOCK
CLASPS BOTH SIDES FOR
ACCESS TO PUMP IMPELLER
BUTTERFLY VALVE
PRESSURE GAUGE
INSULATED PIPING UP TO
BUTTERFLY VALVE
OPENING FOR PUMP
COUPLING GUARD.
CONTINUOUS
GASKETING MATERIAL
HANDLES RIVETED TO
JACKET OF REMOVABLE
END COVER
2" INSULATING BLOCK
BEHIND HEAVY GAUGE
ALUMINUM COVER
HEAVY GAUGE
ALUMINUM JACKET
REMOVABLE
ALL ENDS TO BE
"U" BENT MIN. 2"
ANCHOR TO
VALVE (TYP)
WATER PIPING
BUILDING
TRIPLE-DUTY VALVE (PCHWP'S)
(PCHWP'S SUCTION ONLY)
SUPPORT
SUCTION DIFFUSER AND STRAINER
W/ ACCESS COVER; PIPE DRAIN TO
FLOOR DRAIN
2" DIA. PIPE
CONCRETE
SPLIT CASE PUMP DETAIL
NOT TO SCALE
ANCHOR TO
SUPPORT
COVER
REFER TO STRUCTURAL PLANS
INSTALL NEOPRENE
ALONG ENTIRE BASE
ISOLATION PADS
EMCS SENSOR (TYP)
BUTTERFLY VALVE (TYP)
(PCHWP'S SUCTION ONLY)
CHECK VALVE
W/ PORT VALVES
ON SUPPLY & RETURN
PRESSURE GAUGE
W/ PORT VALVES
D at e D es cr ip tio n
D at e:
D ra w in g Fi le N am e:
D ra w n
B y:
M A
C D
IL
L
A
IR
F O
R C
E B
A S
E , F
LO
R
ID
A
Sheet No.
D es ig ne d B y:
A pp ro ve d B y:
R ev ie w ed B y:
M ar k A pp r.
6T H
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
Facility I.D.
C A
D D
L ea de r:
M ay
4,
- 9
:2 2a m b y m ar ke
Q :\P
R O
JE
C
T
FI
LE
S
\2
8\
-2
M
A
FB
B
C
E N
TC
O
M H
V A
C \A s B ui lts
\C A
D D
\M -5
.d w g
2018-264
AS BUILTS
21ofSheet
PR
OJ
EC
T
NO
. N
VZ
R
-0
CE
NT
CO
M
B
RE
PA
IR
H
VA
C
D
EC
GC
J
AS
B
UI
LT
S
JH
J
U N
M-501
M
EC
HA
NI
CA
L
DE
TA
IL
S
JE
FF
RI
ES
JE
FF
RI
ES
DW
GN
AM
E
SEQUENCE OF OPERATIONS CONTROL SYSTEM ARCHITECTURE
CONTROL SYSTEM DIAGRAM
D at e D es cr ip tio n
D at e:
D ra w in g Fi le N am e:
D ra w n
B y:
M A
C D
IL
L
A
IR
F O
R C
E B
A S
E , F
LO
R
ID
A
Sheet No.
D es ig ne d B y:
A pp ro ve d B y:
R ev ie w ed B y:
M ar k A pp r.
6T H
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
Facility I.D.
C A
D D
L ea de r:
M ay
4,
- 9
:3 2a m b y m ar ke
Q :\P
R O
JE
C
T
FI
LE
S
\2
8\
-2
M
A
FB
B
C
E N
TC
O
M H
V A
C \A s B ui lts
\C A
D D
\M -5
.d w g
2018-264
AS BUILTS
21ofSheet
PR
OJ
EC
T
NO
. N
VZ
R
-0
CE
NT
CO
M
B
RE
PA
IR
H
VA
C
D
EC
GC
J
AS
B
UI
LT
S
JH
J
U N
M-502
M
EC
HA
NI
CA
L
CO
NT
RO
LS
JE
FF
RI
ES
JE
FF
RI
ES
DW
GN
D at e D es cr ip tio n
D at e:
D ra w in g Fi le N am e:
D ra w n
B y:
M A
C D
IL
L
A
IR
F O
R C
E B
A S
E , F
LO
R
ID
A
Sheet No.
D es ig ne d B y:
A pp ro ve d B y:
R ev ie w ed B y:
M ar k A pp r.
6T H
C
IV
IL
E
N G
IN
E
E R
S Q
U A
D R
O N
Facility I.D.
C A
D D
L ea de r:
M ay
4,
- 9
:2 2a m b y m ar ke
Q :\P
R O
JE
C
T
FI
LE
S
\2
8\
-2
M
A
FB
B
C
E N
TC
O
M H
V A
C \A s B ui lts
\C A
D D
\M -6
.d w g
2018-264
AS BUILTS
21ofSheet
PR
OJ
EC
T
NO
. N
VZ
R
-0
CE
NT
CO
M
B
RE
PA
IR
H
VA
C
D
EC
GC
J
AS
B
UI
LT
S
JH
J
U N
M-601
M
EC
HA
NI
CA
L
SP
EC
IF
IC
AT
IO
NS
JE
FF
RI
ES
JE
FF
RI
ES
DW
GN
| M-100-M-100 |
| Sheets and Views |
| M-100-M-100 |
| M-101-M-101 |
| Sheets and Views |
| M-101-M-101 |
| M-401-M-401 |
| Sheets and Views |
| M-401-M-401 |
| M-501-M-501 |
| Sheets and Views |
| M-501-M-501 |
| M-502-M-502 |
| Sheets and Views |
| M-502-M-502 |
| M-601-M-601 |
| Sheets and Views |
| M-601-M-601 |
File details come from the government source that posted it. Updated .