Bidders Library Operational Test and Evaluation - DoTE MEMO 10-18-2010.pdf

PDF 73 KB Posted

Attached to
TEC II Services RFP
Solicitation number
HC102821R0006
Issued by

About this file

This memorandum from the Director of Operational Test and Evaluation establishes guidelines for using production-representative systems in Initial Operational Test and Evaluation (IOT&E). It specifies that IOT&E should utilize Low Rate Initial Production systems assembled with the parts, tools, manufacturing processes, software, logistics systems, and maintenance manuals intended for full-rate production. When using LRIP systems is impractical, the system must at least incorporate the same hardware, software, and manufacturing processes defined in critical design reviews and intended for full-rate production. The Director must be provided details on any process differences to independently evaluate their acceptability. Adherence to these guidelines will be assessed as part of reviewing and approving Test and Evaluation Master Plans and Test Plans, and proposals to use non-LRIP systems must demonstrate compliance with the criteria.

The related solicitation seeks Test, Evaluation, and Certification services for the Joint Interoperability Test Command to ensure systems, networks and platforms meet interoperability, information assurance and cybersecurity requirements. The Defense Information Systems Agency is the contracting agency.

View the file

Other files

File Type Posted
HC102821R0006 Conformed Through amendment 0008.pdf PDF
HC102821R0006 AMD 0007.pdf PDF
HC102821R0006 Conformed Through amendment 0007.pdf PDF
HC102821R0006 Conformed Through amendment 0006.pdf PDF
HC102821R0006 AMD 0006.pdf PDF
HC102821R0006 AMD 0005.pdf PDF
HC102821R0006 Conformed Through amendment 0005.pdf PDF
HC102821R0006 Conformed Through amendment 0004.pdf PDF
HC102821R0006 AMD 0004.pdf PDF
HC102821R0006 Conformed Through amendment 0003.pdf PDF
HC102821R0006 AMD 0003.pdf PDF
HC102821R0006 Conformed through amendment 0002.pdf PDF
HC102821R00060002.pdf PDF
Bidders Library DISA Form 786.pdf PDF
Bidders Library Test and Evaluation Scorecard Guidebook Version 3 0 3 Dec 2020.pdf PDF
Bidders Library TRB CAB Charter V4 0 121420.pdf PDF
HC102821R00060001.pdf PDF
Bidders Library DODI 5000 02.pdf PDF
Bidders Library Instrumentation and Tools List 2021.xlsx XLSX spreadsheet
Bidders Library DISA I 240 110 36.pdf PDF
Bidders Library DODI 5000 02t.pdf PDF
TEC II Bidders Library List.xlsx XLSX spreadsheet
Bidders Library DoD Policy Instruction and Guidance - DoDI 4000 19.pdf PDF
Bidders Library Cybersecurity - DOD Cybersecurity TE Guidebook.pdf PDF
Bidders Library Security - DISAI 240-110-8.pdf PDF
Bidders Library Security - DoDI 5200 01.pdf PDF
Bidders Library JITC Instructions - JITCI 270-95-02.pdf PDF
Bidders Library Interoperability Test and Evaluation - NR KPP Evaluation Guidebook.docx DOCX document
Bidders Library JITC Instructions - JITCI 380-50-02.pdf PDF
Bidders Library Operational Test and Evaluation - DISA Test and Evaluation Scorecard Template.pptx PPTX presentation
Bidders Library Security - DoDM 5105 21.pdf PDF
Bidders Library Security - DoDM 5200 02.pdf PDF
Bidders Library Interoperability Test and Evaluation - DOD AS-SIP 2013.pdf PDF
Bidders Library Interoperability Test and Evaluation - JITC Notional Guide for Action Officers.pdf PDF
Bidders Library Interoperability Test and Evaluation - DOD Dictionary.pdf PDF
Bidders Library Security - ICD 703.pdf PDF
Bidders Library Interoperability Test and Evaluation - DoDI 8100 04.pdf PDF
Bidders Library Operational Test and Evaluation - DOTE TEMP Guidebook.pdf PDF
Bidders Library DoD Policy Instruction and Guidance - DoDD 5230 25.pdf PDF
Bidders Library JITC Instructions - JITCI 200-50-02.pdf PDF
Bidders Library Cybersecurity - NIST SP 800-37r2.pdf PDF
Bidders Library Security - DISAI 240-115-10.pdf PDF
Bidders Library DoD Policy Instruction and Guidance - DoDD 5144 02.pdf PDF
Bidders Library Interoperability Test and Evaluation - JTC SOP.pdf PDF
Bidders Library DoD Policy Instruction and Guidance - DoDD 7045 20.pdf PDF
Bidders Library Security - DoDM 5200 01 Vol 1.pdf PDF
Bidders Library Interoperability Test and Evaluation - DoD 8570 01-M.pdf PDF
Bidders Library Operational Test and Evaluation - JITC OTE Guidebook v2 0.docx DOCX document
Bidders Library DoD Policy Instruction and Guidance - DoD Net Centric Service Strategy.pdf PDF
Bidders Library Interoperability Test and Evaluation - DoDAF v2-02.pdf PDF
Show 40 more

Latest 50 of 153 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE OF THE SECRETARY OF DEFENSE

1700 DEFENSE PENTAGON

WASHINGTON, DC 20301-1700

OCT 1 8 2010

OPERATIONAL TEST

AND EVALUATION

MEMORANDUM FOR COMMANDER, ARMY TEST AND EVALUATION

COMMAND

COMMANDER, OPERATIONAL TEST AND EVALUATION

FORCE

COMMANDER, AIR FORCE OPERATIONAL TEST AND

EVALUATION CENTER

DIRECTOR, MARINE CORPS OPERATIONAL TEST AND

EVALUATION ACTIVITY

COMMANDER, JOINT INTEROPERABILITY TEST

COMMAND

DEPUTY UNDER SECRETARY OF THE ARMY, TEST &

EVALUATION COMMAND

DEPUTY, DEPARTMENT OF THE NAVY TEST &

EVALUATION EXECUTIVE

DIRECTOR, TEST & EVALUATION, HEADQUARTERS,

U.S. AIR FORCE

TEST AND EVALUATION EXECUTIVE, DEFENSE

INFORMATION SYSTEMS AGENCY

SUBJECT: Use of Production-Representative Test Articles for Initial Operational Test and Evaluation (IOT&E)

Consistent with Title 10 USC 2400, Department of Defense (DoD) Directive

5000.01 and DoD Instruction 5000.02 state production-representative articles should be used for test and evaluation. This memorandum expands upon the discussion of production representative systems contained in the Defense Acquisition Guidebook, Section 9.4.3. DOT&E will use the following criteria in evaluating whether systems are production-representative.

Wherever practicable, 101'&E will be conducted using low-rate initial production (LRIP) systems assembled using the parts, tools, and manufacturing processes intended for use in full-rate production. The system will also utilize the intended production versions of software. In addition, the logistics system and maintenance manuals intended for use on the fielded system should be in place.

When the use ofLRIP articles is impractical, the system used in 101'&E should, at a minimum, incorporate the same parts and software to be used in LRIP articles. In particular, the hardware and software should be as defined by the system-level Critical o

Design Review, Functional Configuration Audit, and System Verification Review, including correction of appropriate major deficiencies identified during developmental testing. Manufacturing processes to be used in full-rate production should also be adhered to as closely as possible. DOT&E must be provided detailed infonnation describing any process differences in order to independently evaluate whether the differences are acceptable.

DOT&E will assess adherence to the above guidelines as part of its responsibility for reviewing and approving Test and Evaluation Master Plans and Test Plans. Proposals to use articles not from LRIP to conduct lOT&E will be considered for approval by DOT&E using the criteria stated above as part of those reviews.

d. ?If. kLJ2.- J. Michael Gilmore Director