qasp_25_Jan_2015.docx
DOCX document 27 KB Posted
- Attached to
- DECC Furniture Purchase and Installation
- Solicitation number
- HC102815T0062
- Issued by
-
Defense Information Systems Agency
About this file
Attachment 7- QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_HC102815T0062.docx | DOCX document | |
| HC102815T0062_0003.pdf | ||
| Question_HC102815T0062.docx | DOCX document | |
| Question_HC102815T0062.docx | DOCX document | |
| HC102815T0062_0002.pdf | ||
| HC102815T0062_0001.pdf | ||
| Attachment_A_-_Concept_Floor_Plans_(23_Feb_2015).pdf | ||
| Attachment_B_-_Enlarged_Typicals_(23_Feb_2015).pdf | ||
| Attachment_9_Wage_Determination_Montgomery_AL.docx | DOCX document | |
| Attachment_C_-_Panelboard_Specification_(19_Feb_2015).docx | DOCX document | |
| RFQ_FBO_HC102815T0062_Material_List.xlsx | XLSX spreadsheet | |
| Attachment_10_Wage_Determination_Ogden _Utah.docx | DOCX document | |
| HC102815T0062.pdf | ||
| encl10a_evalplan_rating.docx | DOCX document | |
| Site_Visit_Instructions_as_of_25_Feb_15.docx | DOCX document | |
| Attachment_D_-_Comm_Materials_(25_January_2015).xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract or Task Order Title Enterprise Service Desk Furniture Purchase & Installation DECC Montgomery and DECC Ogden
2. Work Requirements:
· Task 1 – Project Schedule, Proposed Layout, Submittals, and Purchase of Furniture
· Task 2 – Specific Installation Tasks
3. Primary Method of Surveillance: There will be Customer Input, Layout Review and Periodic Inspection for Task 1. There will be 100% inspection of Task 2.
· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.
· Random Sampling. This is usually the most appropriate method for recurring tasks. With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Computer programs may be available to assist in establishing sampling procedures.
· Periodic Inspection: These services are monitored weekly, monthly, quarterly, semiannually, annually, etc. Periodic types of activities are perfect for periodic inspection because not only are they infrequent, but there is normally a predetermined, specified time frame within which the tasks must be accomplished. Therefore, you know exactly when to conduct the evaluations. Periodic inspections automatically become 100 percent evaluations or "100 percent checks." Inspections should be divided and scheduled by frequency: annual, semiannual, quarterly, monthly, weekly and as required. Sometimes services are required for which the time or frequency cannot be predicted, such as accident investigations, one-time special tasking by higher headquarters, etc. These would be labeled "as required inspections." Others are known and predictable such as the quarterly status report or the monthly travel report currently included in some DISA service contracts.
· Customer Input. Although usually not a primary method, this is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied upon to complain consistently when the quality of performance is poor, e.g., dining facilities, building services, customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints should be documented, preferably on a standard form.
4. Scope of Performance: The selected vendor will be required to craft a design that meets the criteria provided in this PWS. Purchase and install electrical equipment as described
5. Performance Standards:
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| 6.1.1 Subtask 1- Project Schedule |
| Project schedule meet the period of performance and PWS. |
| Review of proposed schedule |
| 6.1.3 Subtask 3 – Proposed Furniture Layout |
| Proposed solution meets the requirements of the PWS, Proposed Concept Floor Plan and code requirements. |
| Routine inspection of deliverable products and services. |
| 6.1.4 Subtask 4 - Electrical Submittals |
| Material submissions, shop drawings, product data, etc. require only minor modifications to comply with the PWS. |
| Technical compliance review by Technical POC and Site POCs. |
| 6.1.4 Subtask 4 - Electrical Submittals |
| Submits Lock-Out Tag-Out Plans as required |
| Technical compliance review by Technical POC and Site POCs. |
| 6.1.4 Subtask 4 - Electrical Submittals |
| Submits required documents for ASIs, including MOPs as required. HAZCONS are coordinated 100% of the time. |
| Technical compliance review by Technical POC and Site POCs. |
| 6.1.7 Subtask 7 – Close-Out Documents |
| Submittal includes all warranties, complete as-built drawings and installed equipment list |
| 100% inspection of submitted documents |
| 6.2.10 Subtask 10 – Communication Material |
| Materials are delivered as scheduled with minimum 95% materials delivered. |
| 100% inspection of delivered materials |
| 6.3.1 Subtask 1 – Installation Schedule |
| Revised Project Schedule (as required) to meet the period of performance and PWS. |
| Review of proposed schedule |
| 6.3.2 Subtask 2 – Demolition of Existing Furniture |
| Completely removed and disposed of existing furniture |
| Random sampling inspections of work area and contractor’s disposal process. |
| 6.3.3 Subtask 3 – Furniture Installation |
| Proposed solution meets the requirements of the PWS and Proposed Concept Floor Plan. |
| Random sampling inspection of installed products |
| 6.3.3 Subtask 4 – Electrical Installation |
| Electrical system installed as per approved submittal and to meet applicable codes and standards |
| Random sampling inspection of installed products |
| 6.3.3 Subtask 4 – Electrical Installation |
| Work meets PWS requirements 95% of the time. Deficient work is corrected in a timely manner. HAZCONS are coordinated 100% of the time. All circuits work as expected. No unscheduled HAZCON events. |
| Random sampling inspection of installed products |
6. Mandatory or regulatory compliance items: The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.
7. Acceptable Quality Level (AQL):
· 100% equipment provided and functioning as required.
· No major deficiencies noted.
· On time
8. Evaluation Method:
There will be a 100% review of the submittals by Technical POC, as defined by PWS. Once the package has been approved of and all comments have been addressed, the contractor can proceed onto the installation phase.
At the close-out of the project the a walkthrough will be to verify that the installation was properly done and that there are no deficiencies. Any existing deficiencies shall be added to a punch list and will be addressed in a timely manner.
9. Incentives (Positive and/or Negative): None Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2
Enclosure 6, QASP Page 2 of 2 Pages v3–10 Jul 14
File details come from the government source that posted it. Updated .