Hazardous_Building_Materials_Inventory_Report_McLevy_Building_Freeman_April_2019.pdf

PDF 6 MB Posted

Attached to
MCLEVY HALL HISTORICAL REPAIR/RESTORATION PHASE 1
Solicitation number
PEB003267
Issued by
Fairfield County, Connecticut

About this file

The document is a Hazardous Building Materials Inspection Report prepared by Freeman Companies, LLC for the City of Bridgeport's Office of Planning and Economic Development, focusing on the McLevy Building located at 180 State Street in Bridgeport, Connecticut. The inspection was conducted on July 5, 2018, and March 21, 2019, to assess pre-renovation asbestos and lead materials throughout the building's interior and roof. The survey involved sampling and analyzing 28 different homogeneous building materials, with a total of 66 representative samples collected and tested for asbestos, lead-based paint, and potential PCBs.

The report identified several asbestos-containing materials, including textured ceiling (approximately 1,500 SF), joint compound (approximately 17,400 SF), 12"x12" floor tile (approximately 10,400 SF), floor tile mastic, black roof flashing tar, and black gutter tar. For lead-based paint, six surfaces were found to have lead concentrations above 0.50% by dry weight, including metal stair treads, plaster ceilings, metal stair banisters, metal stall doors, and brick walls. The estimated total abatement costs for these materials are $213,000 for asbestos, $78,000 for lead-based paint, $5,000 for universal waste disposal, and an additional $58,200 for consulting fees, bringing the total estimated abatement cost to $354,200. The report emphasizes the need for licensed asbestos abatement contractors and compliance with OSHA and EPA regulations during any renovation or demolition activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hazardous Building Materials Inspection Report McLevy Building 180 State Street Bridgeport, CT

September 2018

Revised April 2019 Freeman File No: 2018-0401

Prepared for:

City of Bridgeport Office of Planning and Economic Development

999 Broad Street Bridgeport, CT 06604

Prepared by:

Freeman Companies, LLC 36 John Street

Hartford, CT 06106

DRAFT

City of Bridgeport Office of Planning and Economic Development Attn: Frank Croke 999 Broad Street Bridgeport, CT 06604

RE: Limited Hazardous Building Materials Survey for Proposed Renovations Location: McLevy Building, 180 State Street, Bridgeport CT Freeman Companies Project #: 2018-0401

Dear Mr. Croke:

In accordance with our proposal, Freeman Companies, LLC (Freeman), conducted a limited pre-renovation asbestos and lead bulk sampling of suspect materials for the interior and roof of the McLevy Building located at 180 State Street, Bridgeport, Connecticut. The purpose of the bulk sampling and analysis survey was to sample materials for asbestos, lead-based paint, and PCBs prior to any planned renovations to the building.

The inspection was conducted on July 5, 2018 and March 21, 2019.

We thank you for the opportunity to provide you with our consulting services. If you have any questions regarding this report or its contents, please contact me at 860-929-9108.

Sincerely, Freeman Companies, LLC

Matthew Chalifour Hazardous Building Materials Manager

Table of Contents

1.0 INTRODUCTION

1.1 Purpose

1.2 Building Description

1.3 Special Terms and Conditions

2.0 ASBESTOS INVESTIGATIVE SURVEY

2.1 General Summary

2.2 Methodology

2.3 Results of Sampling and Analysis for Asbestos

3.0 LEAD-BASED PAINT SCREENING SURVEY

3.1 General Information

3.2 Purpose and Scope of Work

3.3 Methodology

3.4 Testing Methodology

3.5 Lead-Based Standards

3.6 Results of Sampling and Analysis for Lead Paint

4.0 ESTIMATED BUILDING MATERIAL ABATEMENT COSTS

4.1 Asbestos Abatement

4.2 Lead Abatement

5.0 CONCLUSIONS AND RECOMMENDATIONS

5.1 Asbestos

5.2 Lead

6.0 REPORT LIMITATIONS CRITERIA

FIGURES

Figure 1 Sample Location Plan

TABLES

Table 1 Asbestos Analytical Results Table 2 Lead Paint – AAS Results

APPENDICIES

Appendix A: ACM Laboratory Analytical Reports Appendix B: LBP Laboratory Analytical Reports Appendix C: Licenses and Accreditations

HBMI Inspection Services McLevy Building, Bridgeport, CT September 2018 Revised April 2019

1.0 INTRODUCTION

1.1 Purpose

Freeman Companies, LLC (Freeman) was retained by the City of Bridgeport Office of Planning and Economic Development (the Client) to conduct a pre-renovation asbestos and lead inventory of suspect materials associated with proposed renovations to the McLevy Building (the Site) located at 180 State Street, Bridgeport, Connecticut. An asbestos and lead inspection of the interior of the Site building was conducted by Matthew Chalifour on July 5, 2018. An asbestos, lead, and polychlorinated biphenyls (PCB) inspection of the roof of the Site building was conducted by Matthew Chalifour on March 21, 2019. During the roof inspection no painted services were observed, and no suspect caulking or glazing was observed, therefore, no samples were collected for lead or PCBs. Mr. Chalifour is a State of Connecticut Department of Public Health (CTDPH) license asbestos inspector (CTDPH license number 000324) and CT licensed lead inspector/risk assessor (CTDPH license number 002279). The asbestos survey was conducted in conformance with the Environmental Protection Agency (EPA) National Emissions Standards for Hazardous Air Pollutants (NESHAP) 40 CFR Part 61.

The purpose of this investigation was to provide a limited Hazardous Building Materials Investigation (HBMI) report as part of proposed renovations to the Site.

1.2 Building Description

The Site was built in 1853 with a stone exterior and gable style roof. Interior materials consist of a combination of hardwood floors, carpet in select areas, and terrazzo flooring in main corridors and stairways. The gross area of the building is approximately 26,500 square feet.

1.3 Special Terms and Conditions

Freeman was contracted to perform a pre-renovation investigative survey of areas affected by the proposed renovation activities. These areas included basement, 1st, 2nd, 3rd floors, attic, and roof. Inaccessible areas were generally identified as behind mirrors and under terrazzo floor. Estimated quantities and approximate locations of asbestos-containing materials (ACM’s) as presented were based on the visual observations at the time of the survey. Every attempt was made to locate all suspect materials. However, additional materials may be discovered above hard ceilings or behind walls during demolition or renovation activities.

2.0 ASBESTOS INVESTIGATIVE SURVEY

2.1 General Summary

The following presents the survey sampling procedures, results, analytical methods, and conclusions based on survey findings. Detailed information relative to ACM descriptions and locations are presented in the appendices to this report. The analytical reports for the asbestos analyses are located in Appendix A. Appendix A further illustrates each type of suspect asbestos-containing material (ACM) identified their location, and whether the materials are classified as ACM or non-ACM based upon the analytical results. All samples were submitted to SanAir Technologies Laboratory, Inc. (SanAir). SanAir is a CT Licensed Laboratory.

2.2 Methodology

As required by the U.S. Occupational Safety & Health Administration (OSHA), the EPA, and the State of Connecticut Department of Public Health (DPH), sampling was performed by an EPA Asbestos Hazard Emergency Response Act (AHERA)-accredited and DPH-certified asbestos inspector (see Appendix B). Sampling was performed in a manner to prevent airborne fiber release and in accordance with the protocols specified in EPA 40 CFR Part 763. Samples were placed in appropriately labeled containers that were sealed and submitted to the laboratory for analysis. The samples were submitted for petrographic analysis using the EPA-endorsed Polarized Light Microscopy with Dispersion Staining (PLM/DS) method. The percentage of asbestos present in each sample was determined by the visual area estimation technique.

Samples were collected using a wet technique to prevent airborne fiber release. Each suspect material was sampled using a decontaminated knife to cut through its entire thickness to ensure that a complete cross section was obtained. The sample was then placed in an appropriately labeled container, which was sealed and submitted to the laboratory for analysis. Multiple samples were collected at each location.

2.3 Results of Sampling and Analysis for Asbestos

Homogenous building materials identified during the survey are documented in Table 1 of this report which includes; material descriptions, locations, conditions, sample number and asbestos content and estimated quantities (if any). Table 1 also includes all suspect materials that were identified and/or sampled during the survey (including non-ACMs and ACMs).

A total of 28 different homogeneous building materials were sampled and a total of 66 representative samples were submitted to SanAir for analysis on July 5, 2018. A total of 6 different homogeneous building materials (on the roof) were sampled and a total of 12 representative samples were submitted to SanAir for analysis on March 21, 2019. Copies of the laboratory analytical reports are attached as Appendix A.

Refer to Table 1 for a summary of the results of the sampling.

3.0 LEAD-BASED PAINT SCREENING SURVEY

3.1 General Information

A lead-based paint (LBP) screening survey was conducted to identify materials confirmed as containing measurable amounts of LBP.

Results from the LBP screening conducted by Freeman can be used to estimate the quantity of LBP materials that will be generated with proposed renovation activities. The analytical reports for the LPB screening are located in Appendix B. This survey information should be provided to parties responsible for any planned demolitions (as appropriate) of the locations of LBP in order to comply with the OSHA regulations for Hazard Communication and Worker Safety, as well as disposal determinations for building materials.

3.2 Purpose and Scope of Work

The intent of the LBP screening survey was to determine if selected surfaces contained measurable amounts of lead in the paint. Actual analytical readings are presented in Table 2.

3.3 Methodology

Random sampling of representative painted surfaces as detailed in section 3.1 was conducted to determine whether the materials were coated with measurable levels of lead.

3.4 Testing Methodology

Applicable regulatory-approved methods to test for lead include the following:

1. Portable X-Ray Fluorescence Analyzer (XRF)

2. Atomic Absorption Spectrophotometry (AAS)

Freeman used the AAS method to determine if a surface contains lead-based paint.

3.5 Lead-Based Standards

When LBP is impacted by any renovation or demolition activities, it becomes regulated by federal regulations, including but not limited to:

• 29 CFR Part 1926.62. Lead in Construction: Requires engineering controls, personal protective equipment, worker decontamination, medical surveillance, worker training, and recordkeeping when workers are exposed to lead in concentrations above the established "action level" of 30 micrograms of lead per cubic meter of air.

• 40 CFR Part 261-265. Resource Conservation and Recovery Act (RCRA) Hazardous Waste Regulations: Regulates the disposal of hazardous wastes (wastes which contain concentrations of lead in excess of 5 parts per million (5 ppm) as measured by TCLP), including demolition debris.

Although there are currently no Federal or State regulations which establish dangerous levels of lead in applied paint coatings for structures other than residential building and childhood poisoning situations, contractors need to be made aware of the presence of LBP so that they

September 2018 Revised April 2019 may take appropriate actions to train and inform their workforce, select and install engineering controls, and provide personal protective equipment to prevent occupational exposure to lead-based paint.

The State of Connecticut and the U.S. Department of Housing and Urban Development (HUD) have developed technical guidelines for testing, abatement, cleanup, and disposal of lead-based paint in specific types of buildings such as public and Indian housing, and locations where children below the age of six years old reside. These guidelines define the regulated level of lead paint (Toxic Level of Lead) as paint containing greater than 1.0 milligrams lead per square centimeter of surface as measured on-site by an X-ray fluorescent analyzer or more than 0.50 percent lead by dry weight as measured by AAS.

For the purposes of this survey, all paints containing detectable amounts of lead are considered lead-based paints. This action is taken because OSHA regulates lead in construction based on airborne exposures and it cannot be ensured that lead paint with concentrations of lead less than or 0.50% mass will not result in exposures exceeding the OSHA standard during disruption of these materials during the proposed demolitions.

3.6 Results of Sampling and Analysis for Lead Paint

On July 5, 2018, a LBP screening survey was conducted on representative accessible painted surfaces at the Site. A representative from Freeman Companies, Matthew Chalifour, State of Connecticut licensed lead inspector #002279, conducted the testing. LBP screening was performed using the AAS methodology.

Six (6) of the surfaces sampled were above 0.50% lead by dry weight as measured by AAS. Copies of the laboratory analytical reports are attached as Appendix B.

Refer to Table 2 for a summary of the results of the LBP sampling.

4.0 ESTIMATED BUILDING MATERIAL ABATEMENT COSTS

4.1 Asbestos Abatement

Table 1 below provides an estimate to abate ACM at the project site. This estimate is strictly to be used as remediation/abatement cost as well as field oversight and does not include engineering support services as stated below.

Table 1 – ACM Abatement Cost Estimate

Asbestos-Containing Material Quantity Per unit abatement cost estimate Total Abatement Cost

Textured Ceiling ~ 1,500 LF $7 $10,500

Joint Compound ~17,400 LF $5 $87,000 Floor Tile ~20,800 LF $3.46 $72,000 Roof Flashing Tar ~ 700 LF $11.43 $8,000

Asbestos Abatement Total $213,000

Lead-Based Paint Abatement Total $78,000

Consulting Fees 20% $58,200

Total Abatement Estimate $349,200 swatts Text Box

4.2 Lead Abatement

Table 2 below provides an estimate to abate LBP at the project site. This estimate is strictly to be used as remediation/abatement cost as well as field oversight and does not include engineering support services as stated below.

Table 2 – LBP Abatement Cost Estimate

Lead-Based Paint Components Quantity Per unit abatement cost estimate Total Abatement Cost

1 Metal Staircase 1 $7,000 $7,000 Plaster Ceiling 18,000 SF $2.00 $9,000 Metal Stair Railings/Banisters 3 $7,333 $22,000 Brick Walls in Basement 30,000 SF $1.33 $40,000

TOTAL $78,000

During any renovation or demolition process, safe work procedures must be implemented by properly (lead-paint) trained workers employed by contractors to address worker protection, lead exposure controls, waste stream management, and ambient air quality monitoring. Specifically, contractors will be required to comply with all applicable OSHA regulations including 29 CFR 1926.62, "Lead Exposure in Construction: Interim Final Rule" and 29 CFR 1926.59, "Hazard Communication for the Construction Industry". In addition, pre-disposal lead-waste testing requirements must be complied with.

4.3 Universal Abatement

Table 3 below provides an estimate to abate universal waste at the project site. This estimate is strictly to be used as remediation/abatement cost as well as field oversight and does not include engineering support services as stated below.

Table 3 – LBP Abatement Cost Estimate

Universal Waste Quantity Per unit abatement cost estimate Total Abatement Cost

Universal Waste N/A $5,000 $5,000

TOTAL $5,000

A cost estimate for abatement/remediation of building materials (includes interior and exterior area) listed above are based on the results of the survey described herein as well as contractor estimates provided on 4/4/19. This estimate assumes

1. Physical access to all areas,

2. Quantities and locations of hazardous building materials as described in the tables listed above. Should additional unknown materials be identified during abatement/renovations additional cost will be incurred.

3. This estimate does not include repair/replacement of abated materials.

4. Consulting fee includes field oversight; does not include plans and specifications and or any additional reporting

5. Time frame to be determined

5.0 CONCLUSIONS AND RECOMMENDATIONS

5.1 Asbestos

Based on the results of the laboratory analyses, the following materials were confirmed to contain asbestos:

• Textured Ceiling (approximately 1,500 SF)

• Joint Compound (approximately 17,400 SF)

• 12”x12” Floor Tile (approximately 10,400 SF)

• 12”x12” Floor Tile Mastic (approximately 10,400 SF)

• Black Roof Flashing Tar (approximately 550 LF)

• Black Gutter Tar (approximately 200 LF)

In accordance with the OSHA regulations (29 CFR Part 1926.1101 and 1910.1001), all potential contractors bidding on work must first be informed of the results of this survey. All materials identified as negative for asbestos may be removed at will and disposed of as standard construction debris. In addition, notification regarding the presence of the ACM must be provided to all employees and tenants who occupy any areas containing ACM.

In accordance with EPA NESHAPS regulations (40 CFR Part 61), building owners must remove all ACM from a facility (or area of a facility) before any activity begins that would break up, dislodge, or similarly disturb the ACM. Given joint compound and wallboard are considered composite building materials, contractor shall consider all wallboard and joint compound to be ACM unless samples are collected to prove otherwise.

In the State of Connecticut, a licensed asbestos abatement contractor must perform all asbestos-related activities, including the renovation/demolition portion of the work that includes asbestos disturbance. Disturbance of ACM can only be done by trained and licensed individuals.

It should be noted that the State of Connecticut regulations governing asbestos abatement does not distinguish between friable and non-friable material. Therefore, full containment procedures are required for any interior abatement work (removal, encapsulation, or enclosure) involving both Category I and/or Category II non-friable ACM.

5.2 Lead

Six (6) of the surfaces sampled were above 0.50% lead by dry weight as measured by AAS.

• Gray Metal Stair Treads leading to Attic

• Beige Paint on Plaster Ceilings (3rd Floor)

• Black Metal Stair Banisters/Railings (Main Stairway)

• Red Metal Stall Doors (Men’s Room in Basement)

• White Brick Walls (Basement)

Asbestos Abatement Total $213,000

Lead-Based Paint Abatement Total $78,000

Universal Waste Disposal $5,000

Consulting Fees 20% $58,200

Total Abatement Estimate $354,200

• Black Metal Stair Railings (Basement)

6.0 REPORT LIMITATIONS CRITERIA

Information contained in this report is based on site observations and sample results relevant to the scope of work for this survey.

Conclusions of this report are based on the survey, study, and/or investigation. This is not to be interpreted as a complete compilation of all existing information pertaining to the site conditions.

It should be noted that site conditions observed during this investigation may change based on any number of influencing factors and/or environmental variables such as fluctuations in indoor and outdoor temperatures, humidity and seasonal changes in sunlight. These factors can influence the spread and concentration of molds as they change. This report is not intended to guarantee that the investigated site is, or is not, free from conditions, which could pose a threat or hazard to human health or safety. Should further research on the site be conducted, any additional data should be submitted to Freeman for review and revisions as necessary.

This report is intended for the sole use of the Client and may not be used or relied upon by others without the written consent of the Client.

The scope of work conducted in performing this service for the Client may not be appropriate to satisfy the needs of other Parties, and the use or re-use of this document or the findings, conclusions, or recommendations is at the risk of said user.

The criteria used to evaluate the survey results includes, but is not limited to, guidelines recommended by the:

• American Conference of Governmental Industrial; Hygienists (ACGIH);

• The American Society for Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE);

• The U.S. Environmental Protection Agency (EPA);

• The American Industrial Hygiene Association (AIHA);

• The American Indoor Air Quality Council (AIAQC);

• Indoor Environmental Standards Organization (IESO);

• The Institute of Inspection Cleaning and Restoration Certification (IICRC);

• The National Air Duct Cleaners Association (NADCA);

FIGURES

MChalifour Oval

MChalifour Oval

MChalifour Callout 04A,B 05A-C

MChalifour Callout 06A, B

MChalifour Oval

MChalifour Callout 07A, B

MChalifour Oval

MChalifour Callout 08A, B

MChalifour Oval

MChalifour Callout 13C 14C

MChalifour Oval

MChalifour Callout 15A, B

MChalifour Oval

MChalifour Callout 26A, B

MChalifour Text Box Legend

- Sample Location - Negative Asbestos

- Sample Location - Positive Asbestos

- Sample Location - Negative Lead

- Sample Location - Positive Lead

MChalifour Rectangle

MChalifour Callout

LP-08

MChalifour Rectangle

MChalifour Callout

LP-09

MChalifour Rectangle

MChalifour Callout

LP-10

MChalifour Rectangle

MChalifour Callout

LP-11

MChalifour Rectangle

MChalifour Callout

LP-12

MChalifour Oval

MChalifour Oval

MChalifour Rectangle

Rectangle

MChalifour Callout 11A, 12A

MChalifour Oval

MChalifour Callout 27C 28C

MChalifour Text Box Legend

- Sample Location - Negative Asbestos

- Sample Location - Positive Asbestos

- Sample Location - Negative Lead

- Sample Location - Positive Lead

MChalifour Oval

MChalifour Oval

MChalifour Rectangle

MChalifour Callout 11B 12B 13B 14B

MChalifour Oval

MChalifour Callout 16A, B

MChalifour Oval

MChalifour Callout 17A, B

MChalifour Oval

MChalifour Callout 18A, B 19A, B 22A, B 23A, B

MChalifour Oval

MChalifour Callout 27B 28B

MChalifour Text Box 32'X14'X11.5'

MChalifour Text Box Legend

- Sample Location - Negative Asbestos

- Sample Location - Positive Asbestos

- Sample Location - Negative Lead

- Sample Location - Positive Lead

MChalifour Rectangle

MChalifour Callout

LP-02

MChalifour Rectangle

MChalifour Callout

LP-07

MChalifour Oval

MChalifour Oval

MChalifour Rectangle

MChalifour Oval

MChalifour Oval

MChalifour Callout 01A-C

MChalifour Callout 02A-C

MChalifour Callout 03A-C

MChalifour Text Box 36'X16'X11'

MChalifour Oval

MChalifour Callout 09A, B

MChalifour Oval

MChalifour Callout 10A, B 11C, 12C 20A, B 21A, B

MChalifour Oval

MChalifour Callout 2A, B

MChalifour Oval

MChalifour Callout 25A, B

MChalifour Oval

MChalifour Callout 27A, 28A

MChalifour Text Box Legend

- Sample Location - Negative Asbestos

- Sample Location - Positive Asbestos

- Sample Location - Negative Lead

- Sample Location - Positive Lead

MChalifour Rectangle

MChalifour Callout

LP-03

MChalifour Rectangle

MChalifour Callout

LP-04

MChalifour Rectangle

MChalifour Callout

LP-05

LP-06

MChalifour Oval

MChalifour Oval

MChalifour Rectangle

MChalifour Callout 13A, 14A

MChalifour Text Box Legend

- Sample Location - Negative Asbestos

- Sample Location - Positive Asbestos

- Sample Location - Negative Lead

- Sample Location - Positive Lead

MChalifour Rectangle

MChalifour Callout

LP-01

MChalifour Oval

MChalifour Oval

MChalifour Rectangle

TABLES

Table 1 – Asbestos Analytical Results

180 State Street

Bridgeport, Connecticut July 2018, March 2019

Sample Number Material Description Location(s) Estimated

Quantity Analytical Result

01A 2'x4' Ceiling Tile Kitchen 3rd Floor N/A None Detected

01B 2'x4' Ceiling Tile Kitchen 3rd Floor N/A None Detected

01C 2'x4' Ceiling Tile Kitchen 3rd Floor N/A None Detected

02A 1'x1' Ceiling Tile 3rd Floor N/A None Detected

02B 1'x1' Ceiling Tile 3rd Floor N/A None Detected

02C 1'x1' Ceiling Tile 3rd Floor N/A None Detected

03A Textured Ceiling Court Room 3rd Floor 1,500 SF 8% Chrysotile

03B Textured Ceiling Court Room 3rd Floor 1,500 SF NA/PS

03C Textured Ceiling Court Room 3rd Floor 1,500 SF NA/PS

04A Woven Insulation Wrap Basement N/A None Detected

04B Woven Insulation Wrap Basement N/A None Detected

05A Pipe Fitting Basement N/A None Detected

05B Pipe Fitting Basement N/A None Detected

05C Pipe Fitting Basement N/A None Detected

06A Glue Daubs Basement N/A None Detected

06B Glue Daubs Basement N/A None Detected

07A HVAC Basement N/A None Detected

07B HVAC Basement N/A None Detected

08A Tar on I Beam Basement N/A None Detected

08B Tar on I Beam Basement N/A None Detected

09A Window Glazing Court Room 3rd Floor N/A None Detected

09B Window Glazing Court Room 3rd Floor N/A None Detected

10A Wallpaper Glue Hallway 3rd Floor N/A None Detected

10B Wallpaper Glue Hallway 3rd Floor N/A None Detected

11A Gypsum Wallboard 1st Floor N/A None Detected

11B Gypsum Wallboard 2nd Floor N/A None Detected

11C Gypsum Wallboard 3rd Floor N/A None Detected

12A Joint Compound 1st Floor 17,400 SF 2% Chrysotile

12B Joint Compound 2nd Floor 17,400 SF NA/PS

12C Joint Compound 3rd Floor 17,400 SF NA/PS

13A Skim Coat Attic N/A None Detected

13B Skim Coat 2nd Floor N/A None Detected

13C Skim Coat Basement N/A None Detected

14A Wall Plaster Attic N/A None Detected

14B Wall Plaster 2nd Floor N/A None Detected

14C Wall Plaster Basement N/A None Detected

15A Ceramic Tile Glue Basement N/A None Detected

15B Ceramic Tile Glue Basement N/A None Detected

16A Wood Panel Glue Room 202 N/A None Detected

16B Wood Panel Glue Room 202 N/A None Detected

17A Window Glazing 2nd Floor N/A None Detected

17B Window Glazing 2nd Floor N/A None Detected

18A Floor Tile Grout 2nd Floor Women's Room N/A None Detected

18B Floor Tile Grout 2nd Floor Women's Room N/A None Detected

19A 4" Cove Base 2nd Floor Women's Room N/A None Detected

19B 4" Cove Base 2nd Floor Women's Room N/A None Detected

20A 4" Cove Base 3rd Floor N/A None Detected

20B 4" Cove Base 3rd Floor N/A None Detected

21A 4" New Cove Base 3rd Floor Court Room N/A None Detected

21B 4" New Cove Base 3rd Floor Court Room N/A None Detected

22A Glue on 4" Cove Base 2nd Floor N/A None Detected

22B Glue on 4" Cove Base 2nd Floor N/A None Detected

23A Glue on 4" Cove Base 2nd Floor N/A None Detected

23B Glue on 4" Cove Base 2nd Floor N/A None Detected

24A Carpet Glue 3rd Floor N/A None Detected

24B Carpet Glue 3rd Floor N/A None Detected

25A Carpet Glue 3rd Floor N/A None Detected

25B Carpet Glue 3rd Floor N/A None Detected

26A 12"x12" Floor Tile Basement N/A None Detected

26B 12"x12" Floor Tile Basement N/A None Detected

27A 12"x12" Floor Tile 3rd Floor 10,400 SF 3% Chrysotile

27B 12"x12" Floor Tile 2nd Floor 10,400 SF NA/PS

27C 12"x12" Floor Tile 1st Floor 10,400 SF NA/PS

28A Mastic Under Floor Tile 3rd Floor 10,400 SF 2% Chrysotile

28B Mastic Under Floor Tile 2nd Floor 10,400 SF NA/PS

28C Mastic Under Floor Tile 1st Floor 10,400 SF NA/PS

032119 - 01A, B Black Flashing Tar Roof ~550 LF 5% Chrysotile

032119 - 02A, B Black Roof Tar Roof N/A None Detected

032119 - 03A, B Black Tar Gutter ~500 LF 7% Chrysotile

032119 - 04A, B Black Built up Roofing Roof N/A None Detected

032119 - 05A, B White Asphalt Roofing Roof N/A None Detected

032119 - 06A, B White Interior Window Glazing Roof Penthouse N/A None Detected Bold values represent samples with detectable concentrations of asbestos NA/PS: Not analyzed, positive stop

Table 2 – Lead Paint - AAS Results

180 State Street

Bridgeport, Connecticut July 2018

Sample Number Room / Area Component Paint Color Substrate

Results (% Lead

By Weight) LP-01 Stairs to Attic Stair Treads Grey Metal 1.14%

LP-02 2nd Floor Door Black Wood 0.03%

LP-03 3rd Floor Wall Off-white Plaster 0.02%

LP-04 3rd Floor Vault Room Floor Grey Concrete 0.06%

LP-05 Office 301 Crown Molding Beige Wood 0.38%

LP-06 Office 301 Ceiling Beige Plaster 9.43%

LP-07 2nd Floor Stair Stair Banister Black Metal 11.69%

LP-08 Men’s Room in Basement Door Frame Beige Wood <0.01%

LP-09 Basement Radiator Black Metal <0.01%

LP-10 Men’s Room in Basement Stall Doors Red Metal 4.00%

LP-11 Basement Walls White Brick 2.29%

LP-12 Basement Stair Railings Black Metal 2.33% Bold values represent samples of lead concentrations >0.5% by dry weight

APPENDIX A

ACM Laboratory Results

SanAir ID#: 18028823

Project #: 2018-0401

Project Name: McLevy

Report Date: 7/16/2018

Analysis Report prepared for Freeman Companies

Dear Matthew Chalifour, We at SanAir would like to thank you for the work you recently submitted. The 66 sample(s) were received on Monday, July 09, 2018 via FedEx. The final report(s) is enclosed for the following sample(s): 01A, 01B, 01C, 02A, 02B, 02C, 03A, 03B, 03C, 04A, 04B, 05A, 05B, 05C, 06A, 06B, 07A, 07B, 08A, 08B, 09A, 09B, 10A, 10B, 11A, 11B, 11C, 12A, 12B, 12C, 13A, 13B, 13C, 14A, 14B, 14C, 15A, 15B, 16A, 16B, 17A, 17B, 18A, 18B, 19A, 19B, 20A, 20B, 21A, 21B, 22A, 22B, 23A, 23B, 24A, 24B, 25A, 25B, 26A, 26B, 27A, 27B, 27C, 28A, 28B, 28C.

These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.

Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory

Final Report Includes:

- Cover Letter

- Analysis Pages

- Disclaimers and Additional Information

Sample conditions:

- 66 samples in Good condition.

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2018-0401Project Number:

P.O. Number:

Project Name: McLevy

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 4:35:29 PM

18028823 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

860-929-9108Phone:

Analyst: Robertson, Erin

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

01A / 18028823-001 2'x4' Ceiling Tile/ Kitchen 3rd Fl.

White Fibrous

Homogeneous

50% Cellulose 30% Min. Wool

20% Other None Detected

01B / 18028823-002 2'x4' Ceiling Tile/ Kitchen 3rd Fl.

White Fibrous

Homogeneous

50% Cellulose 30% Min. Wool

20% Other None Detected

01C / 18028823-003 2'x4' Ceiling Tile/ Kitchen 3rd Fl.

White Fibrous

Homogeneous

50% Cellulose 30% Min. Wool

20% Other None Detected

02A / 18028823-004 1'x1' Ceiling Tile/ 3rd Fl.

White Fibrous

Homogeneous

80% Min. Wool 5% Cellulose

15% Other None Detected

02B / 18028823-005 1'x1' Ceiling Tile/ 3rd Fl.

White Fibrous

Homogeneous

80% Min. Wool 5% Cellulose

15% Other None Detected

02C / 18028823-006 1'x1' Ceiling Tile/ 3rd Fl.

White Fibrous

Homogeneous

80% Min. Wool 5% Cellulose

15% Other None Detected

03A / 18028823-007 Textured Ceiling/ 3rd Fl. Court Rm

White Non-Fibrous

Homogeneous

92% Other 8% Chrysotile

03B / 18028823-008 Textured Ceiling/ 3rd Fl. Court Rm

Not Analyzed

03C / 18028823-009 Textured Ceiling/ 3rd Fl. Court Rm

Not Analyzed

04A / 18028823-010 Woven Insulation Wrap/ Basement

White Fibrous

Homogeneous

95% Cellulose 5% Other None Detected

Analyst:

Analysis Date: 7/16/2018 Date: 7/16/2018

Approved Signatory:

2018-0401Project Number:

P.O. Number:

Project Name: McLevy

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 4:35:29 PM

18028823 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

04B / 18028823-011 Woven Insulation Wrap/ Basement

White Fibrous

Homogeneous

95% Cellulose 5% Other None Detected

05A / 18028823-012 Pipe Fitting/ Basement

Gray Non-Fibrous

Homogeneous

35% Min. Wool 65% Other None Detected

05B / 18028823-013 Pipe Fitting/ Basement

Gray Non-Fibrous

Homogeneous

35% Min. Wool 65% Other None Detected

05C / 18028823-014 Pipe Fitting/ Basement

Gray Non-Fibrous

Homogeneous

35% Min. Wool 65% Other None Detected

06A / 18028823-015 Glue Daubs/ Basement

Brown Non-Fibrous

Homogeneous

100% Other None Detected

06B / 18028823-016 Glue Daubs/ Basement

Brown Non-Fibrous

Homogeneous

100% Other None Detected

07A / 18028823-017 HVAC Flex Connector/ Basement

Black Fibrous

Homogeneous

85% Cellulose 15% Other None Detected

07B / 18028823-018 HVAC Flex Connector/ Basement

Black Fibrous

Homogeneous

85% Cellulose 15% Other None Detected

08A / 18028823-019 Tar On I Beam/ Basement

Black Non-Fibrous

Homogeneous

100% Other None Detected

08B / 18028823-020 Tar On I Beam/ Basement

Black Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 7/16/2018 Date: 7/16/2018

Approved Signatory:

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2018-0401Project Number:

P.O. Number:

Project Name: McLevy

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 4:35:29 PM

18028823 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

09A / 18028823-021 Window Glazing/ 3rd Fl. Court

Black Non-Fibrous

Homogeneous

100% Other None Detected

09B / 18028823-022 Window Glazing/ 3rd Fl. Court

Black Non-Fibrous

Homogeneous

100% Other None Detected

10A / 18028823-023 Wallpaper Glue/ 3rd Fl. Hallway

Cream Non-Fibrous

Homogeneous

3% Cellulose 97% Other None Detected

10B / 18028823-024 Wallpaper Glue/ 3rd Fl. Hallway

Cream Non-Fibrous

Homogeneous

3% Cellulose 97% Other None Detected

11A / 18028823-025 Gypsum Wallboard/ 1st Fl

White Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

11B / 18028823-026 Gypsum Wallboard/ 2nd Fl.

White Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

11C / 18028823-027 Gypsum Wallboard/ 3rd Fl.

White Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

12A / 18028823-028 Joint Compound/ 1st Fl

White Non-Fibrous

Homogeneous

98% Other 2% Chrysotile

12B / 18028823-029 Joint Compound/ 2nd Fl

Not Analyzed

12C / 18028823-030 Joint Compound/ 3rd Fl.

Not Analyzed

Analyst:

Analysis Date: 7/16/2018 Date: 7/16/2018

Approved Signatory:

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2018-0401Project Number:

P.O. Number:

Project Name: McLevy

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 4:35:29 PM

18028823 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

13A / 18028823-031 Skim Coat/ Attic

White Non-Fibrous

Homogeneous

100% Other None Detected

13B / 18028823-032 Skim Coat/ 2nd Fl.

White Non-Fibrous

Homogeneous

100% Other None Detected

13C / 18028823-033 Skim Coat/ Basement

White Non-Fibrous

Homogeneous

100% Other None Detected

14A / 18028823-034 Wall Plaster/ Attic

Gray Non-Fibrous

Homogeneous

10% Cellulose 90% Other None Detected

14B / 18028823-035 Wall Plaster/ 2nd Fl.

Gray Non-Fibrous

Homogeneous

10% Cellulose 90% Other None Detected

14C / 18028823-036 Wall Plaster/ Basement

Gray Non-Fibrous

Homogeneous

10% Cellulose 90% Other None Detected

15A / 18028823-037 Ceramic Tile Glue/ Basement

Cream Non-Fibrous

Homogeneous

100% Other None Detected

15B / 18028823-038 Ceramic Tile Glue/ Basement

Cream Non-Fibrous

Homogeneous

100% Other None Detected

16A / 18028823-039 Wood Panel Glue/ Rm 202

Green Non-Fibrous

Homogeneous

100% Other None Detected

16B / 18028823-040 Wood Panel Glue/ Rm 202

Green Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 7/16/2018 Date: 7/16/2018

Approved Signatory:

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2018-0401Project Number:

P.O. Number:

Project Name: McLevy

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 4:35:29 PM

18028823 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

17A / 18028823-041 Window Glazing/ 2nd Fl

White Non-Fibrous

Homogeneous

100% Other None Detected

17B / 18028823-042 Window Glazing/ 2nd Fl

White Non-Fibrous

Homogeneous

100% Other None Detected

18A / 18028823-043 Fl. Tile Grout/ 2nd Fl. Women's Rm

White Non-Fibrous

Homogeneous

100% Other None Detected

18B / 18028823-044 Fl. Tile Grout/ 2nd Fl. Women's Rm

White Non-Fibrous

Homogeneous

100% Other None Detected

19A / 18028823-045 4" Cove Base/ 2nd Fl. Women's Rm

Brown Non-Fibrous

Homogeneous

100% Other None Detected

19B / 18028823-046 4" Cove Base/ 2nd Fl. Women's Rm

Brown Non-Fibrous

Homogeneous

100% Other None Detected

20A / 18028823-047 4" Cove Base/ 3rd Fl.

Black Non-Fibrous

Homogeneous

100% Other None Detected

20B / 18028823-048 4" Cove Base/ 3rd Fl.

Black Non-Fibrous

Homogeneous

100% Other None Detected

21A / 18028823-049 4" New Cove Base/ 3rd Fl. Court Rm

Black Non-Fibrous

Homogeneous

100% Other None Detected

21B / 18028823-050 4" New Cove Base/ 3rd Fl. Court Rm

Black Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 7/16/2018 Date: 7/16/2018

Approved Signatory:

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2018-0401Project Number:

P.O. Number:

Project Name: McLevy

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 4:35:29 PM

18028823 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

22A / 18028823-051 Glue On 4" Cove Base/ 2nd Fl.

Brown Non-Fibrous

Homogeneous

100% Other None Detected

22B / 18028823-052 Glue On 4" Cove Base/ 2nd Fl.

Brown Non-Fibrous

Homogeneous

100% Other None Detected

23A / 18028823-053 Glue On 4" Cove Base/ 2nd Fl.

Cream Non-Fibrous

Homogeneous

100% Other None Detected

23B / 18028823-054 Glue On 4" Cove Base/ 2nd Fl.

Cream Non-Fibrous

Homogeneous

100% Other None Detected

24A / 18028823-055 Carpet Glue/ 3rd Fl

Green Non-Fibrous

Homogeneous

2% Synthetic 98% Other None Detected

24B / 18028823-056 Carpet Glue/ 3rd Fl

Green Non-Fibrous

Homogeneous

2% Synthetic 98% Other None Detected

25A / 18028823-057 Carpet Glue/ 3rd Fl.

Yellow Non-Fibrous

Homogeneous

2% Synthetic 98% Other None Detected

25B / 18028823-058 Carpet Glue/ 3rd Fl.

Yellow Non-Fibrous

Homogeneous

2% Synthetic 98% Other None Detected

26A / 18028823-059 12" Fl. Tile/ Basement

Brown Non-Fibrous

Homogeneous

100% Other None Detected

26B / 18028823-060 12" Fl. Tile/ Basement

Brown Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 7/16/2018 Date: 7/16/2018

Approved Signatory:

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2018-0401Project Number:

P.O. Number:

Project Name: McLevy

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 4:35:29 PM

18028823 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

27A / 18028823-061 12" Fl Tile/ 3rd Fl.

Beige Non-Fibrous

Homogeneous

97% Other 3% Chrysotile

27B / 18028823-062 12" Fl Tile/ 2nd Fl.

Not Analyzed

27C / 18028823-063 12" Fl Tile/ 1st Fl.

Not Analyzed

28A / 18028823-064 Mastic Under Fl. Tile/ 3rd Fl.

Black Non-Fibrous

Homogeneous

4% Cellulose 94% Other 2% Chrysotile

28B / 18028823-065 Mastic Under Fl. Tile/ 2nd Fl.

Not Analyzed

28C / 18028823-066 Mastic Under Fl. Tile/ 1st Fl.

Not Analyzed

Analyst:

Analysis Date: 7/16/2018 Date: 7/16/2018

Approved Signatory:

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2018-0401Project Number:

P.O. Number:

Project Name: McLevy

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 4:35:29 PM

18028823 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

Disclaimer

The final report cannot be reproduced, except in full, without written authorization from SanAir.

Fibers smaller than 5 microns cannot be seen with this method due to scope limitations. The accuracy of the results is dependent upon the client’s sampling procedure and information provided to the laboratory by the client. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample and information provided by the client. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Samples are held for a period of 60 days.

For NY state samples, method EPA 600/M4-82-020 is performed.

Polarized- light microscopy is not consistently reliable in detecting asbestos in floor covering and similar non-friable organically bound materials. Quantitative transmission electron microscopy is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos containing.

Asbestos Certifications NVLAP lab code 200870 City of Philadelphia: ALL-460 PA Department of Environmental Protection Number: 68-05397 California License Number: 2915 Colorado License Number: AL-23143 Connecticut License Number: PH-0105 Massachusetts License Number: AA000222 Maine License Number: LB-0075 New York ELAP lab ID: 11983 Rhode Island License Number: AAL-126 Texas Department of State Health Services License Number: 300440 Commonwealth of Virginia 3333000323 Washington State License Number: C989 West Virginia License Number: LT000566 Vermont License: AL166318

Revision Date: 11/30/2017

APPENDIX B

LBP Laboratory Results

SanAir ID#: 18028824

Project #: 2018-0401

Project Name: McLevy Building

Report Date: 7/16/2018

Analysis Report prepared for Freeman Companies

Dear Matthew Chalifour, We at SanAir would like to thank you for the work you recently submitted. The 12 sample(s) were received on Monday, July 09, 2018 via FedEx. The final report(s) is enclosed for the following sample(s): LP-01, LP-02, LP-03, LP-04, LP-05, LP-06, LP-07, LP-08, LP-09, LP-10, LP-11, LP-12.

These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.

Sincerely, Abisola Kasali Metals Laboratory Director SanAir Technologies Laboratory

Final Report Includes:

- Cover Letter

- Analysis on Test Family AA

- Disclaimers and Additional Information

Sample conditions:

- 12 samples in Good condition.

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2018-0401Project Number:

P.O. Number:

Project Name: McLevy Building

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 12:38:15 PM

18028824 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

Analyst: Laverty, Jaynie

Test Method: SW846/M3050B/7000B

Lead Paint Analysis PAINT µg Pb Sample Size Calculated Sample Sample

Sample Description In Sample (grams) RL Results Results

18028824 - 1 LP-01 1196 0.1048 95.4 11420 1.14 %

Gray Paint On Metal Stairs To Attic µg/g (ppm) By Weight

18028824 - 2 LP-02 30 0.1053 95 281.5 0.03 %

Blk Paint On Wood Doors µg/g (ppm) By Weight

18028824 - 3 LP-03 23 0.1077 92.9 213.2 0.02 %

Off White Paint On Plaster Walls/ 3rd Fl.

µg/g (ppm) By Weight

18028824 - 4 LP-04 59 0.1033 96.8 575.2 0.06 %

Gray Fl. Paint On Concrete Fls.

Vault Rm 3rd Fl.

µg/g (ppm) By Weight

18028824 - 5 LP-05 398 0.1048 95.4 3796 0.38 %

Beige Crown Molding Office 301 µg/g (ppm) By Weight

18028824 - 6 LP-06 9710 0.103 97.1 94280 9.43 %

Beige Ceiling Paint On Plaster Office 301 µg/g (ppm) By Weight

18028824 - 7 LP-07 12690 0.1085 92.2 116900 11.69 %

Blk Stair Banister 2nd Fl. µg/g (ppm) By Weight

18028824 - 8 LP-08 < 10 0.1104 90.6 <90.6 <0.01 %

Paint On Men's Room Door Frame in Basement µg/g (ppm) By Weight

18028824 - 9 LP-09 < 10 0.113 88.5 <88.5 <0.01 %

Paint On Radiator In Basement µg/g (ppm) By Weight

18028824 - 10 LP-10 4018 0.1004 99.6 40020 4.00 %

Paint On Men's Room Stalls In Basement µg/g (ppm) By Weight

18028824 - 11 LP-11 2548 0.1114 89.8 22880 2.29 %

Paint On Brick Walls In Basement µg/g (ppm) By Weight

18028824 - 12 LP-12 2429 0.1044 95.8 23270 2.33 %

Paint On Stair Railings In Basement µg/g (ppm) By Weight

Method Reporting Limit <10 µg/0.1 g paint

Signature:

Date: 7/10/2018 Date: 7/10/2018

Reviewed:

2018-0401Project Number:

P.O. Number:

Project Name: McLevy Building

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 12:38:15 PM

18028824 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2018-0401Project Number:

P.O. Number:

Project Name: McLevy Building

7/5/2018Collected Date:

7/9/2018 9:00:00 AMReceived Date:

7/16/2018 12:38:15 PM

18028824 SanAir ID Number

FINAL REPORT

Freeman CompaniesName:

Address: 36 John Street

Hartford, CT 06106

Revision Date 1/12/2018

Disclaimer

SanAir Technologies Laboratory, Inc. participates in the Environmental Lead Accreditation Program (ELAP) administered by AIHA-LAP, LLC (Lab ID162952). Refer to our accreditation certificate or www.aihaaccreditedlabs.org for an up to date list of the Fields of Testing for which we are accredited. SanAir also participates in the State of New York’s DOH-ELAP (Lab Id 11983), and has met the EPA's NLLAP program standards.

Final reports cannot be reproduced, except in full, without written authorization from SanAir Technologies

Laboratory, Inc. SanAir is not responsible for sample collection or interpretation made by others. This report does not constitute endorsement by AIHA-LAP, LLC and/or any other U.S. governmental agencies; and may not be accredited by every local, state or federal regulatory agency. SanAir Technologies Laboratory, Inc only assures the precision and accuracy of the data it generates and assumes no responsibility for errors or biasing that occur during collection prior to SanAir’s receipt of the sample(s). SanAir’s Method Detection Limits (MDL) and Reporting Limits (RL) have been derived using various materials meeting each accrediting agencies’ standards. All quality control results are acceptable unless otherwise noted. Results are not corrected for blanks.

Lead Exposure Limits

Paint

0.5% by weigh HUD definition of lead based paint

1.0 mg/cm

5000 ppm

APPENDIX C

Licenses and Accreditations

1.0 INTRODUCTION
1.1 Purpose
1.2 Building Description
1.3 Special Terms and Conditions
2.0 ASBESTOS INVESTIGATIVE SURVEY
2.1 General Summary
2.2 Methodology
2.3 Results of Sampling and Analysis for Asbestos
3.0 LEAD-BASED PAINT SCREENING SURVEY
3.1 General Information
3.2 Purpose and Scope of Work
3.3 Methodology
3.4 Testing Methodology
3.5 Lead-Based Standards
3.6 Results of Sampling and Analysis for Lead Paint
4.0 ESTIMATED BUILDING MATERIAL ABATEMENT COSTS
4.1 Asbestos Abatement
4.2 Lead Abatement
4.3 Universal Abatement
5.0 CONCLUSIONS AND RECOMMENDATIONS
5.1 Asbestos
5.2 Lead
6.0 REPORT LIMITATIONS CRITERIA
APPENDIX A
ACM Laboratory Results
APPENDIX B
APPENDIX C

File details come from the government source that posted it. Updated .