AMENDMENT 0004 TO SOLICITATION H9225727QE001

This is Amendment 0004 (effective November 19, 2026) to Request for Quotation (RFQ) H9225727QE001, issued by Marine Corps Special Operations Command (MARSOC), located at Camp Lejeune, North Carolina. The amendment adds Section M provisions regarding evaluation procedures and award factors for the Direct Action Instructor Support requirement at the Marine Corps Raider Training Center (MRTC).

The amendment introduces three key evaluation provisions: authorization for the Government to use approved automated analysis tools to assist with organizing and reviewing proposal information while retaining all final decision-making authority with duly appointed Government personnel; requirements to maintain offeror confidentiality and protect proprietary information and Controlled Unclassified Information consistent with applicable regulations; and detailed evaluation factors for award on a comparative best-value basis under FAR Part 12 simplified acquisition procedures. The evaluation sequence proceeds through Qualifying Criteria (Pass/Fail), Technical Capability, Past Performance, and Price, with Technical Capability and Past Performance weighted as more important than Price. Qualifying criteria include required representations, certifications, CMMC Level 2 (Self) status with current UID(s), SPRS information, cybersecurity documentation, and current Secret Facility Clearance for the prime contractor verified through appropriate Government security channels. Technical Capability subfactors address Staffing/Retention/Key Personnel, Transition and Mission Continuity, Management/Safety/Quality Control/Reporting, and Materials and Ancillary Support, with technical ratings assigned using adjectival scales (Outstanding, Good, Acceptable, Marginal, Unacceptable). Past Performance evaluation considers recency (within five years with at least six months performance) and relevancy to the current Direct Action Instructor Support requirement, with confidence ratings of Substantial, Satisfactory, Neutral, Limited, or No Confidence. Price evaluation includes Total Evaluated Price calculation covering the base period, four 12-month option periods, and a single six-month FAR 52.217-8 extension period, with assessment of mathematical accuracy, completeness, reasonableness, pricing balance, and workforce compensation and retention risk.

View the file

Other files

File Type Posted
Amend 3_H9225727QE0010003 SF 30.pdf PDF
Questions and Answers_13Nov2026.pdf PDF
2_Pricing Template_12Nov2026.xlsx XLSX spreadsheet
3_Draft DD254_12Nov2026.pdf PDF
Questions and Answers_12Nov2026.pdf PDF
4_QASP_12Nov2026.pdf PDF
Amend 2_H9225727QE0010002 SF 30.pdf PDF
1_Direct Action_SOW_12Nov26.pdf PDF
Amend 1_H9225727QE0010001 SF30.pdf PDF
Solicitation - H9225727QE001.pdf PDF
3_Draft DD254_14Oct2026.pdf PDF
5_Question Answer Template_14Oct2026.xlsx XLSX spreadsheet
7_OCI Disclosure Form_14Oct2026.docx DOCX document
2_Pricing Template_14Oct2026.xlsx XLSX spreadsheet
4_QASP_14Oct2026.pdf PDF
6_Teaming Agreement_14Oct2026.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

19 Nov 2026

4. REQUISITION/PURCHASE

REQUISITION NUMBER

5. PROJECT NUMBER (if applicable)

6. ISSUED BY CODE H92257

MARSOC H92257

400 RR (BLDG), RIFLE RANGE ROAD, CAMP LEJEUNE ATTN G4 CONTRACT

SNEADS FERRY, NC 28460-0101

UNITED STATES

Krissia Avelares Valle, Email: krissia.i.avelaresvalle.mil@socom.mil Telephone: 9104400875 Samuel Williams, Email: samuel.williams1@socom.mil Telephone: 9104400773

7. ADMINISTERED BY (if other than Item 6)

CODE

SCD: PAS:

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

CODE: FACILITY CODE:

9A. AMENDMENT OF SOLICITATION NUMBER

H9225727QE001

9B. DATED (SEE ITEM 11)

14 Oct 2026

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; 1 or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required) See Section G - Contract Administration Data

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK

ONE

A.THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Schedule

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Samuel Williams

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

19 Nov 2026

Computer generated. Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA-FAR (48 CFR) 53.243

1.

2.

3.

4.

1.

2.

3.

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to add the following to Section M, all other terms and conditions remain the same: Block 14 (Description of Amendment/Modification):

Use of Automated Analysis Tools in Support of Evaluation

The Government may use approved automated analysis tools to assist Government personnel with organizing, summarizing, and reviewing proposal information. Such tools may assist in identifying solicitation-compliance issues and areas for evaluator review.

Inherently Governmental Functions Notwithstanding the use of automated analysis tools to support the evaluation process, all final evaluation judgments, ratings, source-selection decisions, and award decisions will be made solely by duly appointed Government personnel. The Government retains sole responsibility for inherently governmental functions and will not delegate decision-making authority to an automated analysis tool.

Offeror Confidentiality and Data Protection The Government will use approved automated analysis tools in a manner consistent with applicable requirements for safeguarding proprietary information, source-selection-sensitive information, and Controlled Unclassified Information (CUI).

Evaluation Factors for Award

Header Miscellaneous Text (Modified):

EVALUATION FACTORS FOR AWARD

1.0 General

The Government will evaluate timely quotations in accordance with the evaluation factors described in this section and will make one award to the responsible quoter whose quotation is determined to provide the best value to the Government.

This is a comparative commercial-services evaluation conducted under applicable RFO FAR Part 12 simplified acquisition procedures. The Government will not establish a formal competitive range or conduct a traditional FAR Part 15 source selection.

The Government may award without communications. The Government may communicate with quoters or request clarification of limited aspects of a quotation when determined necessary by the Contracting Officer and consistent with applicable simplified acquisition procedures. Quoters shall not assume that they will have an opportunity to revise their quotation after submission.

The Government will evaluate quotations using the following sequence:

Qualifying Criteria;

Technical Capability;

Past Performance; and Price.

Qualifying Criteria will be evaluated on a Pass/Fail basis. A quotation that fails to satisfy a material qualifying criterion may be eliminated from further consideration.

The remaining evaluation factors are listed in descending order of importance:

Technical Capability;

Past Performance;

Price.

Technical Capability and Past Performance, when considered together, are more important than Price. However, the importance of Price will increase as quotations become more equal under the Technical Capability and Past Performance factors.

The Government will not award to a quotation with an unreasonable price, materially unbalanced pricing, an unacceptable technical rating, or an unacceptable workforce-compensation/retention risk.

1.1.1 Use of Automated Analysis Tools in Support of Evaluation

H9225727QE0010004

3.

4.

5.

6.

7.

1.

2.

3.

4.

1.1.2 The Government may use approved automated analysis tools to assist Government personnel with organizing, summarizing, and reviewing proposal information. Such tools may assist in identifying solicitation-compliance issues and areas for evaluator review.

1.1.3 Inherently Governmental Functions. Notwithstanding the use of automated analysis tools to support the evaluation process, all final evaluation judgments, ratings, source-selection decisions, and award decisions will be made solely by duly appointed Government personnel. The Government retains sole responsibility for inherently governmental functions and will not delegate decision-making authority to an automated analysis tool.

1.1.4 Offeror Confidentiality and Data Protection. The Government will use approved automated analysis tools in a manner consistent with applicable requirements for safeguarding proprietary information, source-selection-sensitive information, and Controlled Unclassified Information (CUI).

2.0 Qualifying Criteria--Pass/Fail

The Government will evaluate Volume I to determine whether the quoter submitted the required administrative, security, cybersecurity, representations, certifications, and other qualifying information identified in Section L.

A quotation may be rated Fail and eliminated from further consideration when the quoter:

Fails to provide required representations, certifications, or solicitation fill-ins;

Takes exception to a material RFQ requirement;

Fails to provide required CMMC, SPRS, or cybersecurity information;

Fails to provide required security or DD254-related information;

Fails to acknowledge a material RFQ amendment; or Otherwise fails to comply with a material qualifying criterion.

The Government will evaluate whether the quoter has provided the required CMMC Level 2 (Self) status, CMMC UID(s), SPRS information, affirmation(s), and other required cybersecurity documentation. Failure to demonstrate a current CMMC Level 2 (Self) status as required by Section L 3.5 will result in a Fail rating under Qualifying Criteria.

Security and Facility Clearance. The Government will evaluate whether the quoter has demonstrated that the prime contractor possesses a current Secret Facility Clearance at the time of quotation submission and has submitted the information required by Section L 3.4.

The Government will verify the quoter's FCL status through appropriate Government security channels using the submitted CAGE code. A current Secret non-possessing FCL satisfies this requirement.

Failure to demonstrate a current Secret FCL at the time of quotation submission, or failure to provide the required FCL representation and CAGE code, will result in a Fail rating under the Qualifying Criteria. A quoter receiving a Fail rating under Qualifying Criteria is ineligible for award.

A Pass rating under Qualifying Criteria means only that the quoter has met the applicable qualifying criteria and is eligible for further consideration. A Pass rating does not establish technical acceptability, responsibility, price reasonableness, or entitlement to award.

3.0 Factor I--Technical Capability

The Government will evaluate the quoter's demonstrated capability to perform the Direct Action Instructor Support requirement in accordance with the Statement of Work.

The Technical Capability factor will be evaluated using the following subfactors, listed in descending order of importance:

Staffing, Retention, and Key Personnel;

Transition and Mission Continuity;

Management, Safety, Quality Control, and Reporting; and Materials and Ancillary Support, if included in the final RFQ.

Subfactors 2 and 3 are approximately equal in importance. Subfactor 4, is less important than Subfactors 1 through 3.

The Government will evaluate the information submitted in Volume II, required key-personnel resumes, qualification cross-reference matrix, and any other relevant information available to the Government.

3.1 Subfactor I--Staffing, Retention, and Key Personnel

3.

4.

5.

6.

7.

8.

1.

2.

3.

4.

5.

6.

7.

8.

1.

2.

3.

4.

5.

6.

7.

8.

The Government will evaluate the quoter's ability to recruit, hire, validate, retain, and replace qualified personnel throughout the period of performance.

The evaluation will consider:

The quoter's access to qualified Direct Action, CQB, combat-marksmanship, range-safety, and tactical-instructor personnel;

The demonstrated process for validating SOW-required personnel qualifications;

The quality and credibility of the quoter's recruiting, retention, and backfill approach;

Historical staffing, retention, time-to-fill, and backfill information for similar work, if provided;

The availability and qualifications of the proposed Direct Action High-Risk Training Instructors;

The extent to which key-personnel resumes and qualification matrices demonstrate compliance with SOW minimum requirements;

The quoter's ability to provide qualified personnel on the first day of performance; and The degree to which the approach reduces risk of vacancies, personnel turnover, qualification shortfalls, or mission disruption.

Failure of a proposed key person to meet a material SOW minimum qualification may result in a deficiency and an Unacceptable technical rating.

3.2 Subfactor II--Transition and Mission Continuity

The Government will evaluate the quoter's transition and day-one execution approach.

The evaluation will consider:

The credibility of the transition plan;

The ability to validate required personnel qualifications, security clearances, and installation-access requirements;

The process for transfer of work control and coordination with Government personnel;

The ability to sustain uninterrupted training operations during transition;

The process for managing staffing gaps, absences, attrition, and unanticipated personnel shortfalls;

The adequacy of identified transition risks and mitigation actions; and The degree to which the approach reduces the risk of interruption to MRTC training operations.

The Government will evaluate the quoter's approach to maintaining uninterrupted performance of all required DAHRTI duties during any period in which an instructor holding a Government-accepted SOF-equivalent qualification is limited to Government-authorized duties pending completion of MIQC and appointment by the MRC Commander.

3.3 Subfactor III--Management, Safety, Quality Control, and Reporting

The Government will evaluate the quoter's management approach for safe, continuous, and compliant performance of the requirement.

The evaluation will consider:

Management structure, authority, accountability, escalation procedures, and communication with Government personnel;

Live-fire, range, shoot-house, tactical-training, and instructor-safety procedures;

Methods for ensuring instructor currency and continued compliance with SOW qualification requirements;

Quality-control processes for identifying, tracking, correcting, and preventing performance problems;

Methods for preparing, validating, and submitting SOW-required reports;

Knowledge-capture and continuity-of-information processes;

Travel-management procedures, including accountability, approval, tracking, and compliance with FAR 31.205-46 and the Joint Travel Regulations; and The ability to manage labor hours and resources within the final SOW and pricing-schedule structure.

3.4 Subfactor IV--Materials and Ancillary Support

The Government will evaluate the quoter's approach to obtaining, managing, tracking, quality-controlling, and timely delivering contractor-furnished materials and ancillary support required by the SOW.

The evaluation will consider supply-chain controls, procurement controls, quality controls, contingency planning, and the degree to which the approach reduces risk to training execution and mission continuity.

4.0 Technical Ratings

The Government will assign an overall Technical Capability rating based on the integrated assessment of the Technical Capability subfactors.

Co lor

Adjectival Rating

Description

Bl ue

Outstandi ng

The quotation demonstrates an exceptional approach and thorough understanding of the requirements. It contains multiple strengths or at least one significant strength, and the risk of unsuccessful performance is low.

Pu rpl e

Good The quotation demonstrates a thorough approach and understanding of the requirements. It contains at least one strength or significant strength, and the risk of unsuccessful performance is low to moderate.

Gr ee n

Acceptab le

The quotation demonstrates an adequate approach and understanding of the requirements. The risk of unsuccessful performance is no greater than moderate.

Ye llo w

Marginal The quotation does not demonstrate an adequate approach or understanding of one or more requirements, and/or the risk of unsuccessful performance is high.

Re d

Unaccept able

The quotation fails to meet one or more material requirements, contains one or more deficiencies, or presents an unacceptable risk of unsuccessful performance. An Unacceptable quotation is ineligible for award.

4.1 Technical Evaluation Definitions

The following definitions apply to the Government's Technical Capability evaluation:

Strength: A feature of the quotation that exceeds a stated requirement or provides a meaningful benefit to the Government during contract performance.

Significant Strength: A feature of the quotation that appreciably exceeds a stated requirement or provides a material benefit to the Government in safety, staffing reliability, transition readiness, mission continuity, or reduced Government oversight.

Weakness: A feature of the quotation that increases the risk of unsuccessful performance.

Significant Weakness: A feature of the quotation that appreciably increases the risk of unsuccessful performance.

Deficiency: A material failure of a quotation to meet a Government requirement, or a combination of significant weaknesses that creates an unacceptable risk of unsuccessful performance.

Risk: The potential for unsuccessful performance, including disruption to training schedules, degradation of training quality, inadequate staffing, safety issues, increased Government oversight, or failure to meet mission requirements.

5.0 Factor II--Past Performance

The Government will evaluate the recency, relevancy, quality, and risk associated with the quoter's past performance.

The Government may consider information submitted by the quoter as well as information obtained from CPARS, FAPIIS, customer references, Government records, and other relevant sources.

The Government will assess whether the quoter's past performance demonstrates a reasonable expectation that the quoter will successfully perform the MRTC Direct Action Instructor Support requirement.

5.1 Recency

Past performance is recent when it was performed in whole or in part during the five years preceding the quotation due date and includes at least six months of performance.

5.2 Relevancy

3.

The Government will assess the similarity of prior work to the current requirement in terms of scope, magnitude, complexity, personnel qualifications, tactical instruction, safety requirements, security environment, staffing, transition, and mission continuity.

Relevancy Rating Description

Very Relevant Present or past performance involved essentially the same scope, magnitude, complexity, and performance risk as the current requirement.

Relevant Present or past performance involved similar scope, magnitude, complexity, and performance risk as the current requirement.

Somewhat Relevant Present or past performance involved some of the scope, magnitude, complexity, or performance risk of the current requirement.

Not Relevant Present or past performance involved little or none of the scope, magnitude, complexity, or performance risk of the current requirement.

5.3 Past Performance Confidence Ratings

Confidence Rating Description

Substantial Confidence

Based on the quoter's recent and relevant performance record, the Government has a high expectation that the quoter will successfully perform the requirement.

Satisfactory Confidence

Based on the quoter's recent and relevant performance record, the Government has a reasonable expectation that the quoter will successfully perform the requirement.

Neutral Confidence

No recent and relevant performance record is available, or the performance record is too limited to support a meaningful confidence assessment.

The quoter will not be evaluated favorably or unfavorably.

Limited Confidence

Based on the quoter's recent and relevant performance record, the Government has a low expectation that the quoter will successfully perform the requirement.

No Confidence Based on the quoter's recent and relevant performance record, the Government has no expectation that the quoter will successfully perform the requirement.

6.0 Factor III--Price

The Government will evaluate Total Evaluated Price by adding the base-period price, the prices for all four 12-month option periods, and the evaluated value of the single six-month FAR 52.217-8 extension period represented by CLINs 5001 through 5005. Evaluation of options and the extension period does not obligate the Government to exercise any option or extension.

The Government will evaluate price for:

Mathematical accuracy;

Completeness;

3.

4.

5.

Reasonableness;

Balance among CLINs, labor categories, and periods of performance; and Workforce-compensation and retention risk.

6.1 Price Reasonableness

The Government will evaluate whether the proposed price is fair and reasonable using one or more price-analysis techniques, including comparison with:

Other quotations;

The Independent Government Cost Estimate;

Historical prices;

Market research;

Labor-market information;

Published commercial pricing, if applicable; and Other relevant price information.

A quotation with an unreasonable price may be ineligible for award.

6.2 Price Balance

The Government will evaluate whether prices are materially unbalanced among labor categories, CLINs, travel, materials, option periods, and the FAR 52.217-8 extension period.

A quotation may be determined unacceptable when it contains materially unbalanced pricing that creates unacceptable risk to the Government.

6.3 Workforce Compensation and Retention Assessment

The Government will evaluate the Total Compensation Plan in accordance with FAR 52.222-46 to assess whether the proposed compensation structure reflects a sound management approach and understanding of contract requirements.

The evaluation will consider the totality of the proposed compensation structure and supporting information, including proposed direct compensation, fringe benefits, compensation relationships among labor categories, recruiting and retention approach, compensation realism, and consistency with the quoter's total compensation plan.

The Government will assess the quoter's ability to recruit and retain qualified professional personnel and provide uninterrupted, high-quality performance. The Government will not apply undisclosed predetermined wage-rate benchmarks as the sole basis for an adverse assessment.

A Total Compensation Plan that is unrealistically low, inadequately supported, internally inconsistent, or otherwise fails to demonstrate the ability to recruit and retain qualified professional personnel may be assessed adversely. Failure to submit a required Total Compensation Plan may render the quotation unacceptable.

7.0 Best-Value Determination

The Contracting Officer will make an integrated comparative assessment of the quotations under the stated evaluation factors.

The Government is not required to select the lowest-priced quotation. The Government may select a higher-priced quotation when the Contracting Officer determines that the quotation's documented technical capability, reduced performance risk, staffing reliability, transition readiness, safety approach, and/or past-performance advantages provide benefits that justify the additional price.

No rating, confidence assessment, or price alone guarantees award.

The award decision will document the basis for selecting the quotation that provides the best value to the Government, including the comparative benefits and risks of the selected quotation and the reasonableness of any associated price premium.

SUMMARY OF CHANGES
Evaluation Factors for Award

File details come from the government source that posted it. Updated .