This document is a Quality Assurance Surveillance Plan (QASP) for the MRTC Direct Action IDIQ contract (H9225727QE001). The QASP establishes the Government's framework for monitoring contractor performance related to Direct Action training instruction, including high-risk training instructors, episodic direct action instructors, and combat marksmanship instructors. The plan applies to staffing, retention, backfill, and transition requirements; instructor qualification, currency, safety, and security compliance; course and lesson-material support; monthly status reports and after-action reports; logistical coordination; and quality-control functions.
The QASP defines 15 performance objectives with specific standards and thresholds monitored through multiple surveillance methods including 100 percent inspection, random sampling, periodic inspection, direct observation, documentation review, customer feedback, and trend analysis. Key performance requirements include maintaining 96 percent qualified personnel availability; achieving 100 percent compliance with security clearances and personnel qualifications; delivering instruction meeting 90 percent of applicable course and safety standards; submitting monthly reports and after-action reports within specified timeframes; ensuring 100 percent safety compliance; maintaining approved key personnel without unauthorized substitutions; and completing corrective actions within established timelines. The Contracting Officer retains authority over contract interpretation and remedies, while the Contracting Officer's Representative (COR) conducts surveillance activities, documents findings, and reports significant nonconformances involving safety, security, qualifications, mission interruption, or fraud concerns. The QASP must be reviewed before award, at performance start, upon task order issuance with unique requirements, when contract documents change materially, and annually during performance, though changes require formal contract modification to create new obligations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 1_H9225727QE0010001 SF30.pdf | ||
| Solicitation - H9225727QE001.pdf | ||
| 2_Pricing Template_14Oct2026.xlsx | XLSX spreadsheet | |
| 3_Draft DD254_14Oct2026.pdf | ||
| 6_Teaming Agreement_14Oct2026.docx | DOCX document | |
| 5_Question Answer Template_14Oct2026.xlsx | XLSX spreadsheet | |
| 7_OCI Disclosure Form_14Oct2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
MRTC DIRECT ACTION IDIQ
1. Purpose This Quality Assurance Surveillance Plan establishes the Government’s approach for monitoring contractor performance under the MRTC Direct Action Instructor Support requirement.
The QASP is intended to ensure that contractor performance conforms to the Statement of Work, task orders, applicable course Programs of Instruction, security requirements, safety requirements, and contract terms and conditions.
This QASP does not create new contract requirements, change the Statement of Work, direct contractor personnel, or authorize the COR to alter contract terms. Only the Contracting Officer may modify the contract.
2. Scope This QASP applies to contractor performance supporting:
• Direct Action High-Risk Training Instructors;
• Episodic Direct Action Instructors;
• Episodic Combat Marksmanship Instructors;
• Staffing, retention, backfill, and transition requirements;
• Instructor qualification, currency, safety, and security requirements;
• Course support, POI support, and logistical coordination;
• Monthly Status Reports;
• After Action Reports;
• Training-resource summaries;
• Travel and materials/ancillary support, if included in the final SOW and CLIN structure;
• Quality-control, reporting, and mission-continuity requirements.
The SOW requires qualified personnel, continuous staffing, transition support, current tactical expertise, course support, reporting, and maintenance of required security clearances.
3. Roles and Responsibilities
3.1 Contracting Officer
The Contracting Officer shall:
• Retain authority to interpret, modify, administer, and enforce the contract;
• Review significant performance issues;
• Determine contractual remedies, if appropriate;
• Approve or disapprove Key Personnel substitutions;
• Coordinate with the COR, requiring activity, security office, and other Government personnel as necessary.
3.2 Contracting Officer’s Representative
The COR shall:
• Conduct surveillance in accordance with this QASP;
• Review contractor deliverables and observe contractor performance;
• Document surveillance results;
• Notify the Contracting Officer of actual or potential nonconforming performance;
• Coordinate with Government technical personnel on performance observations;
• Avoid directing contractor personnel outside the scope of the contract.
3.3 Requiring Activity/Government Technical Personnel
Government technical personnel may provide performance observations, validate course-support requirements, identify mission impacts, and assist the COR with surveillance.
They shall not alter contract requirements or direct contractor performance outside the authority delegated by the Contracting Officer.
3.4 Contractor
The contractor shall:
• Maintain an internal quality-control system;
• Correct identified nonconforming performance;
• Provide qualified, cleared, and available personnel;
• Submit required reports and deliverables;
• Notify the Government of staffing, safety, security, transition, or performance risks;
• Cooperate with surveillance activities.
4. Surveillance Methods The Government may use one or more of the following surveillance methods:
Method Description
100 Percent Inspection
Review of all required deliverables, certifications, reports, or critical performance events.
Random Sampling Review of a representative sample of instructor activities, reports, training events, personnel files, or administrative actions.
Periodic Inspection
Scheduled review conducted monthly, quarterly, before a course, after a course, or at other defined intervals.
Customer Feedback
Input from MRTC instructors, course managers, range personnel, Government technical representatives, and students, where appropriate.
Direct Observation Observation of instructor performance, range safety, course support, staffing, and training execution.
Documentation Review
Review of resumes, qualification records, training certificates, security clearance verification, reports, travel approvals, and other contract records.
Trend Analysis Review of recurring staffing, retention, reporting, safety, or performance issues across surveillance periods.
5. Performance Rating Approach The COR will record each surveillance result as either:
• Conforming: Performance meets the applicable standard and threshold; or
• Nonconforming: Performance does not meet the applicable standard, threshold, or contract requirement.
A single nonconformance does not automatically establish a contractual default.
However, significant, repeated, safety-related, security-related, or mission-impacting nonconforming performance shall be promptly reported to the Contracting Officer.
Performance results will be documented in surveillance records and used to support performance assessments, quality-control discussions, CPARS input, and other contract-administration actions, as appropriate.
6. Performance Requirements Summary
No.
Performance Objective
Performance Standard Threshold Surveillance Method / Frequency
Transition Risk Mitigation Plan
Contractor submits a Transition Risk Mitigation Plan addressing schedule, staffing, performance, and mission-continuity risks before performance begins.
95% submitted on time and materially responsive to SOW requirements.
100% document review before start of performance and upon material revision.
Performance Objective
Performance Standard Threshold Surveillance Method / Frequency
Qualified Staffing and Personnel Availability
Contractor provides and maintains qualified personnel as required by the SOW, task orders, and approved key-personnel requirements.
96% of required qualified personnel are present and available throughout the applicable performance period.
Daily staffing review;
random personnel-file review; monthly trend analysis.
Personnel Qualifications and Currency
Contractor personnel meet applicable SOW qualification, training, instructor-currency, safety, and certification requirements before performing assigned duties.
100% compliance for personnel performing duties requiring stated qualifications, clearances, or certifications.
100% review before initial performance;
random monthly review; review upon substitution.
Security Clearance Compliance
Contractor personnel maintain the clearance level and security requirements specified in the SOW and DD254.
100% compliance before performance and throughout the period of performance.
100% verification before access;
periodic review with security office; review upon personnel change.
Instructor Performance and Subject- Matter Expertise
Contractor instructors deliver instruction in accordance with the SOW, POI, applicable references, safety requirements, and approved training standards.
90% of observed instructor performance meets applicable course, POI, and safety standards.
Direct observation during training events; monthly review of course records; random inspections.
POI and Lesson-Material Support
Contractor provides required support for POI development, lesson materials, course preparation, and training-resource requirements.
90% of reviewed material is accurate, complete, timely, and free of substantive error.
Review as required by TEEP, course schedule, or Government tasking.
Monthly Status Reports
Contractor submits monthly status reports containing required information, including personnel, training accomplishments, work in progress, and identified or anticipated issues.
100% submitted on time and containing required information.
100% document review monthly.
After Action Reports
Contractor submits AARs following each POI, course, or exercise and includes recommendations to improve training effectiveness and efficiency.
90% submitted to the COR within 15 calendar days after the applicable event.
100% document review after each POI, course, or exercise.
Objective
Performance Standard Threshold Surveillance Method / Frequency
Logistical Resource Summaries
Contractor provides required summaries of travel, labor hours, equipment utilization, expendables, and recommendations following courses or exercises.
90% submitted within 15 calendar days after the applicable event.
100% document review after each course or exercise.
Safety and Risk Management
Contractor personnel comply with range, shoot-house, live-fire, deliberate risk-management, time-critical risk-management, and unit safety procedures.
100% compliance with critical safety requirements; no unauthorized or unsafe conduct.
Direct observation during training;
incident review;
review of safety documentation as required.
Key Personnel and On-Site Contractor Lead
Contractor maintains approved Key Personnel and the designated On-Site Contractor Lead.
Substitutions and lead-designation changes comply with the Key Personnel requirement.
100% compliance with approval and notification requirements.
100% review of personnel-substitution and lead-designation actions.
Quality Control and Corrective Action
Contractor identifies, tracks, corrects, and prevents recurring performance deficiencies through its quality-control process.
90% of corrective actions are completed within the contractor’s approved corrective-action timeline or Government-directed timeline.
Monthly review of quality-control records; review following significant nonconformance.
Travel Management
Contractor obtains required approvals, tracks travel, manages travel expenditures, and submits required travel documentation in accordance with the contract, FAR 31.205-46, and the Joint Travel Regulations.
100% of reviewed travel actions have required approval and supporting documentation.
Random sampling monthly; 100% review of questioned or high-risk travel actions.
Materials and Ancillary Support
Contractor provides approved materials or ancillary support within required timeframes and maintains required accountability records.
90% of reviewed material/support actions are timely, properly documented, and conform to contract requirements.
Random sampling;
100% review of high-value or mission-critical purchases.
Annual Sustainment, PII, and Other
Contractor provides required annual sustainment training certifications, PII training
100% compliance by required due dates.
100% document review annually and upon personnel onboarding.
Objective
Performance Standard Threshold Surveillance Method / Frequency
Required Certifications certifications, waivers, or other personnel documentation specified by the SOW.
7. Surveillance Record The COR shall document each surveillance event using a record containing, at a minimum:
Field Required Entry
Contract Number H9225727QE001
Task Order, if applicable [Insert]
Date of Surveillance [Insert]
Location / Course / Event [Insert]
Performance Objective Number [Insert]
Surveillance Method [Insert]
Sample Size or Scope [Insert]
Applicable Standard and Threshold [Insert]
Result Conforming / Nonconforming
Description of Findings [Insert]
Contractor Response, if applicable [Insert]
Corrective Action Required Yes / No
Corrective Action Due Date [Insert]
COR Name and Signature [Insert]
Contracting Officer Notification Required Yes / No
8. Nonconforming Performance Procedures When the COR identifies nonconforming performance, the COR shall:
1. Document the observation;
2. Notify the contractor’s designated representative, as appropriate;
3. Request corrective action within the authority delegated by the Contracting
Officer;
4. Notify the Contracting Officer of significant, repeated, safety-related, security-related, or mission-impacting nonconformance;
5. Track corrective-action status; and
6. Document the final resolution.
The COR shall immediately notify the Contracting Officer of any nonconformance involving:
• Personnel performing without required qualifications or clearance;
• Unsafe live-fire, range, shoot-house, or weapons-handling conduct;
• Failure to provide required personnel creating mission interruption;
• Failure to maintain required Key Personnel;
• Unauthorized substitution of Key Personnel;
• Security incident or safeguarding concern;
• Suspected fraud, waste, abuse, or mischarging;
• Significant travel or materials irregularity; or
• Any event that may require suspension, stop-work action, cure notice, termination, or other contractual remedy.
9. QASP Review and Update This QASP shall be reviewed:
• Before award;
• At the start of performance;
• Upon issuance of a task order containing unique surveillance requirements;
• When the SOW, PRS, QASP, or CLIN structure changes materially; and
• At least annually during contract performance.
Changes to the QASP shall not modify the contract or create new contractor obligations unless incorporated by contract modification executed by the Contracting Officer.