Attachment 3 - Initial Task Order SOW.docx

DOCX document 23 KB Posted

Attached to
Concrete Targets
Solicitation number
H9224023R0012
Issued by

About this file

This statement of work outlines requirements for target support services for the Naval Special Warfare Command. The contractor shall manufacture, transport, place, and remove eight concrete targets per delivery off the coast of San Clemente Island, California. Six deliveries are required between October 2023 and August 2024. The concrete targets shall measure approximately 4x3x3 feet with a wider base for stability, include a rebar lifting eye and four 36-inch pipe protrusions. Each target shall weigh approximately 2,000 pounds. The contractor will be responsible for the personnel, management, materials, equipment, vessel and facilities to complete the deliveries. The initial period of performance is from September 30, 2023 through September 29, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – Initial Task Order SOW

STATEMENT OF WORK (SOW)

FOR TARGET SUPPORT SERVICES

Contract H92240-24-D-TBD Task Order H92240-24-F-TBD

1.0 OBJECTIVES

1.1 The Naval Special Warfare Command (NSWC) requires concrete target manufacturing, transportation, placement, and removal of target debris in support of the NSWC in the waters off the coast of San Clemente Island, CA.

2.0 SCOPE

2.1 The Contractor shall provide the personnel, management, materials, equipment, vessel, and facilities necessary to provide the target manufacturing, transportation, and placement of eight (8) concrete blocks.

3.0 REQUIREMENTS

3.1 The Contractor shall make six (6) deliveries of eight (8) concrete targets debris in accordance with this SOW.

3.2 Concrete target specifications are as follows:

3.3.1. Approximately 4’x 3’ x 3’ with base width dimension wider than the top width for stability.

3.3.2.One (1) re-bar lifting eye.
3.3.3.Four (4) pipe protrusions extending approximately 36” from the top of the clump.

3.3.4. Targets shall weigh approximately 2,000 pounds.

ELIN #
Description
Qty.
Total Price
A001
Manufacture, Deliver, Placement. Retrieval & Disposal 8 Concrete Clumps.

4.0 PLACE OF PERFORMANCE

4.1 The targets shall be delivered off the coast of San Clemente Island, CA.

4.2 Fiscal Year (FY) 24 Delivery Schedule:

18 Oct. 2023

13 Dec 2023
21 Feb 2023
May 2024 (TBD)
June 2024 (TBD)
Aug. 2024 (TBD)

5.0 PERIOD OF PERFORMANCE

5.1 The anticipated period of performance for the initial task order is 30 September 2023 – 29 September 2024.

5.2 The initial delivery is 18 October 2023.

5.3 Government POCs: To be provided upon award.