ATTCH_3_-_First_Task_Order_Requirement_TOR_MFF_Canopy_Control.pdf

PDF 14 KB Posted

Attached to
MFF Canopy Control Instruction Services Federal contract opportunity
Solicitation number
H92240-19-Q-2035
Issued by
United States Special Operations Command

About this file

ATTCH 3 - First Task Order Requirement (TOR) MFF Canopy Control Instruction Services

View the file

Other files for this federal contract opportunity

Other files attached to MFF Canopy Control Instruction Services, newest first.
File Type Posted
ATTCH_1_-_PWS_MFF_Canopy_Control_Final_Rev_1.pdf PDF
Canopy_Control_Questions.docx DOCX document
RFQ_-_Combined_Synopsis_Solicitation_Final.pdf PDF
ATTCH_1_-_PWS_MFF_Canopy_Control_Final.pdf PDF
ATTCH_2_-_Exhibit_Line_Item_Number_(ELIN)_Table.xlsx XLSX spreadsheet
ATTCH_5_-_Parachute_Rigger_Statement.pdf PDF
ATTCH_6_-_OPNAVINST_3501.225C.pdf PDF
ATTCH_4_-_Past_Performance_Information_Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ORDER REQUEST

Naval Special Warfare Command

Military Freefall (MFF) Canopy Control Course of Instruction (COI)

1. SCOPE

1.1 The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform MFF Canopy Control COI as defined in the basic contract Performance Work Statement except for those items otherwise specified in this request.

2. REQUIREMENTS

2.1 The specific requirements for this task order will be in accordance with Performance Work Statement of the basic contract

2.2 Pricing for this Task Order will be in accordance with the following CLIN/ELIN(s) from the basic contract:

CLIN/ELIN Description Period of Performance (POP)

0001/A001 MFF Canopy Control COI (5 days, 10 students)

27-31 May 2019

0001/A001 MFF Canopy Control COI (5 days, 10 students)

3-7 June 2019

3. GOVERNMENT FURNISHED PROPERTY/EQUIPMENT/INFORMATION (GFP/GFE/GFI)

N/A

4. TASK ORDER PERIOD OF PERFORMANCE

4.1 The periods of performance are as follows:

4.1.1 27-31 MAY2019

4.1.2 3-7 JUNE 2019

5. PLACE OF PERFORMANCE

5.1 The place of performance is the contractor’s facility.

File details come from the government source that posted it.