ADDENDA_01_-_PERFORMANCE_WORK_STATEMENT.pdf

PDF 59 KB Posted

Attached to
VIDEO PRODUCTION - SERVICES Federal contract opportunity
Solicitation number
H92240-17-Q-1065
Issued by
United States Special Operations Command

About this file

Addenda 01 - Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to VIDEO PRODUCTION - SERVICES, newest first.
File Type Posted
REVISED_ADDENDA_01.pdf PDF
Video_Production_Contract_-_Questions_and_Responses_H92240-17-Q-1065.pdf PDF
DD254_Security_Classification_-_Video_Production_-_13SEP2017.pdf PDF
ADDENDA_04_-_SCA_-_WAGE_DETERMINATION.pdf PDF
FBO_INPUT.pdf PDF
ADDENDA_03_-_APPLICABLE_PROVISIONS.pdf PDF
ADDENDA_02-_CLIN_PRICING.xlsx XLSX spreadsheet
COMBINED_SOLICITATION_SYNOPSIS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver: August 2017

Performance Work Statement Naval Special Warfare Command

NSWCEN Training Video Production

1. BACKGROUND

1.1 As part of the N32 Training Innovation initiative, the Curriculum Systems Division is developing a digital media pipeline to support Naval Special Warfare (NSW) training. The Naval Special Warfare Center (NSWCEN) requires the use of Independent Video Production Contractors to produce the training films that will populate the NSWCEN digital training pipelines (e.g., instructional media made available to NSW students and Instructors during training).

2. OBJECTIVES

2.1 The objective of this requirement is to produce six training videos that will be made available to staff and students through a digital pipeline. This first round of six (6) training videos will be implemented within the Special Warfare Combatant-Craft Crewman (SWCC) schoolhouse, and will then be used as a ‘proof-of-concept’ model to be replicated throughout other areas of the command.

3. SCOPE

3.1 The Contractor shall provide the personnel, management, materials, equipment and facilities (not otherwise provided by the Government) necessary to: Plan, produce, edit, and compress final video files for any pipeline viewing application (must be rendered to play properly on all online, offline, disc, hard-drive, tablet, local or remote, network or standalone system). All applicable versions will be delivered in the required format (e.g., QuickTime Video, WAV audio files, MP4, DVD, BluRay, etc.)

for each project. Deliverables will be the final video cut (finished product should not require any additional changes) made available for immediate staff/student viewing.

3.2 Rights to Materials Produced and Delivered under the Contract. The Government will have unlimited rights to rights to use, modify, reproduce, perform, display, release, or distribute in whole or in part, within any timeframe, and for any purpose all work product crafted, produced, or delivered under this contract. Material delivered becomes the property of Naval Special Warfare and the US Government.

The Contractor shall not release or share with any third party any material created, produced under this contract without explicit authorization from Naval Special Warfare.

4. REQUIREMENTS

4.1 The contractor shall work under the Government Technical POC’s guidance throughout the duration of the contract, staying on script and under budget. All final creative decisions (AKA: ‘final cut’) will reside with the Government Technical POC.

4.2 The contractor shall work within curriculum guidelines, NSW staff availability, location availability, script requirements, and budgetary constraints to complete the following tasks as required for each project: pre-production documentation (script, storyboards, shot list, shooting schedule), on-location video production, studio recording time, post production editing and sound work, graphic design/visual effect elements, and quality assurance on final edits.

4.3 The Contractor shall develop the following training videos:

4.3.1 O' Course: Contractors shall format this legacy video to current audio/video specifications. With principle photography and post production already complete, this project requires minor updates to meet to new digital pipeline format requirements.

Existing video and audio files will be reviewed in new streaming formats to ensure accurate playback.

4.3.2 Heavy Weapons: Contractors shall reshoot portions of this legacy video to cover updates to current weapon systems and operational techniques. Existing video and audio files will be reviewed in new streaming formats to ensure accurate playback.

4.3.3 NSW Lifesaving: Contractors shall provide principle photography and post-production services as required to shoot and edit a completed training video. Some principle footage already exists, requiring contractors to download media files into their own editing suites.

Final video and audio files will be reviewed in new streaming formats to ensure accurate playback.

4.3.4 Navigation/Plotting: Contractors shall provide pre-production, principle photography and post-production services as required to shoot and edit a completed training video. Final video and audio files will be reviewed in new streaming formats to ensure accurate playback.

4.3.5 SWCC Craft Movement/Signaling: Contractors shall provide pre-production, principle photography and post-production services as required to shoot and edit a completed training video. Final video and audio files will be reviewed in new streaming formats to ensure accurate playback.

4.3.6 SWCC Instructional Digital Video Library: Contractors shall provide pre-production, principle photography and post-production services as required to shoot and edit a completed training video. Final video and audio files will be reviewed in new streaming formats to ensure accurate playback.

4.4 Training videos will be shot in High Definition Resolution or higher. Final videos will be delivered in the required format (i.e.; QuickTime Video, WAV audio files, MP4, DVD, BluRay, etc.) for each project.

4.5 The Contractor shall have the following production experience:

4.5.1 Operational experience with Canon, Sony, Panasonic, JVC, and RED cameras, on-location sound equipment, voice-over recording, and animation/visual FX software.

Vendors must be approved by technical POC.

4.6 Participate in a Post-Award Conference.

4.6.1 This meeting shall provide an introduction between the Contractor personnel and

Government personnel who will be involved with the contract. The meeting shall provide the opportunity to discuss technical, management and security issues. The Post Award Conference will aid both the Government and Contractor in achieving a clear and mutual understanding of all requirements, and identify and resolve any potential issues. The Contractor shall be prepared to discuss any items requiring clarification and gather information as necessary to support each deliverable. Contractor shall participate in a pre-award conference no later than twenty (20) days after issuance of award.

5. DELIVERABLES

5.1 Contractors will submit a finalized script, shot list, and story boards for approval prior to the start of filming. These documents will provide a preliminary look at the visual elements of production, allowing for final notes from NSW personnel to be considered prior to filming.

5.2 Contractors will submit the final video cut (finished product should not require any additional changes) made available for immediate staff/student viewing. The dates for each delivery are approximate, based on training schedules that are constantly flexing. Each project will be produced by the contractor while under guidance of the Government Technical POC. If training priorities shift, project deadlines will be adjusted to meet new requirements. All initial videos will be completed within a year of the post award conference.

Description Contract

Line Item Number

PWS

Ref.

Delivery Date

O’ Course Video 0001 4.3.1 2 months after award Heavy Weapons Video

0002 4.3.2 4 months after award

NSW Lifesaving Video 0003 4.3.3 4 months after award

Navigation/Plotting Video 0004 4.3.4 8 months after award

SWCC Craft Movement / Signaling Video

0005 4.3.5 10 months after award

Description Contract Line Item Number

PWS

Ref.

Delivery Date

SWCC Instructional Digital Video Library

0006 4.3.6 12 months after award

6. CONTRACTOR MANPOWER REPORTING:

6.1 The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Naval Special Warfare Center – Curriculum Systems Division (technical POC) via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30.

While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil.

7. CONTRACTOR TRAVEL:

7.1 In addition to the Post-Award Conference, Contractor travel is authorized for one trip to each new production location (see locations listed in section 14) to film all required training evolutions. All other communication and transfer of materials will be completed digitally whenever possible.

7.2 Contractor costs for Government authorized travel are included in this contract. All travel shall be in accordance with FAR 31.205-46 and applicable travel regulations (Joint, Federal or Standardized).

Contractor payment claims shall include applicable documentation to support actual costs incurred (e.g.

airfare and hotel/lodging receipts) as well as any receipts valued at or above $75.00. Failure to provide appropriate documentation may result in loss of reimbursement of travel expenses.

8. SECURITY:

8.1 Security will be in accordance with the attached DD254. Contractor team individual(s) supporting this task will be cleared at the Secret level at the start of the task. Contractor and Sub-contractors will be authorized to courier classified information up to the “Secret” level in performance of official duties upon approval of and designation by the COR.

8.2 The Contractor shall insure requirements for safeguarding classified information and classified materials, for obtaining and verifying personnel security clearances, for verifying security clearances and indoctrination of visitors, for controlling access to restricted areas, for protecting government property, and for the security of automated and non-automated management information systems and data are fulfilled. The contractor's management system shall prevent unauthorized disclosure of classified and sensitive unclassified information. The government shall be immediately notified if any security incident or any indication of a potential unauthorized disclosure or compromise of classified or sensitive unclassified information.

8.3 The Contractor shall provide security management support. Typical efforts include, but are not limited to, performing classified document control functions, classified materials inventories, program access requests, preparing and monitoring personnel indoctrination and debriefing agreements, and maintaining and using security-related databases.

8.4 Contractor shall establish appropriate administrative, technical, and physical safeguards to protect any and all nonpublic Government data to ensure the confidentiality, integrity, and availability of Government data.

8.5 All Contractor personnel are required to be citizens of the United States.

8.6 Contractor must be able to obtain personnel and vehicle access to military installations. Contractor is responsible for coordinating all necessary access through the local Military Pass and Decal Office.

http://www.ecmra.mil/ http://www.ecmra.mil/

9. SAFETY:

9.1 Safety requirements must be in place during the filming of all NSW high-risk training evolutions.

Contractors will remain under constant guidance of NSW instructor staff or technical POC during all filming. Safety briefs will be provided by staff at the start of each new video shoot. Local safety instructions and guidance must be adhered to at all times.

9.2 If government provided weapons and ammunition are used at a contractor’s facility, the contractor must be able to provide approved weapon and ammunition storage facilities.

9.3 Risk Controls

9.3.1 All high-risk training is categorized as High Risk in accordance with

COMNAVSPECWARCOMINST 1500.1. As such, an Operational Risk Assessment and the implementation of risk controls are required for all training events.

9.4 Mishaps

9.4.1 The Government process must be in place that will ensure any mishaps are reported, investigated and recorded. This information will be input into the Web Enabled Safety System (WESS) by the Government.

9.4.2 Safety and training related problems or mishaps involving or observed by the contractor shall be addressed immediately to the designated RSO or ROIC. A formal written report shall be prepared and submitted to the Safety Officer within 2 working days of the incident

10. GOVERNMENT FURNISHED PROPERTY/EQUIPMENT/INFORMATION (GFP/GFE/GFI):

10.1 Contractors will generally provide their own equipment for filming evolutions, however some government property may be used to assist production when necessary. Technical POC should be consulted prior to any NSW equipment being used for filming. Contractors will use their own hardware and software for the editing, sound work, and digital graphics/animation portions of each project.

11. QUALITY CONTROL:

11.1 The contractor shall implement and maintain a Quality Control Plan (QCP) to ensure work performed conforms to the scope of work and meets the requirements under this PWS. The QCP shall, at a minimum provide a method for performing inspections; identifying, correcting and preventing problems/defective service; addressing customer complaints, and improving the quality of services over the life of the contract.

12. QUALITY ASSURANCE:

12.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner. The Government will assign a Contracting Officer’s Representative (COR) who will be responsible for monitoring performance in accordance with the requirements of the PWS. The COR will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.

12.2 Contract Discrepancy Report (CDR). In the event of unsatisfactory contractor performance, the CO will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the contractor's corrective action response to determine acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.

13. APPLICABLE DOCUMENTS:

Document Web link (if applicable)

COMNAVSPECWARCOMINST 1500.1

High Risk Training Safety Program

Available upon request

COMNAVSPECWARCOMINST 5100.1F

NSWC Safety and Occupational Health Program

Available upon request

OPNAVINST 3104.3A https://fas.org/irp/doddir/navy/opnavinst/3104 _3a.pdf

14. PLACE OF PERFORMANCE

14.1 Filming will be conducted in various locations around the San Diego area to include but not limited to: NAB Coronado; Pacific SOCAL OP Area; San Diego Bay; Mission Bay; Pacific Ocean; Point Loma; La Posta; Niland (Imperial County); San Clemente Island; Camp Pendleton and Advanced Training Center, Imperial Beach, CA.

15. PERIOD OF PERFORMANCE

15.1 Period of performance will be one year.

16. ESTIMATED LEVEL OF EFFORT

16.1 The below estimated level of effort is provided to assist in submission of quotes. The Government anticipates labor skills from the following labor categories may be required in performance of above described tasking: Director, Producer, Screenwriter, Storyboard Artist, Cinematographer, Camera Operator, Editor, Graphic Designer and Digital Visual Effects Artist.

16.2 LEVEL OF EFFORT: 2,732 Total Hours

16.2 Planning/Needs Analysis = 63 hrs. total

16.2.1 Client Consultation – 24 hrs.

16.2.2 Defining Requirements – 12 hrs.

16.2.3 Gap Analysis – 18 hrs.

16.2.4 Project Scope Determination – 9 hrs.

16.3 Pre-Production = 396 hrs. total

16.3.1 Site Survey – 16 hrs.

16.3.2 Curriculum/Training documentation Review – 24 hrs.

16.3.4 Storyboarding – 180 hrs.

16.3.5 Script Development – 140 hrs.

16.3.6 Shot List – 24 hrs.

16.3.7 Scheduling – 12 hrs.

16.4 Production = 1,010 hrs. total

16.4.1 Principle Photography

16.4.1.1 O-Course – 24 hrs.

16.4.1.2 Heavy Weapons – 32 hrs.

16.4.1.3 NSW Lifesaving – 120 hrs.

16.4.1.4 Navigation/Plotting – 160 hrs.

16.4.1.5 SWCC Craft Movement/Signaling – 180 hrs.

16.4.1.6 SWCC Instructional Video Library – 76 hrs. (BCT), 22 hrs. (Pre-CQT), 396 hrs.

(CQT) = 494 total hours

16.5 Post Production = 1,263 hrs. total

16.5.1 Footage Transfer – 18 hrs.

16.5.2 Digital Capture – 25 hrs.

16.5.3 Video Editing – 380 hrs.

16.5.4 Audio Editing – 420 hrs.

16.5.5 Voice-Over Recording – 120 hrs.

16.5.6 Audio Sweetening – 48 hrs.

16.5.7 CGI Modeling/Animation/Motion – 160 hrs.

https://fas.org/irp/doddir/navy/opnavinst/3104_3a.pdf https://fas.org/irp/doddir/navy/opnavinst/3104_3a.pdf

16.5.8 Graphics, Labels, Digital Design – 80 hrs.

16.5.9 Digital Compression – 12 hrs.

4. REQUIREMENTS
4.6 Participate in a Post-Award Conference.
4.6.1 This meeting shall provide an introduction between the Contractor personnel and Government personnel who will be involved with the contract. The meeting shall provide the opportunity to discuss technical, management and security issues. The Pos...

File details come from the government source that posted it. Updated .