PWS_Knee_Mill_2_Aug_16.pdf

PDF 202 KB Posted

Attached to
CNC Knee Mill Controller, Installation and Training
Solicitation number
H92240-16-T-0090
Issued by

About this file

Performance Work Statement dated 2 Aug 2016

View the file

Other files

File Type Posted
H92240-16-T-0090_Revised.docx DOCX document
H92240-16-T-0090.docx DOCX document
SWD_15-4341.txt TXT text file
Product_Description_CNC_Knee_Mill_Controller_2_Aug_2016.pdf PDF
H92240-16-T-0090_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Naval Special Warfare Command

Installation and Training for CNC Controls for U.S. Government Military Vehicles Knee Mill.

02 Aug 16

1. BACKGROUND

1.1 With the purchase of a CNC Knee Mill controller installation and training will be required.

2. OBJECTIVES

To have a CNC Knee Mill controller installed in the U.S. government designated facility & have operational training provided to four government personnel on CNC Knee Mill.

3. SCOPE The Contractor shall provide the personnel, management and materials necessary to….

3.1 Provide one time installation of CNC control kit with training provided to four personnel on the safe and proper use of the CNC control’s and all hardware associated with the Knee Mill.

4. REQUIREMENTS

4.1 The contractor shall install all hardware and software provided in CNC control kit.

Upon completion of installation shall provide basic system training to include material set up, tool set up and use of CNC CAD program and interface.

4.1.1 Course requirements are:

CNC set up.

CNC operation.

CAD set up and operation.

4.1.2 Develop & provide course schedules.

4.1.3 Develop & provide training plans.

4.2 Participate in a Post-Award Conference.

4.2.1 This meeting shall provide an introduction between the Contractor personnel and Government personnel who will be involved with the contract. The meeting shall provide the opportunity to discuss technical, management and security issues. The Post Award Conference will aid both the Government and Contractor in achieving a clear and mutual understanding of all requirements, and identify and resolve any potential issues. The Contractor shall be prepared to discuss any items requiring clarification and gather information as necessary to support each deliverable. The Contractor shall provide a written summary of the Post-

Award Conference (CDRL A003).

5. DELIVERABLES

Deliverable CDRL PWS Ref. Delivery Date

Training Schedule A001 4.1.2 5 days after contract award

Training Plan A002 4.1.3 5 days after contract award

Post Award Conference

Minutes

A003 4.2.1 1 work day after post award conference

6. SECURITY

6.1 Contractor shall establish appropriate administrative, technical, and physical safeguards to protect any and all nonpublic Government data to ensure the confidentiality, integrity, and availability of Government data.

6.2 Contractor must be able to obtain personnel and vehicle access to military installations. Contractor is responsible for coordinating all necessary access through the local Military Pass and Decal Office.

7. GOVERNMENT FURNISHED PROPERTY/EQUIPMENT/INFORMATION

(GFP/GFE/GFI)

7.1 The Government will provide computers, desks and facilities to support training requirements. Contractor to get in contact with Mark Anizan to set up date and time of training.

8. QUALITY ASSURANCE

8.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.

8.2 Contract Discrepancy Report (CDR). In the event of unsatisfactory contractor performance, the CO will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the contractor's corrective action response to determine acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.

9. APPLICABLE DOCUMENTS

Document Web link

DoDI 8500.2, Information Assurance (IA)

Implementation http://www.dtic.mil/whs/directives/corres/pdf/850002 p.pdf

DoDI 8510.01, DoD Information

Assurance Certification and Accreditation

Process (DIACAP), http://www.dtic.mil/whs/directives/corres/pdf/851001 p.pdf

10. PLACE OF PERFORMANCE

10.1 Training shall be conducted at Building 3897 JEB Little Creek-Fort Story.

11. PERIOD OF PERFORMANCE

11.1 Contractor will propose time frame for installation and training.

http://www.dtic.mil/whs/directives/corres/pdf/850002p.pdf http://www.dtic.mil/whs/directives/corres/pdf/850002p.pdf http://www.dtic.mil/whs/directives/corres/pdf/851001p.pdf http://www.dtic.mil/whs/directives/corres/pdf/851001p.pdf

File details come from the government source that posted it. Updated .