PWS_Technical_Exhibit_Attachments.doc

DOC document 39 KB Posted

Attached to
GULF COAST NSW 11 Meter Rigid Inflatable Boat (RIB) maintenance, sustainment, repair, and upgrade services
Solicitation number
H92240-16-T-0049
Issued by

About this file

PWS Technical Exhibits

View the file

Other files

File Type Posted
H92240-16-T-0049-02.docx DOCX document
Questions_and_Answers.docx DOCX document
H92240-16-T-0049-01.docx DOCX document
Attachment_III_-_ELIN_Structure.xlsx XLSX spreadsheet
H92240-16-T-0049.docx DOCX document
Attachment_II_-_Work_Items.docx DOCX document
Attachment_V_-_QASP_ _Matrix.doc DOC document
Attachment_VI_-_Past_Performance_Information_Form_(RBEC).doc DOC document
Attachment_I_-_Performance_Work_Statement_(PWS).docx DOCX document
Attachment_IV_-_Wage_Determination.docx DOCX document
Attachment_VII_-_Past_Performance_Report_Form_(RBEC).doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to the required services of the Performance Work Statement (PWS) items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard
Performance Threshold
Method of Surveillance

PRS # 1.

The contractor shall complete up to four (4) 11M RIBs concurrently in the allotted time frames as specified in the PWS.

PWS 5.0

Contractor will be in violation of performance standard if unable to complete up to four (4) 11M RIBs concurrently in the allotted time frames as specified in the PWS. Upon notice of a validated violation, Contractor shall immediately correct or establish acceptable corrective action plans within five working days.
Validated Customer Complaint received by COR.

PRS # 2

Contractor shall ensure that on completion of all work in attachment 2 work categories, BP, ME, and BC, the craft and bilges are free from debris, oil, and other detritus.

PWS 6.1
Contractor will be in violation of performance standard if unable to ensure that on completion of all work in Attachment 2 work categories, BP, ME, and BC, the craft and bilges are free from debris, oil, and other detritus.. Upon notice of a validated violation, Contractor shall immediately correct or establish acceptable corrective action plans within five working days.
Validated Customer Complaint received by COR.

PRS # 3

Contractor shall provide required hard copy and electronic reports, with specified information on parts used, clearances, etc.

PWS 9.2
Contractor will be in violation of performance standard if required reports are not received on more than 5% of work completed within one week. Upon notice of a validated violation, Contractor shall immediately correct or establish acceptable corrective action plans within five working days.
Validated Customer Complaint received by COR.

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable
Frequency
# of Copies
Medium/Format
Submit To
Hard copy of work accomplished, parts used, and inspection reports (if applicable) as specified in PWS section 9.2.
Hard copy will be delivered within one week of craft acceptance by the SBT.

One copy.

Hard copy.

COR.

Electronic copy of work accomplished, parts used, and inspection reports (if applicable) as specified in PWS section 9.2.
Electronic copy will be sent within one week of craft acceptance by the SBT.
One electronic copy will be forward to multiple email addresses.
Electronic copy will be in Excel format.
COR and the NSWG-4 Deputy Engineer. COR will provide current email addresses.

File details come from the government source that posted it. Updated .