Attachment_9_-_PWS_NSW_IESS_Modernization_-_Final.docx

DOCX document 33 KB Posted

Attached to
Enterprise Integrated Electronic Security System
Solicitation number
H92240-15-T-0081
Issued by

About this file

Attachment 9 - PWS NSW IESS Modernization - Final

View the file

Other files

File Type Posted
Amendment_0002.doc DOC document
Questions_ _Answers_14_Aug.docx DOCX document
Attachment_4_-_Price_List_v2.xlsx XLSX spreadsheet
Attachment_2_-_Past_Performance_Information_Form.doc DOC document
H92240-15-T-0081_Amendment_0001.pdf PDF
H92240-15-T-0081_Final.pdf PDF
Attachment_3_-_Past_Performance_Report_Form.doc DOC document
Attachment_11_-_Wage_Determination_San_Diego.PDF PDF
Attachment_4_-_Price_List_11_Aug.xlsx XLSX spreadsheet
Attachment_7_-_DD254_IESS.doc DOC document
Attachment_5_-__QASP_NSW_IESS_Support.doc DOC document
Attachment_10_-_Wage_Determination_VA.PDF PDF
Attachment_13_-_Wage_Determination_Stennis.PDF PDF
Attachment_8_-_NSW_IESS_Equipment_11_Aug.xlsx XLSX spreadsheet
Attachment_1_-_PWS_NSW_IESS_Support_-_Final.docx DOCX document
Attachment_6_-__QASP_Matrix_NSW_IESS_Support.doc DOC document
Questions_ _Answers_11_Aug_v2.docx DOCX document
Attachment_12_-_Wage_Determination_Homestead.PDF PDF
Attachment_14_-_Wage_Determination_Hawaii.PDF PDF
Questions_ _Answers_11_Aug_afternoon.docx DOCX document
H92240-15-T-0081_11_Aug.doc DOC document
Attachment_9_(Rev_1.0)_-_PWS_NSW_IESS_Modernization_(Revised).docx DOCX document
Attachment_13_-_Wage_Determination_Stennis.PDF PDF
Attachment_11_-_Wage_Determination_San_Diego.PDF PDF
Attachment_12_-_Wage_Determination_Homestead.PDF PDF
Questions_ _Answers.docx DOCX document
Attachment_1_-_PWS_NSW_IESS_Support_-_KMW_MOD_10_AUGUST.docx DOCX document
Attachment_14_-_Wage_Determination_Hawaii.PDF PDF
Attachment_10_-_Wage_Determination.PDF PDF
Attachment_4_-_Price_List.xlsx XLSX spreadsheet
H92240-15-T-0081_30_July.doc DOC document
Attachment_2_-_Past_Performance_Information_Form.doc DOC document
Attachment_7_-_DD254_IESS.doc DOC document
Attachment_5_-__QASP_NSW_IESS_Support.doc DOC document
Attachment_3_-_Past_Performance_Report_Form.doc DOC document
Attachment_6_-__QASP_Matrix_NSW_IESS_Support.doc DOC document
West_Coast_IESS_Agenda_11-12_JUNE_15_(REV_1).docx DOCX document
NSW_East-West_Coast_IESS_Equipment_List_-_Count.docx DOCX document
East_Coast_IESS_Agenda_8-9_JUN_15_(REV_1).docx DOCX document
Questions_v2_29_May.docx DOCX document
Questions_26_May.docx DOCX document
REQUEST_FOR_INFORMATION_-_NSW_Attachment_to_Interested_Parties_-_Final.docx DOCX document
NDA.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

NAVAL SPECIAL WARFARE COMMAND

INTEGRATED ELECTRONIC SECURITY SYSTEM (IESS)

MODERNIZATION

1.0 INTRODUCTION

Naval Special Warfare Command (NAVSPECWARCOM) Force Programs Office is responsible for the physical security and force protection of personnel assigned to its headquarters command and subordinate activities. General physical security is enabled by Access Control Systems (ACS), Close-circuit televisions (CCTV), and Intrusion Detection Systems (IDS). Collectively, these systems form an integrated electronic security system (IESS) capability designed to detect unauthorized intrusion into secured areas and control access of personnel buildings and interior spaces.

There is an immediate need to replace certain failing components of NSW IESS systems. Specifically, the Contractor shall replace failing or outdated ACS, CCTV, and IDS equipment at Naval Special Warfare Group Three (NSWG-3), Naval Special Warfare Group Four (NSWG-4), and Naval Special Warfare Group 10 (NSWG-10) facilities located in Little Creek, VA.

2.0 OBJECTIVE

Produce a modernization plan for NSW IESS systems at designated locations that removes and replaces failing or outdated ACS, CCTV, and IDS hardware components supporting intrusion detection, building access control, and video monitoring capabilities. The plan may include upgrading related software on servers and clients to current industry releases. The Contractor shall ensure hardware and software components conform to and support the overall enterprise plan and shall include integration and end-user testing in the plan to ensure full IESS compatibility and functionality. Upon Government approval, the contractor shall execute the plan.

3.0SCOPE
3.1NSW requires initial modernization services to upgrade or replace hardware or software that is broken beyond repair or outdated and no longer supportable. The Contractor shall provide the personnel, materials, and equipment (not otherwise provided by the Government) necessary to replace and/or upgrade IESS components at NSWG-4 and NSW-10 located at Little Creek, VA.
3.2The current Access Control System (ACS) at NSWG-4 operates using a proprietary software program called Picture Perfect which controls access functions for doors and gates to the entire compound. The ACS includes access control servers where the picture perfect software program is installed, a main Intelligent System Controller (ISC) panel, door control panels, and door card readers. The CCTV system includes a Digital Video Recorder (DVR), Video Channel expanders, Video Workstation Expansion Units, CCTV Keyboard expansion Units, Video decoders, 27” Full HD LED Monitors, Network Video Recorders (NVR), application servers, KVM console switches, IP Dome day/night cameras, Modular High Performance Video Encoders, Video Encoder Power Supply Units, Digital Keyboard w/ LCD Display Units, Digital Keyboard Power Supply Units, Ethernet Switches, and Port Switches. The CCTV system operates using Bosch VIDOS video management system with Bosch components. The Government anticipates the following components being replaced: access control server, door card readers, DVR servers, DVR control stations, DVRs/NVRs, CCTV Expansion Units, Video Expanders and Decoders, Console Switches, Power Units, CCTV cameras, and CCTV monitors.
3.3The current Access Control System (ACS) at NSWG-10/SRT-2 operates using a proprietary software program called Access 3000 which controls access functions for doors, gates, and turnstiles to the entire compound. The ACS includes an access control software is installed into a desktop computer which serves as their server, a main Intelligent System Controller (ISC) panel, door control panels, gate, turnstile, and door card readers. The CCTV system includes a Digital Video Recorder (DVR), Video Channel expanders, Video Workstations, CCTV Keyboard unit, Video decoders, LED/LCD Monitors, Network Video Recorders (NVR), application servers, KVM console switches, Dome (fixed/PTZ) day/night cameras Video encoders and supply units, Ethernet/Port switches. There are two (2) CCTV systems currently operating which cover the buildings and compound. These CCTV systems are the Verint Edge VR-200 system and the Interlogix with VID Center utilizing the DVR Tru Vision TVR 11.
3.4The Contractor shall ensure that replace and/or upgraded components are interoperable and compatible with existing components. Work shall be accomplished without loss of existing data. The Contractor’s Modernization Plan shall, at a minimum, identify failing IESS components; propose replacement equipment (manufacturer, make, model, and quantity); recommend any related equipment or infrastructure upgrades; include a project schedule describing tasks and timelines for work completion; identify regulatory requirements related to the effort; document how integration and acceptance testing will be performed; and specify labor and material warranty periods.
3.5The Contractor shall perform the following related actions in support of this effort:
3.5.1Hardware / Software:
3.5.1.1Upgrade or replace existing access IESS equipment per plan.
3.5.1.2Upgrade or replace related infrastructure such as system racks, camera and TV mounts, wiring and connectors, hubs and ports, power supplies, and other miscellaneous materials.
3.5.1.3Upgrade or replace related software systems as necessary.
3.5.1.4Migrate data from existing database to new system without loss of information.
3.5.2Integration / Testing:
3.5.2.1Integrate replacement hardware and software with existing IESS systems.
3.5.2.2Ensure all cabling and device connections are labeled.
3.5.2.3Provide functional testing for upgraded IESS systems.
3.5.2.4Provide user testing of upgraded IESS systems.
3.5.2.5Provide backup and fail-over testing of upgraded IESS systems.
3.5.3Configuration Management:
3.5.3.1Configuration Management Equipment List: The contractor shall document all equipment changes as a result of this modernization effort. Documentation shall include as a minimum: equipment name, Make, Model, Manufacturer, serial number if applicable, location physically installed, door or area supported, alarm modes, associated (linked) equipment, and capability information (for example, resolution and aperture of a camera, or mounting type and field-of-view for a PIR). The contractor shall record system software, software versions, software license information, and system and security patches as part of configuration records. This information may be stored in the integrated security system rather than a separate electronic tool, but must be able to be easily retrieved and saved in electronic (PDF or XLS) format (i.e., a full reporting function must exist). CM equipment lists shall be provided not more than 15 calendar days following the completion of this task.
3.5.3.2Configuration Management Drawings: The contractor shall update as-built drawings of the security system updates as a result of this modernization effort. Project and facility drawing documentation shall be maintained in AutoCAD .dwg format. As-builts drawings shall include, at a minimum, equipment type, location, and label data. CM drawings shall be provided not more than 15 calendar days following the completion of this task. Drawings are controlled items and shall be managed for configuration management and program sustainability.
3.5.3.3The contractor shall deliver technical documentation related to this modernization effort not more than 15 calendar days following the completion of this task.
4.0GOVERNMENT FURNISHED INFORMATION

The Government will provide the Contractor with a list of existing IESS components. The Government shall provide a list of contacts for technical information on existing systems, access to general and restricted areas, and questions.

5.0GOVERNMENT FURNISHED MATERIAL/EQUIPMENT
5.1Existing IESS system components not designated for upgrade/replacement are considered GFE.
5.2The government does not anticipate purchasing or providing any material or equipment for this task order.

5.3 The government will dispose of non-repairable or non-reusable equipment in accordance with local policies and procedures.

6.0 GOVERNMENT FURNISHED TRANSPORTATION

Work under this Task Order will be accomplished in the Little Creek, VA area. The government does not anticipate any remote or inaccessible site requirements requiring Government-provided transportation.

7.0CONTRACTOR FURNISHED MATERIAL/EQUIPMENT
7.1The Contractor shall furnish all material and equipment required for modernization. This shall include the equipment needed to access various IESS system components, to include lifting equipment (e.g., scissor lift), in order to complete these tasks.
7.2The Contractor shall use Microsoft Office Suite products for deliverables.
7.3The Contractor is responsible for disposing of non-hardware materials associated with this task order. The Contractor shall dispose of materials that the Government considers hazardous, such as batteries, according to law and site guidelines.
8.0TRAVEL REQUIREMENTS

The government seeks to have technical support personnel reside within the area where maintenance is to be performed under this task order. Therefore, the government does not anticipate a need for travel.

9.0 DELIVERABLES

The Contractor shall make the following deliverable:

PWS Reference
Deliverable
Method of Delivery and Due Date
NA
Modernization Plan
· Initial Plan delivered 10 days after Task Order award

· Produced in Microsoft Word format

· Delivered as email attachment

3.5.3.1
Configuration Management Equipment Lists
· Due 15 calendar days following completion of modernization

· Changes summarized in monthly status report

· Delivered on CD

3.5.3.2
Configuration Management (As-Built) Drawings
· Due 15 calendar days following completion of modernization

· Changes summarized in monthly status report

· Delivered on CD

3.5.3.3
Technical Documentation
· Due 15 calendar days following completion of modernization

· Changes summarized in monthly status report

· Delivered on CD

10.0OTHER CONDITIONS AND REQUIREMENTS
10.1Normal working hours for this project will fall between the hours of 6:00 AM to 6:00 PM Monday-Friday. The Contractor shall schedule employees to assure availability during normal working hours.
10.2The Contractor must obtain prior approval from COR for work outside of normal working hours.
11.0PERIOD OF PERFORMANCE
11.1The period of performance for the Assessment task order shall be 10 days, and for the Modernization task order shall be 3 months beginning at task order award.
12.0QUALITY ASSURANCE (QA)

The Government will perform QA of the Contractor’s performance under this task order using the method of surveillance specified in the Quality Assurance Surveillance Plan (QASP). The Government reserves the right to perform QA inspections at any time.

The following items have been identified for surveillance in accordance with the QASP: Modernization Plan; Modernization; Preventive Maintenance Plan; Preventative Maintenance; Repair and Replacement; Configuration Management Equipment Lists; Configuration Management (As-Built) Drawings; Technical Documentation; Technical Refresh Plan; Equipment / Material Inventory; and Monthly Status Report.

13.0 COR AND POINT OF CONTACT

The Contracting Officer’s Representative (COR) is Mr. Ken Warburton, N01FP, who can be reached at (619) 537-1230 or via email at kenneth.warburton@navsoc.socom.mil. He serves as the point-of-contact for this effort.

File details come from the government source that posted it. Updated .