Amendment_01_for_H92237-16-R-8008.pdf

PDF 145 KB Posted

Attached to
MeS PSC RFP
Solicitation number
H92237-16-R-8008
Issued by

About this file

Amendment 01 for H92237-16-R-8008

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

A00001 12 Jan 2016

6. ISSUED BY CODE H92237 7. ADMINISTERED BY (If other than Item 6) CODE

SOJTF-A Contracting Office Unit 3E Bagram, Afghanistan

APO AE 09354

Email: tiffany.jones@socom.mil

SEE BLOCK 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.

X H92237-16-R-8008

9B. DATE (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not ex-tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(4) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MDE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying offices, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return ___ copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section heading, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1. Amend H92237-16-R-8008 See Summary of changes below.

2. Add the amended Manning Table, dated 12 Jan 2016

----------------------------------All previous terms and conditions remain the same.-----------------------------------------------

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer) 12 Jan 16 mailto:tiffany.jones@socom.mil

--------------------------------------------------------Summary of Changes ----------------------------------------------------

Changed From:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL PRICE

0002 Mazar-e-Sharif

Armed Guards 78 guards

10 MONTHS $ $

PoP: 01 APR 2016 – 31 JAN 2017

FFP, ACRN: AA

PSC: R430 Project Code: 9GF

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL PRICE

1002 Mazar-e-Sharif

Armed Guards 78 guards

12 MONTHS $ $

PoP: 01 FEB 2017 – 31 JAN 2018

FFP, ACRN: AB

2002 Mazar-e-Sharif

Armed Guards 78 guards

12 MONTHS $ $

PoP: 01 FEB 2018 – 31 JAN 2019

FFP, ACRN: AC

MAZAR-E SHARIF

Location Type Qty per Shift Shift per Day TOTAL SMW Compound FP/GA Patrol 2/2 2 4+(1) [5] Flight Line ECP Static Sentry 2/2/2 3 6+(1) [7] Tower 1 Static Sentry 1/2/2 3 5+(1) [6] Tower 2 Static Sentry 1/2/2 3 5+(1) [6] Flight Line Static Sentry 2/2 2 4+(1) [5] MX Hanger 1 FP/GA Patrol 2/2 2 4+(1) [5] MX Hanger 2 FP/GA Patrol 2/2 2 4+(1) [5] Camp Stevenson Tower 1 Static Sentry 1/2/2 3 5+(1) [6] Camp Stevenson Tower 2 Static Sentry 1/2/2 3 5+(1) [6] Camp Stevenson Tower 3 Static Sentry 1/2/2 3 5+(1) [6] Camp Stevenson Tower 4 Static Sentry 1/2/2

5+(1) [6]

Camp Stevenson Tower 5 Static Sentry 1/2/2 3 5+(1) [6] Camp Stevenson ECP Static Sentry 1/1 2 2 [2] Camp Stevenson Mobile FP/GA Patrol 1/1 2 2 [2] Mobile Escort 4 1 4+(1) [5] Mobile Interpreter 1/1/1 3 3+(1) [4]

Mobile Shift Supervisor 1/1/1 3

3+(1) [4]

Command Post/BDOC BDOC Ops Officer 1/1/1 3 3+(1) [4] Mobile Site Manager 1/0/0 1 1 [1] Mobile Logistician 1/0/0 1 1 [1]

Changed To:

0002 Mazar-e-Sharif

Armed Guards 44 guards

10 MONTHS $ $

PoP: 01 APR 2016 – 31 JAN 2017

FFP, ACRN: AA

1002 Mazar-e-Sharif

Armed Guards 44 guards

12 MONTHS $ $

PoP: 01 FEB 2017 – 31 JAN 2018

FFP, ACRN: AB

2002 Mazar-e-Sharif

Armed Guards 44 guards

12 MONTHS $ $

PoP: 01 FEB 2018 – 31 JAN 2019

FFP, ACRN: AC

MAZAR-E SHARIF

Location Type Qty per Shift Shift per Day TOTAL SMW Compound FP/GA Patrol 2/2 2 4+(1) [5] Flight Line ECP Static Sentry 2/2/2 3 6+(1) [7] Tower 1 Static Sentry 1/2/2 3 5+(1) [6] Tower 2 Static Sentry 1/2/2 3 5+(1) [6] Flight Line Static Sentry 2/2 2 4+(1) [5] MX Hanger 1 FP/GA Patrol 2/2 2 4+(1) [5] MX Hanger 2 FP/GA Patrol 2/2 2 4+(1) [5] Mobile Escort 4 1 4+(1) [5] Mobile Interpreter 1/1/1 3 3+(1) [4]

Mobile Shift Supervisor 1/1/1 3

3+(1) [4]

Command Post/BDOC BDOC Ops Officer 1/1/1 3 3+(1) [4] Mobile Site Manager 1/0/0 1 1 [1] Mobile Logistician 1/0/0 1 1 [1]

---------------------------------------------------------End of Summary of Changes-------------------------------------------

File details come from the government source that posted it. Updated .