QA_Set_10_170706.pdf

PDF 46 KB Posted

Attached to
SPEAR Family of Tactical Headborne Systems
Solicitation number
H92222-17-R-0003
Issued by

About this file

QA Set 10

View the file

Other files

File Type Posted
H92222-17-R-0003-0009.pdf PDF
QA_Set_11_170717.pdf PDF
H92222-17-R-0003-0007.pdf PDF
H92222-17-R-0003-0006.pdf PDF
Attachment_4_Past_Performance_Questionnaire_170628.pdf PDF
QA_Set_9_170705.pdf PDF
H92222-17-R-0003-0005.pdf PDF
QA_Set_8_170606.pdf PDF
Attachment_4_Past_Performance_Questionnaire_170531.pdf PDF
Exhibit_A_CDRLs_170531.pdf PDF
H92222-17-R-0003-0004.pdf PDF
QA_Set_7_170516.pdf PDF
H92222-17-R-0003.pdf PDF
QA_Set_6_170509.pdf PDF
H92222-17-R-0003-0002.pdf PDF
Exhibit_A_CDRLs_170501.pdf PDF
H92222-17-R-0003-0001.pdf PDF
QA_Set_5_170501.pdf PDF
QA_Set_4_170426.pdf PDF
Attachment_04_Past_Performance_Questionnaire_170406.pdf PDF
H92222-17-R-0003.pdf PDF
Exhibit_A_CDRLs_170301.pdf PDF
Attachment_05_Price_Matrix_170426.xlsx XLSX spreadsheet
REVISED_QA_Set_2_170418.pdf PDF
QA_Set_3_170406.pdf PDF
QA_Set_2_170405.pdf PDF
Attachment_4_Past_Performance_Questionnaire_170404.pdf PDF
Q&A_Set_1_170327.pdf PDF
Attachment_05_Price_Matrix_170316.xlsx XLSX spreadsheet
Exhibit_A_CDRLs_170301.pdf PDF
H92222-17-R-0003_DRAFT.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPEAR Family of Tactical Headborne Systems Q&A Set 10 6 July 2017

Q1: Industry requests access to PED-IP-007-Helmet Ballistic Testing Procedures for Multi-Size Headforms, can this be posted to FBO or sent to vendors that submitted an NOI?

A1: This document is added as Attachment 6 to the solicitation. Please see RFP Amendment 07 on

FBO.

Q2: Where will PSPEC 1.2 ‘Sizing,’ be evaluated as part of evaluation criteria, in Phase I (go/no-go) or Phase III (FAT)? Specifically referring to this section of PSPEC 1.2, “Ballistic helmet and non-ballistic helmet shells shall follow the same sizing algorithm and shall have the same cut lines and Projected Protected Area of the Head (PPAH), +/- 0.46in2.” Section 1.2 is referenced in the go/no-go matrix but only under “Materials/components/construction” with regards to the Configuration Management Plan. The only true reference to PPAH within the go/no-go matrix is under “Weight/PPAH,” and refers to PSPEC 3.9 & 3.15.1 respectively which references both weight & min & max PPAH only but not the comparison between the bump and ballistic shell. Due to the above, we feel the current +/-0.46 sq in requirment falls under Phase III and not under Phase I go/no=go, is this correct?

A2: This is correct. The comparison between ballistic and bump PPAH will occur on proposals that proceed to Phase III.