GSC_AcadBldg_Chiller_100_CD_NBP.pdf
PDF 1 MB Posted
- Attached to
- Academic Building Chiller Replacement_GSC
- Solicitation number
- PE-57600-RFQ-2026-000000012
- Issued by
- Johnson County, Georgia
About this file
This document is a set of construction drawings for the Academic Building Chiller Replacement project at Gordon State College in Barnesville, Georgia, prepared by NBP Engineers, Inc. of Macon, Georgia. The project involves the replacement of an existing air-cooled chiller system (CHR-1) with a new YORK TRANE unit rated at 166 tons minimum capacity with specified performance parameters including entering water temperature of 54°F, leaving water temperature of 42°F, and water flow of 166 GPM. The scope includes demolition of existing chiller, valves, and piping; installation of new chiller equipment; replacement of two redundant chilled water pumps (P-1 and P-2) rated at 7.5 horsepower each with 1,750 RPM; underground piping replacement; application of new hydronic heat trace to exposed piping; installation of new pipe supports; and all associated mechanical and electrical work. The drawings, dated March 4, 2026, and approved for construction, include HVAC schematics, site plans, basement mechanical room details, electrical single-line diagrams, and equipment schedules. The project engineer's seal expires June 30, 2026 (COA #PEF000774).
The electrical work includes replacement of the existing 400-ampere, three-phase fused disconnect switch with a new unit in the same location; installation of new 3#250 KCMIL copper conductors with ground wire and 2.5-inch rigid/liquidtite conduit from the disconnect to the new pumps; and replacement of the existing chiller pump starter with a new 30-ampere, three-phase breaker in the motor control center. The new chiller requires 480 volts at 175 amperes, representing a reduction from the existing 350-ampere requirement. The system includes variable frequency drives (VFDs) for both pumps with BACnet/MSTP communication cards for building automation system integration. New lighting consisting of 15 LED light strips (Lithonia ZL1F, 4500 lumens, 40K color temperature) will be installed in the mechanical room and electrical room B-3, reusing existing switches and circuitry. All existing transformers, heat trace circuiting, and receptacles are to remain in place, with the contractor responsible for disconnect and reconnection as needed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
M001
M100
SHEET NO. TITLE
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
ABBREVIATIONS, LEGENDS, & SCHEDULE - HVAC
M101
M201
NBP Project No.: 26002
GORDON STATE COLLEGE
ACADEMIC BUILDING - CHILLER REPLACEMENT
Barnesville, Georgia
E001
E101
E201
LARGE SCALE - BASEMENT MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC
SITE PLAN - DEMOLITION - HVAC
SITE PLAN - NEW WORK - HVAC
M401 FLOW DIAGRAM & DETAILS - HVAC
SITE PLAN - NEW WORK - ELECTRICAL
03.04.2026 FOR CONSTRUCTION
LARGE SCALE - BASEMENT MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL
LEGEND, & RISER - ELECTRICAL
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26002\26002m001.dgn
AS SHOWN
P:\26002\26002m001.dgn
DATE PLOTTED
DGN FILE
04-MAR-2026
RRH
LTF
RRH
03.04.2026
26002
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
N B P P ro je c t
N o
A C
A D
E M
IC
B
U
IL
D
IN
G C
H
IL
L E
R R
E P
L A
C E
M E
N T
F O
R
C
N S T
R U
C T
IO
N
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
M001
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
F DEGREES FAHRE C DEGREES CENTI
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
SPS
SD
COMBINATION STARTER
STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALL VALVE WITH
3/4" HOSE END
BALANCE VALVE
THREADED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
BALL VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
RELIEF VALVE
FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWN
ELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
TEE OUT BOTTOM
MANUAL AIR VENT
PIPE TEST PLUG
HEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS
CONDENSER WATER FLOW
DRAIN
HEATING WATER RETURN
HOT WATER DOMESTIC
G
D
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12
DOOR GRILLE
REFERS TO DETAIL OR
PLAN ON SHEET M-1.THERMOSTAT
INTERVAL TIMER
T
I.T.
1\M-4
DUCT/PLENUM w/LINER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
INSULATED FLEX. DUCT
c
ECCENTRIC REDUCER
HWS
HWR
SCHS
SCHR
CONDENSER WATER RETURN
CS
CR
STATIC PRESSURE SENSOR
SMOKE DETECTOR
POINT OF CONNECTION
DUCT SPLIT
THREADED & FLANGED
THREADED & FLANGED
UNION
GAUGE TAPPING
GAUGE WITH TAPPING
THREADED & FLANGED
THREADED & FLANGED
PIPE SOCKET WELL
FLOW INDICATOR BALANCER
M
T G THERMOSTAT w/GROUND
ANNULAR ELEMENT FLOW STATION
M
DAMPER - BLADE VIEW DAMPER - END VIEW
xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)
DOUBLE WALL INSULATED
ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}
CHILLED WATER FLOW
CHILLED WATER RETURN
CHS
CHR
WATER SUPPLY
SECONDARY CHILLED
WATER RETURN
SECONDARY CHILLED
CV
CVA
CONSTANT VOLUME
ADJUSTABLE
CONSTANT VOLUME
CFM
PRESSURE SENSOR
NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.
IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND
SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT
THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD
SCHEDULES - HVAC
LEGENDS, &
ABBREVIATIONS,
MINIMUM
CAPACITY-MBH
RATING
EWT LWT
WATER
FLOW-GPM
EVAPORATOR DATA
MAXIMUM PRESSURE
DROP-FT-H O
FOULING
FACTOR
MAX. TOTAL
INPUT
ELECTRICAL DATA
KW
MARK VOLTAGE/PHASE/HERTZ
EACH
REMARKS
AIR COOLED CHILLER SCHEDULE
MIN.
IPLV
CHR-1
MANUFACTURERS
YORK
TRANE
NOTES:
MINIMUM
TONS
NOM. CAPACITY
MARK SERVICE
TYPE
PUMP
GPM APPROX.
FT.H O
MAX. MIN.
EFF.%
REMARKS
2 B&G(EA.) HP
MANUFACTURERS
PUMP SCHEDULE
PATTERSON TACO
RPM
100 1,056 54 42 166 80 0.0001 1 18 480/3/60 16.1 YLAA CGAM 1 2
NOTES:
1 PUMPS ARE N+1 REDUNDANT.
P-2
P-1
CHILLED WATER
CHILLED WATER
ES
ES
7.5
7.5
E1510-2BD
E1510-2BD
HVES-E2D
HVES-E2D
FI2009D
FI2009D
VFD
VFD
UNIT MUST HAVE A BACNET/MSTP COMMUNICATION CARD.
UNIT COMPRESSORS MUST HAVE HIGH HOT GAS BYPASS AND VARIABLE SPEED CONDENSER FAN(S) ON LEAD CIRCUIT.
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26002\26002m100.dgn
AS SHOWN
P:\26002\26002m100.dgn
DATE PLOTTED
DGN FILE
04-MAR-2026
RRH
LTF
RRH
03.04.2026
26002
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
N B P P ro je c t
N o
A C
A D
E M
IC
B
U
IL
D
IN
G C
H
IL
L E
R R
E P
L A
C E
M E
N T
F
N S T
R U
C T
IO
N
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
T
B-3
ELECTRICAL
B-1
MECH. ROOM
ACADEMIC BUILDING
YARD HYDRANT
ƒ"
1"
G
MH#10
#T10
E E
C H R
C H S
M100
SCALE: 1 = 20'-0
20 0 10 20 40
C H
R
C H S
1&2
M201
4" U.G. PIPING TO CHR-1
CHILLER
REMOVE EXISTING
VALVES & CHILLER
VALVES & PIPING BETWEEN
REMOVE EXISTING BUTTERFLY
DEMOLITION - HVAC
SITE PLAN -
SITE PLAN - DEMOLITION - HVAC
TO MECHANICAL ROOM
4" U.G. CHR/S PIPING
TO BE REPLACED IN NEW WORK
REMOVE EXISTING HEAT TRACE
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26002\26002m101.dgn
AS SHOWN
P:\26002\26002m101.dgn
DATE PLOTTED
DGN FILE
04-MAR-2026
RRH
LTF
RRH
03.04.2026
26002
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
N B P P ro je c t
N o
A C
A D
E M
IC
B
U
IL
D
IN
G C
H
IL
L E
R R
E P
L A
C E
M E
N T
F
N S T
R U
C T
IO
N
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
T
B-3
ELECTRICAL
B-1
MECH. ROOM
ACADEMIC BUILDING
YARD HYDRANT
ƒ"
1"
G
MH#10
#T10
E E
C H R
C H S
C H
R
C H S
M101
SCALE: 1 = 20'-0
20 0 10 20 40
1&2
M201
SITE PLAN - NEW WORK - HVAC
NEW WORK - HVAC
SITE PLAN -
NEW CHILLER CHR-1
AS REQUIRED
PROVIDE NEW PIPE SUPPORTS
TO ALL EXPOSED CH PIPING
APPLY NEW HYDRONIC HEAT TRACE
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26002\26002m201.dgn
AS SHOWN
P:\26002\26002m201.dgn
DATE PLOTTED
DGN FILE
04-MAR-2026
RRH
LTF
RRH
03.04.2026
26002
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
N B P P ro je c t
N o
A C
A D
E M
IC
B
U
IL
D
IN
G C
H
IL
L E
R R
E P
L A
C E
M E
N T
F
N S T
R U
C T
IO
N
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
B-2
ELEVATOR
B-1
MECH. ROOM
B-3
ELECTRICAL
1 1
B
C
10 12
E
A
B-2
ELEVATOR
B-1
MECH. ROOM
B-3
ELECTRICAL
1 1
B
C
10 12
E
A
T
EXISTING ACP
C H R
C H S
C H S
T
T
TO CHILLER
4" U.G. CHR/S
SO
UN
D
AT
TE
NU
AT
OR
EX
IS
TI
NG
C H
S FM
FM
110/30
AP
MCC
EXISTING
6"{
6"{
D
D
HANGAR RODS
EXISTING
40"{ UP
PUMP H-1
EXISTING HW
PUMP H-2
EXISTING HW
SD
BLR-1
EXISTING
1•"
EVACUATION SWITCH
EXISTING SMOKE
LOUVER w/DAMPER 8'-0"x11'-0"
EXISTING
F-4
EXISTING
UH
EXISTING
F-3
EXISTING
SUPPORT BRACKET
EXISTING WALL
12"{ CHIMNEY PIPE
EXISTING
DRAFT DIVERTER
EXISTING
EXISTING 2"HWS/R
1" DRAIN
EXISTING
AP
AP
AP
AVD
MSB
T
K V
A
BLP
BH
SUMP PUMP
EXISTING
EXISTING WH
G
EXISTING GAS METER
BACKBOARD
TELEPHONE
HWR PUMP
EXISTING
COMPRESSION TANK
EXISTING HW SYSTEM
M201
NEW WORK - HVAC
DEMOLITION &
MECHANICAL ROOM -
BASEMENT
LARGE SCALE -
SCALE:
= 1'-0
4 0 2 4 8
T
EXISTING ACP
C H R
C H S
C H S
T
T
TO CHILLER
4" U.G. CHR/S
SO
UN
D
AT
TE
NU
AT
OR
EX
IS
TI
NG
C H
S FM
FM
BASEMENT MECHANICAL ROOM - DEMOLITION - HVAC
LARGE SCALE -
SCALE:
= 1'-0
4 0 2 4 8
BASEMENT MECHANICAL ROOM - NEW WORK - HVAC
LARGE SCALE -
110/30
AP
MCC
EXISTING
6"{
6"{
D
D
HANGAR RODS
EXISTING
40"{ UP
PUMP H-1
EXISTING HW
PUMP H-2
EXISTING HW
SD
BLR-1
EXISTING
1•"
EVACUATION SWITCH
EXISTING SMOKE
LOUVER w/DAMPER 8'-0"x11'-0"
EXISTING
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
F-4
EXISTING
UH
EXISTING
F-3
EXISTING
SUPPORT BRACKET
EXISTING WALL
12"{ CHIMNEY PIPE
EXISTING
DRAFT DIVERTER
EXISTING
EXISTING 2"HWS/R
1" DRAIN
EXISTING
AP
AP
AP
AVD
MSB
T
K V
A
BLP
BH
SUMP PUMP
EXISTING
EXISTING WH
G
EXISTING GAS METER
BACKBOARD
TELEPHONE
HWR PUMP
EXISTING
COMPRESSION TANK
EXISTING HW SYSTEM
REMOVE EXISTING P-2
REMOVE EXISTING P-1
VFD-P-2NEW
VFD-P-1NEW
NEW
NEW
P-2
P-1
TO PUMP
4" DN
NOTES:(THIS SHEET ONLY)
‚" BUTTERFLY VALVE WITH BLIND FLANGE FOR FUTURE CONNECTION OF TEMPORARY CHILLER.
CONNECTION OF TEMPORARY CHILLER.
‚" BUTTERFLY VALVE WITH BLIND FLANGE FOR FUTURE
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26002\26002m401.dgn
AS SHOWN
P:\26002\26002m401.dgn
DATE PLOTTED
DGN FILE
04-MAR-2026
RRH
LTF
RRH
03.04.2026
26002
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
N B P P ro je c t
N o
A C
A D
E M
IC
B
U
IL
D
IN
G C
H
IL
L E
R R
E P
L A
C E
M E
N T
F
N S T
R U
C T
IO
N
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
M401
CHILLED WATER SYSTEM
SUMMARIES
INPUT/OUTPUT
DDC PANELS
ACP
OUTPUTS INPUTS SOFTWARE
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT. LOGS
F A
IL
U
E
M
D E (S
N
T E S
A
N D
N O
T E S
T R
E
D
L
G
S Y
S T
G
A P
H
IC
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
P
A
K E
U P
S E
T P
O
IN
T
J
U S
T
D
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
W
IM
IT
R U
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
U
S
A R
T
S T
O P
D A
Y
N
IG
H
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
P
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
C U
R R
E
L A
Y
D
IF
F
P
R E S
S U
R E
S P
E
N T
R O
L
S T
E A
M
W A
T
F
O W
O P
E R
A T
IN
A T
U S
D R
IV
E
S
T A
T U
S
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
S P
E E
D
IN
D
IC
A T
IO
N
G
F
O W
U S
A
F
B T
U
K W
H
S T
A T
U S
TAG
NOTES:
CHR-1 CHILLER 1
VFD-1 & 2 CHILLER PUMP-1 & 2
1. PROVIDE FULL INTEGRATION THROUGH THE BACNET INTERFACE CARD FOR INPUT OF ALL OPERATING PARAMETERS TO THE BAS.
CHR-1
CHILLED WATER FLOW DIAGRAM - HVAC
NOT TO SCALE
AIR COOLED CHILLER ISOMETRIC
DRAIN VALVE WITH HOSE
CONNECTION AT LOW POINT
M.A.V. AT
HIGH POINTS
(FOR ESTIMATING PURPOSES ONLY. PROVIDE PIPING ARRANGEMENT FOR UNIT FURNISHED.)
C H S
C H
R
CABLE ON PIPING
OUTDOORS ABOVE
GRADE
FLANGE ON GROUND
CONDUCTOR TO EVAPORATOR
ELECTRIC HEATING
WALL
AS SYSTEM PIPE.
MANUAL AIR VENT
TERMINATE DRAIN WITH HOSE END
CONNECTION 18" ABOVE FLOOR.
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
CEILING. LOCATE VALVE AND TERMINATE DRAIN
HERE, UNLESS NOTED OTHERWISE AND POSITION
VALVE FOR VERTICAL DOWN DISCHARGE.
•" PIPE SAME MATERIAL
2•"
VERTICAL
PIPE
SUPPORT
WELDED PIPETHREADED / BRAISED
PIPING
BALL VALVE (EXPOSED) OR
GATE VALVE (CONCEALED)
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
6"MAX.
NOT TO SCALE NOT TO SCALE
C H S
C H
R
4"
CHR-
& DETAILS - HVAC
FLOW DIAGRAM
BRANCH CIRCUIT FROM
PANELBOARD,SWITCHGEAR,OR MCC
(2600)
SYSTEM SHOWN IN NORMAL (VFD NOT BYPASSED)
NUMBERS IN PARENTHESES INDICATE DIVISION
UNDER WHICH WORK OR EQUIPMENT IS SPECIFIED.
NOT TO SCALE
MODE, MOTOR RUNNING.
OVERLOAD
CIRCUIT
BREAKER
VFD SINGLE LINE DIAGRAM
VFD PACKAGE
RECTIFIER AND
INVERTER
NOTES:(THIS DETAIL ONLY)
TYPICAL END SUCTION PUMP
ELEVATION
FLEXIBLE CONNECTION
FLEXIBLE COUPLING AND
COUPLING GUARD
PIPE INSULATION
PRESSURE GAUGE
TEST PLUG
‚" BALL VALVE, TYPICAL
ADJUSTABLE FOOT
FULL SIZE BLOWDOWN ‚" DRAIN
TO FLOOR DRAIN
PAN (CHILLED WATER
PUMP(S) ONLY
18 GA. S.S. DRIP
2"
1"
SUCTION DIFFUSER
WITH STRAINER
BALL OR BUTTERFLY
•" DRAIN TAPPING
PIPE TO FLOOR DRAIN
CIRCUIT SETTER
NOT TO SCALE
(2600)
(2300)
MOTOR (2300)
PIPING AT CHILLER YARD
HEAT TRACE ALL EXPOSED
EXISTING CONCRETE BASE
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26002\26002e001.dgn
AS SHOWN
P:\26002\26002e001.dgn
DATE PLOTTED
DGN FILE
04-MAR-2026
KMS
BCO
KMS
03.04.2026
26002
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
N B P P ro je c t
N o
A C
A D
E M
IC
B
U
IL
D
IN
G C
H
IL
L E
R R
E P
L A
C E
M E
N T
F
N S T
R U
C T
IO
N
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
E001
NOTES:(THIS SHEET ONLY)
PARTIAL POWER RISER - CHILLER REPLACEMENT
NOT TO SCALE
NEW CHILLER 480V @175A MOCP
EXISTING CHILLER 480V @350A MOCP
REPLACE EXISTING CHILLER IN PLACE
F
ELEC/MECH ROOM
400A/3P/3R
FCHILLER
NEW
CHILLER
T
EXTERIOR
CONNECTION TO EQUIPMENT
CAP
CONDUIT DOWN
CONDUIT UP
RECEPTACLES
CIRCUITS
ELECTRICAL LEGEND
DUPLEX RECEPTACLE - NORMAL
QUAD - NORMAL
GFCI DUPLEX RECEPTACLE - NORMAL
GFCI QUAD - NORMAL
SPECIAL - TYPE NOTED OR SHOWN
WEATHER PROOF RECEPTACLE (GFCI)
ELECTRIC WATER COOLER RECEPTACLE(GFCI)
CONDUIT CONCEALED IN CEILING OR WALL
CONDUIT IN GROUND, SLAB, OR UNDER FLOOR
FLEXIBLE RACEWAY
RACEWAY EXPOSED
WP
AC
ABOVE COUNTER DUPLEX RECEPTACLE (COORDINATE
HEIGHT WITH ARCHITECT)DUPLEX RECEPTACLE - TAMPER PROOFT
HOMERUN - ONE ARROW PER CIRCUIT
WP
PANELBOARD-250 VAC OR LESS
SURFACE MOUNTED
PANELBOARD-250 VAC OR LESS
RECESSED
PANELBOARD-OVER 250 VAC
SURFACE MOUNTED
PANELBOARD-OVER 250 VAC
RECESSED
BACKBOARD
J
M
GENERAL EQUIPMENT
T
JJ
TRANSFORMER
FRAME AMPS/POLES/NEMA TYPE
FUSE PER MANUFACTURERS RECOMMENDATIONS
ENCLOSED BREAKER-RECESSED IN WALL
ENCLOSED CIRCUIT BREAKER
EMERGENCY PUSHBUTTON
COMBINATION STARTER AND DISCONNECT
EXHAUST FAN
MANUAL STARTER AND MOTOR RATED SWITCH
MOTOR
JUNCTION BOX - WALL/CEILING/FLOOR
SURGE SUPPRESSOR
DISCONNECT SWITCH: "F" IF FUSED
F
SLAB OR BELOW GRADE
GROUNDING CONDUCTOR- UNDER
G
C GROUND ROD - C IF CHEMICAL
GROUND CONNECTION (SCHEMATIC)
GROUNDING
PB
CHILLER
CWP
VFD BY DIV 23 VFD BY DIV 23
LOCATION. FUSE PER MANUFACTURERS RECOMMENDATION (TYP 250A).
REPLACE THE EXSTING 400/3/3R FUSED DISCONNECT WITH NEW IN SAME
REPLACE THE EXISTING RECETPACLE COVERS WITH NEW.
EXISTING MCC
7.5 7.5
TO REMAIN AS IS IN THIS LOCATION. DISCONNECT AND RECONNECT AS NEEDED.
ALL EXISTING TRANSFORMERS, HEAT TRACE CIRCUITING AND RECEPTACLES
TO KEEP IT OFF THE CONCRETE.
LIQUID TITE CONNECTION TO < 36". PROVIDE SUPPORT ON GRADE FOR RIGID CONDUIT
TO CHILLER ROUTED EXPOSED ALONG THE GROUND TO CONNECTION POINT. MINIMIZE
PROVIDE NEW 3#250 KCMIL CU, 1#4G, 2.5" RIGID/LIQUIDTITE IMC FROM DISCONNECT
OVER TO THE NEW REDUNDANT PUMPS.
INSIDE THE MOTOR CONTROL CENTER. PROVIDE NEW 4#10 AWG WIRE IN 1/2" EMT/FLEX
REPLACE EXISTING CWP STARTER AND REPLACE WITH A NEW 30/3 BREAKER ONLY
NEW MCC CIRCUIT.
PROVIDE WIREWAY/JUNCTION BOX TAP AS NEEDED TO CONNECT BOTH MOTORS TO
THE EXISTING CONDUCTORS TERMINATED IN THE MCC AND NOTIFY THE ENGINEER.
LOCATION. CONFIRM NEW CHILLER MOCP PRIOR TO ORDERING. NOTE THE SIZE OF
REPLACE THE EXISTING STARTER WITH A NEW 250A BREAKER ONLY IN THE SAME
ELECTRICAL
LEGEND, & RISER -
REPORT TO ENGINEER SIZE AND INSULATION TYPE
REUSE EXISTING CONDUCTORS TO NEW DISCONNECT
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26002\26002e101.dgn
AS SHOWN
P:\26002\26002e101.dgn
DATE PLOTTED
DGN FILE
04-MAR-2026
KMS
BCO
KMS
03.04.2026
26002
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
N B P P ro je c t
N o
A C
A D
E M
IC
B
U
IL
D
IN
G C
H
IL
L E
R R
E P
L A
C E
M E
N T
F
N S T
R U
C T
IO
N
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
1 1
B
C
A
10987521
E
F
H
C
E
G
H
T
B-3
ELECTRICAL
B-1
MECH. ROOM
ACADEMIC BUILDING
YARD HYDRANT
ƒ"
1"
G
MH#10
#T10
E E
C H R
C H S
NEW CHILLER CHR-1
E101
MAIN SWITCHBOARD (MSB)
SCALE:
= 1'-0
8 0 4 8 16
1&2
E201
IN MECH. ROOM
TO JUNCTION BOX
HEAT CABLE
ROOM (MCC-B3)
CENTER IN MECH.
TO MOTOR CONTROL
J
SITE PLAN - NEW WORK - ELECTRICAL
ELECTRICAL
NEW WORK -
SITE PLAN -
DISCONNECT/RECONNECT HEAT TRACE
MAINTAIN EXSITING 120V CIRCUTING.
IN PLACE WITH NEW
EXISTING DISCONNECT REPLACED
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26002\26002e201.dgn
AS SHOWN
P:\26002\26002e201.dgn
DATE PLOTTED
DGN FILE
04-MAR-2026
KMS
BCO
KMS
03.04.2026
26002
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
N B P P ro je c t
N o
A C
A D
E M
IC
B
U
IL
D
IN
G C
H
IL
L E
R R
E P
L A
C E
M E
N T
F
N S T
R U
C T
IO
N
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
B-2
ELEVATOR
B-1
MECH. ROOM
B-3
ELECTRICAL
1 1
B
C
10 12
E
A
B-2
ELEVATOR
B-1
MECH. ROOM
B-3
ELECTRICAL
1 1
B
C
10 12
E
A
EXISTING ACP
MCC
EXISTING
PUMP H-1
EXISTING HW
PUMP H-2
EXISTING HW
SD
BLR-1
EXISTING
F-4
EXISTING
UH
EXISTING
F-3
EXISTING
BH
BLP
MSB T
K
V A
G
EXISTING GAS METER
SUMP PUMP
EXISTING
EXISTING AHU
EXISTING HWR PUMP
WH
TELEPHONE BACKBOARD
F-4
EXISTING
TO MCC
J
TO TRANSFOMRER
EXISTING CONNECTION
MAINTAIN CIRCUITS AS IS
OUT TO EXISTING CHILLER YARD.
VFD-P-2NEW
VFD-P-1NEW
NEW
NEW
P-2
P-1
E201
NEW WORK - ELEC
DEMOLITION &
MECHANICAL ROOM -
BASEMENT
LARGE SCALE -
SCALE:
= 1'-0
4 0 2 4 8
EXISTING ACP
BASEMENT MECHANICAL ROOM - DEMOLITION - ELEC
LARGE SCALE -
SCALE:
= 1'-0
4 0 2 4 8
BASEMENT MECHANICAL ROOM - NEW WORK - ELEC
LARGE SCALE -
MCC
EXISTING
PUMP H-1
EXISTING HW
PUMP H-2
EXISTING HW
SD
BLR-1
EXISTING
F-4
EXISTING
UH
EXISTING
F-3
EXISTING
BH
BLP
MSB T
K
V A
G
EXISTING GAS METER
SUMP PUMP
EXISTING
EXISTING AHU
EXISTING HWR PUMP
WH
TELEPHONE BACKBOARD
F-4
EXISTING
TO MCC
J
REMOVE EXISTING P-2
REMOVE EXISTING P-1
GENERAL NOTES:(THIS SHEET ONLY)
A
DOCUMENTS AND ACTUAL CONDITIONS AT THE SITE MAY VARY.
OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT"
BEEN PREPARED USING "AS-DESIGN" DOCUMENTS. NEITHER THE
DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE
B
TO COMPLETE THE DEMOLITION/NEW WORK.
CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED
SCOPE OF DEMOLITION/NEW WORK AND IN NO WAY RELIEVES THE
THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL
C COORDINATE DEMOLITION WORK WITH NEW WORK.
D
AREA REQUIRING WORK.
COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO OR NEAR
PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS,
E
TEXTURE, QUALITY, ETC.)
MATERIAL, SIZE, ALIGNMENT, JOINT WORK, FINISHES, COLOR,
SURFACES SHALL BE REPAIRED TO MATCH EXISTING (IN
MECHANICAL, ELECTRICAL, AND PLUMBING WORK), SUCH
WHERE SURFACES ARE DAMAGED BY DEMOLITION (INCLUDING
F
EXISTING SURROUNDINGS.
ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH
COVER FOR ANY ABANDONED BOXES. WHERE CONDUIT IN SLAB IS
SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK
LONGER BE IN USE TO THE POINT OF LAST TERMINATION. THERE
REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO
USED FOR NEW WORK
EXISTING MCC TO BE
NOTES:(THIS SHEET ONLY)
WITH CHAIN HANGER AND BLACK FINISH.
OF DESIGN IN THE LITHONIA ZL1F, 4500 LUMENS, 40K COLOR TEMP
OVERHEAD LIGHTING. REUSE SWTICHES AND CIRCUITING. BASIS
ELECTRICAL B-3 AND MECH ROOM B-1, REPLACING THE EXISTING
PROVIDE 15 TOTAL NEW 4' LED LIGHT STRIPS ONE FOR ONE IN BOTH
REDUNDANT. ONLY ONE RUNS AT A TIME.
CONTROL CENTER WITH 4#10 CU WIRE IN•" EMT/FLEX. PUMPS ARE
CONNECT BOTH NEW VFDS TO THE NEW 30/3 BREAKER IN THE MOTOR
TO TRANSFOMRER
EXISTING CONNECTION
MAINTAIN CIRCUITS AS IS
OUT TO EXISTING CHILLER YARD.
VFD TO MOTORS.
NEW VFDs BY DIV 23. CONNECT BOTH TO NEW MCC CIRCUIT. WIRE THRU
| 26002aCov |
| 26002m001 |
| 26002m100 |
| 26002m101 |
| 26002m201 |
| 26002m401 |
| 26002e001 |
| 26002e101 |
| 26002e201 |
File details come from the government source that posted it. Updated .