DOC A EOC ITOC 100 Submission Review Comments.doc
DOC document 38 KB Posted
- Solicitation number
- GS-11-P-16-MM-C-7000
About this file
DOC A EOC ITOC 100 Submission Review Comments
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_02_EOC-ITOC_RFI_LOG_01272016.pdf | ||
| AMEND_02_SF30.docx | DOCX document | |
| EOC-ITOC_RFI_LOG_01192016.pdf | ||
| AMEND_01_SF30.docx | DOCX document | |
| PreSol Agenda 010716.pdf | ||
| Site Visit Sign In 010716.pdf | ||
| EOC ITOC 100 CD Narrative - Appendix.pdf | ||
| VOL2_EOC ITOC 100 Construction Documents-Specifications.pdf | ||
| EOC ITOC 100 CD Narrative.pdf | ||
| VOL1_EOC ITOC 100 Construction Documents-Specifications.pdf | ||
| SF1442-14a.pdf | ||
| NEW--BLANK--NCIC GSA SCVR Oct 2014.xlsx | XLSX spreadsheet | |
| RnC C301 GC OCT 15.docx | DOCX document | |
| SmallBusinessSet-AsideGCAgreement.pdf | ||
| PBS_Past_Performance_Form_Rev_6_12_15.docx | DOCX document | |
| C201-SB_LPTA_OCT_2015.pdf | ||
| GSA527-15.pdf | ||
| SF_24-98 Bid Bond.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORANDUM FOR: GAFTIE MARLOW
PROJECT MANAGER
PROJECT DEVELOPMENT DIVISION (WPC)
FROM:
LAURA DOYLE
FIRE PROTECTION ENGINEER
SAFETY, ENVIRONMENT, AND FIRE PROTECTION BRANCH (WPYG)
SUBJECT:
FIRE PROTECTIOIN ENGINEERING REVIEW COMMENTS
PROJECT TITLE:
DHS Operations Center A (DOC A) EOC/ITOC
BUILDING NUMBER: DC1340CE
CONTRACTOR (CONSTR. OR A/E): ZGF
SUBMISSION TYPE & DATE:
100 % Construction Drawings, Dated 6/19/2015
Submission is approved.
XXX
Submission is approved as noted.
Submission is disapproved.
Resubmission is required for items(s) listed.
NO: | FIRE AND LIFE SAFETY REVIEW COMMENTS
1. Dwg FJ-152 shows no fire rating for the EOC/ITOC. Is a fire rating required due to the sensitive nature of this area?
2. Dwg AE-651: Please confirm that all locking hardware shall comply with NFPA 101, special locking hardware.
3. Dwg F??: Please provide information on any modifications required to the sprinkler system. Will the 8 foot demountable partitions create a sprinkler obstruction requiring additional sprinkler coverage? Will the new ceiling require modifications to the sprinkler system? If any sprinkler work is required, please include the following:
a. Design and Installation shall be performed by a certified sprinkler contractor or a specialist who is experienced in the design and installation of automatic sprinkler systems (minimum 3 years). The system shall be designed in accordance with the requirements of NFPA 13 (2005)
b. Location of Sprinkler Heads: The spacing of sprinkler heads shall not exceed that permitted by NFPA 13 for the hazard occupancy.
c. Steel piping with wall thickness less than Schedule 30 shall not be threaded. Plastic piping shall not be permitted. Minimum pipe schedule shall be schedule 10. Plain end fittings are not permitted. Pipe 2.5” and smaller must be schedule 40 and must be threaded.
d. Pipe and Hanger Supports: Provide pipe supports, sway braces, hangers, and clamps in accordance with NFPA 13.
e. Sprinkler heads shall be in conformance with NFPA 13. Release elements shall be suitable for specific application and shall match existing. Provide quick response standard coverage heads in all light hazard office and all other occupancies in which their use is listed or approved. Mixed coverage of standard response and quick response sprinklers is prohibited.
f. Sprinkler shop drawings shall be submitted for review and approval to the GSA Fire Protection Engineer. Upon receipt of the approved sprinkler shop drawings, the contractor shall coordinate with the GSA fire alarm shop for system drain down.
g. Preliminary Testing: Hydrostatically test wet-pipe sprinkler system, as required by NFPA 13, in the presence of the Contracting Officer or his designated representative.
h. Submit as-built drawings to the Contracting Officer upon completion of the project. These drawings shall indicate changes from the original layout, marked in red.
Provide a written response to all comments with the next submission.
Prepared by:
Laura Doyle, PE
Fire Protection Engineer
Safety, Environment and Fire Protection Branch
202-708-5250 (office) 202-439-0495 (cell)
Date:
July 20, 2015