Amendment_02.Solicitation_GS11P15MKC0030.111915.pdf

PDF 1 MB Posted

Attached to
Replace of Fire Alarm System at the US Geological Survey (USGS) National Center, Headquarters - JW Powell Building located in Reston, Virginia
Solicitation number
GS11P15MKC0030
Issued by

About this file

Amendment 2 to Solicitation GS11P15MKC0030

View the file

Other files

File Type Posted
Amendment_03.Solicitation_GS11P15MKC0030.JW_Powell.120415.pdf PDF
Agreement.GS11P15MKC0030.Rev.Fire_Alarm.JW_Powell.120415.pdf PDF
Solicitation.GS11P15MKC0030.Fire_Alarm.JW_Powell.111915.pdf PDF
Questions_and_Answers.Solicitation_GS11P15MKC0030.111915.pdf PDF
Asbestos_Management_Plan.JW_Powell.pdf PDF
USGS_print_plant_Positive_HSAs.xls XLS spreadsheet
SEM_Report_for_JOHN_W_POWELL.pdf PDF
USGS_power_plant_Positive_HSAs.xls XLS spreadsheet
USGS_Physics_Building_Positive_HSAs.xls XLS spreadsheet
Sign-in_Sheet.JW_Powell_FA_Project.10302015.pdf PDF
USGS_Main_building_Positive_HSAs.xls XLS spreadsheet
Amendment_1.Solicitation_GS11P15MKC0030.JW_Powell.111215.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
SF1442.GS11P15MKC0030.JW_Powell.pdf PDF
Contractors_Qualifications_and_Financial_Information_Form_527.pdf PDF
SF24.Bid_Bond.pdf PDF
DOL_Wage_Rates.GS11P15MKC0030.pdf PDF
Agreement.GS11P15MKC0030.Fire_Alarm.JW_Powell.101615.pdf PDF
SOW.DB_FIRE_ALARM_PROJECT.JW_Powell.pdf PDF
Solicitation.GS11P15MKC0030.Fire_Alarm.JW_Powell.101615.pdf PDF
Reps_and_Certs.GS11P15MKC0030.JW_Powell.101615.docx DOCX document
Presolicitation_Notice_-_DB_Fire_Alarm_Project.JW_Powell.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243

Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code

2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE

(x) 9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)

CODE FACILITY CODE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Check One

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA

(Signature of person authorized to sign)

15C. DATE SIGNED

(Signature of Contracting Officer)

16C. DATE SIGNED

AdrienneBSmith Text Box To All Perspective Offerors

AdrienneBSmith Text Box Bonnie Echoles, Contracting Officer

Continuation Page

PAGE 2 OF 2 GS-11P-15-MK-C-0030/02

Continued from Block 14...

3. Specification (Restricted Access)

4. FA-JW Powell - As built drawings (restricted access). The as-built drawings provided are not accurate and must be field verified by the contractor for accuracy. They are useful as they are for the RFP. This is a compressed (ZIP) filed CAD drawings. The plans are a jigsaw puzzle of the floors (over 50 pages). To be re-assembled by the offeror's CAD person.

The following changes, clarifications, additions and supplements are hereby incorporated into this SOLICITATION in their entirety as submitted.

For questions concerning this Amendment (02), please contact Adrienne Smith via email at adrienne.smith@gsa.gov.

The purpose of this Amendment (02) is to distribute the following information.

1. GSA responses to questions posed by offerors;

2. Revised Solicitation Document outlining revisions to Evaluation Factor 1; ...See Continuation Page

WPC-15-0392

WPC

GSA, OFFICE OF PROJECT DELIVERY (WPC)

301 7th STREET, SW, Room 2002

WASHINGTON DC 20407

See Block 6 Yes Off

GS-11P-15-MK-C-0030

Yes Off No See Schedule Off Off Off Off Off Off Descript: The purpose of this Amendment (02) is to distribute the following information.

1. GSA responses to questions posed by offerors;

2. Revised Solicitation Document outlining revisions to Evaluation Factor 1; ...See Continuation Page

Descript1:
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT:
IDCode:
pdfpage1: 1
Pages: 2
DocNo: 02
EffDate: NOV 19, 2015
ReqNo: WPC-15-0392
ProjNo:
IssuedByCode: WPC
IssuedBy: GSA, OFFICE OF PROJECT DELIVERY (WPC)

301 7th STREET, SW, Room 2002

WASHINGTON DC 20407

AdminByCode:
AdminBy: See Block 6
ContractorCode:
FacCode:
SolChg: Yes
AwdChg: Off
SolNo: GS-11P-15-MK-C-0030
SolDate: OCT 16, 2015
AwdNo:
AwdDate:
NoCopies:
Amended: Yes
OffrExt: Off
OffrNoEx: No
ApprData: See Schedule
ChgeOrd: Off
ChgeOrder:
Modify: Off
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).:
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
SignName:
SignTitl:
ContDate:
ContrOfficerInfo:
CODate:
Contractor Info:
ContractorPOC:
Contractor:
ModAmount:
Header:
15B. CONTRACTOR/OFFEROR:
Footer1:
signature:

File details come from the government source that posted it. Updated .