Amendment 04- Action Items.pdf

PDF 1 MB Posted

Attached to
Amendment 03 - Response Time/Location Federal contract opportunity
Solicitation number
GS-11P-12-DC-C-0007
Issued by
General Services Administration Public Buildings Service Region 3

About this file

Solicitation GS-11P-12-DC-C-0007 Commercial Items Request for Proposals for providing services for Industrial Hygiene services (IH) program in various locations within the National Capital Region Washington DC is amended as follows Attachment L Exhibit J Action Items for Industrial Hygiene is being replaced in its entirety. Please review document IH Requirement Action Items. Except as amended herein all other terms and conditions of solicitation GS-11P-12-DC-C-0007 remain unchanged.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 03 - Response Time/Location, newest first.
File Type Posted
IH Solicitation GS-11P-12-DC-C-0007 - FINAL - REVISED 3-5-2012.pdf PDF
Amendment 07 - Questions Ver. 2.2.pdf PDF
Amendment 06 - Extention of Closing Date.pdf PDF
Amendment 03- Response Time - Location.pdf PDF
Amendment 02 - CSP.pdf PDF
Amendment 01 - Questions Ver. 1.pdf PDF
IH Solicitation GS-11P-12-DC-C-0007 - FINAL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243

Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code

2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE

(x) 9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)

CODE FACILITY CODE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Check One

A. THIS ORDER ID ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA

(Signature of person authorized to sign)

15C. DATE SIGNED

(Signature of Contracting Officer)

16C. DATE SIGNED

Supplementary Page

PAGE 2 OF GS-11P-12-DC-C-0007/AM04

Description of Modification/Amendment:

Solicitation GS-11P-12-DC-C-0007 Commercial Items Request for Proposals for providing services for Industrial Hygiene services (IH) program in various locations within the National Capital Region, Washington, DC is amended as follows:

Attachment L # Exhibit J # Action Items for Industrial Hygiene is being replaced in its entirety.

Please review document IH Requirement Action Items.

Except as amended herein, all other terms and conditions of solicitation GS-11P-12-DC-C-0007 remain unchanged.

Supplementary Page

PAGE 3 OF GS-11P-12-DC-C-0007/AM04

PAGE 2 OF GS-11P-12-DC-C-0007/AM04

Solicitation GS-11P-12-DC-C-0007 Commercial Items Request for Proposals for providing services for Industrial Hygiene services (IH) program in various locations within the National Capital Region, Washington, DC is amended as follows:

Attachment L – Exhibit J – Action Items for Industrial Hygiene is being replaced in its entirety.

Please review document IH Requirement Action Items.

Except as amended herein, all other terms and conditions of solicitation GS-11P-12-DC-C-0007 remain unchanged.

PAGE 3 OF GS-11P-12-DC-C-0007/AM04

ACTION ITEMS FOR INDUSTRIAL HYGEINE REQUIREMENT

GS-11P-12-DC-C-0007

LIN ITEM

0001 Industrial Hygienist-Senior 0002 Industrial Hygienist-Technician 0003 Occupational Health & Safety Technician 0004 Certified Industrial Hygienist 0005 Certified Safety Professional 0006 Registered Sanitarian 0007 Environmental Engineer 0008 Asbestos: PCM (on-site, 3 hrs) 0009 Asbestos: PCM (same day) 0010 Asbestos: PCM (24 hours) 0011 Asbestos: Bulk (3 Days) 0012 Asbestos: Bulk (24 hours) 0013 Asbestos: Bulk (Same Day) 0014 Asbestos PLM Surface (24 hours) 0015 Asbestos TEM Surface Wipe (ASTM D-5755-95) 0016 TEM: Air (24 hours) 0017 TEM: Air (6 Hours Weekday) 0018 TEM: Air (6 Hours Weekend) 0019 TEM: Bulk (24 hour) 0020 TEM: Bulk (7 days) 0021 TEM: Surface (7 days) 0022 TEM Lab Preparation Fee 0023 Asbestos: Point Counting (Same day) 0024 Asbestos: Point Counting (24 hours) 0025 Particulate Characterization: PLM/TEM 0026 Coal Dust, Air 0027 Coal Tar Pitch Volatiles: Air/PNA (12 hours) 0028 Coal Tar Pitch Volatiles: Air/PNA (10 days) 0029 Coal Tar Pitch Volatiles: Next Component 0030 Coal Tar Pitch Volatiles: PNA Scan (15 days) 0031 Dust Gravimetric: Dust Nuisance 0032 Dust Gravimetric: Respirable (3 Day) 0033 Dust Gravimetric: Respirable (24 Hours) 0034 Formaldehyde (24 Hours) 0035 Formaldehyde (12 hours) 0036 Lead: Air (3 Day)

PAGE 4 OF GS-11P-12-DC-C-0007/AM04

0037 Lead: Air (24 Hour) 0038 Lead Air (6 Hour Weekday) 0039 Lead Air: (6 Hour Weekend) 0040 Lead: Wipe (3 Day) 0041 Lead: Wipe (24 Hours) 0042 Lead Wipe (6 Hour Weekday) 0043 Lead Wipe: (6 Hour Weekend) 0044 Lead Paint: AA: Bulk Paint Chips (3-5 day) 0045 Lead Paint: AA: Bulk Paint Chips (24 Hours) 0046 Lead Paint: AA: Bulk Paint Chips (8 Hours) 0047 Mercury, Charcoal (10 days) - NIOSH Method 0048 Mercury Surface Wipes: (24 hour) 0049 Mold/Bacteria: Plate (10 days) 0050 Non-Viable Mold Spore Trap (48 Hours) 0051 Organic Vapors (VOC) Absorption (24 hours) 0052 Organic Vapors (VOC) Absorption (10 days) 0053 PCB: Wipe (24 hours) 0054 PCB: Wipe (5 days) 0055 PCB: Air (10 days) 0056 PCB: Air (3 days) 0057 PCB: Soil (10 days) 0058 PCB: Concrete (10 days) 0059 PCB: Concrete (3 days) 0060 PCB: Water (10 days) EPA 608 0061 PCB: Oil (10 days) 0062 PCB: Oil (1 day) 0063 PCB: Paint (3 days) 0064 Metal Fume, Air 0065 Radon: Alpha Trak 0066 Radon: Charcoal Cann 0067 Radon: soil (30 days) 0068 Radon: water (30 days) 0069 Silica, X-Ray Diff. Filter (7 days) 0070 Silica, X-Ray Diff. Filter (48 hours) 0071 Silica, X-Ray Diff. Bulk (7 days) 0072 Silica, X-Ray Diff. Bulk (48 hours) 0073 Water Quality Testing: Bacteria (10 days) 0074 Water Quality Testing: Bacteria (48 Hours) 0075 Water Quality Testing: Bromide (10 Day) 0076 Water Quality Testing: Bromide (48 Hours) 0077 Water Quality Testing: Chlorides (10 days) 0078 Water Quality Testing: Chlorides (48 Hours) 0079 Water Quality Testing: Chlorine (10 Days)

PAGE 5 OF GS-11P-12-DC-C-0007/AM04

0080 Water Quality Testing: Chlorine (48 Hours) 0081 Water Quality Testing: Color (10 Days) 0082 Water Quality Testing: Color (48 Hours) 0083 Water Quality Testing: Copper (10 Days) 0084 Water Quality Testing: Copper (48 Hours) 0085 Water Quality Testing: Total Coliforms (10 Days) 0086 Water Quality Testing: Total Coliforms (48 Hours) 0087 Water Quality Testing: Fecal Coliform (10 Days) 0088 Water Quality Testing: Fecal Coliform (48 Hours) 0089 Water Quality Testing: Fluoride (10 Days) 0090 Water Quality Testing: Fluoride (48 Hours) 0091 Water Quality: Heavy Metal: EPA Screening (10 Days) 0092 Water Quality: Heavy Metal: EPA Screening (48 Hours) 0093 Water Quality Testing: Iron (10 Days) 0094 Water Quality Testing: Iron (48 Hours) 0095 Water Quality Testing: Lead (10 Days) 0096 Water Quality Testing: Lead (48 Hours) 0097 Water Quality Testing: Legionella (10 days) 0098 Water Quality Testing: Legionella (48 Hours) 0099 Water Quality Testing: Manganese (10 Days) 0100 Water Quality Testing: Manganese (48 Hours) 0101 Water Quality: Mercury (24 hour) 0102 Water Quality Testing: Metals, Common (10 Days) 0103 Water Quality Testing: Metals, Common (48 Hours) 0104 Water Quality Testing: Organic Chemicals (10 Days) 0105 Water Quality Testing: Organic Chemicals (48 Hours) 0106 Water Quality Testing: pH (48 hours) 0107 Water Quality Testing: pH (direct read) 0108 Water Quality Testing: Sulfate (10 Days) 0109 Water Quality Testing: Sulfate (48 Hours) 0110 Water Quality Testing: Sulfite (10 Days) 0111 Water Quality Testing: Sulfite (48 Hours) 0112 Water Quality Testing: Turbidity (10 Days) 0113 Water Quality Testing: Turbidity (48 Hours) 0114 Colorimetric Detector Tubes 0115 Smoke Tubes

Direct Reading Instrumentation: Category I (with recorder less than $4,000)

Direct Reading Instrumentation: Category I (with recorder greater than $4,000)

0118 Direct Read Air Monitor: Mercury 0119 Gas Chromatography/Mass Spectrometry: Bulk 0120 Gas Chromatography/Mass Spectrometry: Air

PAGE 6 OF GS-11P-12-DC-C-0007/AM04

Soil, Sediment or Water: Total Petroleum Hydrocarbon DRO and GRO (EPA 8015B) (10 days)

Soil, Sediment or Water: Total Petroleum Hydrocarbon DRO and GRO (EPA 8015B) (48 hours)

0123 Groundwater: BTEX/MTBE/Naphthalene

0124 Soil, Sediment or Water: Target Compound List Semi-Volatiles 0125 Soil, Sediment or Water: Target Compound List Volatiles

Soil, Sediment or Water: Target Compound List PCB/Pesticides (5 days)

Soil, Sediment or Water: Target Compound List PCB/Pesticides (1 day)

Soil, Sediment or Water: Target Analyte List for Metals and Cyanide

0129 Stormwater or wastewater: Total Phosphorous 0130 Stormwater or wastewater: Total Kjeldahl Nitrogen 0131 Stormwater or wastewater: Fats/Oils/Grease 0132 Stormwater or wastewater: Biological Oxygen Demand 0133 Stormwater: Mercury 0134 Stormwater or wastewater: Total Suspended Solids

0135 Stormwater or wastewater: Priority Pollutant Metals Total Scan

Stormwater or wastewater: Priority Pollutant Metals Individual Scan

ENVIRONMENTAL SITE TESTING: ENVIRONMENTAL

SOIL AND GROUNDWATER: TCL - Total (Complete Set)

0138 Soil: RCRA 8 metals (5 days) 0139 Soil: RCRA 8 metals (1 day) 0140 Soil: PAHs ( 5 day) 0141 Soil: PAHs (1 day)

0142 Waste Characterization (ignitability, reactivity, corrosivity) 0143 TCLP - Full (5 days) 0144 TCLP - Full (2-3 days) 0145 TCLP- Metals 0146 TCLP-Volatiles 0147 TCLP - Semi-volatiles (10 days) 0148 TCLP - Pesticides (10 days) 0149 Phenol, 24 hr turnaround (weekday) 0150 Phenol, 3 day turnaround 0151 CAD Services

Equipment Rental (Lighting, generators, compress jackhammers, etc)

PAGE 7 OF GS-11P-12-DC-C-0007/AM04

0153 SEM: Air 0154 SEM: Bulk 0155 Geoprobe (with Mobilization and Derived Waste Disposal)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT:
IDCode:
pdfpage1: 1
Pages: 9
DocNo: AM04
EffDate: FEB 24, 2012
ReqNo: WPMA-12-0008
ProjNo:
IssuedByCode: WPGQ
IssuedBy: GSA, ACQUISITION MANAGMENT DIVISION

301 7TH STREET SW

ROOM 7107

WASHINGTON DC 20407-0001

AdminByCode:
AdminBy: See Block 6
ContractorCode:
FacCode:
SolChg: Yes
AwdChg: Off
SolNo: GS-11P-12-DC-C-0007
SolDate: FEB 08, 2012
AwdNo:
AwdDate:
NoCopies:
Amended: Yes
OffrExt: Off
OffrNoEx: No
ApprData: See Schedule
ChgeOrd: Off
ChgeOrder:
Modify: Off
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).:
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Supplementary Page.
SignName:
SignTitl:
ContDate:
ContrOfficerInfo:
CODate:
Contractor Info:
ContractorPOC:
Contractor:
ModAmount:
Header:
15B. CONTRACTOR/OFFEROR:
Footer1:
signature:

File details come from the government source that posted it. Updated .