About this file

Amendment 05

View the file

Other files

File Type Posted
Amend08.doc DOC document
Amend07.doc DOC document
Amend06.doc DOC document
GSA 527 exp 7.31.12.pdf PDF
Form SF LLL.pdf PDF
Amend04.doc DOC document
Form SF LLLA.pdf PDF
Form 527.pdf PDF
Amend03CCfinal.doc DOC document
Attendee's List.pdf PDF
Amend02CC.doc DOC document
Amend01.doc DOC document
Announcement - Preproposal Conference.doc DOC document
St. Es.Campus Coordinator.RFP final.DOC DOC document
Form 33 CC.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

GS11P10MKC0063

PAGE OF

PAGES

2. AMENDMENT/MODIFICATION NO.

Amendment 05

3. EFFECTIVE DATE

07/07/2010

REQUISITION/PURCHASE REQ. NO.

PROJECT NO. (If applicable)

6. ISSUED BY
CODE
MM000
7. ADMINISTERED BY (If other than Item 6)
CODE
MM000

GSA, NCR, PBS,

Campus Development Team (WP) 301 7th Street, SW Room 4606 Washington, DC 20407

GSA, NCR, PBS,

Campus Development Team (WP)

301 7th Street, SW Room 4606

Washington, DC 20407

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9.A. AMENDMENT OF SOLICITATION NO.

(X)
GS11P10MKC0063 RECOVERY

To All Prospective Offerors

9B. DATED (SEE ITEM 11)

06/01/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning. copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.

(x)
A.

THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

c.

THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D.

OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not FORMCHECKBOX is required to sign this document and return ________ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).

The solicitation is hereby amended as follows:

The following changes, clarifications, additions and supplements are hereby incorporated into this SOLICITATION in their entirety as submitted. Continued on Page 2 of this Amendment

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Bonnie Echoles, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED
16B. UNITED STATES OF AMERICA

BY

Bonnie Echoles .

(Signature of Contracting Officer)

16C. DATE SIGNED

07/07/2010

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

GS11P10MKC0063, RECOVERY: Campus Coordinator, Consolidation of DHS at the St. Elizabeths Campus, SE, Wash., DC

ITEM A:

THE PROPOSAL RECEIPT DATE remains as follows:

July 12, 2010 by 2:00 PM, EST. Place of receipt as follows:

GSA, NCR, ROB – Bid Room 301 7th Street, SW, Room 1065 Washington, DC 20407 Phone: (202)708-5961

ITEM B:

Use the attached revised GSA FORM 527 – Contactor’s Qualifications and Financial Information (Exp 7.31.12); Submittal: Price Proposal, TAB 6.

ITEM C:

The following is hereby incorporated as a modification to ITEM 145 under CAMPUS COORDINATOR RFI LOG #2 as issued under Amendment Four.

145
The RFP indicates that only 5 resumes for the Evaluated Key Personnel categories (as indicated in Section H, H.2.1) should be submitted under Factor 3: Key Personnel. However, during the preproposal conference it was indicated that in addition to the Evaluated Key Personnel categories, Offerors would need to provide information for personnel proposed for positions listed under Non-Evaluated Key Personnel and the additional positions listed in Section B in the Labor Category list (B.8.2 Additional Services Base Period). Should we include resumes in Factor 3: Key Personnel for all 16 of the positions indicated in Section B; only resumes for the 10 Evalulated Key Personnel and Non-Evaluated Key Personnel; or only the 5 Evaluated Key Personnel?
Include resumes for the evaluated and non-evaluated definitely, others may be submitted at your discretion.

ITEM D:

Use the following guide in preparation and submittal of your firm’s response to this RFP:

Technical Proposals shall be in three (3) severable parts:

· Part One - Technical Proposals Requirements

· Part Two – Technical Proposal Evaluation Factors

· Part Three – Forms

(1) Part One – Technical Proposal Requirement

The first part of the Technical Proposal shall be marked “PART 1 - TECHNICAL PROPOSAL REQUIREMENTS.” All copies must contain original signatures (dark blue ink) on all documents signed. Be sure that all information is correct and accurate. Protruding tabs must be used to separate each section/form(s). The CC must include the following information:

· Tab 1 - One (1) Procurement Integrity Certificate (Attachment 2)

· Tab 2 - One (1) Proposal Certification Statement (Attachment 3)

· Tab 3 - One (1) Conflict of Interest Certification (Attachment 4)

· Tab 4 - One (1) Statement of Availability

· Tab 5 - One (1) Schedule of Code of Business Ethics and Conduct (Attachment 6)

· Tab 6 - One (1) Confidentiality and Non-Disclosure Agreement (Attachment 5)

(2) Part Two – Technical Proposal Evaluation Factors

The second part of the Technical Proposal shall be marked “PART 2 - TECHNICAL PROPOSAL EVALUATION FACTORS.” All copies must contain original signatures (dark blue ink) on all documents signed. Be sure that all information is correct and accurate. Protruding tabs must be used to separate each section/form(s). The CC must include the following information:

· Tab 1 - Experience of Firm

· Tab 2 - Past Performance of Firm

· Tab 3 - Key Personnel

· Tab 4 - Management Approach and Capabilities

· Tab 5 – Small Disadvantaged Business Participation Plan

(3) Part Three – Forms

The third part of the Technical Proposal shall be marked “PART 3 – FORMS.” All copies must contain original signatures (dark blue ink) on all documents signed. Be sure that all information is correct and accurate. Protruding tabs must be used to separate each section/form(s). The forms required to be filled out and submitted are as follows:

· Tab 1 - One (1) copy of DOCUMENT SECURITY NOTICE TO PROSPECTIVE BIDDERS/OFFERORS.

· Tab 2 - One (1) copy of the Signature Authority (Section A, with Firm Name, Signature with proper authority is a material requirement, and failure to include with the offer a statement/delegation of that authority on the firm’s letterhead will render your offer nonresponsive.)

· Tab 3 - One (1) copy of the GSA Form 527, Contractor’s Qualifications and Financial Information.

L.8.2.4 Price Proposal Contents

All copies must contain original signatures (dark blue ink) on all documents signed. Be sure that all information is correct and accurate. Protruding tabs must be used to separate each section/form(s). The CC must include the following information:

· TAB 1 - one (1) Standard Form 33 from Section-A with items 12 through 18 completed.

· TAB 2 - one (1) set each of Representations and Certifications from Section-K with all entries completed including the Tax and DUNS numbers; Standard Form LLL – Disclosure of Lobbying Activities; and Standard Form LLLA – Disclosure of Lobbying Activities (Continuation Sheet).

· TAB 3 - one (1) copy of the completed pricing sheets from Section B of this RFP; attachments to the pricing sheets from the offeror which detail additional pricing/information may be included, provided they are so identified and do not qualify or form a part of the offer.

· TAB 4 - As required by the provision FAR 52.222-46 in this Section-L, the CC is required to include its total Compensation Plan.

· TAB 5 – one (1) copy of the Subcontracting Plan. Proposals submitted by large business offerors must include a subcontracting plan in which they are required to discuss and include their actual formal plan for subcontracting with small business firms. The Subcontracting Plan shall be complete with all applicable information set forth clearly and concisely.

(1) If selected for award, the subcontracting plan should be ready for approval without the need to obtain additional information.

(2) Overall Target Participation

(3) Overall Target Participation goals are a summation of all awards to small, small disadvantaged, HUB Zone small, veteran-owned small, service disabled veteran-owned small, and Woman Owned Small Business (WOSB) concerns at all tiers of the project.

(4) The Government will allow the Offeror’s Subcontracting Plan to include Overall Target Participation for first; second, third (and etc.) tier subcontracting.

(5) There shall be no double counting of dollar amounts.

(6) The denominator used to arrive at the percentage goals for SB, SDB, HUBZone small, veteran-owned small, service disabled veteran-owned small, and WOSB must noted.

This Subcontracting Plan requirement does not apply to small businesses (receipts not exceeding $33.5 million average annual gross revenues for the last three years; for a joint venture legal firm, such revenues for the firms may not exceed that threshold when combined).

· Tab 6 - One (1) copy of the GSA Form 527, Contractor’s Qualifications and Financial Information.

ITEM E:

Offerors must acknowledge receipt of this amendment on offer form, giving number and date.

Attachments:

GSA FORM 527 – Contactor’s Qualifications and Financial Information (Exp 7.31.12)

END OF AMENDMENT NO. FIVE (5)

File details come from the government source that posted it. Updated .