Amend04.doc
DOC document 272 KB Posted
- Solicitation number
- GS11P10MKC0063
About this file
SF 30 - Amendment 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend08.doc | DOC document | |
| Amend07.doc | DOC document | |
| Amend06.doc | DOC document | |
| Amend05.doc | DOC document | |
| GSA 527 exp 7.31.12.pdf | ||
| Form SF LLL.pdf | ||
| Form SF LLLA.pdf | ||
| Form 527.pdf | ||
| Amend03CCfinal.doc | DOC document | |
| Attendee's List.pdf | ||
| Amend02CC.doc | DOC document | |
| Amend01.doc | DOC document | |
| Announcement - Preproposal Conference.doc | DOC document | |
| St. Es.Campus Coordinator.RFP final.DOC | DOC document | |
| Form 33 CC.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
GS11P10MKC0063
PAGE OF
PAGES
2. AMENDMENT/MODIFICATION NO.
Amendment 04
3. EFFECTIVE DATE
07/01/2010
REQUISITION/PURCHASE REQ. NO.
PROJECT NO. (If applicable)
| 6. ISSUED BY |
| CODE |
| MM000 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
| MM000 |
GSA, NCR, PBS,
Campus Development Team (WP) 301 7th Street, SW Room 4606 Washington, DC 20407
GSA, NCR, PBS,
Campus Development Team (WP)
301 7th Street, SW Room 4606
Washington, DC 20407
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9.A. AMENDMENT OF SOLICITATION NO.
| (X) |
| GS11P10MKC0063 RECOVERY |
To All Prospective Offerors
9B. DATED (SEE ITEM 11)
06/01/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning. copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.
| (x) |
| A. |
THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
c.
THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D.
OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not FORMCHECKBOX is required to sign this document and return ________ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).
The solicitation is hereby amended as follows:
The following changes, clarifications, additions and supplements are hereby incorporated into this SOLICITATION in their entirety as submitted. Continued on Page 2 of this Amendment
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Bonnie Echoles, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
BY
Bonnie Echoles .
(Signature of Contracting Officer)
16C. DATE SIGNED
07/01/2010
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
GS11P10MKC0063, RECOVERY: Campus Coordinator, Consolidation of DHS at the St. Elizabeths Campus, SE, Wash., DC
ITEM A:
THE PROPOSAL RECEIPT DATE remains as follows: PER Amendment No. 3
July 12, 2010 by 2:00 PM, EST. Place of receipt as follows:
GSA, NCR, ROB – Bid Room 301 7th Street, SW, Room 1065 Washington, DC 20407 Phone: (202)708-5961
ITEM B:
The following documents are hereby DELETED in their entirety:
ATTACHMENT 1 - PRIVACY ACT NOTICE TO EMPLOYEES AND OFFICIALS (rev.)
The following documents are hereby INCORPORATED in their entirety:
Attachment 2 – Procurement Integrity Certificate
Attachment 6 - Code of Business Ethics and Conduct (Part One – Technical Proposal Requirement; Tab 5)
DOCUMENT SECURITY
GSA FORM 527 – CONTRACTOR ‘S QUALIFICATIONS AND FINANCIAL INFORMATION (Part Three – Forms) STANDARD FORM LLL – DISCLOSURE OF LOBBYING ACTIVITIES (Part Three – Forms) STANDARD FORM LLLA – DISCLOSURE OF LOBBYING ACTIVITIES (CONTINUATION SHEET) (Part Three – Forms)
ITEM C:
The attached Campus Coordinator RFI Log #2 (Issued under Amendment No. Four (4)) is hereby incorporated in its entirety.
ITEM D:
Offerors must acknowledge receipt of this amendment on offer form, giving number and date.
Attachments:
Attachment 2 – Procurement Integrity Certificate
Attachment 6 - Code of Business Ethics and Conduct
DOCUMENT SECURITY
GSA FORM 527 – CONTRACTOR ‘S QUALIFICATIONS AND FINANCIAL INFORMATION
STANDARD FORM LLL – DISCLOSURE OF LOBBYING ACTIVITIES
STANDARD FORM LLLA – DISCLOSURE OF LOBBYING ACTIVITIES (CONTINUATION SHEET)
Campus Coordinator RFI Log #2
END OF AMENDMENT NO. FOUR (4)
ATTACHMENT 2
PROCUREMENT INTEGRITY CERTIFICATION
CONTRACTOR CERTIFICATE OF PROCUREMENT INTEGRITY
(1) I, (Type Name)_____________________________, am the officer or employee responsible for the preparation of this offer and hereby certify that, to the best of my knowledge and belief, with the exception of any information described in this certificate, I have no information concerning a violation or possible violation of subsections 27 (a), (b), (d), or (f) of the Office of Federal Procurement Policy Act, as amended (41 U.S.C. 423), (hereinafter referred to as “the Act”), as implemented in the FAR, occurring during the conduct of this procurement.
(2) As required by subsection 27 (e)(1)(B) of the Act, I further certify that, to the best of my knowledge and belief, each officer, employee, agent, representative, and consultant of (Firm)_______________________________ who has participated personally and substantially in the preparation or submission of this offer has certified that he or she is familiar with, and will comply with, the requirements of subsection 27(a) of the Act, as implemented in the FAR, and will report immediately to me any information concerning a violation or possible violation of subsections 27(a), (b), (c), or (f) of the Act, as implemented in the FAR, pertaining to this procurement.
(3) Violations of possible violations: (Continue on plain bond paper if necessary and label “Certificate of Procurement Integrity (Continuation Sheet)”) ENTER “NONE” IF NONE EXIST:____________________
(4) I agree that, if awarded a contract under this solicitation, the certifications required by subsection 27 (e)(1)(B) of the Act shall be maintained in accordance with paragraph (f) of this provision.
Typed name and signature of the officer or employee responsible for the offer and date:
Signed:____________________________________Date:_______________
Typed Name:___________________________________________________
Part III Section J - List of Documents, Exhibits, and Other Attachments
ATTACHMENT 6
SCHEDULE OF CODE OF BUSINESS ETHICS AND CONDUCT
Name and Signature of Official
In accordance with FAR Part 52.203-13 Contractor Code of Business Ethics and Conduct (APRIL 2010), the following notice is provided:
Your signature on this document indicates your agreement to provide within 30 days after contract award, per the referenced FAR Clause, a copy of your firm’s written code of business ethics and conduct of which each employee engaged in performance of the contract will receive.
You further agree to:
(i) Exercise due diligence to prevent and detect criminal conduct; and
(ii) Otherwise promote an organizational culture that encourages ethical conduct and a commitment to compliance with the law.
You further agree to timely disclose, in writing, to the agency Office of the Inspector General (OIG), with a copy to the Contracting Officer, whenever, in connection with the award, performance, or closeout of this contract or any subcontract thereunder, the Contractor has credible evidence that a principal, employee, agent, or subcontractor of the Contractor has committed—
(A) A violation of Federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 of the United States Code; or
(B) A violation of the civil False Claims Act (31 U.S.C. 3729-3733).
You further agree to establish an on-going Business Ethics Awareness and Compliance Program and Internal Control System within 90 days after contract award.
DOCUMENT SECURITY
NOTICE TO PROSPECTIVE BIDDERS/OFFERORS
This solicitation includes Sensitive But Unclassified (SBU) building information. SBU documents provided under this solicitation are intended for use by authorized users only. In support of this requirement, GSArequires bidders/offerors to exercise reasonable care when handling documents relating to SBU buildinginformation per the solicitation.
REASONABLE CARE:
1. Limiting dissemination to authorized users. Dissemination of information shall only be made upon determination that the recipient is authorized to receive it. The criterion to determine authorization is need-to-know. Those with a need-to-know are those who are specifically granted access for the conduct of business on behalf of or with GSA. This includes all persons or firms necessary to do work at the request of the Government, such as architects and engineers, consultants, contractors, sub-contractors, suppliers, and others that the contractor deems necessary in order to submit an offer/bid or to complete the work or contract, as well as maintenance and repair contractors and equipment service contractors.
NOTE: It is the responsibility of the person or firm disseminating the information to assure that the recipient is an authorized user and to keep records of recipients.
Authorized users shall provide identification as set forth below:
Valid identification for non-Government users. Authorized non-Government users shall provide valid identification to receive SBU building information. The identification shall be presented and verified for each dissemination. Valid identification shall be all items (a) through (c), below, and including item (d), as necessary:
(a) A copy of a valid business license or other documentation granted by the state or local jurisdiction to conduct business. The license at a minimum shall provide the name, address, phone number of the company, state of incorporation, and the name of the individual legally authorized to act for the company. The business must be of the type required to do the work. A general contractor’s license may be substituted for the business license in states that issue such licenses. In the rare cases where a business license is not available from the jurisdiction, the information shall be provided and testified to by the submitter; and
(b) Verification of a valid DUNS Number against the company name listed on the business license or certification. Verification may be obtained through http://www.fpdc.gov, or by calling Dun & Bradstreet at 703-807-5078 to set up an account; and
(c) A Valid IRS Tax ID Number of the company requesting the information; and, as necessary,
(d) A Valid picture state driver’s license shall be required of person(s) picking up SBU documents. Phone verification must be made to a previously validated authorized user that the individual(s) picking up the documentation is authorized to do so by the company obtaining the documents. SBU documents will not be released to any individual or firm who has not, either previously or at the time of pickup, supplied the required documentation as outlined in paragraphs (a) through (c), above.
2. Retaining and destroying documents. The efforts required above shall continue throughout the entire term of the contract and for whatever specific time thereafter as may be necessary. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CD’s, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.
3. Term of Effectiveness. The efforts required above shall continue throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the Government. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention.
4. Written agreement of disposal. For all contracts using SBU building information, the contractor shall provide a written statement that he and his subcontractors have properly disposed of the SBU building documents, with the exception of the contractor’s record copy, at the time of Release of Claims to obtain final payment. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CDs, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.
The recipient acknowledges the requirement to use reasonable care, as outlined above, to safeguard the documents and, if not awarded, the contract (and at the completion of any protest/appeal process) will make every reasonable and prudent effort to destroy or render useless all SBU information received during the solicitation.
I agree that I will abide by this agreement and will only disseminate Sensitive But Unclassified (SBU) building information to other authorized users under the conditions set forth above.
Signature:______________________________________________
Title:__________________________________________________
Date:__________________________________________________
Copy of business license attached
DUNS Number:_________________________________________
Verified: Yes No
IRS Tax ID Number______________________________________ CAMPUS COORDINATOR RFI LOG #1 (Amendment One)
| Item No. |
| QUESTION |
| RESPONSE |
| 1 |
| Will the construction manager for Phase 1 for the Consolidation of the Department of Homeland Security (DHS) at the St. Elizabeths Campus be excluded from consideration for the campus coordinator solicitation? |
| FAR Subpart 9.5 specifically addresses Organizational and Consultant Conflicts of Interest. This subpart prescribes responsibilities, general rules, and procedures for identifying, evaluating, and resolving organizational conflicts of interest. The scope for the Campus Coordinator will include the administration of global issues pertaining to all three (3) phases for the project. The global issues will be relative to the oversight and management of interdependent projects. At a minimum, it is expected that there will be three (3) Architects of Record (one for each phase); three (3) Construction Management Firms (one for each phase), and over one hundred Construction Contractors (large and small). Each Construction Management (CM) professional services contract is intended to perform design phase (excluding actual design), procurement phase, construction phase, reimbursable, supplemental, claims, testing, and miscellaneous services under each phase. |
| 2 |
| Will the campus coordinator for the Consolidation of the Department of Homeland Security (DHS) at the St. Elizabeths Campus be excluded from consideration for the Phase 2 and Phase 3 construction management solicitations? |
| 3 |
| SF 33 lists the proposal due date as July 1, 2010. The RFP on page 93 lists the due date as June 28, 2010. Which is correct? |
| Due date is July 1, will be updated. |
| 4 |
| Subsection L.8.2.3, Technical Proposal Contents, says that the technical proposal shall be no more than 75 pages, inclusive of the table of contents, charts, exhibits and any other materials. (1) Part One – Technical Proposal Requirements lists 8 pages of forms (for a joint venture, this would mean 16 pages of forms). (3) Part Three – Forms, requires SF 33 (plus any amendments), representations and certifications (16 pages) and GSA form 527 (24 pages for our joint venture. Thus approximately 50 of the 75 pages would be required forms. Is it GSA’s intent to limit Part Two to 75 pages or to move the form from the technical proposal to the price proposal? |
| 75 pages are just for the Technical portion. |
| 5 |
| Subsection L.8.2.3, Technical Proposal Contents, and Subsection 8.2.4, Price Proposal Contents, both require SF 33 (plus amendments) and representations and certifications. Does GSA want to see both forms in both proposals? |
| No, just the Pricing. |
| 6 |
| FACTOR 2: Past Performance of Firm, page 97, references a Past Performance Questionnaire at attachment 11. The RFP currently has no attachments. Will GSA supply the Past Performance Questionnaire? |
| Contracting Officer will supply forms. |
| 7 |
| Can GSA align the key personnel titles on p. 41 with the titles used on the pricing sheets in Section B? |
| Yes |
| 8 |
| In Section H, p. 42, is the webmaster/IT specialist analogous to the IT Coordinator or the assistant IT coordinator on the pricing sheets? |
| Yes |
| 9 |
| FACTOR 3: Key Personnel, p. 90, “resumes for key personnel shall not exceed three typed pages.” Does this statement mean three pages total for five resume or three pages each for five resumes? |
| 3 pages for each person. |
| 10 |
| Please define the difference between FACTOR 5: Small Disadvantaged Business Participation Plan, p. 100, with targets expressed as dollars and percentages of total contract value, and Price Proposal Tab 5, Subcontracting Plan? |
| See attached Sheet – SDB Participation Plan and SB Subcontracting Plan. |
CAMPUS COORDINATOR RFI LOG #2 (Amendment Four)
| Item No. |
| QUESTION |
| RESPONSE |
| 11 |
| B.5 - Refers to a Schedule B. We were unable to locate. Was the reference meant to be Section C - Scope of Work? |
Yes, Section C for scope.
| 12 |
| B.7(a) - Should the aggregate of the base and 6 additional years (7 years total) be $35 million, not the $30 million published? |
| YES |
| 13 |
| B.7.(g) - Should it be six option years and not four option years as published? |
| YES, 1 Base plus 6 Options. |
| 14 |
| C.3.4 - Refers to an Appendix A of Section C. We were unable to locate. |
| Appendix A was deleted. |
| 15 |
| C.4.10 - This article states that the government will be responsible for all costs associated licensing and implementation of the e-PM system. It goes on to say that in the event the e-PM system is not available at the time of contract award the CC shall be responsible for for providing an e-PM system to GSA for use on the project. Will the government be responsible for the costs associated with licensing and implementation of a CC provided e-PM system? |
Thank you for your review.B.7(a) - Should the aggregate of the base and 6 additional years (7 years total) be $35 million, not the $30 million published?
Yes and yes.
| 16 |
| Has the Campus Coordinator contract been awarded for Ph 1 (Coast Guard and DHS ) ? |
| The scope for the Campus Coordinator will include the administration of global issues pertaining to all three (3) phases for the project. There is no separate contract for any phase. |
| 17 |
| Please confirm that the 90-page limit is referring to the text the CC provides for the proposal and that the forms requested by GSA are in addition to that page count. B.7(a) - Should the aggregate of the base and 6 additional years (7 years total) be $35 million, not the $30 million published? |
| 90 page limit is a guideline. Yes. |
| 18 |
| May we please provide text as single-spacing rather than the double-spacing? |
| Single spacing is allowed only in the resumes. |
| 19 |
| 3. May we exclude the Table of Contents from the page count? |
4. May we use 11x17 pages to count as 1 page?
5. Does the cost volume have a page limit?
3. Yes, 4. Yes, 5. No.
| 20 |
| 6. May we use a different font and/or size (rather than Times New Roman 12) for accents, such as headings, tables, exhibits, org chart, graphics, captions, etc? |
| Yes |
| 21 |
| 7. Please clarify number of copies to be submitted: RFP states 4 (1 original and 3 copies) but the SF33 states 5 (1 original and 4 copies). |
| 1 original + 3 copies. Make changes to the SF 33. |
| 22 |
| 8. Section K (Reps & Certs) and SF33 are asked for in both Volumes I and II. Is this correct? If so, please confirm that these will not count towards the total page count, as these are not part of our typed submittal. |
| The documents will NOT count towards the page total. |
| 23 |
| 9. Pg. 6 Section B.3 reflects an effective contract period of base plus 6 option years for a potential 7 year contract period. |
| Correct. |
| 24 |
| 10. Pg. 21 Section C.4.7 “The CC shall generate and monitor the Campus Master Schedules, an integrated master project schedule throughout the course of the project using, Microsoft Project.” |
| This will be a software program used for monitoring the campus programs scheduling requirements. |
| 25 |
| Pg. 22 Section C.4.10 Electronic Project Management System states that the GSA intends to implement a web-based ePM system prior to award of this contract. On Pg. 99 Under Resource Capacity, the RFP states: Explain the types of Information Management Systems, including ePM, to be used in this contract performance and describe the way you expect to utilize technology to its fullest extent to facilitate the design and construction. It is not clear if the GSA is providing an unknown system under this contract per provisions of Section C.4.10 or if the CC is proposing one under the requirements by stating which system the CC will use per Pg. 99 of the RFP under Resource Capacity. Please clarify. |
| The Government will specifiy and purchase the system when determined. |
| 26 |
| Pg. 94 of the RFP: Tab 5 - One (1) Schedule of Code of Business Ethics and Conduct Part III, Section J: There is no form/schedule included with the RFP with this title. Please provide and verify that this will not count towards the 90 page limit. |
| Refer to FAR 52.203-13 Contractor Code of Business Ethics and Conduct, included in its entirety. Attachment 6 - Schedule of Code of Business Ethics and Conduct is provided within. This Attachment will not count towards the page count. |
| 27 |
| Pg. 97, Factor 2 refers to a Past Performance Questionnaire, Section L Attachment 11. This attachment has not been provided. |
| Questionnnaire was provided under Amendment No. One |
| 28 |
| Pg. 95 Part 3 mentions form 527, Contractor’s Qualifications and Financial Information, from Part IV, Section L in each of the Technical Proposal Binders. Please provide this form and verify that it will not count towards page limit. |
| Forms will not count towards limit. Form provided herein. |
| 29 |
| Pg. 47 Section H.15 Permits and Licenses: What permits, aside from establishment of a site office on the campus, does the GSA envision of the CC? |
| None |
| 30 |
| Pg. 64 Attachment 3: When is this to be submitted? If with the proposal, in what section should it be included? |
| With the Pricing. |
Pg. 98 of the RFP: Resumes for key personnel shall not exceed 3 typed pages.
3 pages allowed per resume
| 32 |
| Pg. 94 of the RFP: Tab 4 Statement of Availability: There is a reference to Part IV Section M, however this paragraph is not included in Part IV of Section M. |
| Statement of Availability is a simple statement submitted by your firm attesting to the availability and corporate commitment of the key personnel proposed under this cotract. |
| 33 |
| Pg. 97, Factor 2 refers to a Past Performance Questionnaire, Section L Attachment 11. This attachment has not been provided. |
| Questionnnaire was provided under Amendment No. One |
| 34 |
| Pg. 94 of the RFP: Tab 1 - One (1) Procurement Integrity Certification for Procurement Officials, for each person assigned to the Contract: To include one page for each person assigned to the contract is 5 pages. |
| These will not count towards the 90 page limit. |
| 35 |
| Pg. 97 FACTOR 1: Experience of Firm: Please clarify this statement: “Statements of past experience shall not exceed three typed pages, 12-point text and one-inch margins" |
| This means nor more than 3 pages per project (i.e., up to 9 pages) |
| 36 |
| Section L.8.2.2, page 94, States that the page limitation for the proposal is 90 pages and Section L.8.2.3 states that the page limitation for the Techncial Proposal is 75 pages. Is the page limitation for the Cost Proposal 15 pages? If so, this is not consistent with the Section L.8.2.4, Price Proposal Contents, whose required contents exceed a 15 page limit. Please provide clarification and guidance. |
| 90 page limit is a guideline. |
| 37 |
| Section L.8.2.5, Evaluation Criteria, Factor 4, Staffing Plan requires an extensive and detailed breakout of manpower requirements by project phase by company by month over the 7 year period of performance, but only allocates 2 pages (8 ½ x 11 inch 12-point text). Please provide clarification on the requirements and page count. Will 11 x 17 inch foldout be allowed for the staffing plan? |
| Yes. |
| 38 |
| Please confirm the requirement that the proposal shall be double-spaced. The Evaluation Factor subsection guidance does not mention double-space requirements. Additionally, the Government provided forms and certifications are not double spaced, is it the Government’s intent that we re-format the forms to comply with the double space requirement? |
| Double spaced except for resumes, if desired. |
| 39 |
| Paragraph G.3 defines a requirement for pre-invoice meetings to determine billable amounts and invoice documentation requirements. This requirement seems inconsistent within the context of a FFP effort. Please provide clarification? |
| No, that is CMs scope. |
| 40 |
| Paragraph B.7 (a) - Please provide clarification on the MOL and total contract value. A MOL of $5M/yr for a 7 year POP equates to a total max contract value of $35M vice $30M. Is the MOL/yr or total contract value mis-stated? |
| S/B $35M. |
| 41 |
| Section L.8.2.5, Evaluation Criteria, Factor 4, Staffing Plan states “The staffing plan should exclude manpower for supplemental services, and do not include any manpower for miscellaneous services, and/or post construction claim services.” Are “miscellaneous services” the same as “other services” identified in Section C, Scope of Work, Paragraph C.3.1, “The CC may also be tasked with other services as needed such as value engineering, inspections, and financial services by example.”? |
| Yes. |
| 42 |
| Paragraph H.10, Office Space, Equipment and Supplies. Please provide additional information sufficient to provide a firm fixed price to include: |
i. What quantity of area is allocated for the triple-wide trailer complex?
ii. What is proximity to utilities and what utilities are available?
iii. Is the area level for placement of the trailer complex?
iv. Is area provided for on-site parking of contractor personnel?
v. Does the contractor maintain and monitor a dedicated parking area for government personnel?
vi. What quantity of government personnel does the contractor provide and maintain?
vii. Is the area for government personnel equipped with both systems furniture workstations and hard walled office? In what quantities?
viii. Does the government anticipate a relative small conference area dedicated for government use?
1. Paved parking lot, 2. Within 50 yards. 3. Yes. 4. Yes, but limited parking, 5. No, 6. None.7. No need for Govt personnel area., 8. N/A.
| 43 |
| Section C, Scope of Work |
a. Page 18 C.2 – what is the relationship between the three A&E contractors listed and the Campus Coordinator? Are there any intended duplicative services? Does the CC support GSA in program support of these A&E contractors as well?
b. Page 21 - As the Master Project schedule is identified as to be developed with MS Project, are the multiple vendors on the site required to use MS Project as well? (this question is related to compatibility of software)
c. Page 21 - Is there a baseline quantity on the number of weekly A/E project progress meetings and respective durations? Quarterly? Monthly?
d. Page 22 – If the contractor provides the e-PM system, does the government have an expectation on number of license required to be purchased? As well as quantity of training sessions for required government personnel?
e. Page 24 - C.4.20 and C.4.21 are repeats, was a different aspect of the HVAC Quality Assurance Review intended?
a. Just a working on the same team relationship, no authority. B. No, just the CMs, C. Usually weekly for each project. D. Govt. will provide system., E. No.
| 44 |
| For Attachments 1 & 2, Please confirm that the name of the procurement official shall be left blank. |
| Yes. |
| 45 |
| Submit 1 person for each position? |
| Should submit both the evaluated 5 and unevaluated 5. |
| 46 |
| Statement of availablitiy was not found. |
| Statement of Availability is a simple statement submitted by your firm attesting to the availability and corporate commitment of the key personnel proposed under this cotract. |
| 47 |
| Schedule of code of ethics was not found. |
| Included herein. |
| 48 |
| Are utilities near the trailer site? |
| Yes |
| 49 |
| Is there a form to be filled representing the monthly cost of mobilizing, monthly reocurring overhead? |
| No |
| 50 |
| Will a Real Estate specific Solicitation be issued for the DHS / St Elizabeths Consolidation project which addresses items such as: |
A. Lease Strategy / Lease Optimization B. Lease Administration C. Financial Cost - Benefit Analysis D. Other Financial Metrics Not at this time. Leasing issues and strategies are being performed by the GSA Leasing group.
| 51 |
| The current solicitation requires cost and pricing data which triggers both layers of government cost accounting regulations - FAR Cost Principles and Cost Accounting Standards. These requirements are also required for multiple tiers of subcontractors. These requirements will exclude commercial real estate firms and other non-typical government contractors from participating. These types of firms do not meet these requirements. Given there is nothing government-unique to the nature of the services and they are the same as bought by non-government property owners every day, we would suspect this solicitation would be on a commercial item basis and exempt Cost and pricing data and exempt from those government-unique cost accounting requirements. - especially at a subcontractor level. Please advise if these requirements will be modified. |
| Not at this time. |
| 52 |
| The RFP, Amendment No 1 indicates that all questions/RFIs must be received by 3:00 PM, EST on Wednesday, June 22, 2010. However, June 22, 2010 is a Tuesday. Additionally, at the preproposal conference, it was indicated that questions/RFIs must be received on that date by close of business. Would you clarify the exact day, date, and time that RFIs/questions are due? |
Can you notify bidders of this particular clarification as soon as possible?
RFIs due Wednesday, 06/22/2010, 3PM.
| 53 |
| Because we are anticipating and Amendment with numerous changes to submittal requirements, we request an extention to the due date of at least 2 weeks for this proposal. |
Can you notify bidders of an extension as soon as possible?
No extension at this time.
| 54 |
| Can you please tell me how the furniture for the project listed below will be handled? Will it be a bid system ? Will the contractors be handling it in the scope of their work? Any information would be most appreciated. |
| All furniture will be thru the GSA FAS contract that Bill P is part of - a completely separate bid process |
There is NO furniture in the P&W Adaptive reuse plans - they will show a layout for reference only
| 55 |
| I reviewed your website but I was unable to locate plans for the project(s) listed below. Also how many addenda were issued If the information is not currently available, when should I check back on this? |
| The drawings and specifications for this project is listed in the Solicitation. Please read the solicitation in its entirety to find the person to contact for the information you are inquiring. |
| 56 |
| Only services pertaining to Global Design, Global Commissioning and As-built Documentation (Items 1, 2 and 9) are described in the ensuing scope of work. Responsibilities for items 3, 4, 5, 6, 7 and 8 are not defined. Please elaborate or provide a scope of work of what is expected for these six areas of expertise. |
| No further description will be provided. |
| 57 |
| In regards to items 1, 2 and 9 above, the scope included in subsections C.4.7, C.4.8, C.4.9, C.4.10, C.4.20, C.4.21, C.5 C.6 seem to be duplicative of and/or overlapping with the scope awarded to the Phase 1 CM and potentially to be awarded to the Phase 2 & 3 CMs. Please clarify the intent to include these scopes in the CC scope of work. |
| CC will perform oversight for CM activities as they relate to the consistancy of all phases. |
| 58 |
| In subsection C.4.8, paragraph three it states that "the CC shall conduct and the CMs shall participate in weekly Subcontractor meetings." Please advise as to which subcontractors are being referred to, i.e., the CC's subcontractors, GSA's other consultants, the CM's subcontractors and consultants or the general contractors’ subcontractors? Due to the amount of CM and prime general contractors working on the project, these meetings could easily amount to dozens of meetings per week. Please clarify which subcontractors you are referring to. |
| This is regarding the subcontractors related only to the fields that the CC is responsible for i.e: IT, security, Move coordination… |
| 59 |
| In subsection L.2.8.2, there is a reference to page limitation of 90 pages. In subsection L.8.2.3, there is a reference to a limitation of 75 pages. Please confirm the page limitation. |
| The intent is to keep the page limit under or around 90. |
| 60 |
| In subsection L.8.2.2, the requirement is Times New Roman 12 point, double spaced, one-inch margins. However, in the Factors (pp. 97-99), requirements are defined as 12-point text and one-inch margins. No font is specified, nor is double spacing specified. Is single spacing acceptable? Is any legible font acceptable? |
| Use New Times Roman 12pt dble spaced in all areas except resumes where single spacing is acceptable. |
| 61 |
| Pg. 93 Section L.8.2.2 Proposal Arrangement references double-spaced and page limitation of 90 pages; however, Section L.8.2.3 Technical Proposal Contents states this proposal shall not contain more than 75 pages, which leaves only 15 pages for the Cost Volume, which includes the Small Business plan as well. For a full Small Business plan, the page count can average 15+ pages. Please allow us to provide this single-spaced; please also verify that the SB plan does NOT count towards the 90 page limit. |
| Single spacing only on resumes. |
| 62 |
| Pg. 44, Section H.10 requires the CC to provide on-site office facilities for both its personnel and that of GSA. The direct cost of these facilities and the noted equipment and supplies are not part of standard overhead pricing of the man-hour rates as noted in the RFP. Are the proposed estimates for these on-site provisions part of a negotiation with GSA upon notification of Award to ensure most economical operation, as they are not part of the pricing evaluation of Section B.8 starting on Pg. 9. It is assumed that these are negotiated direct costs with GSA to ensure best-value prior to NTP. |
| No space is needed for GSA personnel, Cost should be included in overhead section. No rent will be charged for spce to place a trailer complex. |
| 63 |
| Pg. 43 Section H 2.2: The section requires that the Security Specialist work with the GSA, DHS, CM and Project Teams to ensure continuity and coordination of similar security systems set forth by DHS. Are these systems or their criterion known at this time to ensure the specialist is familiar with the DHS requirements? Is that important at this time? |
| The quality and experience of your security person is important at this time for evaluation. |
| 64 |
| Pg. 31 Section E.4 FAR 52.246-4 Inspection of Services: How does this section apply to the CC role and responsibilities? It is not apparent that the CC will conduct tests [Ref para (c) ] or routine inspection that might be the role of the GC’s activities. Please clarify. |
| Just oversight. |
| 65 |
| Only services pertaining to Global Design, Global Commissioning and As-built Documentation (Items 1, 2 and 9) are described in the ensuing scope of work. Responsibilities for items 3, 4, 5, 6, 7 and 8 are not defined. Please elaborate or provide a scope of work of what is expected for these six areas of expertise. |
| No further description will be provided. |
| 66 |
| In regards to items 1, 2 and 9 above, the scope included in subsections C.4.7, C.4.8, C.4.9, C.4.10, C.4.20, C.4.21, C.5 C.6 seem to be duplicative of and/or overlapping with the scope awarded to the Phase 1 CM and potentially to be awarded to the Phase 2 & 3 CMs. Please clarify the intent to include these scopes in the CC scope of work. |
| CC will perform oversight for CM activities as they realate to the consistancy of all phases. |
| 67 |
| In subsection C.4.8, paragraph three it states that "the CC shall conduct and the CMs shall participate in weekly Subcontractor meetings." Please advise as to which subcontractors are being referred to, i.e., the CC's subcontractors, GSA's other consultants, the CM's subcontractors and consultants or the general contractors’ subcontractors? Due to the amount of CM and prime general contractors working on the project, these meetings could easily amount to dozens of meetings per week. Please clarify which subcontractors you are referring to. |
| This is regarding the subcontractors related only to the fields that the CC is responsible for i.e: IT, security, Move coordination… |
| 68 |
| In subsection L.2.8.2, there is a reference to page limitation of 90 pages. In subsection L.8.2.3, there is a reference to a limitation of 75 pages. Please confirm the page limitation. |
| The intent is to keep the page limit at or around 90. |
| 69 |
| In subsection L.8.2.2, the requirement is Times New Roman 12 point, double spaced, one-inch margins. However, in the Factors (pp. 97-99), requirements are defined as 12-point text and one-inch margins. No font is specified, nor is double spacing specified. Is single spacing acceptable? Is any legible font acceptable? |
| Use New Times Roman 12pt dble spaced in all areas except resumes where single spacing is acceptable. |
| 70 |
| Section B.5 (page 6) states “Offerors must provide a firm fixed price for each Base and Option within each phase of the work that addresses all of the services/requirements as detailed in Section C.” The pricing sheet provided in Section B.8.1 Summary (page 9) has only two columns - one for Office Space, Equipment, and Supplies and the other for Additional Services. Please clarify if Offerors are intended to include a firm fixed price for the labor to perform the services/requirements outlined in Section C under the column for Office Space, Equipment, and Supplies? |
| Yes include a firm fixed price for the labor to perform the services/requirements outlined in Section C under the column for Office Space, Equipment, and Supplies. |
| 71 |
| Section B.7.g (page 8) states “…for each respective performance period, i.e., the base year or one of the four option years…” Can the Government clarify whether this is a typographical error and should read six option years? |
| Should read base + 6 option years. |
| 72 |
| Section B.8.2 through B.8.8 Additional Services (pages 10 – 16) includes 16 Labor Categories, while Section H.2.2 Duties and Responsibilities (pages 42 – 43) provides duties and responsibilities for only 10 of these Labor Categories. |
Please clarify if the IT Coordinator is the same as the Webmaster / IT Specialist?
May Offerors propose rates for additional Labor Categories that are required by Section C, Scope of Work, such as Scheduler, Public Affairs Specialist, etc.? If not, how does GSA propose the Offeror include labor rates for these positions?
Yes,
| 73 |
| Section C.3.4 Project Requirements (page 19) states “the CC shall comply with the project requirements provided in Appendix A of Section C. ”The referenced Appendix is not included in the RFP. Will the government provide this document? |
| Appendix will not be provided. |
| 74 |
| The March 26, 2010 Federal Business Opportunities Presolicitation announcement made reference to a “6. Labor/Trade APPRENTICESHIP and TRAINING PROGRAM: The Government will evaluate the means by which the Offeror shall promote the growth of skilled craft labor, specifically the contractor's use of a registered apprenticeship program.” |
Is this a requirement for Offerors under this contract? Or is the CC responsible for reporting this data to GSA for other contractors (members of the Project Delivery Team)?
FBO announcement incorrectly referenced a Labor/Trade APPRENTICESHIP and TRAINING PROGRAM requirement. This program is reserved for the Construction Industry.
| 75 |
| Section L.8.2.5 Evaluation Criteria, Factor 4: Management Approach and Capabilities – Resource Capacity (page 99) states that “CC shall also discuss how it will supplement their in-house resources with major subcontractors, especially with regards to foundations, structural, mechanical, and electrical work.” |
Please clarify if Offerors are expected to perform this specific work, i.e., foundations, structural, mechanical, and electrical, or if this language was included in error.
CC shall also discuss how it will supplement their in-house resources with subconsultants, especially with regards to overseeing and managing issues related to foundations, structural, mechanical, and electrical work.
| 76 |
| Section L.8.2.5 Evaluation Criteria, Factor 3: Key Personnel (page 98) states that “Resumes for key personnel shall not exceed three (3) typed pages.” |
Is this page limit for each resume (potentially 15 pages) or for the entire Factor?
Yes, each resume has a limit of three (3) typed pages, potential 15 pages total.
| 77 |
| Section C.4.7 Detailed Project Schedule Development and Maintenance (page 21) states “The GSA overall project schedule is provided above in the Schedule section of these General Requirements.” The referenced overall project schedule is not included in the RFP. Will the government provide this document? |
| This item will not be provided. |
| 78 |
| Section C.4.10 Electronic Project Management System (page 22) states “Electronic storage and transmission of information via the e-PM system shall be compliant with the provisions of the Document Security section of these General Requirements.” |
The referenced Document Security section is not included in the RFP. Will the government provide this Section?
Included herein.
| 79 |
| Section C.4.21 HVAC Quality Assurance Reviews (page 24) is a duplicate of Section C.4.20 on the same page. Please clarify if a section is missing. |
| This is a duplicate entry; no section is missing. |
| 80 |
| Section C.6.6 Final Commissioning Services (page 27) refers to PCCS submittals. |
Please clarify what the acronym “PCCS” refers to.
Post Construction Contract Services
| 81 |
| Section H.2.2 Duties and Responsibilities (pages 42 – 43) provides duties and responsibilities for 10 of the 16 Labor Categories represented in Sections B.8.2 through B.8.8 Additional Services (pages 10 – 16). Please provide additional information describing the duties and responsibilities the Government anticipates for the other 6 Labor Categories. |
| No further description will be provided. |
| 82 |
| Section J contains “Attachment 3 Proposal Certification Statement” (page 64). |
Please clarify if the Offeror needs to complete this statement and where it should be included in either the Technical or Cost/Price Proposal response.
With the Pricing
| 83 |
| Section L.8 General (page 93) states “proposals shall be submitted by June 28, 2010 by 2:00 PM EST” while the SF 33 states that proposals are due July 1, 2010 at 2:00 pm local time. Please clarify the correct date and time for submittal of the proposal response. |
| July 12, 2010 at 2:00 pm is the proposal due date. |
| 84 |
| Section L.8.2.2 Proposal Arrangement (page 94) states “All materials submitted shall be typeface Times New Roman 12 point, double spaced on 8-1/2 x 11-inch white paper with one inch margins all around and printed on one side.” Are these formatting requirements to be followed for all Parts of the Technical Proposal including Part One – Technical Proposal Requirements and Part Three – Forms? The forms provided in the RFP do not comply with the typeface and font requirements. |
| Forms in RFP are to be submitted as issued. |
| 85 |
| Section L.8.2.2 Proposal Arrangement (page 94) lists a Page Limitation of 90 pages and Section L.8.2.3 Technical Proposal Contents (page 94) states “The Technical Proposal shall not contain more than seventy-five (75) numbered pages…” What is the page limit for the Technical Proposal? Is there a page limit for the Cost/Price Proposal? Are all Parts of the Technical Proposal included in the page count, including Parts One and Three? |
| 90 pages is the limit for the Technical Proposal. No limit on the Cost Proposal. |
| 86 |
| Section L.8.2.3 Technical Proposal Contents (1) Part One – Technical Proposal Requirement states “One Statement of Availability from Part IV Section M” and “One Schedule of Code of Business Ethics and Conduct Part III, Section J” should be included following Tabs 4 and 5, respectively. Neither of these documents is included in the RFP. Please provide these forms and instructions for completing them. |
| Schedule of Code of Business Ethics and Conduct included in amendment; Statement of Availability is a simple statement submitted by your firm attesting to the availability and corporate commitment of the key personnel proposed under this cotract. . |
| 87 |
| Section L.8.2.3 Technical Proposal Contents (3) Part three – Forms (page 95) states “One (1) copy of the GSA Form 527, Contractor’s Qualifications and Financial Information, from Part IV, Section L” should be included following Tab 3 of this Part of the Technical Proposal. The referenced form is not included in the RFP. Is it acceptable to download a copy from www.forms.gov? |
| GSA Form 527 included in amendment. |
| 88 |
| Section L.8.2.5 Evaluation Criteria, Factor 1: Experience of Firm (page 97) states that “Statements of past experience shall not exceed three typed pages…” |
Is this page limit for each program (potentially nine pages, three pages each for three programs) or for the entire Factor?
Page limit for each program (potentially nine pages, three pages each for three programs)
| 89 |
| Section L.8.2.5 Evaluation Criteria, Factor 2: Past Performance of Firm (page 97) states that “the CC shall have the owner of the project submit a completed Past Performance Questionnaire (Attachment 11).” The referenced Attachment is not included in the RFP. Please provide the Past Performance Questionnaire. |
| Included under Amendment No. One |
| 90 |
| Section L.8.2.2 puts a 90 page limit on the total number of pages for our response. Section L.8.2.3 limits the Technical Proposal response to 75 pages. Other sections in L.8 provide additional page limitations. |
| 90 pages is the limit, not including chart, graphics and schedules. |
| 91 |
| Section L.8.2.2 requires that all pages of the response are to be double spaced, which effectively reduces the total page count fro 90 to 45. Please verify the requirement for double spacing. |
| Except in resumes, please dbl space. |
| 92 |
| In the preproposal conference, we were told that resumes could be single spaced. Can you provide written verification of this? |
| Confirmed |
| 93 |
| Section L.8.2.2 requires that all pages be no larger than 8-1/2 x 11. In order to be responsive to the RFP, we expect that there will be some graphs and tables that will be much more readable on 11 x 17 pages. Can we use larger sized pages and how will th |
| Yes |
| 94 |
| Section L, Factor 4, Staffing Plan requires that the staffing plan shall illustrate the project team by phase for all basic services required in Section C (Scope of Work) of the RFP. Section C discusses a broad range of services, but does not define or sp |
| The Government expects ot receive a staffing plan projecting the out years as the project progresses through the phases. |
| 95 |
| Section C.3.4 references Appendix A as part of Section C. No Appendix is attached. Please provide or clarify. |
| Appendix A will not be provided. |
| 96 |
| Section C.4.7 references a GSA overall project schedule that was to be provided in the RFP. None was included. Please clarify. |
| Will not be provided. |
| 97 |
| Section C.6.3, 5th bullet, references the GSA Building Commissioning Guide that was to be attached as Exhibit 1. We cannot find this attachment. Please clarify. |
| Will not be provided. |
| 98 |
| Section B.6 indicates for the CC to provide a Firm-Fixed-Price for all office space, equipment and supplies as set forth in Section H. Those requirements are outlined in Section H.10 to consist of the following - |
| ok |
| 99 |
| 2 triple-wide Trailers w/ heating & cooling, plumbing & toilet facilities |
| ok |
| 100 |
| Telephones |
| ok |
| 101 |
| Janitorial Services |
| ok |
| 102 |
| Physical Security |
| ok |
| 103 |
| Office & Conference Room Furniture |
| ok |
| 104 |
| Supplies, etc |
| ok |
| 105 |
| Office Equipment for CC staff |
| ok |
| 106 |
| Section B.7 (i) requires that we include courier / messener service, supplies, equipment, and communication services associated with the contract in our hourly rates. Please clarify where we should include these costs. |
| No |
| 107 |
| Section L.8.2.5 - Factor 1:Experience of Firm requests the CC to submit at least 1, but no more than 3 similar project. We were told in the preproposal conference that this was incorrect and we could submit at least 2, but no more than 5 projects. Please |
| Correct, 2 similar, up to 5. |
| 108 |
| Please verify that SF33 is omitted from Technical Proposal Part 3 “forms” TAB 1 and ONLY included in Price Proposal TAB 1. |
| Confirmed |
| 109 |
| Please verify that ORCA is omitted from Technical Proposal Part 3 “forms” TAB 2 and ONLY included in Price Proposal TAB 2. |
| Confirmed |
| 110 |
| I cannot locate the “statement of availability form” which the solicitation states is located in Part IV Section M. Please advise where this form is located. |
| Included herein. |
| 111 |
| I cannot locate the “schedule of business ethics and conduct” which the solicitation states is located in Part III Section J. Please advise where this form is located. |
| Included herein. |
| 112 |