Attachment 15, Project Photographs
Figure 1 Typical existing core area VAV box with pneumatic controls. Pneumatic controls are to be converted to Direct Digital Controls (DDC). Gray material is asbestos spray on fire proofing.
Figure 2 Typical capped duct work in Project 7 area, at penetrations through the fourth and fifth floors. Duct work behind the cap has been filled with grout.
Figure 3 Perimeter VAV box with duct work removed and capped. The Contractor shall removed the cap and reinstall the ductwork to the perimeter floor penetrations.
Figure 4 Original perimeter VAV box with duct work intact.
Figure 5 Existing Large HVAC Register To be Replaced Throughout the Project Areas
Figure 6 Replacement low profile registers to be used through the project area