BIDDERS QUESTIONS AND RESPONSES

Q1. Sheet A2‐‐ Storage room 6 calls for new shelving for storage, yet gives no details. Please tell us what is required.

A1. SHEET A2 O – THERE IS A NOTE AND A SECTION CUT AT ROOM 6 STORAGE. THE

SECTION IS FOR DETAIL 5/A4..THE NOTE STATES: “NEW SHELVING FOR STORAGE BOXES

REFERENCE DETAIL 5/A4. DETAIL 5/A4 SHOWS A SIMPLE PAINTED WOOD SHELVING USING

PLYWOOD AND WOOD STUDS..

Q2. Sheet A2-- Calls for new furring at the two concrete columns.

Please provide a sketch of what is required at these two location.

A2. SHEET A2 – PROVIDE NEW COLUMN FURRING AND FINISH. COLUMN TO BE COVERED WITH SHEET ROCK OR GALVANIZED METAL. PROVIDE ROOM TO CONCEAL CONDUIT UNDER COVER. ATTACHED SKETCH INDICATES A METAL COVER DETAIL.

Q3. Sheet A2-- Is it safe to assume the dashed line on the west side of the conference room is the proposed projection screen? Any special anchoring required?

A3. SHEET A2 SHOWS A DASHED LINE WHERE THE PROJECTOR SCREEN IS TO BE MOUNTED. SHEET A3 PLAN 1 IS THE REFLECTIVE CEILING PLAN WHICH HAS A NOTE IDENTIFYING THE PROJECTOR SCREEN. SECTION 11132 PROJECTION SCREENS HAS ADDITIONAL INFORMATION REGARDING THE TYPE AND INSTALLATION OF THE SCREEN. PLEASE PROVIDE THE FOLLOWING PER SPEC:

3.2 INSTALLATION

A. General: Install projection screen assembly as recommended by the manufacturer for the conditions of use: complete and ready to use, with all necessary attachments, adaptors, and accessories.

1. Coordinate with interfacing and related trades as necessary.

2. Mount rigidly and permanently into solid backing unless specifically indicated otherwise by manufacturer. (USE BRACED DETAIL FOR ATTACHMENT PONT SIMILAR TO 3/A6.)

3.3 SCHEDULE

A. Manual Projection Screens

1. One 5 feet high by 8 feet wide, mount on ceiling of Conference Room where directed on

DRAWINGS.

Here are a few items I would like to get clarification on:

Q4. Sheet 7 - In the window and frame schedule Item 3 lists a quantity of 12 where I found only 3 on the floor plan. Item 5 shows 2 and I found a total of 1. Item 6 lists a total of 3 and I found 1 and the sizes don’t match each other.

A4. Sheet A7– (see attached SHEET A7r) MAKE THE FOLLOWING CORRECTIONS/CHANGES TO WINDOW AND FRAME SCHEDULE:

ITEM 3 CHANGE QUANTITY FROM 12 TO 4

ITEM 5 CHANGE QUANTITY FROM 2 TO 1

ITEM 6 CHANGE SIZE/WIDTH FROM 2’-9” TO 4’-0”

ITEM 6 CHANGE QUANTITY FROM 3 TO 1

MAKE DIMENSION CHANGE ON WINDOW ELEVATION 5, CHANGE WIDTH FROM 3’-8” TO 3’-6”

Q5. Sheet A4, A5 & A7.

1.The decorative glass behind the front desk, Is that to be one piece of glass or 3 pieces?

2. Can the pattern be put on digitally to a piece of tempered ½” instead of laminated?

3. How does the fins anchor into the counter?

A5.

1. YES, THE GLASS CAN BE ONE OR THREE PIECES.

2. YES

3. SEE ATTACHED DETAILSKA1, DATED 30 MAR 10