AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED

(SEE

ITEM

11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

IDCode:
EffDate: MAR 11, 2010
ReqNo:
ProjNo:
IssuedBy: GSA, Northern Service Center (10PSN)

Federal Building, Courthouse 222 W 7th Ave, Rm 151 Anchorage AK 99513-7500

AdminBy: GSA, Client Resources (10PSNR) Federal Building, Courthouse 222 W 7th Ave, Rm 151 Anchorage AK 99513-7500

NoCopies: 1
Amended: Yes
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: This amendment is to correct the posting of this acquisition with regards to the proposal due date. The acquisition was posted on March 4 and the first 15 days or the period of March 4-19 is the required "Notice of solicitation" to comply with FAR Part 5.203(a). The timeframe of March 20- April 20 is the required 30 days posting of the solicitation to comply with FAR Part 5.203(c).

Add the following information to Section 12500, 2.4 Workstations salient characteristics: (F) surfaces constructed of high pressure laminates with balanced backer sheet construction and a commercial 45lb core material. (G) Pedestals and drawers are to include counterweights, use ball bearing commercial grade suspensions. Box drawers to open 90% or more and file drawers 100%. (H) leg design allows for leg to be used in any position -- left , right, or freestanding.

A sign copy of this amendment must be with the SF1442 when submitting your proposal acknowledging receipt of the amendment.

SignName:
SignTitl:
ContDate:
CODate:
OffrExt: Yes
OffrNoEx: Off
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off
ContractorCode:
FacCode:
ContractorPOC:
AwdChg: Off
SolChg: Yes
SolNo: GS-10P-10-XJ-C-0017
SolDate: MAR 04, 2010
AwdNo:
IssuedByCode: 10PSN
AdminByCode: 10PSNR
ContrOfficerInfo:
DocNo: 0001
AwdDate:
text1: 10B. DATED (SEE ITEM 13)
block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
pageblock: PAGE OF PAGES
block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Contractor:
ContratorInfo:
ModAmount:
block12: 12. ACCOUNTING AND APPROPIATION DATA (If required)
ApprData: See Schedule
Pages: 1
Page: 1

File details come from the government source that posted it. Updated .