Section E - Inspection Acceptance.docx

DOCX document 19 KB Posted

Attached to
Dial-tone Infrastructure Procurement System (DIPS) for the Tri-state Region of Washington, Oregon and Idaho
Solicitation number
GS10F12LPR0002
Issued by

About this file

Section E - Inspection Acceptance

View the file

Other files

File Type Posted
A02.Section M - Evaluation Factors.docx DOCX document
A02.Section B - Part I and TEP Worksheet.docx DOCX document
A02.Section I - Contract Clauses.docx DOCX document
A02.Section A.docx DOCX document
A02.Workbook.Section BSchedulesAthruDIdaho.xlsx XLSX spreadsheet
RFP Amend 02 DIPS GS10F12LPR0001.docx DOCX document
A02.SF 33.GS10F12LPR0002.pdf PDF
A02.Section C - Statement of Work.docx DOCX document
A02.Section L - Instructions Considerations and Notices to Offerors.docx DOCX document
A02.Workbook.SectionBSchedulesAthruDOregon.xlsx XLSX spreadsheet
A02.Section F -Deliveries or Performance.docx DOCX document
A02.Section H - Special Contract Requirements.docx DOCX document
A02.Workbook.SectionBSchedulesAthruDWashington.xlsx XLSX spreadsheet
Section J - List of Docs Exh and Other Attachments.A01.docx DOCX document
CTX lines by TOPS System and Customer Number.xlsx XLSX spreadsheet
RFP Amend 01 DIPS GS10F12LPR0001.docx DOCX document
Section F -Deliveries or Performance.docx DOCX document
Section L - Instructions Considerations and Notices to Offerors.docx DOCX document
Section D - Packaging Marking.docx DOCX document
Section K - Reps and Certs.docx DOCX document
Section H - Special Contract Requirements.docx DOCX document
Section B - Part I and TEP Worksheet.docx DOCX document
Section G - Contract Admin Data.docx DOCX document
Section A.docx DOCX document
IGE Workbook.Section B - Schedules A thru D Idaho.xlsx XLSX spreadsheet
IGE Workbook.Section B - Schedules A thru D Oregon.xlsx XLSX spreadsheet
Section J - List of Docs Exh and Other Attachments.docx DOCX document
Section M - Evaluation Factors.docx DOCX document
IGE Workbook.Section B - Schedules A thru D Washington.xlsx XLSX spreadsheet
Section C - SOW.docx DOCX document
SF 33.GS10F12LPR0002.pdf PDF
Section I - Contract Clauses.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION E - INSPECTION AND ACCEPTANCE

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses.

(a) Federal Acquisition Regulation: https://www.acquisition.gov/far/

(b) General Services Acquisition Manual: https://www.acquisition.gov/GSAM/gsam.html

FAR

CLAUSE NO.

CLAUSE TITLE AND DATE

52.246-2
INSPECTION OF SUPPLIES – FIXED PRICE (AUG 1996)
52.246-4
INSPECTION OF SERVICES – FIXED PRICE (AUG 1996)
52.246-16
RESPONSIBILITY FOR SUPPLIES (APR 1984)

E.2 TESTING

(a) Testing means that part of inspection that determines the properties or elements, including functional operation of services/supplies or their components, by the application of established industry standards, scientific principles and procedures. At a minimum, testing associated with the installation of a switched voice line(s) should ensure the numbers are correct and calls can be placed and received via the service. The Contractor shall, using the nomenclature provided, classify, conduct and provide the Government with information resulting from all functional, performance, and interoperability tests sufficient to ensure the service is operational. Failure to meet the requirements of any portion of a test shall be deemed a failure of the entire test.

(b) Upon completion of installation test(s), the Contractor shall notify the authorized Government representative in writing that these tests has been completed, as this marks the beginning of the thirty (30) day acceptance period described in E.4.

(c) For service not previously provided by the Contractor at the required location or when establishing new service, the Contractor shall provide the GSA COTR an electronic copy of the Functional Test Certification no later than five (5) calendar days after the cutover of services. Any outstanding exceptions or discrepancies shall be identified. Plans for resolution of the exceptions or discrepancies and the completion date for implementation of those plans shall be included in the Certification. The Certification shall state that all service/system tests were completed according to established industry standards and that the service is operational. Beginning of the thirty (30) day acceptance period shall not start until all deficiencies are corrected.

E.3 STANDARDS AND GUIDELINES

The Contractor shall inspect all services and equipment, as well as test all equipment to ensure that the standards, regulations, and guidelines addressed in Section C are met.

E.4 ACCEPTANCE TEST PERIOD

No payments will be made by the Government to the Contractor for any services performed by the Contractor in support of this Contract until the services performed have been accepted, irrespective of the Government’s beneficial use of partially complete or partially operational equipment and/or service, irrespective of the length of time of said beneficial use pending acceptance, and irrespective of the substantiality of the Contractor’s performance. The parties hereby agree that the beneficial use of equipment and/or services before the effective date of the Government’s acceptance is purely incidental to such testing and that no additional sums are due to the Contractor. Further, payment for the acceptance test period will be due only for the successful consecutive 30-day period.

The 30-day period will begin when the requirements in E.2(b) are met and not before the service is required by the Government. Service will be considered acceptable if the Government does not identify problems within the 30-days after notification. Exceptions and full monetary adjustments will be made if it is apparent that the service installation was never completed.

Solicitation No. GS-10F-12-LP-R-0002 ( E-