450GG_Infrastructure_Contract_Price_form_Amend0003.pdf
PDF 87 KB Posted
- Solicitation number
- GS-09P-16-KT-C-7006
About this file
Amended contract price form 5/18/2016
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOTAL EVALUATION PRICE FORM
PROPOSAL SCHEDULE
I. Construction Services Offer
Provide a Price for the Construction services needed to complete the work described in the
Scope of Work. Please also include a breakdown of Construction Services of each Line item in the format of your choosing.
Line Item
BASE Bid
(A) Material & Equipment
Pricing
(B) Labor Costs
(= A+B) Subtotal
1 OA intakes $ $ $
Partial CW mains replacement with limited ACM pipe and fitting abatement
3 Roof Replacement $ $ $
(2) Penthouse wall replacements with ACM wall footing abatement
Clean, prepare and paint (4) corrugated screen wall panels on roof.
Salt corrosion repair and partial replacement of structural steel supports at cooling tower platforms and pipe weldments, and (4) fan replacements with structural steel/demo’d pipe LBP abatement
Window film replacement (floors 2 through 20) See specs for excluded areas
BASE TOTAL = $
* Option 1 is listed as 3A in the Project Manual Bid Set dated 3/18/2016 Section 012400 Options ** Option 2 is listed as 4B in the Project Manual Bid Set dated 3/18/2016 *** Option 3 is listed as 4C in the Project Manual Bid Set dated 3/18/2016 **** Option 4 is listed as 6A in the Project Manual Bid Set dated 3/18/2016
For the purposes of evaluation the Construction Services Offer consists of the
Base + ALL options.
II. Estimated Modification Costs
Provide your mark up rate that will be in the form of a single mark-up to be applied to the total direct cost of any modification. This rate shall be applied to the total direct cost of any modification, and will be inclusive of all prime and first tier subcontractor overheads, general and administrative cost, bonds, insurance, site overhead, miscellaneous costs such as small tools and the like, and all other indirect and direct costs associated with any contract modification. This rate offered by the contractor shall be accepted by the
Government and used in contract modifications in lieu of negotiating overhead, commission, and profit, and will be applied to the overall total of direct costs on each modification for the prime contractor and first tier subcontractors. No other mark-ups, Line Item
Options
(C)
Material & Equipment
Pricing
(D) Estimated
Labor Costs
(= C+D) Subtotal
Option 1*
Add Vapor Barrier to Roof System
Option 2**
Replace corrugated screen wall metal panels, corrosion repair on screen wall structural members, preparation and painting.
Option 3***
Replace all louvers at Penthouse walls.
Option 4****
Window film for South Entry Pavilion only
Options 1-4 TOTAL = $ fees, or indirect costs will be allowed the prime contractor or first tier subcontractors on either their own work or on work being performed by lower tier subcontractors. For purposes of bid evaluation, the offered markup will be multiplied by the Government estimated sum for direct costs for future modifications (as indicated on the Total
Evaluation Price Form) to arrive at the evaluated future modification mark-up cost, and is added to the contractor’s bid for evaluation purposes only in determining the low offeror.
Contract modification mark-up rate:
Mark-up Rate
Estimated Direct Costs
Total Estimated Mark-up
% X $1,000,000.00 = $
III. Evaluation Compensable Delay Costs
Provide your daily delay rate to be used as the sole daily delay cost to include all contractor and subcontractor (at any tier) field overhead, home office overhead, general overhead, general and administrative costs, commissions, profits, bonds, insurance fees, and any other direct and indirect costs which are the result of delays caused solely by the Government.
Evaluated compensable delay costs:
Contractor Offered Daily Rate
Estimated Delay
Total Estimated Delay Cost
$_________/Day X 14 Working Days =
(Items II –III will be evaluated for award, but not awarded.)
TOTAL EVALUATED PRICE (ITEMS I-III) $_______________________________
File details come from the government source that posted it. Updated .