AMENDMENT #2, A MISTAKE WAS MADE AND AMENDMENT #1 WAS RELOADED, PLEASE DISREGARD.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award IDIQ Construction, newest first.
File Type Posted
amendment#1-0031.pdf PDF
amendment#1-0031.pdf PDF
solicitation 0031.pdf PDF
Revised Tier 2 for 0031.pdf PDF
sample project 0031.pdf PDF
sample project 2-0031.pdf PDF
sample project 3 - 0031.pdf PDF
Solicitation No. GS-09P-09-KSD-0031.pdf PDF
ADDITIONAL INSTRUCTIONS.for GS-09P-09-KSD-0031.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 16

2. AMENDMENT/MODIFICATION NO.

AM02

3. EFFECTIVE DATE

2/27/2009

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (IF APPLICABLE)

6. Issued By Code 9PMFC 7. ADMINISTERED BY (If other than Item 6) Code

GSA, PBS, FM&SPD, Property Management Branch Contracts Section, 9PMFC 450 Golden Gate Avenue, 4th Floor San Francisco, CA 94102-3434

8. Name and Address of Contractor (No., street, county, State and ZIP Code (x) 9A. AMENDMENT OF SOLICITATION NO.

GS-09P-09-KSD-0031

X 9B. DATED (SEE ITEM 11)

1/28/2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of

Offers is extended x is not extended.

Offer's must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __3__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO : (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _____ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PROJECT: Construction and related services for Various Zones within the States of Arizona, California, Hawaii and Nevada

1. This Amendment is issued to incorporate Part II response to the following unanswered questions shown below:

IV. Regarding Sample Project Specs (Part II):

Tier 1 For the tier 1 sample project, what is height of the walls to receive the insulation panels?

ANSWER: 9'6" to 10'

Is the square footage “Aprox 300 sf” listed on the drawing the approximately square footage of the panels?

ANSWER: It is for the wall space Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Shirley A. Washington

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

________________________________________ BY ______________________________________________ (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA, Reproduced by FSS

FAR (48 CFR) 53.243

Continuation of Standard Form 30 Page 2 of 16

For the ceiling insulation, can we base the square footage on the dimensions (15’-6 ¾” x 12’-2-7/16”) as shown in the drawing?

ANSWER: Yes

The scope calls for insulating the ceiling. Is the ceiling a t-bar / drop type ceiling with removable panels or is it a hard drywall type ceiling?

ANSWER: T-Bar, w/ 2X4 panels

What is the height of the ceiling? We need this to figure the acoustical panels as well.

ANSWER: 9'6" to 10'

Is there electrical outlets or switches on the walls that receive the panels?

ANSWER: Yes, 1 - duplex outlet

For Tier 1 projects, will there be more details on the elevation of walls, a ceiling plan & details, and more details for walls existing and new insulation of walls and ceilings.

ANSWER: Please see attached colored drawings

Confirm South wall dimension is 15’-6 ¾” and West wall is 12’-2 7/16”.

ANSWER: Yes

What is the height of the walls?

ANSWER: 9'6" to 10'

Are there any hazardous materials (i.e. lead, asbestos, etc) in the work area that need to be accounted for?

ANSWER: No

Please confirm the existing ceiling is a lay in acoustical tile ceiling and advise what type of ceiling panels in case repairs are necessary.

ANSWER: T-Bar with 2X4 panels

Where is the work area in the building? Ground floor? If not, is there a service elevator that can be used? Where is it in relation to the work area? How wide are the hallways accessing the work area?

ANSWER: 1st floor; yes service elevator is available; there is ample space to move materials to and from job site.

As all work is scheduled after normal business hours, will workers need to be escorted and monitored by security personnel? If so, who will bear the cost and what rates should be used.

ANSWER: Yes, the Agency and GSA will provide personnel for security purposes

Can we assume that there is adequate parking for workers and delivery vehicles at no cost to the contractor?

ANSWER: There is no parking at public building for contractors, However, there is room for materials to be delivered at the building docks

Please specify cove base manufacturer, and amount needed

ANSWER: There is no cove base required for the Tier I project

Room measurements (Including ceiling height)

ANSWER: ceiling height are 9’6” – 10’, scale and room dimensions are on drawings

Specify sound soak panels (finishes)

ANSWER: Fabric panels selection, color is provide in the statement of work

Occupied area? If so, who moves/replaces furniture?

ANSWER: Yes. Furniture to be moved and replaced by Tenant

Is the existing ceiling t-bar or drywall?

ANSWER: T-Bar with 2X4 panels

How do you want to attach panels to ceiling (screws will show)

ANSWER: Panel should come with clips or adhesive

Continuation of Standard Form 30 Page 3 of 16

How many sound soak penetrations (i.e. phone jacks, teledata, electrical)

ANSWER: 1 - duplex outlet

Will any electrical have to be removed and remounted (i.e. signage, curtains)

ANSWER: Yes the one outlet will need to be flush with new panel wall

What is the size of the room in which the panels will be installed?

ANSWER: Room dimensions are shown on drawings

Is there a sound damping standard designated for the sound absorbing panels?

ANSWER: 1” NRC to be equal or better than .85 - .90 as shown in the statement of work

Do the outlet boxes, communication boxes, and electrical switches need to be relocated to the new depth of the sound absorbing panels?

ANSWER: Yes, the 1 – duplex outlet, will need to be flush with new panel wall

5. What is the current ceiling construction (hard deck or drop ceiling)?

ANSWER: T-Bar, w/ 2X4 panels

Tier I, I need total SF of sound board.

ANSWER: Review drawings, the two wall which are to receive the sound panel measure 15’-6 ¾” X 10’ and 12- 2 7/16” X 10’, and the 12 – 2 7/16 wall has one duplex out to be furred out and flush with the new wall

Dimensions of the room, ANSWER: Room dimensions are shown on drawings

The ceiling height, ANSWER: 9'6" - 10'

The density of the soundboard. The minimum acoustic qualities of the soundboard, db rating of the sound board.

ANSWER: A sample cut sheet of the requested panel is referenced in the statement of work. The spec header Enclosures, states the panel shall be equal or better to a Guilford fabric panel

Approved method of installation of the soundboard. Approved manufacturers of the soundboard.

ANSWER: Installation shall be a minimum of the manufactures recommendations as shown in the statement of work

Tier 2 For Tier 2 projects, will there be more floor plan details?

ANSWER: Please see attached colored drawings

If the intent is to prepare the proposal based solely on the provided areas under Execution, please furnish the number and size of doors, trim, outlets, light switches, etc that need to be accounted for. Are there any carpet transitions to other flooring that needs to be accounted for?

ANSWER: Please see attached colored drawings to view door ways, there is no count on electrical, data drops available.

The doors and frames are standard size steel hollow core

Are there any hazardous materials (i.e. lead, asbestos, etc) in the work area that need to be accounted for?

ANSWER: No

Paragraph II.B states that “Surfaces to be painted shall be repaired and new patches…”. Please provide information about what type of wall is to be repaired and the approximate square footage of the repair.

ANSWER: Wall details would be provide if it is a larger repair. These are generally minor sheetrock repairs (1/2” to ¾” ), normal / minor prep work for painting projects. Refer to drawing for surface dimension.

Are there operable windows available in the areas to be painted for ventilation and to remove fumes?

ANSWER: No

Where is the work area in the building? Ground floor? If not, is there a service elevator that can be used? Where is it in relation to the work area? How wide are the hallways accessing the work area?

ANSWER: 2nd Floor, service elevator is available, there is ample space to move materials to and from job site

Continuation of Standard Form 30 Page 4 of 16

Can we assume that there is adequate parking for workers and delivery vehicles at no cost to the contractor?

ANSWER: There is no parking at public building for contractors; However, there is room for materials to be delivered at the building docks

How many existing doors and frames?

ANSWER: Doors & frames, windows are shown on drawings. You can see the door on the colored drawings

What type doors and frames (hollow metal?)

ANSWER: Doors and frames are standard size steel hollow core

Door dimensions

ANSWER: Standard size steel hollow core

What type of paint is currently on walls?

ANSWER: Flat latex paint

Height of walls

ANSWER: 9’6” to 10’

Is the painting 52,311sf wall space or floor space?

ANSWER: Wall space

On-site staging area- is there one available?

ANSWER: Delivery, laydown and work space are available. No storage available

Plan for carpet take-off

ANSWER: Contractor will be required to provide work schedule for GSA and customer to approve. All furniture, paint and carpet shall be completed for next business day use

Assumptions- Floors vacant/occupied?

ANSWER: Occupied

On-site staging area?

ANSWER: Yes there is a lay down space, but no storage space available. All materials shall be removed from work location prior to start of business day

Delivery Elevator, with back up to dock for material off-loading?

ANSWER: Service elevator is available, there is ample space to move materials to and from job site. However, there is room for materials to be delivered at the building docks

Schedule phasing per floor/rooms?

ANSWER: Yes

Project area considered Sensitive, non-classified?

ANSWER: Yes, sensitive and classified

Existing carpet to be removed may be salvaged and redistributed in lieu of disposal?

ANSWER: Yes, contractor can do with the old materials as they wish

Painting surfaces to be walls only? If not, are doors/frames to be painted? If so, type of doors?

ANSWER: No; all wall surfaces, doors and frames; standard size steel hollow core

Windows, how many and- if wood encased, to be re-putted?

ANSWER: No windows are effected. All window are shown on drawings

Existing floor- concrete, wood?

ANSWER: Concrete

Thresholds and carpet reducers- how many per floor?

Continuation of Standard Form 30 Page 5 of 16

ANSWER: None

Any identified hazardous waste- (i.e. lead based paint and mastics?)

ANSWER: None

Has there been an asbestos survey performed on the glue, tape, etc. holding the carpet down?

ANSWER: Assume there is no HazMat

The "REVISED TIER 2 SAMPLE PROJECT" that was just issued on Feb. 11, 2009 contains floor plans for the sample project. The highlight color to show the area of construction is in black and makes it impossible to count the number of doors and frames to be painted. Can the floor plans be re-issued without the black highlighting or can we be provided with a door and frame count for bidding purposes?

ANSWER: See attached colored drawings to view door ways, there is no count on electrical, data drops available. The doors and frames are standard size steel hollow core

Tier II, I need the sf of paint for the walls, ANSWER: This information is provided in the statement of work

The quality of the paint for the walls & the approved manufacturers with color codes for the paint.

ANSWER: This information is provided in the statement of work

I need the number of coats of paint and if a primer is required.

ANSWER: Application shall be a minimum of the manufactures recommendations as shown in the statement of work

Need the acceptable method of application of the paint.

ANSWER: Application shall be a minimum of the manufactures recommendations as shown in the statement of work

Approved carpet manufactures, type of carpet.

ANSWER: Carpet type and style selected is stated in the statement or work

Warranty of carpet, ANSWER: Minimum of one year after completion of work

Padded or un padded.

ANSWER: Carpet type and style selected is stated in the statement or work

Is there an accent stripe?

ANSWER: No

Are there accents any where?

ANSWER: Not applicable

Are carpet tiles acceptable?

ANSWER: Carpet type and style selected is stated in the statement or work

If carpet tiles are acceptable what is the preferred method of installation?

ANSWER: Installation shall be a minimum of the manufactures recommendations as shown in the statement of work

X. Regarding contract terms and conditions (Part II):

1. In reviewing the subject solicitation with respect to the applicable Contract Clauses incorporated by reference, namely –

• 52.215-2, Audit and Records -- Negotiations

• 52.215-10, Price Reduction for Defective Cost and Pricing Data,

• 52.215-12, Subcontractor Cost or Pricing Data, and

• 52.215-13, Subcontractor Cost or Pricing Data – Modification;

it was observed that these clauses are based on application of the Cost Accounting Standards Board Regulations, Standards and Rules (August 1, 2008) (the “Standards” herein).

2. Standards Part 9903, Subpart 9903.201-1(b), CAS Program Requirements, states as follows:

Continuation of Standard Form 30 Page 6 of 16

“The following categories of contracts and subcontracts are exempt from all CAS requirements:

(1) * * *

(2) * * *

(3) Contracts and subcontracts with small businesses.”

It would be appreciated if the Contracting Officer would clarify whether the referenced Standards clause regarding small businesses being exempt from CAS requirements makes it inappropriate to invoke the above referenced FAR clauses, or limit their application, in the subject solicitation.

Answer: Application will be limited, if used at all

Page VI-4 – is this for information only, but need not be submitted with proposal?

Answer: Reference only, do not submit

Page VI-7 – is this for information only, but not need to be submitted with proposal?

Answer: Reference only, do not submit

Page VI-15 – is this for contractors information only, but not need to be submitted with proposal?

Answer: Information only, do not submit

XIII. Miscellaneous Questions (Part II):

Solicitation stated Tier 1 contracts are those contracts with a dollar threshold for task orders up to $100,000 and Tier 2 for order above $100,000. However, the Bid Forms listed contract maximum for Tier 1 = $25,000,000 and Tier 2 = $50,000,000. We are a small business and maximum bonding capacity is $2M. Please advise how this work and if we are eligible to bid the project. There is no amendment in the website. Is that possible to notify us when it is ready?

Answer: You can only bid what your bond will cover. Amendment 01 and this amendment have been posted

Is previous bid packages public information? If yes, where can I get a copy? Thank you.

Answer: Yes, but there is not enough time to provide copies

Has there been any consideration given to this Solicitation being a Non-Compete SDVOBE Set Aside solicitation?

Answer: No

In additional instructions its states that you need current business license in the state you are bidding for. Will a current contractors license be sufficient?

Answer: A contractor license in the state you are bidding on

I would like to see if there is binding requirements along the lines of prequalification or something of that nature to further our pursuit of this contract. Also, is there a pre-bid date for this contract?

Answer: No to all your questions above

What are certifications from ORCA?

Answer: Representations and Certifications where you have to enter information concerning your company.

Page VII-Page 10, No. 2.02 – The Government may determine that an offer is unacceptable if the item prices are significantly unbalanced. What do they mean?

Answer: Overloading the lower class labor categories to benefit the hight, i.e. clerks, engineers, etc.

VIII. Regarding Factor 3, Experience:

The answer to a Factor 3, Experience question from Amendment 01 is revised as shown--

Will similar past performance experience performed under predecessor companies by key personnel be considered?

Answer: Yes

The attached GSA Form 527, Contractor's Qualifications and Financial Information shall be completed in its entirety and a copy submitted with the Offeror's Price Proposal in accordance with Paragraph 5.(c), Instructions for Submitting Proposals, Page VII - 8, Revised 2/17/2009, and Paragraph 3.04, Price Proposal Submission Requirements from Supplementary Instructions - 00120, Pages VII - 11 & 12, Revised 2/17/2009.

Continuation of Standard Form 30 Page 7 of 16

A fillable PDF version of the form can be found and downloaded at the following link:

http://contacts.gsa.gov/webforms.nsf/0/45D7A4AA4D16697E85256A2A004E8E8B/$file/gs527.pdf

IMPORTANT NOTE: This Amendment does NOT extend the revised Offer Receipt Date and time of March 6, 2009 at

3:00PM PST.

Continuation of Standard Form 30 Page 8 of 16 Tier 1 Sample Project Colored Drawing - NOTE: Agency is responsible for dismantle and reinstall of furniture

Continuation of Standard Form 30 Page 9 of 16 Tier 2 Sample Project Colored Drawing - Probation First Floor

Continuation of Standard Form 30 Page 10 of 16

Tier 2 Sample Project Colored Drawing - Probation Second Floor

Continuation of Standard Form 30 Page 11 of 16

Continuation of Standard Form 30 Page 12 of 16

Continuation of Standard Form 30 Page 13 of 16

Continuation of Standard Form 30 Page 14 of 16

Continuation of Standard Form 30 Page 15 of 16

Continuation of Standard Form 30 Page 16 of 16