Attachments 1 - 14 and Plans 1 - 5.pdf
PDF 4 MB Posted
- Solicitation number
- GS-08P-12-VE-P-0007
About this file
Attachments 1 - 14 and Plans 1 - 5.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FormSF30 With Addenda 1.pdf | ||
| Amendment 0001 FormSF30.pdf | ||
| Additional Questions and Answers Posted to Feb Biz Ops Feb 8.doc | DOC document | |
| HQ Cable Rewire - Site Tour.doc | DOC document | |
| HQ Cable Rewire - Q A.docx | DOCX document | |
| Moab Cabeling Project Complete Sol.pdf | ||
| Attachments 1 - 14 and Plans 1 - 5.pdf | ||
| Moab Cabeling Project Complete Sol.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Administration
CANY-HQ COMMS REHAB
Cover Page
PROJECT LOCATION
2282 SW Resource Blvd.
Moab, UT
PROJECT CONTACTS
Kyle Gardner GSA Project Manager 801.524.5260
Jerry Silver GSA Contracting Officer 801.524.5260
John Lewis NPS Engineer 435.719.2152
PART 1 - GENERAL
1.1 Project Overview
Canyonlands National Park requires the rehabilitation of its data and telephone cabling at its
Headquarters (HQ) office in Moab Utah. This building is one level, with drop ceilings in the main office area and various ceilings in the warehouse. The total building footprint is 35,063 square feet. In the Office Area the existing cabling lies on top of the suspended ceiling in the return air space and then typically runs vertically through ¾” conduit down to each box through sheet rocked walls. Work in the Office Area will require installing new cable trays
(approximately 582 lf) above the suspended ceiling, moving and replacing office furniture to access boxes, removal of existing cabling, and re-using existing wall boxes and existing conduit drops and providing new Cat 6 plenum cable, face plates and jacks. Work will also include installation of new cable outlet locations as shown on the drawings. Work in the
Warehouse Area will require new wall mounted trays (approximately 281 lf); installation of new Cat 6 cable in existing conduit, and moving of furniture and equipment as necessary to access the work. New cable outlets will also be added in the Warehouse area. The total project will require 346 new cables be pulled and 64 additional cables be added, for a total of
410 new cables. The equipment room will require approximately 60 lineal feet of new heavy duty cable tray, 10 patch panels and 3 new equipment racks. Several wall penetrations will require firestops. Testing of all installed cabling components is required. All work of this contract will require that the HQ building remain operational to all employees during standard work hours from 7 am to 5:30 pm Monday thru Friday. During the standard work hours all employees shall have functional computer and telephone service at their normal work stations. No work shall be performed in the Office Areas during standard work hours, except the equipment room. The Contractor is expected to work nights and weekends, and has exclusive access to the building on the weekends. Work can be performed in the warehouse area anytime as long as service is not disrupted during standard work hours.
Statement of Work
Canyonlands National Park Recabling
1.2 Existing Conditions
Work of this contract requires rehabilitation of the existing Communications system.
Therefore the Contractor will be working around, under, over and in-between existing:
lighting, HVAC ducts, power runs, plumbing, drop ceiling, drop ceiling support wires, fire sprinkler piping, and all other items that may be in the way of installing the new Structured
Cabling System. Where necessary the Contractor shall also penetrate all existing sheetrock walls (non load bearing, non fire rated) that extend above the drop ceiling. The Contractor shall bid accordingly for working with all existing conditions. There will be no adjustment for latent conditions.
1.3 Extent of Work
Extent of Work. All work will be performed under a single contract. The Contractor shall provide all labor, materials, equipment, tools, transportation, per diem and supplies required to complete the work in accordance with the plans, specifications and terms of the contract.
The Contractor shall coordinate layout and installation of their work with the Parks existing communications equipment and service suppliers. This will require that the Contractor maintain a ‘parallel cable plant’ during the duration of the contract. This parallel cable plant will consist of the old cabling system and the newly installed cable system, which will allow the Park to continue daily operation until the new system is fully functional. The Contractor shall be responsible to ensure that during the course of the contract all employees have functional computers and telephone service. Upon completion of the contract the
Contractor shall provide the Park with a complete Structured Data Cabling system which includes commissioning and testing
Provide all labor, supervision, materials, and equipment to perform the work specified below.
It will be the contractor’s responsibility to furnish all tools, carts, specialized equipment and related items not specifically noted as being furnished by GSA.
All measurements and quantities given in the Statement of Work (SOW) are estimates only and should not be relied on for accuracy. Contractor shall be responsible for developing actual take off amounts at the appropriate time.
1.4 Period of Performance
The period of performance for this contract is 45 days.
1.5 Warranty
The Contractor shall warranty the materials and workmanship for one year, and shall replace or repair defective cables or terminations at no additional cost to the Government. If individual equipment (ie cable, racks, patch cords, etc) have manufacture warranties greater than one year, these warranties shall be provided in the O&M manual
1.6 Qualifications For Structured Data Cabling Installer
The contractor shall be fully conversant and capable in the cabling of low voltage applications such as, but not limited to voice and data network systems. The Contractor shall at a minimum possess the following qualifications:
Must have at a minimum
1) RCDD certified individual on-staff.
2) BICSI Certified Installers or equivalent.
3) Possess those licenses/permits required to perform telecommunications installations in the specified jurisdiction.
4) Have a minimum of 5 years in the communications structured cabling business and be able to provide three owner refrences for projects within the last 18 months.
5) Personnel trained in the installation of pathways and support for housing horizontal and backbone cabling
6) Personnel knowledgeable in local, state, province and national codes, and regulations.
All work shall comply with the latest revision of the codes of regulations.
7) Be factory certified by the manufacturer used in installation of all transmission components of all copper and fiber links and be able to provide the manufacturer warranty.
1.7 Location and Site Tour
Location. Canyonlands National Park HQ is located at 2282 SW Resource Blvd, in Moab
Utah. From Moab Center St & Highway 191 proceed approximately 3.5 miles South on
Highway 191. Look for the Park HQ sign on the right, also on the left will be the garbage transfer station with big overhead doors. Turn left here onto Resource Blvd; follow the road around to the left and the Park building will be on the left.
A site tour will be conducted on ???? at ??? . DUE TO THE NATURE OF THIS
WORK ALL PROSPECTIVE BIDDERS ARE HIGHLY ENCOURAGED TO
ATTEND.
PART 2 – SCOPE OF WORK
2.1 General – Contractor will provide all labor, materials, and equipment as necessary to complete the following work as per plans and specs:
A. General Requirements
B. Moving Furniture
C. Cable Trays and Supports
D. New Cable and Demo Old
E. New Faceplates, Jacks, and Boxes
F. Equipment Room
G. Punch Down, Testing, and Labeling
H. Firestops
2.2 Other Instructions
A. All work shall be completed using the best practices of the industry and per the plans and specifications
CANYONLANDS N.P.
HEADQUARTERS
MOAB UTAH
CONTRACT #
INSTALL STRUCTURED CABLING SYSTEM
PARK: CANY
BUILDING: HQ
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
OCTOBER 2011
CANY-HQ COMMS REHAB TOC-1
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
01110 Summary of Work
01270 Definition of Bid Items
01310 Project Meetings
01330 Submittals
01360 Accident Prevention
01770 Project Closeout
DIVISION 7 – THERMAL & MOISTURE PROTECTION
078413 Penetration Firestopping………………………………………………….……………………
DIVISION 27 – COMMUNICATIONS
270500 Common Work Results for Communications…………………………………………………..
271100 Communications Equipment Room…………………………………………………………….
271500 Communications Horizontal Cabling……………………………………………………………
CANY-HQ COMMS REHAB 01110-1
SUMMARY OF WORK
SECTION 01110
PART 1 GENERAL
1 .1 DESCRIPTION AND REQUIREMENTS
A. Description. Canyonlands National Park requires the rehabilitation of its data and telephone cabling at its Headquarters (HQ) office in Moab Utah. This building is one level, with drop ceilings in the main office area and various ceilings in the warehouse. The total building footprint is 35,063 square feet. In the Office Area the existing cabling lies on top of the suspended ceiling in the return air space and then typically runs vertically through ¾” conduit down to each box through sheet rocked walls. Work in the Office Area will require installing new cable trays (approximately 600 ft) above the suspended ceiling, moving and replacing office furniture to access boxes, removal of existing cabling, and re-using existing wall boxes and existing conduit drops and providing new Cat 6 plenum cable (approximately 40,000 ft), face plates and jacks. Work will also include installation of new cable outlet locations as shown on the drawings. Work in the Warehouse Area will require new wall mounted trays (approximately
300 ft); installation of new Cat 6 cable (approximately 10,000 ft) in existing conduit drops, moving of furniture and equipment as necessary to access the work, and removal of existing cabling. New cable outlets will also be added in the Warehouse area. The total project will require 346 new cables be pulled and 64 additional cables be added, for a total of 410 new cables. The equipment room will require approximately 60 lineal feet of new heavy duty cable tray, 10 patch panels and 3 new equipment racks. Several wall penetrations will require firestops. Testing of all installed cabling components is required. All work of this contract will require that the HQ building remain operational to all employees during standard work hours from 7 am to 5:30 pm Monday thru Friday. During the standard work hours all employees shall have functional computer and telephone service at their normal work stations. No work shall be performed in the Office Areas during standard work hours, except the equipment room. The Contractor is expected to work nights and weekends, and has exclusive access to the building on the weekends. Work can be performed in the warehouse area anytime as long as service is not disrupted during standard work hours.
B. Existing Conditions. Work of this contract requires rehabilitation of the existing
Communications system. Therefore the Contractor will be working around, under, over and in-between existing: lighting, HVAC ducts, power runs, plumbing, drop ceiling, drop ceiling support wires, fire sprinkler piping, and all other items that may be in the way of installing the new Structured Cabling System. Where necessary the Contractor shall also penetrate all existing sheetrock walls (non load bearing, non fire rated) that extend above the drop ceiling. The
Contractor shall provide quote(s) accordingly for working with all existing conditions. There will be no adjustment for latent conditions.
C. Extent of Work. All work will be performed under a single contract. The Contractor shall provide all labor, materials, equipment, tools, transportation, per diem and supplies required to complete the work in accordance with the plans, specifications and terms of the contract. The
Contractor shall coordinate layout and installation of their work with the Parks existing communications equipment and service suppliers. This will require that the Contractor maintain
CANY-HQ COMMS REHAB 01110-2
a ‘parallel cable plant’ during the duration of the contract. This parallel cable plant will consist of the old cabling system and the newly installed cable system, which will allow the Park to continue daily operation until the new system is fully functional. The Contractor shall be responsible to ensure that during the course of the contract all employees have functional computers and telephone service. Upon completion of the contract the Contractor shall provide the Park with a complete Structured Data Cabling system which includes commissioning and testing.
D. Period of Performance. The period of performance for this contract is 45 days.
E. Warranty. The Contractor shall warranty the materials and workmanship for one year, and shall replace or repair defective cables or terminations at no additional cost to the Government. If individual equipment (ie cable, racks, patch cords, etc) have manufacture warranties greater than one year, these warranties shall be provided in the O&M manual.
F. Qualifications for Structured Data Cabling Installer. The contractor shall be fully conversant and capable in the cabling of low voltage applications such as, but not limited to voice and data network systems. The Contractor shall at a minimum possess the following qualifications:
1. Have a minimum of 5 years in the communications structured cabling business
2. Provide an onsite certified BICSI ITS Technician for this job.
G. Onsite Supervisor Requirements. The Contactor shall provide for this project an onsite supervisor that is certified to the BICSI ITS Technician level for this job. The onsite supervisor shall be physically onsite at the work location a minimum of 75% of the time work is being performed.
1 .2 LOCATION AND SITE TOUR
A. Location. Canyonlands National Park HQ is located at 2282 SW Resource Blvd, in Moab Utah.
From Moab Center St & Highway 191 proceed approximately 3.5 miles South on Highway 191.
Look for the Park HQ sign on the right, also on the left will be the garbage transfer station with big overhead doors. Turn left here onto Resource Blvd; follow the road around to the left and the
Park building will be on the left.
B. A site tour will be conducted on January 18 th at 12:00 noon . DUE TO THE NATURE OF
THIS WORK ALL PROSPECTIVE CONTRACTORS ARE HIGHLY ENCOURAGED
TO ATTEND.
1.3 SUBMITTALS
A. General. Submittals shall be submitted and have the format as required in section 1330 (except those required with the proposal).
B. Required Submittals. The following is a list of required submittals. If a submittal is required in the specifications but omitted from this list it is still required.
1. Contractor Qualifications. The Contractor shall submit proof that they meet the requirements of 1.1.F.1. by submitting a business license or other documentation to prove they have been in the structured cabling business for at least 5 years. The Contractor shall submit documentation
CANY-HQ COMMS REHAB 01110-3
that their onsite supervisor currently has a BICSI ITS Technician certification to meet the requirements of 1.1.F.2. Provide with the Proposal, to be used as part of the Contractor evaluation.
2. Products. Submit electronic cut sheets (in PDF format) with web address (if available) and warranty documentation for the following items: jacks, cable, patch cable, patch panels, cable trays, cable tray support system, cable support for cable outside cable trays, and equipment racks.
If the product is being submitted for substitution as an approved equal, ensure there is significant technical data for evaluation. Products will be checked to ensure they meet the requirements of this specification. Provide with the Proposal, to be used as part of the Contractor evaluation.
3. Testing equipment. The Contractor shall submit the make and model of the equipment to be used for testing. Provide with the Proposal, to be used as part of the Contractor evaluation.
4. Cable Trays. Mark on the drawing the length and cable tray type and model number. Provide maximum estimated number of cables so that fill capacity can be verified. Provide the maximum support spacing for the cable trays, and provide details on how the support system is attached to the building. Minimum of 10 working days before the pre-construction meeting.
5. Testing Plan per Section 270500, 1.2(testing). Provide the testing procedure to be performed.
Testing plan will be checked to ensure it meets the requirements of this specification. Minimum of 10 working days before the pre-construction meeting.
6. Construction Schedule. Minimum of 10 working days before the pre-construction meeting.
7. Safety Plan. As specified in section 1360. Minimum of 10 working days before the pre-construction meeting.
8. Schedule of Values. Provide a schedule of values that breaks down all costs for lump sum quote items. The schedule of values shall clearly show the number of feet of cable, and cable trays that has been estimated. Minimum of 10 working days before the pre-construction meeting.
9. As-built drawings. Provide marked up drawings at the completion of the work.
1.4 CONTRACTOR'S USE OF PREMISES
A. Lodging: No lodging will be allowed onsite. There are numerous commercial lodging facilities in Moab, including hotels and RV parks.
B. Utilities. The Contractor is allowed to use: the existing 110 V electrical service for their work, the restroom facilities, and the break room. The Contractor is not allowed to use: Government phones or computers.
C. Security and Key Fobs. The Government will issue to the Contractor’s primary employees the necessary key fobs for entrance to the building during periods when the building is closed.
1.5 DELIVERY, STORAGE AND HANDLING
CANY-HQ COMMS REHAB 01110-4
A. Materials Delivery. The Contractor shall ensure that their designated representative is on-site for all materials deliveries.
B. Materials Storage & Staging. The Contractor will be allowed to store materials, equipment and supplies in a box truck or truck and trailer in the warehouse yard which is secured.
C. Materials Handling. Any material that is damaged during transport or unloading may be rejected at the discretion of the COR.
1.5 SPECIAL REQUIREMENTS
A. Scheduling Onsite Work. Government regulations require that a Government employee must be in the building during all times that the Contractor is performing work. Therefore the Contractor shall provide the Contracting Officer’s Representative (COR) with specific work dates that the
Contractor wants to perform work in the building at least one week before working on a set date.
This will allow the COR time to schedule Project Inspectors (PI) to be onsite during the work. If the request is not made a week in advance there is no guarantee that work will be allowed.
B. Scheduling Work in Specific Offices. Numerous offices in the building are locked at night.
Therefore the Contractor shall schedule with the COR one day in advance of offices that the
Contractor wishes to work in, so that the COR can inform employees to secure their office and leave it unlocked.
C. Coordination of Work with the Cleaning Crew. Generally the cleaning crew arrives at 4:00 AM and are out of the building by 6:30 AM. The Contractor shall coordinate with the cleaning crew to ensure that they do not impede the cleaning of the building.
D. Holidays. The Contractor may not work any Federal Holidays unless permission from the COR has been granted.
E. Clean Up & Disposal. The Contractor shall clean up all waste materials, tools and equipment by the start of each Park work day. All materials will be disposed of offsite and in a legal manner.
F. Removed Cable & Equipment. All old cabling, and any other equipment removed by the
Contractor becomes the property of the Contractor to re-use or dispose of offsite in a legal manner. No old cabling or any other equipment removed by the Contractor is to be disposed on on-site in garbage bins or dumpsters.
G. Moving Furniture. The Contractor shall move all furniture required to access their work. All furniture shall be returned to its place by the start of each Park work day.
H. Drop Ceiling Panels. Access to the work will require removing drop ceiling panels. In the location of the cable tray the Contractor shall remove the ceiling panels, store them on-site and leave them off for the duration of the contract, and then replace them after final inspection.
Access to individual cable runs outside of the main cable tray will require that the drop ceiling panels be replaced as the work is accomplished. All drop ceiling panels damaged during the course of this work shall be replaced by the Contractor at no additional cost to the Government.
1.6 FIELD VERIFICATION
CANY-HQ COMMS REHAB 01110-5
A. Cable tray locations are shown on the drawings as a starting point. It is the Contractors responsibility to field locate the cable trays so that they meet all the clearance requirements for electro-magnetic interference as required in section 271500. Lighting and power runs are not shown on the drawings.
B. The Contractor shall field verify that all equipment to be installed will fit in the Equipment
Room, before ordering the equipment.
1.7 SEQUENCE OF WORK
A. Contractor shall at all times conduct their operations to ensure the least inconvenience to Park employees.
1.8 PROJECT SCHEDULE
A. Submit a project schedule. The project schedule shall provide information on the time to perform the various items of the work, and provide an overall time line for the performance of the contract.
B. After work has begun, if it becomes apparent to the COR that the project schedule is not being met or was not initially correct in estimating the required time, the Contracting Officer can require that the Contractor submit an updated project schedule. The Contractor shall submit to the COR the new schedule within three working days of the request.
1.9 AS-BUILT DRAWINGS
A. The Contractor shall diligently mark the location of the new cable trays and cable runs on one set of the contract drawings, where they differ from the contract drawings. At the end of the project the Contractor shall provide the Government with this marked set of drawings.
PART 2 PRODUCTS – NOT USED
PART 3 EXECUTION – NOT USED
END OF SECTION
CANY-HQ COMMS REHAB 01270-1
DEFINITION OF BID ITEMS
SECTION 01270
DEFINITION OF QUOTE ITEMS
1 .1 DESCRIPTION
A. The intent of this section is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends and another begins.
B. If no bid item exists for a portion of the work, include the costs in a related bid item.
C. All quote items required below shall be provided as a lump sum and NOT as a unit price. All quantities given below are provided as checks only. The contractor shall be ultimately responsible for performing their own take offs in the development of their estimates and quotes.
1 .2 QUOTE ITEM NO. 1 – General Requirements. This line includes mobilization, daily travel, per diem, preparation of the accident prevention plan, licensure costs, bonds, and as-built drawings.
1 .3 QUOTE ITEM NO. 2 – Moving Furniture.
1 .4 QUOTE ITEM NO. 3 – Cable Trays and Supports. This line includes cable trays and their supports, and cable support outside of the trays. Work also includes cable trays and supports in the Equipment Room. The following are the Governments approximate estimated quantities, they are provided as a check for the Contractor, the Contractor shall provide their own independent quantities for their bid.
Suspended cable tray in office area: approximately 600 ft
Wall mounted cable tray in warehouse area: approximately 300 ft
Heavy duty cable tray for equipment room: approximately 60 ft
1 .5 QUOTE ITEM NO. 4 – New Cable and Demo Old. Provide and install Cat 6 cable and Cat 6 plenum cable, and remove all old cable and jacks. The following are the Governments approximate estimated quantities, they are provided as a check for the Contractor, the Contractor shall provide their own independent quantities for their bid.
Cat 6 plenum cable (office area): approximately 40,000 ft
Cat 6 cable (warehouse): approximately 10,000 ft
1 .6 QUOTE ITEM NO. 5 – New Faceplates, Jacks, and Boxes. Provide and install faceplates, and jacks at all locations. Provide and install new cable boxes at additional locations shown on the drawings.
1 .7 QUOTE ITEM NO. 6 – Equipment Room. Provide and install racks, power cords, patch panels, patch cables, and remove one florescent ceiling light.
CANY-HQ COMMS REHAB 01270-2
DEFINITION OF BID ITEMS
1 .8 QUOTE ITEM NO. 7 – Punch Down, Testing and Labeling.
1 .9 QUOTE ITEM NO. 8 – Firestops.
PART 2 PRODUCTS NOT USED.
PART 3 EXECUTION NOT USED.
CANY-HQ COMMS REHAB 01310-1
PROJECT MEETINGS
SECTION 01310
1 .1 PRECONSTRUCTION CONFERENCE
A. Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor.
The meeting agenda will include the following as a minimum:
1. Park rules and regulations
2. Authorized Representatives
3. Correspondence procedures
4. Labor standards provisions
5. Payroll reports
6. Modifications
7. Payments to Contractor
8. Acceptance/rejection
9. Construction meetings
10. Subcontractors
11. Documents required under the contract
12. Submittal of shop drawings, project data, samples, and approved equals
13. As-constructed drawings/operation and maintenance (O&M) manuals
14. Saturday, Sunday, holiday and night work
15. Reference materials
16. Contractor quality control
17. Value engineering
18. Liquidated damages
19. Notice to proceed
20. Tentative construction schedule
21. Recycling Program
CANY-HQ COMMS REHAB 01310-2
CANY-HQ COMMS REHAB 01330-1
SUBMITTALS
SECTION 01330
1.1 DESCRIPTION
A. The work of this section consists of submittal requirements before and during construction. All submittals shall be electronic and in Adobe PDF format.
1.2 SUBMITTAL AND APPROVAL PROCEDURES
A. All submittals shall be transmitted using form CM-16, dated 4/00. (A copy of the form is included at the end of this section.) No action will be taken on a submittal item unless accompanied by the transmittal form.
B. Forward all submittals to the Contracting Officer’s Representative (COR), except those required with the proposal. The COR for this project is Kyle Gardner. Phone 801.524.6066.
Email kyle.gardner@gsa.gov
1. Shop Drawings: N/A
2. Samples: N/A
3. Manufacturers' Catalog Sheets: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use, or provide a statement on which one is to be used. Cut sheets that identify more than one product and do not have the proposed product specifically identified will be rejected.
4. Manufacturer's Installation Instructions: When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for the
COR and keep another complete set of instructions at the project site until substantial completion.
C. The COR reserves the right to require submittals in addition to those called for in individual sections.
D. Approved Equals:
1. For each item proposed as an "approved equal," submit supporting data, including:
a. Drawings and samples as appropriate.
b. Comparison of the characteristics of the proposed item with the listed salient features that the item must meet.
c. Changes required in other elements of the work because of the substitution.
d. Name, address, and telephone number of vendor.
CANY-HQ COMMS REHAB 01330-2
e. Manufacturer's literature regarding installation, operation, and maintenance, including any schematics. Describe availability of maintenance service, and state source of replacement materials.
2. A request for approval constitutes a representation that Contractor:
a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
b. Will provide the same warranties for the proposed item as for the item specified.
c. Has determined that the proposed item is compatible with interfacing items.
d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
e. Waives all claims for additional expenses that may be incurred as a result of the substitution.
3. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material. Every effort will be made by the General Services Administration to approve these materials.
E. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review. Each transmittal shall contain only data specific to that individual submittal.
F. Submittal Numbering:
1. Number each submittal consecutively.
2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.
3. Additional re-submittals of the same item shall contain the original number with the next consecutive letter.
G. Contracting Officer's Representative (COR) Review:
1. Any work done or orders for materials or services placed before approval shall be at the
Contractor's own risk.
2. After reviewing submittals, the COR will return one copy of form DSC-1(CS). and one copy of applicable (marked up) submittal sheets to the Contractor. Shop drawing review notations will be returned on the reproducible original shop drawing. All other submitted items will be retained. The Contractor is responsible for producing additional copies for his/her own use.
3. The returned submittal will be marked in one of three ways as defined below:
a. APPROVED: Acceptable with no corrections.
CANY-HQ COMMS REHAB 01330-3
b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required.
All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.
c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified.
TRANSMITTAL – GENERAL SERVICES ADMINISTRATION
Transmittal No.:
Sheet: 1 of:
Building:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
GSA ACTION
Specification Section No.
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Contractor Signature
Recommended by
Title, Date
Title
Date
I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
Review Comments
Action By
Date
Contracting Officer’s Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00 (Formerly DSC-1(CS)
TRANSMITTAL CONTINUATION – GENERAL SERVICES ADMIN. Transmittal No.:
Sheet: 1 of:
Building:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
GSA ACTION
Specification Section No.
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
CM-16 Rev. 4/00 (Formerly DSC-1(CS)
CANY-HQ COMMS REHAB 01360-1
ACCIDENT PREVENTION
SECTION 01360
A. The work of this section establishes the framework necessary for establishing an effective accident prevention program and providing a safe environment for all personnel and visitors, however in accordance with generally accepted construction practices, the Contractor will be solely and completely responsible for safety conditions on the work of the project, including the safety of all persons and property during the performance of the work. The Contractor shall comply with all federal, state, and local safety laws and regulations. The Contracting Officer’s
Representatives (COR) review of this accident prevention plan does not alleviate the Contractor from the burden and all responsibility of providing safe working conditions. The COR’s review and the guidelines of this section are intended solely as an aid to the Contractor.
1 .2 SUBMITTALS
A. Per section 1330
B. Accident Prevention Program: As soon after award as possible, submit for approval an accident prevention program. This plan must be approved before the pre-construction meeting can take place. The Contracting Officer’s Representative (COR) will review the proposed program for compliance with the requirements of these specifications. Under no circumstances is onsite work allowed to be performed until this program has been approved. The plan shall be written for the specifics of this job. General safety plans not adapted for this project will be rejected.
The plan shall provide the details required of items 1 through 8 below:
1. Name of responsible supervisor to carry out the program.
2. Safety Meetings. An initial onsite safety meeting and follow up meetings are required as discussed below. The follow up meeting is intended for employees or subcontractors who were not at the initial meeting. The COR shall be notified of the time and location of all safety meetings, with at least 1 days notice. The submittal shall provide the safety meeting schedule, topics to be covered and list employees and subcontractors who will attend this meeting.
3. Action Plan. List nearest medical facilities and ensure employees know where these are, and the appropriate actions to take.
4. First aid procedures. Provide a list of onsite staff who have first aid training. Provide a list of onsite first aid kits. At a minimum the Contractor should have one first aid kit onsite. Define where this kit will be kept.
5. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, National Park
Service personnel, and Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.
CANY-HQ COMMS REHAB 01360-2
6. Training, both initial and continuing. List employees and their applicable safety training in regards to this type of work.
7. Planning for possible emergency situations, such as floods, fires, cave-ins, slides, explosions, power outages, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property. Define applicable emergencies an appropriate course of action.
8. Personal Protective Equipment (PPE). Define applicable PPE for employees, and when and under what circumstances it must be utilized. During over head pipe handling and laying hard hats must be worn. During all work on or adjacent to roadways safety vests must be worn. A statement requiring the aforementioned two items be worn shall be included under this item number in the safety plan submittal.
1 .3 QUALITY ASSURANCE
A. In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.
B. Qualifications of Employees:
1. Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
2. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
3. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.
Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.
1 .4 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires.
Notify Contracting Officer’s Representative immediately in the event of a reportable accident.
Within 7 days of a reportable accident, fill out and forward to Contracting Officer’s
Representative an Accident/Property Damage Report (Form CM-22). Form may be obtained from the Contracting Officer.
B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer’s
Representative as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
PART 2 PRODUCTS
2 .1 FIRST AID FACILITIES
CANY-HQ COMMS REHAB 01360-3
A. Provide adequate facilities for the number of employees and the type of construction at the site.
2 .2 PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of NIOSH.
PART 3 EXECUTION
3 .1 EMERGENCY INSTRUCTIONS
A. All vehicles shall have a copy of the safety plan which includes telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police.
3 .2 FIRE AND LIFE SAFETY
A. Provide appropriate UL listed fire-extinguishers.
3 .3 PROTECTIVE EQUIPMENT
A. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
3 .4 SAFETY MEETINGS
A. Conduct initial safety meeting as discussed above.
B. Conduct one weekly safety meeting each week.
3 .5 TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
CANY-HQ COMMS REHAB 01770-1
PROJECT CLOSEOUT
SECTION 01770
A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
PART 2 PRODUCTS – NOT USED
PART 3 EXECUTION
3 .1 CLEANING
A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Pick up all construction debris from the site. At time of final inspection, project area shall be thoroughly clean.
3 .2 PROJECT RECORD DRAWINGS
A. Maintain one complete full-size set of contract drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions, and additions.
B. Keep record drawings current. Make record drawings available to the COR for inspection at any time. If project record drawings are not current, the Contracting Officer may retain an appropriate amount of the progress of final payment.
C. On completion of the total project, submit complete record drawings. Include all shop drawings, sketches, and additional drawings that are to be included in the final set.
3 .3 CLOSEOUT SUBMITTALS
A. A list of closeout requirements follows. The intent is to provide an overall summary of requirements and not a comprehensive list. The terms and conditions of the contract still require you to satisfy the requirements of the individual specification sections regardless of what is shown on the list. Submit the following before requesting final inspection.
1. Project Record Drawings: As specified above.
2. Guarantees and Bonds: As specified in the clauses.
3. Special Tools: One set of special tools required to operate, adjust, dismantle, or repair equipment. Special tools are those not normally found in possession of mechanics or maintenance personnel.
4. System Demonstration and Training: Provide the COR and CANY IT staff with a walk through of the project to ensure familiarity with the work accomplished.
CANY-HQ COMMS REHAB 01770-2
3 .4 SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. When project, or designated portion of project, is substantially complete, request the COR provide a final inspection. Upon request, the COR will proceed with inspection within 3 days of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.
B. If, following final inspection, the work is determined to be substantially complete, Contracting
Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a
Letter of Substantial Completion. Contractor shall complete the work described on the list of deficiencies within 7 calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs in accordance with the Inspection of Construction clause of the contract.
C. If, following final inspection, the work is not determined to be substantially complete;
Contracting Officer will notify Contractor in writing. After completing work, Contractor shall request a new final inspection. All re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction clause of the contract.
3 .5 FINAL ACCEPTANCE OF THE WORK
A. After all deficiencies have been corrected, a Letter of Final Acceptance will be issued.
CANY-HQ COMMS REHAB 078413 - 1
FIRESTOP
SECTION 078413 - PENETRATION FIRESTOPPING
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals: Product Data and Installer certificates signed by Installer certifying that products have been installed in compliance with requirements.
PART 2 - PRODUCTS
2.1 PENETRATION FIRESTOPPING
A. Provide penetration firestopping materials that are compatible with one another, substrates, and penetrating items if any.
B. Penetrations in Fire-Resistance-Rated Walls and Horizontal Assemblies: Provide penetration firestopping with ratings determined per ASTM E 814 or UL 1479, based on testing at a positive pressure differential of 0.01-inch wg.
1. F-Rating at Fire-Resistance-Rated Walls: At least 2 hour.
C. Accessories: Provide components for each penetration firestopping system that are needed to install fill materials and to maintain ratings required. Use only those components specified by penetration firestopping manufacturer and approved by qualified testing and inspecting agency.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General: Install penetration firestopping to comply with manufacturer's written installation instructions and published drawings for products and applications indicated.
B. Identify penetration firestopping with preprinted metal or plastic labels. Attach labels permanently to surfaces adjacent to and within 6 inches of firestopping edge so labels will be visible to anyone seeking to remove penetrating items or firestopping. Include the following information on labels:
1. The words "Warning - Penetration Firestopping - Do Not Disturb. Notify Building
Management of Any Damage."
2. Designation of applicable testing and inspecting agency.
3. Manufacturer's name.
4. Installer's name.
C. GSA may engage a qualified testing agency to perform tests and inspections.
CANY-HQ COMMS REHAB 078413 - 2
FIRESTOP
3.2 PENETRATION FIRESTOPPING SCHEDULE
A. Firestopping for Cable Trays with Communications Cables FS-#1(2 hr rating): Is located between the Equipment Room (room 53) and the Roads Office in the Warehouse (room 54).
The wall to be penetrated is 2 layers of type X sheetrock on both sides of steel channel framing at 12” o.c, with batt insulation on the interior. Total thickness is approximately 8 to 9”.
B. Firestopping for Abandonment of Old Cable Penetration FS-#2 (2hr rating): Is located between the Equipment Room (room 53) and the Roads Office in the Warehouse (room 54) and is above the drop ceiling. It is a 4 to 5” diameter pipe. The wall is the same as described in
FS#1.
C. Firestopping for Abandonment of Existing Holes FS-#3 (2hr rating): Is located between the
Equipment Room (room 53) and the Roads Office in the Warehouse (room 54). There are two
½” diameter holes in the Equipment Room and one ½” hole in the Roads Office that shall be firestopped. The wall is the same as described in FS#1.
D. Firestopping for Cable Trays with Communications Cables FS-#4(1 hr rating): Is located in the warehouse between the Roads bay (room 66) and the warehouse bay (room 24). The wall to be penetrated is type x sheetrock on both sides of steel framing at 16” o.c.
END OF SECTION 078413
CANY-HQ COMMS REHAB 270500 - 1
COMMS GENER
SECTION 270500 - COMMON WORK RESULTS FOR COMMUNICATIONS
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals: Product Data.
B. Comply with NFPA 70 (NEC current edition).
C. Grounding: For all communications wiring of this contract, comply with ANSI-J-STD-607-A and with BICSI TDMM, “Grounding, Bonding, and Electrical Protection” Chapter.
1.2 TESTING
A. General. Testing shall consist of industry accepted verification tests for the Category of cable installed ( Cat 6) and shall meet latest requirements of EIA/TIA cabling Standards, specifically
TIA/EIA-568-B.
B. Equipment. Utilize Level 4 Tester to test all cabling components, which include: all outlets, horizontal cable, patch panels, patch cords, etc. to verify compliance with requirements.
C. Non-Compliance. The Contractor shall re-terminate/replace any cable, connection, or cable components found to be defective or non-compliant with these specifications and referenced standards.
D. Reports. Provide test reports electronically to the COR and include test reports in O&M manuals.
E. UTP Cable and Links: All UTP cabling and patch cables must be tested at swept frequencies up to 250 MHZ for internal channel performance parameters as defined in IEEE 802.3 and
TIA/EIA-568B. Certification shall include the following parameters for each pair of cable installed:
1. Wire map (pin to pin connectivity)
2. Length (in feet)
3. Attenuation
4. Near End Crosstalk (NEXT)
5. Far End Crosstalk (FNEXT)
6. ELFEXT
7. Attenuation/Crosstalk Ration (ACR)
CANY-HQ COMMS REHAB 270500 - 2
8. Return Loss
9. Propagation Delay
10. Delay Skew
PART 2 - PRODUCTS
2.1 SLEEVES FOR PATHWAYS AND CABLES
A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized steel, plain ends.
B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop unless otherwise indicated.
C. Sleeves for Rectangular Openings: Galvanized-steel sheet.
D. Sleeve Seals: Modular sealing device, designed for field assembly, to fill annular space between sleeve and raceway or cable.
1. Sealing Elements: EPDM or NBR interlocking links shaped to fit surface of cable or conduit. Include type and number required for material and size of raceway or cable.
2. Pressure Plates: Plastic or Carbon steel or Stainless steel. Include two for each sealing element.
3. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating or Stainless steel of length required to secure pressure plates to sealing elements. Include one for each sealing element.
2.2 GROUT
A. Nonmetallic, Shrinkage-Resistant Grout: ASTM C 1107, factory-packaged, nonmetallic aggregate grout, noncorrosive, nonstaining, mixed with water to consistency suitable for application and a 30-minute working time.
PART 3 - EXECUTION
3.1 GENERAL COMMUNICATION EQUIPMENT INSTALLATION REQUIREMENTS
A. Install communication equipment to allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated.
B. Install communication equipment to provide for ease of disconnecting the equipment with minimum interference to other installations.
CANY-HQ COMMS REHAB 270500 - 3
C. Install communication equipment to allow right of way for piping and conduit installed at required slope.
D. Install communication equipment to ensure that connecting pathways and cables are clear of obstructions and of the working and access space of other equipment.
3.2 SLEEVE AND SLEEVE-SEALS INSTALLATION
A. Concrete Slabs and Walls: Core-drilled holes if required.
B. Cut sleeves to length for mounting flush with both wall surfaces.
C. Size pipe sleeves to provide 1/4-inch annular clear space between sleeve and cable unless sleeve seal is to be installed.
D. Seal space outside of sleeves with grout for penetrations of concrete and masonry and with approved joint compound for gypsum board assemblies.
E. Interior Penetrations of Non-Fire-Rated Walls and Floors: Seal annular space between sleeve and cable, using joint sealant appropriate for size, depth, and location of joint according to
Division 07 Section "Joint Sealants."
3.3 FIRESTOPPING
A. Apply firestopping to communications penetrations of fire-rated floor and wall assemblies to restore original fire-resistance rating of assembly. Comply with requirements in Division 07
Section "Penetration Firestopping."
END OF SECTION 270500
CANY-HQ COMMS 271100 - 1
COMMS E.R.
SECTION 271100 - COMMUNICATIONS EQUIPMENT ROOM
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals: Product Data and Shop Drawings.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
C. The Contractor shall coordinate layout and installation of their work with the Parks existing communications equipment and service suppliers. This will require that the Contractor maintain a „parallel cable plant‟ during the duration of the contract. This parallel cable plant will consist of the old cabling system and the newly installed cable system, which will allow the
Park to continue daily operation until the new system is fully functional.
D. Relocating and setup of equipment. The Contractor shall coordinate with Ron Reed Park IT specialist on relocating existing equipment and setup of new equipment onto the new racks. The
Park will move and setup the following equipment after coordinating the timing with the
Contractor: Router, UPS, Voice Mail Server, and Nortel Enterprise Server. The Contractor shall perform the following after coordinating the timing with the Park: install 8 new Park furnished…