DEPARTMENT OF HEALTH & HUMAN SERVICES Federal Occupational Health
Division of Environmental Health Services 1301 Young Street, Suite 772 Dallas, Texas 75202
ASBESTOS SURVEY REPORT
Conducted for:
GENERAL SERVICES ADMINISTRATION
REGION 7 SAFETY AND ENVIRONMENTAL TEAM
819 TAYLOR STREET
FORT WORTH, TEXAS 76102 (TARRANT COUNTY)
Conducted at:
UNITED STATES BORDER STATION (USBS)
BUILDING 4 J&L SECONDARY
TERMINATION AT I35
LAREDO, TEXAS 78040-9998
GSA BUILDING #TX0323
Conducted on:
JANURARY 30, 2013
Prepared by:
UNITED STATES PUBLIC HEALTH SERVICE
FEDERAL OCCUPATIONAL HEALTH SERVICE
DALLAS AREA OFFICE
1301 YOUNG STREET, SUITE 772
DALLAS, TX 75202
A S B E S T O
Asbestos Survey Report January 30, 2013 United States Border Station (USBS) Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
Reports and other publications issued by the Environmental Health Services (EHS) program of the Federal Occupational Health Service (FOHS) are prepared under procedures established by FOHS, which are designed to assure the technical competency of the persons or organizations under contract to the FOHS. In addition, reports and other publications are reviewed internally by one or more FOHS technical staff, and all comments are addressed to the satisfaction of the issuing office, prior to dissemination.
Mention of company name or products does not constitute endorsement by FOHS.
Asbestos Survey Report January 29, 2013
Building 4 J&L Secondary GSA Building # TX0323 Termination At I35 Laredo, Texas 78040
TABLE OF CONTENTS
Sections
1. EXECUTIVE SUMMARY
2. INTRODUCTION
3. BUILDING DESCRIPTION
4. FINDING SUMMARY OF ASBESTOS CONTAINING MATERIALS
5. SAMPLING PROCEDURES
5.1.SURVEY PROCEDURES
5.2.ANALYTICAL PROCEDURES
6. RECOMMENDATIONS
Appendices
Appendix A BUILDING LAYOUT / BULK SAMPLE LOCATIONS
Appendix B SUMMARY TABLES
Appendix C LABORATORY RESULTS
Appendix D HAZARD RANKING TABLE
Appendix E PHOTOGRAPHS
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
1.0 EXECUTIVE SUMMARY
On January 30, 2013, a survey for asbestos containing building materials (ACM) was conducted at the United States Border Station (USBS), Building 4 J&L Secondary Termination at Interstate 35 in Laredo, Texas 78040. The GSA building number is TX0323.
Construction of the building was completed January 1, 1982. The survey was conducted in accordance with the Memorandum of Agreement and Specifications between the General Services Administration (GSA) and the Federal Occupational Health Service (FOHS).
The objective of the investigation was to assess the presence of asbestos in the building.
The building is scheduled for demolition as part of a major project at the border station. A total of one hundred twenty-one (121) bulk samples of suspect asbestos containing building materials were collected during the survey and submitted for laboratory analysis for asbestos content. Three types of materials were assumed to be asbestos containing because they could not be sampled due to limited access or it would have been too destructive. The following materials were found to be asbestos containing or assumed to be asbestos containing:
Material Description Material Location(s) Room #
Percent Asbestos
Type
Material Condition
Estimated Quantity
Friable Non-
Friable
Hazard Ranking
FT4-Floor tile 12 x 12 Off white, tan mottled floor tile)and associated FTM4-Floor tile Mastic black
Room 406 tool/equipment, Room 405 personal effects storage room, Room 416
Floor Tile 1-4%
Chrysotile Mastic
10-20% Chrysotile
Good 600 SF
600 SF
No 1
DM1- Duct/Pipe mastic/sealant white/cream
Janitor room, penthouse, and ceiling plenum
2-4% Chrysotile
Good 400 SF No 1
RS1-roof sealant silver/gray/dark brown
Roof and Canopy roof
4-10% Chrysotile
Good 1000 SF* No 1
RS2-roof sealant black Roof and Canopy roof
5-15% Chrysotile
Good 1000 SF* No 1
CK3- Caulk brown/black Exterior windows and metal framing joints
2-4% Chrysotile
Good 300 LF No 1
SC1- Sink undercoating white/magenta
Room 410 sink CPT Passenger Chief
4-8% Chrysotile
Good 4 SF No 1
CT3- ceiling tile white Ceiling plenum space above lower ceiling tile
Assumed* Good 2000-3000
SF**
Yes 1
CR4-Brick tile and associated mortar
Permit Processing lobby, hallways, USCBP office
Assumed* Good 1500 SF** No 1
*Most likely the entire roof will need to be abated to remove asbestos containing roofing materials **Assumed materials should be tested for asbestos prior to demolition- most likely they are non-asbestos
Building 4 J&L Secondary GSA Building # TX0323 Termination a I35 Laredo, Texas 78040
2.0 INTRODUCTION
The United States Border Station (USBS), Building 4, J&L Secondary Termination at Interstate35 in Laredo, Texas (Webb County) was surveyed for asbestos containing materials (ACM) by visual inspection and bulk sampling by an accredited inspector on January 30, 2013. This survey was conducted in response to the client’s request for the FOHS to perform the survey under the Memorandum of Agreement and Specifications between the client and Federal Occupational Health Service (FOHS). Scott Fontenarosa, a certified asbestos-building inspector, performed the asbestos survey.
The purpose of the survey was to perform a building inspection according to 40 CFR Part 763 Asbestos Hazard Emergency Response Act - AHERA protocols and EPA 40 CFR Part 61 National Emissions Standard for Hazardous Air Pollutants – NESHAP protocols. A partially destructive sampling method was implemented during the survey. The survey included visual identification and representative sampling of existing and accessible suspect homogeneous building materials. In addition, an assessment of condition, friability, and estimated quantity of material was made.
Homogeneous areas were grouped building-wide and sampled using a building–wide random sampling plan. A thorough attempt was made to access all areas for visual and physical verification of suspect ACM. However, due to the partial destructive nature of this survey and because some areas of the building may have been inaccessible, FOHS does not guarantee that all ACM in the building were located and identified.
The inspection was based on state-of-the-science practices and current regulations in effect at the time of the survey.
3.0 BUILDING DESCRIPTION
The United States Border Station (USBS), Building 4 (TX0323) is a single story building in which construction was completed January 1, 1982. The building is approximately 46,129 square feet and round in shape. The building has a penthouse mechanical room where air handlers are located. The concrete structure rests on a concrete slab on grade. The roof is flat with built-up asphalt. The exterior walls are metal framed glass panels and textured plaster over concrete. The interior walls consists wallboard, plaster/concrete, cinderblock, clay block, and ceramic tile. There are columns that are plaster over concrete. Floors are finished with resilient vinyl tile, ceramic tile, stretched carpet, or brick tiles. Ceilings are suspended metal-grid with lay-in white panels, plaster, or concrete. The front entrance of the building faces north. There are administrative, facility, and detention areas.
Rooms/areas include janitorial, storage, mechanical, restrooms, holding cells, cashier area, vault, break room, interview rooms, command center, hard secondary hallways, soft secondary hallways, general office rooms, conference room, copier room, file room, and laboratory room.
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
4.0 FINDING SUMMARY OF ASBESTOS CONTAINING MATERIALS
Approximately forty (40) homogeneous areas (HA) were identified. The exact number may not be determined because some HA might be layered or associated with another HA that may not have been explicitly distinguished by themselves. For example, mixtures of different floor mastics may be given the same HA number.
Eight (8) HA contained asbestos (>1.0% asbestos), four (4) were assumed to contain asbestos, and twenty-eight (28) HA did not contain detectable asbestos (zero, ND, less than 1% or equal to 1% asbestos).
ASBESTOS CONTAINING (>1.0% ASBESTOS)
& ASSOCIATED HOMOGENEOUS AREAS
HA NUMBER & DESCRIPTION PERCENT ASBESTOS
Surfacing Material MT1 Mortar for Ceramic Brick tile gray…………………………………….......................... Assumed
TSI (Thermal Insulation) DM1 Duct/Pipe Mastic/Sealant, (old) white/cream................................................. 2-4% Chrysotile
Miscellaneous FT4 Floor Tile, 12” x 12” off white, tan mottled ..................................................... 1-4% Chrysotile FTM4 Black Mastic associated with 12” x 12” off white, tan mottled floor tile ...... 10-20% Chrysotile SC1 Sink undercoating white/magenta ................................................................ 4-8% Chrysotile RS1 Roof Sealant black silver/gray/dark brown .................................................. 4-10% Chrysotile RS2 Roof Sealant black ...................................................................................... 5-15% Chrysotile CK3 Caulk, exterior brown/black ........................................................................... 2-4% Chrysotile CT3 Ceiling tile (plenum space) ........................................................................................Assumed CR4 Ceramic Brick tile, brown ..........................................................................................Assumed
Building 4 J&L Secondary GSA Building # TX0323 Termination a I35 Laredo, Texas 78040
HOMOGENEOUS AREAS NOT CONTAINING ASBESTOS
(<1% or ND)
HA NUMBER & DESCRIPTION PERCENT ASBESTOS
Surfacing Materials
JC1 Joint Compound white........................................................................................ ND TX1 Texture, wall, white ............................................................................................ ND TX2 Texture, ceiling, white ........................................................................................ ND PL1 Wall plaster/concrete gray/tan............................................................................ ND PL2 Exterior plaster................................................................................................... ND GR1 Grout, brown associated with ceramic brick tiles ............................................... ND GR2 Grout, white associated with Ceramic tile blue/white.......................................... ND GR2 Grout, white associated with Ceramic tile yellow/white....................................... ND MT2 Mortar tan/gray associated with Ceramic tile blue .............................................. ND MT3 Mortar tan/gray associated with Ceramic tile white............................................. ND MT3 Mortar tan/gray associated with Ceramic tile yellow ........................................... ND
TSI (Thermal Insulation)
None
Miscellaneous
CT1 Ceiling Tile, 2’ x 2’ white random fissures............................................................ ND CT2 Ceiling Tile, 2’ x 2’ coarse random fissures ........................................................ ND CT3 Ceiling Tile, 2’ x 4’ white horizontal fissures………………………………… .......... ND WB1 Wallboard Panel................................................................................................. ND WV1 Wall vinyl base cove, 4’ brown ........................................................................... ND WVM1 Mastic, yellow-brown associated with Wall vinyl base cove, 4’ brown/ ............... ND CK1 Caulk, brown interior windows............................................................................ ND FT1 Floor tile 12” X 12” white with brown streaks ...................................................... ND FTM1 Mastic associated with Floor tile 12” X 12” white with brown streaks.................. ND CM1 Carpet mastic yellow-brown ............................................................................... ND CR1 Ceramic tile blue ................................................................................................ ND CR2 Ceramic tile white............................................................................................... ND CR3 Ceramic tile yellow ............................................................................................. ND FT2 Floor tile 12” X 12” white mottled gray................................................................ ND FTM2 Mastic tan associated with Floor tile 12” X 12” white mottled gray...................... ND FT3 Floor tile 12” X 12” gray mottled blue and white ................................................. ND FTM3 Mastic tan associated with Floor tile 12” X 12” gray mottled blue and white ....... ND BB1 Clay wall block, orange ...................................................................................... ND RT1 Roof tar black..................................................................................................... ND CK2 Caulk exterior, soft brown……………………………………………………… ......... ND RT1 Roof tar, black………………………………………………………………………… .. ND
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
5.0 SAMPLING PROCEDURES
5.1 Survey Procedures
The asbestos survey involved an asbestos assessment comprised of the following three subtasks: Visual Inspection and Sampling, Laboratory Analysis, and Condition Assessment.
The activities performed in each task are detailed in the following paragraphs.
Visual Inspection and Sampling: The survey for asbestos-containing materials (ACM) included visual observation of the exterior, roof, interior surfaces, finishes, areas above suspended ceilings, and mechanical areas.
Laboratory Analysis: All samples were submitted to FOH’s, National Environmental Reference Laboratory, Dallas, Texas and were analyzed by progressive Polarized Light Microscopy (PLM). Polarized Light Microscopy is the EPA recommended analytical method for determining asbestos content in bulk samples.
Condition Assessment: A condition assessment was performed on all suspect asbestos building materials collected. Building materials were categorized by friability, condition, and potential for disturbance. Consideration was given to the process of demolition and renovation and the impact of the forces upon the ACM. The friability assessment was the basis for our recommendations.
The ACM was categorized as required by the National Emissions Standard for Hazardous Air Pollutants (NESHAP). The NESHAP Final Rule Revision (EPA 40 CFR Part 61) dated November 20, 1990, includes several modifications and additions. The modification, which greatly affects abatement alternatives, was the re-categorization of ACM. These are categorized as follows.
Friable: means any material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry.
Category I Non-Friable ACM: means packing, gaskets, resilient floor coverings and roofing materials that contain more than one-percent asbestos.
Category II Non-Friable ACM: means any material, excluding Category I ACM that contains more than one-percent asbestos, and is not friable.
Regulated ACM (RACM): included all friable ACM; Category I ACM that will be or has been subject to sanding, grinding, cutting, or abrading; Category II ACM that has become friable;
and Category II ACM that has a high probability of becoming, or has crumbled, pulverized, or reduced to a powder by forces expected to act on the material in the course of demolition or renovation operations.
These revisions require experienced interpretation from the survey or along with input from the owner’s representative planning the renovation or demolition. This is necessary in order to determine the probability that the subsequent forces will make non-friable ACM become friable.
Building 4 J&L Secondary GSA Building # TX0323 Termination a I35 Laredo, Texas 78040
Prior to conducting the ACM survey, a thorough field observation inspection was conducted to determine appropriate sampling procedures for the building, and to ensure representative assessment was made in collecting the agreed upon samples. The ACM survey consisted of identification and sampling of suspect asbestos-containing materials located in the building. An assessment of material condition and an estimation of material quantities were made at the time of sample collection.
The following protocol was used in the survey:
Materials were divided into homogeneous areas;
Representative samples of each homogeneous area of miscellaneous, surfacing, and thermal system insulation materials were collected;
A minimum of three samples of each homogeneous miscellaneous area was collected.
A minimum of three samples of each homogeneous surfacing area was collected. A minimum of three samples of each homogeneous thermal system insulation material was collected. Additional samples were collected based on square feet or different system type, such as patch material;
After collection, each sample was sealed zip-lock plastic bags and labeled. A sample log was maintained which identified sample number, sample material type, location, and area description location.
5.2 ANALYTICAL PROCEDURES
Bulk samples collected by FOHS were analyzed by the National Environmental Reference Laboratory in Denver, Colorado. Samples analyzed having identified asbestos are reported by percent asbestos range and type(s) of asbestos present. Samples analyzed having no identified asbestos are reported as “none detected” (ND). The methods used for this evaluation were in compliance with the guidelines established by EPA in its Method for the Determination of Asbestos in Bulk Building Materials (EPA-600/R-93
6.0 RECOMMENDATIONS
The recommendations can be applied to basically two classifications: 1) abatement, or 2) managing in place through an Operations and Maintenance (O&M) Program. Abatement is generally accomplished by encapsulating the material, enclosing the material, encasing the ACM, or removing the material. Managing asbestos in place includes implementing, maintaining, and adhering to an O&M Program.
Although it is generally more cost effective for the short term to manage asbestos in place, the material should be documented, maintained and periodically inspected. This alternative can be an effective alternative, but the ACM remains in the building. Prior to demolition or renovation of a building, all friable and many non-friable ACMs must be removed from the affected area.
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
Based upon the field investigation, the following hazard assessment ranking table, and analytical laboratory results of the identified suspect material, the following actions are recommendations:
Hazard Rank Abatement Priority
ACM Condition Response Actions ACM Disturbance Potential
7 1 Significantly Damaged
Evacuate or isolate the area if needed. Remove the ACBM (or enclose or encapsulate if sufficient to contain fibers).
Repair of TSI is allowed if feasible and safe. O&M Plan required.
Any
6 2 Damaged Evacuate or isolate the area if needed. Remove, enclose, encapsulate, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required.
Potential for significant damage
5 3 Damaged Remove, enclose encapsulate, or repair to correct damage. O&M required.
Potential for Damage
4 4 Damaged Same as hazard rank #5. Low
3 5 Good Evacuate or isolate the area if needed. Take steps to reduce potential for disturbance. O&M required.
Potential for significant damage
2 6 Good O&M required. Potential for damage
1 7 Good O&M required. Low
0 8 Non-ACM Inventory for future use Inventory for future use
Building 4 J&L Secondary GSA Building # TX0323 Termination a I35 Laredo, Texas 78040
Recommendations for Specific Homogeneous Areas
Floor Tile (FT4) Hazard Rank 1 Abatement Priority 7 This HA consists of 12” x 12” off white tan mottled vinyl floor tile. The tile contains 1-4% chrysotile asbestos. This floor tile is located in Room 406 tool/equipment, Room 405 personal effects storage room, and Room 416. There is approximately 600 square feet of this material. The floor tile is non-friable and in good condition. The floor tile could present a health hazard potential to building occupants if there was a disturbance causing fiber release. This asbestos containing floor tile should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal.
Floor Tile Mastic, Black (FTM4) Hazard Rank 1 Abatement Priority 7 This HA consists of black mastic and is associated with FT4. The mastic contains 3-6% chrysotile asbestos. This mastic is located in Room 406 tool/equipment, Room 405 personal effects storage room, and Room 416. There is approximately 600 square feet of this material. The mastic could present a health hazard potential to building occupants if there was a disturbance causing fiber release. This asbestos containing mastic should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal.
Sink Undercoating, White (SC1) Hazard Rank 1 Abatement Priority 7 This HA consists of white/magenta sink undercoating. The sink undercoating contains 4- 8% chrysotile asbestos and is located under the sink in Room 410 CPT Passenger Chief.
There is approximately 4 square feet of this material. The sink undercoating could present a health hazard potential to building occupants if there was a disturbance causing fiber release. This asbestos containing mastic should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal.
Duct/Pipe Mastic/Sealant (DM1) Hazard Rank 1 Abatement Priority 7 This HA consists of white mastic/sealant found on ducts/pipes. This material contains 2-4% chrysotile asbestos. This mastic/sealant is found on duct seams and pipe wrap seams found in the janitor room, penthouse mechanical room, and ceiling plenum space. There is approximately 400 square feet of material. The mastic/sealant was determined to be non-friable and in good condition. It should be noted that newer looking duct/pipe mastic/sealant is similar in appearance but does not contain asbestos. For abatement purposes distinguishing the difference between the two may be difficult. Repair and installation records of new materials if available may help. The mastic/sealant could present a health hazard potential to building occupants if there was a disturbance causing fiber release. This asbestos containing mastic should be placed in an Operations and Maintenance program until renovation activities or change in condition requires removal. This asbestos containing mastic/sealant should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal.
Roof Sealant (RS1) Hazard Rank 1 Abatement Priority 7 This HA consists of black silver/gray/black roof sealant. The roof sealant contains 4-10% chrysotile asbestos. This roof sealant is found on the lower roof perimeter parapet wall, around roof pipes, ducts etc. and mixed with roof sealant RS2. There is approximately 1,000 square feet of material, however to adequately abate most of the roofing materials
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040 may have to be removed. The roof sealant was determined to be non-friable and in good condition. The roof sealant could present a health hazard potential to building occupants if there was a disturbance causing fiber release. This asbestos containing roof sealant should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal.
Roof Sealant (RS2) Hazard Rank 1 Abatement Priority 7 This HA consists of black roof sealant. The roof sealant contains 5-15% chrysotile asbestos. This roof sealant is found on the lower roof perimeter parapet wall, around roof pipes, ducts etc. and mixed with roof sealant RS1. There is approximately 1,000 square feet of material, however to adequately abate most of the roofing materials may have to be removed. The roof sealant was determined to be non-friable and in good condition. The roof sealant could present a health hazard potential to building occupants if there was a disturbance causing fiber release. This asbestos containing roof sealant should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal.
Caulk Exterior Black (CK3) Hazard Rank 1 Abatement Priority 7 This HA consists of black/gray caulk. The caulk contains 2-4% chrysotile asbestos. This caulk is found at found at the joints of exterior windows and metal frame panels and is mixed with CK2 brown/black caulk that is non-asbestos containing. There is approximately 300 linear feet of material. The caulk was determined to be non-friable and in good condition. The caulk could present a health hazard potential to building occupants if there was a disturbance causing fiber release. This asbestos containing caulk should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal.
Ceiling Tile White (CT4) Hazard Rank 1 Abatement Priority 7 This HA consists of lay ceiling tile located in the ceiling plenum space approximately 10 feet above the lower lay-in ceiling tile CT1, CT2 and CT3. The ceiling tile was inaccessible for collecting samples for asbestos content. It was assumed to contain asbestos following AHERA protocol although most likely this ceiling tile does not contain asbestos. This assumed asbestos containing ceiling tile should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal. At this time the ceiling tile should be tested for asbestos content.
Ceramic Brick Tile Brown (CR1) Hazard Rank 1 Abatement Priority 7 This HA consists of ceramic brick tile found in the Permit Processing lobby, hallways, and USCBP office. The brick tile was not sampled for asbestos content due to the highly destructive manner required to collect this sample. It was assumed to contain asbestos following AHERA protocol although most likely this tile does not contain asbestos. This assumed asbestos containing ceramic brick tile should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal. At this time the ceramic brick tile should be tested for asbestos content.
Mortar Brown (MT1) Hazard Rank 1 Abatement Priority 7 This HA consists of mortar associated with ceramic brick tile (CR1) found in the Permit Processing lobby, hallways, and USCBP office. The mortar was not sampled for asbestos content due to the highly destructive manner required to collect this sample. It was
Building 4 J&L Secondary GSA Building # TX0323 Termination a I35 Laredo, Texas 78040 assumed to contain asbestos following AHERA protocol although most likely this mortar does not contain asbestos. This assumed asbestos containing mortar should be placed in an Operations and Maintenance program until renovation activities, change in condition, or planned demolition requires removal. At this time the mortar should be tested for asbestos content.
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
APPENDIX A
BUILDING LAYOUT / BULK SAMPLE LOCATIONS
Building 4 J&L Secondary GSA Building # TX0323 Termination a I35 Laredo, Texas 78040
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35
Building 4 J&L Secondary GSA Building # TX0323 Termination a I35
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
APPENDIX B
SUMMARY TABLES
Building 4 J&L Secondary GSA Building # TX0323 Termination At I35 Laredo, Texas 78040
Table 1: Summary of Asbestos-Containing Materials
Functional Area(s) and Room Number(s)
Location of Material
Material Description Estimated Quantity
Sample Number
Analytical Results (Asbestos Type &
Percent)
Hazard Ranking and Condition of
Asbestos- Containing
Material Ceiling plenum, penthouse mechanical room, and janitor
Ducts and pipes
DM1- Duct/Pipe Mastic/Sealant, (old) white/cream
400 SF TX0323-091
TX0323-092
TX0323-093
1-4% Chrysotile 1 Good and Non-
Friable
Room 406 tool/equipment, Room 405 personal effects storage room, and Room 416
Floor FT4-Floor tile 12 x 12” off white tan mottled associated with FTM4- Black mastic
600 SF TX0323-049
TX0323-050
TX0323-051
1-4% Chrysotile 1 Good and Non-
Friable
Room 406 tool/equipment, Room 405 personal effects storage room, and Room 416
Floor FTM4- Black mastic associated with FT4-Floor tile 12 x 12” off white tan mottled
600 SF TX0323-052
TX0323-053
TX0323-054
3-6% Chrysotile 1 Good and Non-
Friable
Room 410 CPT Passenger Chief
Sink SC1-Sink undercoating, white/magenta
4 SF TX0323-064
TX0323-065
TX0323-066
4-8% Chrysotile 1 Good and Non-
Friable
Roof and canopy Roof and canopy
RS1- Roof Sealant black silver/gray/dark brown
1000 SF TX0323-103
TX0323-104
TX0323-105
4-10% Chrysotile 1 Good and Non-
Friable
Roof and canopy Roof and canopy
RS2- Roof Sealant black 1000 SF TX0323-106
TX0323-107
TX0323-108
5-15% Chrysotile 1 Good and Non-
Friable
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
Table 1: Summary of Asbestos-Containing Materials (Continued)
Functional Area(s) and Room Number(s)
Location of Material
Material Description Estimated Quantity
Sample Number
Analytical Results (Asbestos Type &
Percent)
Hazard Ranking and Condition of
Asbestos- Containing
Material Exterior Exterior window and metal frames
CK3- Caulk gray/black 300 LF TX0323-097
TX0323-098
TX0323-099
2-4% Chrysotile 1 Good and Non-
Friable
Ceiling plenum space Ceiling plenum space
CT4- Ceiling tile white 1000-2000
SF
Assumed Assumed 1 Good and Non-
Friable Permit Processing lobby, hallways, and USCBP office
Floors CR4- Brick ceramic tile brown 1500 SF Assumed Assumed 1 Good and Non-
Friable Permit Processing lobby, hallways, and USCBP office
Floors MT1- Brick ceramic tile brown 1500 SF Assumed Assumed 1
Building 4 J&L Secondary GSA Building # TX0323 Termination At I35 Laredo, Texas 78040
Table 2: Summary of Non-Asbestos-Containing Materials
Room Number(s Location of Material
Material Description
Estimated Quantity
Sample Number
Analytical Results
Hazard Ranking and Condition of
Non-Asbestos Containing
Material Permit processing lobby, Room
424 ENF office, Room 408 ATCET office, Room 403, Room 410 CPT
Passenger Chief, Room 411, Room 412 IPT Passenger office, USCBP office, Ceilings CT1-Ceiling Tile, white
2’ x 2’ random fissures
Not Applicable TX0323-001
TX0323-002
TX0323-003
None Detected 0 Good and Non-
Friable
Room 421, Room 407 ENF supervisor, IPT Case File
Processing Clerk, Room 418A Storage room, Ceilings CT2-Ceiling Tile, white
2’ x 2’ random large fissures
Not Applicable TX0323-004
TX0323-005
TX0323-006
None Detected 0 Good and Friable
USCBP office, Room 418, Room 419 AQ1 Supervisors office Ceilings CT3-Ceiling Tile, white 2’ x 4’ horizontal fissures
Not Applicable
TX0323-007
TX0323-008
TX0323-009
None Detected
Good and Friable
Permit processing lobby, Room 424 ENF office, Room 408 ATCET office, Room 403, ENF supervisor, men’s restroom 1, women restroom
1, Room 410 CPT Passenger Chief, Room 411, Room 412 IPT Passenger office, men’s restroom 2, women restroom 2, Room 419
AQ Supervisor, USCBP office, Soft hallway, hard hallway, and mechanical room penthouse
Walls and Ceilings WB-1 Wallboard Not Applicable TX0323-010
TX0323-011
TX0323-012
TX0323-013
TX0323-014
None Detected 0 Good and Friable
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
Room Number(s Location of Material
Material Description
Estimated Quantity
Sample Number
Analytical Results
Hazard Ranking and Condition of
Non-Asbestos Containing
Material Permit processing lobby, Room
424 ENF office, Room 408 ATCET office, Room 403, ENF supervisor, men’s restroom 1, women restroom
1, Room 410 CPT Passenger Chief, Room 411, Room 412 IPT Passenger office, men’s restroom 2, women restroom 2, Room 419
AQ Supervisor, USCBP office, Soft hallway, hard hallway, and mechanical room penthouse
Walls JC1-Joint compound, white
Not Applicable TX0323-015
TX0323-016
TX0323-017
TX0323-018
TX0323-019
None Detected 0 Damaged and Non-
Friable
Room 424 ENF office, Room 408 ATCET office, Walls TX1-Wall texture, white
Not Applicable TX0323-020
TX0323-021
TX0323-022
None Detected 0 Good and Friable
Men’s restroom 1, women’s restroom 1, men’s restroom 2, women restroom 2, Walls TX2-ceiling texture, white
Not Applicable TX0323-023
TX0323-024
TX0323-025
None Detected 0 Good and Friable
Permit processing lobby, room 406 Tools/Equipment room, Room 405 Personal Effects Storage room, Room 424 ENF office, Room 408 ATCET office, Room 403, Room 421, Room 407 ENF supervisor, Room 410 CPT Passenger Chief , Room 411, Room 418, Room 418A Storage room, USCBP office, Soft hallway, and hard hallway
Ceilings and Walls PL1 Plaster, white/tan
Not Applicable TX0323-026
TX0323-027
TX0323-028
TX0323-029
TX0323-030
None Detected 0 Good and Friable
Building 4 J&L Secondary GSA Building # TX0323 Termination At I35 Laredo, Texas 78040
Room Number(s Location of Material
Material Description
Estimated Quantity
Sample Number
Analytical Results
Hazard Ranking and Condition of
Non-Asbestos Containing
Material Permit processing lobby, Room 424 ENF office, Room 408 ATCET office, Room 403, Room 421, Room 407 ENF supervisor, Room 410 CPT Passenger Chief, Room 411, Room 412 IPT Passenger office, IPT Case File Processing Clerk, Room 418, room 418A Storage room, Room 419 AQ Supervisor, USCBP office, Soft hallway, and hard hallway, Walls WV1-Wall vinyl base cove 4”, brown
Not Applicable TX0323-031
TX0323-032
TX0323-033
None Detected 0 Good and Non-
Friable
Permit processing lobby, room Permit processing lobby, Room 424 ENF office, Room 408 ATCET office, Room 403, Room 421, Room 407 ENF supervisor, Room 410 CPT Passenger Chief, Room 411, Room 412 IPT Passenger office, IPT Case File Processing Clerk, Room 418, room 418A Storage room, Room 419 AQ Supervisor, USCBP office, Soft hallway, and hard hallway
Walls WVM1-Mastic associated with Wall vinyl base cove 4”, brown
Not Applicable TX0323-034
TX0323-035
TX0323-036
None Detected 0 Good and Non-
Friable
Permit processing lobby, Room 408 ATCET office, and Room
Floors FT1- Floor tile 12” x12” white with brown streaks
Not Applicable TX0323-037
TX0323-038
TX0323-039
None Detected 0
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
Room Number(s Location of Material
Material Description
Estimated Quantity
Sample Number
Analytical Results
Hazard Ranking and Condition of
Non-Asbestos Containing
Material Permit processing lobby, Room 408 ATCET office, and Room
Floors FTM1-Mastic, clear/yellow associated with Floor tile 12” x 12” white with brown streaks
Not Applicable TX0323-040
TX0323-041
TX0323-042
None Detected 0 Good and Non-
Friable
Room 408 ATCET office, Room 410 CPT Passenger Chief Room
411, and Room 419 AQ Supervisor
Floors FT2- Floor tile 12” x12” white mottled gray
Not Applicable TX0323-043
TX0323-044
TX0323-045
None Detected 0 Good and Non-
Friable
Room 408 ATCET office, Room 410 CPT Passenger Chief Room 411, and Room 419 AQ Supervisor
Floors FTM2-Mastic, clear yellow associated with FT2- Floor tile 12” x12” white mottled gray
Not Applicable TX0323-046
TX0323-047
TX0323-048
None Detected 0 Good and Non-
Friable
Room 424 ENF office and Room 407 ENF supervisor, Floors FT3- Floor tile 12” x12” gray mottled blue and white
Not Applicable TX0323-049
TX0323-050
TX0323-051
None Detected 0 Good and Non-
Friable
Room 424 ENF office and Room 407 ENF supervisor, Floors FTM3-Mastic, clear yellow associated with FT2- Floor tile 12” x12” gray mottled blue and white
Not Applicable TX0323-052
TX0323-053
TX0323-054
None Detected 0 Good and Non-
Friable
All rooms with windows Windows, Interior CK1-Caulk, black Not Applicable TX0323-061
TX0323-062
TX0323-063
None Detected 0
Building 4 J&L Secondary GSA Building # TX0323 Termination At I35 Laredo, Texas 78040
Room Number(s Location of Material
Material Description
Estimated Quantity
Sample Number
Analytical Results
Hazard Ranking and Condition of
Non-Asbestos Containing
Material Room 403 Permit processing lobby, USCBP office, Soft hallway, and hard hallway
Floors GR1-Grout, brown associated with CR1 ceramic brick tile CR4
Not Applicable TX0323-067
TX0323-068
TX0323-069
None Detected 0 Good and Non-
Friable
Men’s restrooms Floors GR2-Grout, white associated with
Ceramic tile blue/white
Not Applicable TX0323-070
TX0323-071
TX0323-072
None Detected Trace <1% Chrysotile
Good and Non-
Friable
Women’s restrooms Floors GR3-Grout, white associated with Ceramic tile yellow/white
Not Applicable TX0323-073
TX0323-074
TX0323-075
None Detected 0 Good and Non-
Friable
Men’s restrooms Walls, Floors MT2- Mortar, gray associated with CR2- Ceramic tile blue
Not Applicable TX0323-076
TX0323-077
TX0323-078
None Detected 0 Good and Non-
Friable
Janitor room 317, Men’s restrooms Walls, Floors MT3- Mortar, gray associated with CR2- Ceramic tile blue/white
Not Applicable TX0323-079
TX0323-080
TX0323-081
None Detected 0 Good and Non-
Friable
Exterior Exterior window frames and metal frames
CK2- Caulk brown soft
Not Applicable TX0323-094
TX0323-095
TX0323-096
None Detected 0 Good and Non-
Friable Exterior Roof and canopy roof RT1-Roof tar black Not Applicable TX0323-100
TX0323-101
TX0323-102
None Detected 0 Good and Non-
Friable Exterior Walls PL2-plaster Not Applicable TX0323-109
TX0323-110
TX0323-111
TX0323-112
None Detected 0
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
Room Number(s Location of Material
Material Description
Estimated Quantity
Sample Number
Analytical Results
Hazard Ranking and Condition of
Non-Asbestos Containing
Material
Women’s restrooms Walls, Floors MT4- Mortar, gray associated with CR3-
Ceramic tile yellow/white
Not Applicable TX0323-113
TX0323-114
TX0323-115
None Detected 0 Good and Non-
Friable
Room 417 janitor, possibly behind interior plaster walls throughout building
Walls BB1-Brick block, orange
Not Applicable TX0323-119
TX0323-120
TX0323-121
None Detected 0 Good and Non-
Friable Room 412 IPT Passenger Office, Room 418, room 418A storage room, Floors CM1- Carpet mastic yellow
Not Applicable TX0323-116
TX0323-117
TX0323-118
None Detected 0
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
APPENDIX C
LABORATORY RESULTS
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
APPENDIX D
HAZARD RANKING
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
HAZAR
D RANK
ABATEMEN
T PRIORITY
ACM
Condition
RESPONSE ACTIONS ACM Disturbance Potential
7 1 Significantly Damaged
Evacuate or isolate the area if needed. Remove the ACBM (or enclose or encapsulate if sufficient to contain fibers). Repair of TSI is allowed if feasible and safe. O&M Plan required.
Any
6 2 Damaged Evacuate or isolate the area if needed. Remove, enclose, encapsulate, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required.
Potential for significant damage
5 3 Damaged Remove, enclose encapsulate, or repair to correct damage. O&M required.
Potential for Damage
4 4 Damaged Same as hazard rank #5. Low
3 5 Good Evacuate or isolate the area if needed. Take steps to reduce potential for disturbance. O&M required.
Potential for significant damage
2 6 Good O&M required. Potential for damage
1 7 Good O&M required. Low
0 8 Non-ACM Inventory for future use Inventory for future use
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
DECISION TREE FLOW CHART & HAZARD ASSESSMENT RANKING
S T A R T
IS
T H EM A T E R IA L
A C M
N o In v e n to ry fo r F u tu re U s e
D A M A G E
C O N D IT IO N
Y e s
D A M A G E D G O O DS IG N IF IC A N T
L YD A M A G E
D
Y e s# 7
D IS T U R B A N C E
P O T E N T IA L
D IS T U R B A N C E
P O T E N T IA L
P O T E N T IA L
F O R
D A M A G E L O W
P O T E N T IA L
F O R
S IG N IF IC A N T
D A M A G E
P O T E N T IA L
F O R
D A M A G E L O W
Y e s Y e s Y e s Y e s Y e s Y e s
# 5# 6 # 4 # 3 # 2 # 1
H OM O G E N EO U S A R E A H A ZA R D A S SE S SM E N T R A N K IN G D E C IS IO N
P O T E N T IA L
F O R
S IG N IF IC A N T
D A M A G E
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
APPENDIX E
PHOTOGRAPHS
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
ASBESTOS PHOTOGRAPHS
HA Nos: FT4 and FTM4 FLOOR TILE AND MASTIC, 12” X 12” off-white/tan mottled and associated black mastic
Approximately 600 Sq. Ft., Good Condition Non-Friable, Low Hazard
HA No: DM1 DUCT/PIPE MASTIC/SEALANT, white
400 Sq. Ft., Good Condition Non-Friable, Low Hazard
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
ASBESTOS PHOTOGRAPHS
HA No: RS1 RS1-ROOF SEALANT silver/gray/dark brown
1000 Sq. Ft, Good Condition, Non-Friable, Low Hazard
HA No: RS2 RS2-ROOF SEALANT black
1000 Sq. Ft, Good Condition, Non-Friable, Low Hazard
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
ASBESTOS PHOTOGRAPHS
HA No: CK2 CK2- Caulk gray/black
300 LF, Good Condition, Non-Friable, Low Hazard
HA No: SC1 SC1- Sink Undercoating
4SF, Good Condition, Non-Friable, Low Hazard
Building 4 J&L Secondary GSA Building # TX0323 Termination at I35 Laredo, Texas 78040
ASBESTOS PHOTOGRAPHS- ASSUMED MATERILAS
HA No: CT4- Assumed Ceiling tiles, white ceiling plenum space
2000-3000 Sq. Ft., Good Condition, Friable, Low Hazard
HA Nos: CR4 and MT1- Assumed
BRICK TILE AND ASSOCIATED MORTAR
1500 Sq. Ft., Good Condition, Friable, Low Hazard