Amendment_No_5_-_Convent_Revised_Specifications.pdf

PDF 1 MB Posted

Attached to
New Construction and Tenant Improvements, Laredo 1 and 2 Ports of Entry
Solicitation number
GS-07P-14-HH-C-0016-Stage2
Issued by

About this file

Convent Revised Specifications

View the file

Other files

File Type Posted
Industry_Outreach_-_San_Antonio_8-6-2015_(1).pdf PDF
Industry_Outreach_-_Laredo_8-5-2015_(1).pdf PDF
Amendment_No_9_-_GS-07P-14-HH-C-0016.pdf PDF
Amendment_No_8_-_Renderings.zip ZIP file
Amendment_No_8_-_GS-07P-14-HH-C-0016.pdf PDF
Amendment_No_8_-_Revised_Drawings.pdf PDF
Amendment_No_8_-_Civil_drawing.DWG DWG drawing
Amendment_No_8_-_Convent_Existing_HVAC.pdf PDF
Amendment_No_8_-_Existing_Canopy_drawings_for_J L.pdf PDF
Amendment_No_7_-_GS-07P-14-HH-C-0016.pdf PDF
Amendment_No_6_-_GS-07P-14-HH-C-0016.pdf PDF
Amendment_No_5_-_Convent_Asbestos_Survey_1995.pdf PDF
Amendment_No_5_-_Sign_in_sheet_for_Site_Visit_-_7-15-14.pdf PDF
Amendment_No_5_-_Convent_Asbestos_Survey_2007.pdf PDF
Amendment_No_5_-_Juarez_Lincoln_Revised_Drawings.zip ZIP file
Amendment_No_5_-_Juarez_Lincoln_Asbestos_Survey_Building_2 _Combined.pdf PDF
Amendment_No_5_-_Juarez_Lincoln_Asbestos_Survey_Bldg_4.pdf PDF
Amendment_No_5_-_Juarez_Lincoln_Asbestos_Survey_Bldg_3.pdf PDF
Amendment_No_5_-_GS-07P-14-HH-C-0016.pdf PDF
Amendment_No_5_-_Convent_Revised_Drawings.pdf PDF
Geotech_Report_-_Juarez-Lincoln.pdf PDF
Amendment_No_4_-_GS-07P-14-HH-C-0016.pdf PDF
Amendment_No_3_-_GS-07P-14-HH-C-0016.pdf PDF
SITE_VISIT.pdf PDF
Amendment_No._2_-_J L_-_NXT00009_-_Div_01_Specifications.pdf PDF
Amendment_No._2_-_Consolidated_Div_01_Specifications.pdf PDF
Amendment_No._2_-_Convent_-NTX00007_-_Div_01_Specifications.pdf PDF
Amendment_No_2_-_GS-07P-14-HH-C-0016.pdf PDF
Laredo_1_ _2_Pre-proposal_meeting_sign_in_sheet_6-16-14.pdf PDF
Amendment_No_1_-_GS-07P-14-HH-C-0016.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-1

Laredo, Texas TEMPORARY FACILITIES AND CONTROLS

GSA Project Numbers NTX00007 & NTX00009

May 23, 2014

PROPERTY OF UNITED STATES GOVERNMENT –FOR OFFICIAL USE ONLY

TEMPORARY FACILITES AND CONTROLS 01 50 00-1

SECTION 01 50 00

TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes requirements for temporary utilities, support facilities and protection.

1. Support facilities include but are not limited to the following:

a. Temporary Processing Facility and Offices.

b. Contractor Field Offices, storage sheds, and fabrication shops.

c. GSA Field Offices.

d. Temporary Movable Tent Structures.

e. Temporary paving.

f. Temporary enclosures.

g. Temporary lifts and hoists.

h. Project identification and other temporary signs.

i. Waste disposal services.

j. Rodent and pest control.

k. Other construction aids and miscellaneous services and facilities.

2. Temporary utilities include, but are not limited to the following:

a. Temporary water service and distribution.

b. Temporary electric power and lighting.

c. Temporary heat and ventilation.

d. Temporary telephone and data service

e. Temporary sanitary facilities, including drinking water.

f. Storm and sanitary sewer.

3. Protection includes but is not limited to the following:

a. Temporary fire protection.

b. Barricades, warning signs, and lights.

c. Enclosure fence.

d. Environmental protection.

B. Work Included:

1. Provide temporary facilities and controls required for construction activities except, if any, for facilities and controls indicated as existing or provided by the Government or others.

2. Provide temporary facilities for exclusive use by the Department of Homeland Security and its representatives, as described in paragraph 3.3, and in accordance with this specification and the construction plans.

3. Provide temporary facilities for exclusive use by GSA and its site representatives, as described in paragraph 3.3, and in accordance with this specification.

4. Provide, for exclusive use by GSA and its site representative, one licensed copy of Primavera P6 scheduling software fully compatible with Contractor’s schedule submittals, including installation

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-2

TEMPORARY FACILITES AND CONTROLS 01 50 00-2

media and yearly maintenance for the project duration. Contractor shall retain ownership of the software.

1.2 UTILITY USE CHARGES

A. Water Service: The Contractor shall provide for construction domestic water service.

B. Sewer Service: Contractor shall provide temporary and portable toilet room facilities for all employees and subcontractors.

C. Electric Power Service: Contractor shall provide for construction electrical service.

D. Utilities for Temporary Facilities: The Contractor shall be responsible for the installation, connection, and maintenance of all utility services, including but not limited to water, sewer, electrical power and others as specifically noted herein, to all temporary facilities, including Temporary Processing Facilities

& Offices, Contractor Field Offices, and GSA Field office.

1. The Contractor shall pay for all utility service charges and fees for the set up, use, and operation of the Contractors Field Offices incurred during the duration of the construction project.

2. The GSA shall pay for all utility service charges and fees for the set up, use, and operation of the

Temporary Processing Facilities & Offices, and GSA Field Offices incurred during the duration of the construction project.

1.3 SUBMITTALS

A. Implementation and Termination Schedule: Within 15 calendar days after the date established for the submittal of the Contractor's Construction Schedule, submit a schedule indicating implementation and termination of each temporary utility.

B. Provide shop drawings and equipment data for the following:

1. Complete design and construction plans, sections and elevations. Include details for perimeter wall systems, interior partitions, structural floor and roof framing for each modular unit.

Documents shall indicate structural design by a licensed structural engineer currently qualified to legally practice in the State of Texas. The structural engineer’s registration seal shall be affixed to all drawing sheets. Indicate all design loading (vertical and lateral) on the plans.

2. Provide drawings, equipment and materials data for electrical, plumbing and HVAC system for engineers and architects review and approval.

3. Provide material data and shop drawings, when applicable for all architectural materials and finishes.

4. Coordinate all aspects of manufacturing, delivery, installation and final utility connections and termination with all required sub-contractor and suppliers to provide the Owner a substantially completed facility ready for immediate occupancy for intended use.

5. Manufacturing firms include but are not limited to the following:

a. Indicom Buildings, Inc.

b. Ramtech Building Systems

c. Palomar Modular Buildings

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-3

TEMPORARY FACILITES AND CONTROLS 01 50 00-3

1.4 QUALITY ASSURANCE

A. Standards and Regulations: Comply with industry standards and with applicable laws and regulations of authorities having jurisdiction, including but not limited to the following:

1. Building code requirements.

2. Health and Safety regulations.

3. Utility company regulations.

4. Police, fire department and rescue squad rules.

5. Environmental protection regulations.

6. NFPA 241 "Standards for Safeguarding Construction, Alterations and Demolition Operations".

7. ANSI-A10 Series standards for "Safety Requirements for Construction and Demolition".

8. NECA Electrical Design Library "Temporary Electrical Facilities", NFPA 70, and NEMA, NECA and UL standards and regulations for temporary electric service.

B. Inspections: Arrange for authorities having jurisdiction to inspect and test each temporary utility before use. Obtain required certifications and permits.

1.5 PROJECT CONDITIONS

A. Install, operate, maintain and protect temporary facilities and controls.

1. Keep temporary services and facilities clean and neat in appearance.

2. Operate temporary services in a safe and efficient manner.

3. Relocate temporary services and facilities as needed as Work progresses.

4. Do not overload temporary services and facilities or permit them to interfere with progress.

5. Provide necessary fire prevention measures.

6. Do not allow hazardous, dangerous or unsanitary conditions, or public nuisances to develop or persist on-site.

B. At the earliest feasible time, when acceptable to the Contracting Officer's Representative, change over from temporary services to use of permanent services and remove temporary facilities when no longer needed.

C. Temporary Use of Permanent Facilities: Contractor shall assume responsibility for the operation, maintenance and protection of each permanent service during its use as a construction facility prior to the

Government's acceptance.

D. Existing Equipment and Items: Cover or otherwise protect and provide security for existing equipment and other items that are to remain in place, to prevent soiling, damage and loss.

1. Temporarily move equipment and other items that interfere with the performance of required work. Upon completion of the work, return the equipment and items to their original location and installation condition.

2. Store equipment and other items that have been temporarily removed. Upon reinstallation, clean and, if damaged, repair or replace equipment and items to match their condition prior to removal.

PART 2 - PRODUCTS

2.1 MATERIALS

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-4

TEMPORARY FACILITES AND CONTROLS 01 50 00-4

A. Provide undamaged materials in serviceable conditions and suitable for use intended.

B. Tarpaulins: Waterproof, fire-resistant UL labeled with flame spread rating of 15 or less. For temporary enclosures, provide translucent, nylon-reinforced, laminated polyethylene or polyvinyl chloride, fire-retardant tarpaulins.

C. Water: Potable and approved by local health authorities.

D. Wood: Lumber complying with DOC PS 20 and applicable grading rules of an inspection agency certified by ALSC's Board of Review for specific use. Provide preservative treated lumber where partially or fully in contact with the earth, concrete or masonry. Provide fire retardant treated lumber for temporary purposes where fire rated products are normally required.

E. Sign, Directory and Other Graphic Panel Materials: Unless otherwise indicated, products shall comply as follows:

1. Panels: Exterior type Grade B-B high-density concrete-form-overlay plywood.

2. Paint: Exterior primer and exterior grade latex gloss enamel topcoat.

F. Safety Barrier and Covered Walkway Materials: Unless otherwise indicated, products shall comply as follows.

1. Panels: Minimum 5/8-inch thick exterior plywood.

2. Paint: Exterior primer and exterior grade acrylic-latex emulsion top coat.

G. Dust Control:

1. Dust Control Adhesive-Surface Walk-off Mats: Provide mats minimum 36 by 60 inches.

2. Polyethylene Sheet: Reinforced, fire-resistive sheet, 10 mils minimum thickness, with flame-spread rating of 15 or less per ASTM E 84 and passing NFPA 701 Test 2

H. Wood Fencing and Vision Panel Materials: Unless otherwise indicated, products shall comply as follows:

1. Panels: Minimum thick exterior plywood.

2. Paint: Exterior primer and exterior grade acrylic-latex emulsion top coat.

I. Open-Mesh Fencing: Minimum 1/8" thick galvanized .051 chain link fabric fencing with galvanized steel pipe posts, .038 inside diameter for line posts and 0.064 inside diameter for corner posts.

1. Fence height: 8 feet.

2. Top Protection: Galvanized barbed-wire top strand.

J. Job-Built Temporary Office, Shop and Shed Materials: Unless otherwise indicated, products shall comply as follows:

1. Framing, Sheathing and Siding: Exterior grade plywood.

2. Roofing: UL Class A standard weight asphalt shingles, or UL Class C mineral surfaced roll roofing.

3. Exterior Paint: Exterior primer and exterior grade acrylic-latex emulsion top coat.

4. Interior Wall Panels for Offices: Minimum .006 thick by 1.22 wide by maximum available lengths, regular type gypsum board with tapered edges, complying with ASTM C 36.

5. Interior Paint for Offices: 2 coats interior latex-satin wall paint.

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-5

TEMPORARY FACILITES AND CONTROLS 01 50 00-5

2.2 EQUIPMENT

A. Provide equipment in serviceable condition and suitable for use intended.

1. Electric Outlets: NEMA-polarized outlets to prevent insertion of 110 to 120 Volt plugs into higher voltage outlets. Provide receptacle outlets equipped with ground fault circuit interrupters, reset button and pilot light for connection of power tools and equipment.

2. Electric Power Cords: Grounded extension cords.

a. Provide hard-service cords where exposed to abrasion or traffic.

b. Provide waterproof connectors to connect separate lengths of electric cords where single lengths will not reach areas of construction activity.

c. Do not exceed safe length-voltage ratio.

3. Lamps and Light Fixtures: General service lamps of wattage required for adequate illumination.

a. Provide guard cages or tempered glass enclosures where exposed to breakage.

b. Provide exterior fixtures where exposed to moisture.

4. Heating Units: Temporary heating units that have been tested and labeled by UL, FM or another recognized trade association related to the type of fuel consumed.

B. Water Hoses: .016 minimum heavy duty abrasive-resistant flexible rubber hoses, 100 feet long with pressure rating greater than the maximum pressure of the water distribution system. Provide adjustable shutoff nozzles at hose discharge.

C. Temporary Offices: Unless specified elsewhere, prefabricated or mobile units or similar job-built enclosures, inclusive of but not limited to lockable entrances, operable windows, serviceable finishes, heating and air conditioning, electric power and lighting, and foundations adequate for the loads.

D. Self-Contained Toilet Units: Temporary single-occupant toilet units of the chemical, aerated recirculation, or combustion type for use by all construction personnel. Units shall be properly vented and fully enclosed with a glass-fiber-reinforced polyester shell or similar nonabsorbent material.

E. Fire Extinguishers: Hand-carried portable UL-rated fire extinguishers.

1. Class A extinguishers for temporary offices and similar spaces.

2. Class ABC dry chemical extinguishers or a combination of extinguishers of NFPA recommended classes for the exposures in other locations.

3. Comply with NFPA 10 and NFPA 241 for classification, extinguishing agent and size required by location and class of fire exposure.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Use qualified personnel for installation of temporary facilities.

B. Locate facilities where they will serve the project adequately and result in minimum interference with performance of construction activities. Maintain, relocate and modify facilities as required during the construction period.

3.2 TEMPORARY UTILITIES

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-6

TEMPORARY FACILITES AND CONTROLS 01 50 00-6

A. Engage the appropriate local utility companies to install temporary services or connect to existing services. Where a utility company provides only part of a service, provide the remainder with matching and compatible materials and equipment in compliance with utility company recommendations.

1. Arrange with the utility company and existing users for a time where service can be interrupted, if necessary, to make connections for temporary services.

2. Provide adequate capacity at each stage of construction.

3. Obtain easements to bring in temporary utilities to the site where Government easements are not available for that purpose.

B. Temporary Electric Power Service: Provide weatherproof grounded electric power service and distribution system of sufficient size, capacity and power characteristics for construction needs. Include meters, transformers, overload-protected disconnects, automatic ground-fault interrupters and main distribution switch gear.

C. Temporary Lighting: Install and operate temporary lighting that will fulfill security and protection requirements without operating the entire system. Provide lighting that provides adequate illumination for construction operations and traffic conditions.

D. Temporary Heat and Ventilation: Provide temporary heat and ventilation required for the construction activities, including but not limited to curing or drying completed installations and protecting construction from adverse effects of low temperatures and high humidity. Use safe equipment that will not have a harmful effect on elements being installed and on completed installations. Coordinate ventilation requirements to produce the ambient condition required for the work and to minimize energy consumption, and to protect personnel from fumes and other harmful effects.

E. Heating Facilities: Provide vented self-contained heaters with individual space thermostatic control. Do not use gasoline-burning space heaters, open flame or salamander-type heating units.

F. Temporary Telephone Service: Minimally provide a separate telephone line for each temporary office and first-aid station, and provide a dedicated telephone line for a fax machine in the Contractor's field office.

G. Temporary Sanitary Facilities: Provide for toilets, wash facilities and drinking water fixtures in compliance with regulations and health codes for type, number, location, operation and maintenance of fixtures and facilities. Provide toilet tissue, paper towels, paper cups and similar disposable materials as appropriate for each facility, and provide covered waste containers for used materials.

1. Toilets: Use of the Government's existing toilet facilities will not be permitted.

2. Toilets: Install separate self-contained toilet units for male and female personnel. Shield toilets to ensure privacy.

3. Wash Facilities: Install wash facilities supplied with potable water at convenient locations for personnel involved in handling materials that require wash-up for a healthy and sanitary condition.

a. Dispose of drainage properly.

b. Supply cleaning compounds appropriate for each condition.

c. Include safety showers, eyewash fountains and similar facilities for the convenience, safety and sanitation of personnel.

4. Drinking Water Facilities: Provide 5-gallon containerized tap-dispenser bottled-drinking water units, complete with paper cup supplies at each modular building group or trailer. The General

Contractor shall service/refill each unit as required. Provide power to electric water coolers to maintain dispensed water temperature at 45 to 55 deg F (7 to 13 deg C). Typically – units are cold water service only. Provide hot and cold water service at GSA Trailer.

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-7

TEMPORARY FACILITES AND CONTROLS 01 50 00-7

H. Sewers and Drainage: If sewers are available, provide temporary connections to remove effluent that can be discharged lawfully. If sewers cannot be used, provide drainage ditches, dry wells, stabilization ponds and similar facilities. If neither sewers nor drainage facilities can be lawfully used for discharge of effluent, provide containers to remove and dispose of effluent off-site in a lawful manner.

1. Filter out excessive amounts of soil, construction debris, chemicals, oils and similar contaminants that might clog sewers or pollute waterways.

2. Connect temporary sewers as directed by sewer utility officials.

3. Maintain temporary sewers and facilities in a clean, sanitary condition. Following heavy use, promptly restore sewers and facilities to normal conditions.

I. Storm Water Controls: Provide earthen embankments and similar barriers in and around excavations and subgrade construction, sufficient to prevent flooding by runoff of storm water from heavy rains.

3.3 TEMPORARY SUPPORT FACILITIES

A. Locate Temporary Processing Facility, field offices, storage sheds, sanitary facilities and other temporary construction and support facilities for easy access.

B. Provide non-combustible construction for offices, shops and sheds located within the construction area or within 30 feet of building lines. Comply with NFPA 241.

A. Contractor Field Offices: Provide prefabricated or mobile units or similar job-built enclosures. Offices shall be insulated, weather tight of sufficient size to accommodate office personnel at the Project site.

Office shall be designed to meet local code requirements, including but not limited to windstorm and wind tie down requirements. Temporary office shall be inclusive of, but not limited to, lockable entrances, operable windows, serviceable finishes, furnishings, heating and air conditioning, electric power and lighting, and foundations adequate for the loads. Additional minimal requirements include:

1. Self-Contained Toilet Units: Temporary single-occupant toilet units of the chemical, aerated recirculation, or combustion type for use by construction personnel. Units shall be vented and enclosed with a glass-fiber-reinforced polyester shell or similar nonabsorbent material.

2. Provide water cooler and a lavatory.

3. Provide emergency medicine cabinet.

4. Meeting Space: Provide a room of not less than 240 sq. ft. for project meetings. Furnish meeting room with conference table, tack board and not less than 12 chairs.

5. Fire Extinguishers: Hand-carried portable UL-rated fire extinguishers.

a. Class A extinguishers for temporary offices and similar spaces.

b. Class ABC dry chemical extinguishers or a combination of extinguishers of NFPA recommended classes for exposures in other locations.

c. Comply with NFPA 10 and NFPA 241 for classification, extinguishing agent and size required by location and class of fire exposure.

6. Maintain offices clean and orderly. Furnish and equip offices for use.

B. Storage Sheds and Fabrication Shops: Provide sheds and shops that are sized, furnished and equipped to accommodate materials and equipment involved. Include complete temporary utility services for intended use. Sheds and shops may be open shelters or fully enclosed spaces, as appropriate for use.

C. Temporary Paving: Construct and maintain temporary roads and paving to support indicated loadings, if any, and to withstand exposure to traffic during the construction period.

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-8

TEMPORARY FACILITES AND CONTROLS 01 50 00-8

1. Locate temporary paving for roads, storage areas and parking where same permanent facilities will be located, or obtain authorization from the Contracting Officer's Representative for proposed temporary paving not located at permanent paving locations.

2. Comply with Division 2 sections applicable to paving for construction and maintenance of temporary paving.

3. Coordinate temporary paving development with subgrade grading, compaction, installation and stabilization of sub-base, and installation of permanent paving.

4. Install temporary paving to minimize the need to rework installations and result in permanent roads and paved areas without damage or deterioration when occupied by the Government.

5. Subject to Contraction Officer's Representative's approval, extend temporary paving in and around the construction area as necessary to accommodate delivery and storage of materials, equipment usage, administration and supervision.

6. Delay installation of permanent paving until acceptable to the Contracting Officer's

Representative. Coordinate with weather conditions to avoid unsatisfactory results.

D. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress or completed, from exposure, inclement weather, other construction operations and similar conditions.

1. Where heat is needed and the building enclosure is not complete, provide temporary enclosures where there is no other provision for containment of heat. Coordinate enclosure with ventilating and material drying or curing requirements to avoid dangerous conditions or unacceptable effects.

2. Install tarpaulins securely with incombustible framing. Close openings of 25 sq. ft. or less with plywood or similar materials.

3. Close openings through floor or roof decks and other horizontal surfaces with load-bearing wood-framed construction.

4. Where enclosure exceeds 100 sq. ft. in area, use UL labeled fire-retardant-treated wood and plywood for framing and sheathing.

E. Temporary Lifts and Hoists: Provide facilities for hoisting materials and personnel.

F. Project Identification and Other Temporary Signs: Provide project identification and other signs of sizes, layout, content, graphics and colors indicated. Locate signs where best to inform public and instruct persons seeking entrance to the project. Support signs on posts or framing of steel or preservative-treated wood.

1. Project Identification Sign: Comply with sign design provided on the AG Series drawings.

Engage an experienced sign printer to apply graphics.

2. Other Temporary Signs: Prepare signs to provide directional information to construction personnel and visitors.

3. Install exterior yard and sign lights so signs are visible at all times when work is being performed.

4. Do not permit installation of unauthorized signs.

G. Collection and Disposal of Waste: Collect waste from construction areas and elsewhere daily. Enforce requirements strictly and dispose of material lawfully.

1. Comply with NFPA 241 for removal of combustible waste material and debris.

2. Do not hold waste materials more than 7 days during periods when the ambient temperature remains continuously less than 80 deg F (27 deg C), or more than 3 days when the temperature exceeds or is expected to rise above 80 deg F (27 deg C).

3. Handle and properly containerize hazardous, dangerous or unsanitary waste materials separately from other waste.

H. Rodent and Pest Control: Retain a local exterminator or pest control company to recommend practices to minimize attraction and harboring of rodents, roaches and other pests. Employ this service to perform

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-9

TEMPORARY FACILITES AND CONTROLS 01 50 00-9

extermination and control procedures at regular intervals so the project will be free of pests and their residue at completion. Perform control operations lawfully, using environmentally safe materials.

I. Temporary Stairs: Until permanent stairs are available, provide temporary stairs where ladders are not adequate. When permanent stairs are available, cover finishes with protective coverings to result in undamaged conditions at project completion.

J. Temporary Processing Facility & Offices: General Contractor shall provide and install, for the sole use of the Department of Homeland Security, a separate Temporary Processing Facility at Bridge 1, including temporary ramp, protected walkways, offices, detention rooms, toilets, and other support spaces for processing of pedestrians entering into the United States of America through the Port of Entry during the duration of the project. The Temporary Processing Facility shall be install, and made fully operational as part of Step 1 of the Bridge 1 project, and shall remain operation throughout the duration of the project until the renovated processing facilities are fully operational. The Temporary Processing

Facility shall consist of the following, and shall be configured and located as indicated shown in the construction drawings:

1. Temporary Processing Facility at Bridge 1, requires the design, construction, delivery and installation of the eight (8) 12'-6" x 40'-0" modules referenced on AP Series Sheets of the construction drawings of the Laredo Convent project, that when assembled on the site, provide the owner a single 50'-0" x 80'-0" (+/-) building.

The scope shall include the assembled modular building structure, the construction of the temporary supporting foundation system, all exterior ramps, walkways, landings, railings, fixtures finishes, complete & operational electrical and mechanical systems in compliance with the conceptual drawings shown in the contract documents. Final connection of the electrical power, sanitary sewer, and domestic water to the finished modular building structure will be provided by the General Contractor. Final connection of the communications and data cabling will be provided and installed by the Owner.

2. Temporary Processing Facilities at Bridge 2, requires the design, construction, delivery and installation of the eight (8) 24'-0" x 40'-0"(nominal) double wide modules referenced as shown on the G Series Sheets of the Combined Project drawings.

The scope shall include the assembled modular building structure, the construction of the temporary supporting foundation system, all exterior ramps, walkways, landings, railings, fixtures finishes, complete & operational electrical and mechanical systems in compliance with the conceptual drawings shown in the contract documents. Final connection of the electrical power, sanitary sewer, and domestic water to the finished modular building structure will be provided by the General Contractor. Final connection of the communications and data cabling will be provided and installed by the Owner.

3. The Temporary Processing Facility structures shall be designed and constructed of modular building units, and their final assembly shall conform to all applicable requirements of the

International Building Code 2009 Edition, strict compliance with the Texas Department of

Licensing and Regulation requirement guidelines in reference to Industrialized Home or Building

Section.

Design and installation of the Temporary Processing Facility, and supporting access ways, shall comply with the current requirements of the Texas Accessibility Standards.

4. Installation:

a. Modular building units shall be tied down and electrically grounded, as required by the local code requirements, to restrict movement or dislocation from temporary foundations

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-10

TEMPORARY FACILITES AND CONTROLS 01 50 00-10

due to wind storms or seismic events; and project the facility from lighting or other electrical fault or surge.

b. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installation. Set units accurately in location, alignment, and elevations, measured from established lines and levels and free of rack.

5. Transporting of the modular building units to the project site shall be done in strict compliance with all applicable Texas Department of Transportation guidelines.

K. GSA Field Offices: The General Contractor shall provide and install, for the sole use of GSA, a separate office with utilities and furnishings indicated on G Series Sheets of the Combined Project drawings.

NOTE: THE LOCATION FOR THE GSA FIELD OFFICES INDICATED ON THE ABOVE

REFERENCED DRAWINGS IS LOCATED ON CITY OF LAREDO PROPERTY. THE GENERAL

CONTRACTOR WILL BE RESPONSIBLE FOR NEGOTIATING THE USE OF THIS SITE WITH

THE CITY OF LAREDO, PAYING ALL RENTAL FEES FOR THE USE OF THE PROPERTY FOR

THE DURATION OF THE PROJECT.

The General Contractor will provide and pay for all utilities of the Field Offices for the duration of the project. This includes, but not limited to, water, sanitary sewer, electricity, internet, phone, etc as indicated below. The General Contractor will provide maintenance, and the office space will be jointly used by the GSA associates and the CMa staff. General layout and requirements for the GSA Field

Offices are as follows:

1. 60’ double-wide trailer (nominally 60’x24’ box) heated and air-conditioned, locking, with fluorescent lighting, 120 VAC convenience outlets, water heater and with (2) entrance doors on one side. Trailer at minimum shall include the follow:

a. Security bars on exterior doors and windows.

b. Skirting (manufacturer’s standard).

c. 42’ long x 6’ wide (clear) covered deck adjacent to trailer, with stairs at each end, OSHA-compliant hand-rails and stair-rails, non-skid surfacing, pressure-treated timber construction, corrugated FRP roof panels over timber framing;

d. Interior build-out with 4 private, locking offices, one 10'x10' drawing/specs layout area, 2 separate handicap-accessible restroom, and one 14 person conference room.

e. Heating and cooling equipment necessary to maintain a uniform indoor temperature of

68°F to 72 F, with 7-day programmable thermostat with automatic setback capability.

f. Light fixtures capable of maintaining average illumination of 30 fc at desk height..

g. Sanitary sewerage service furnished and maintained by Contractor.

h. Potable water service for the restroom plumbing.

i. Provide electrical convenience outlets, and data connections. Electric power service furnished by Contractor with minimum of 1 duplex receptacle on each wall.

j. The General Contractor will also be required to provide the following items within the construction offices:

i. Voice and data communications service(s), including payment of all installation and monthly charges. Provide one voice line to each work station, one additional dedicated line for telephone FAX service, and at least three broadband ethernet, DSL or T1 telephone lines to work stations, one data and voice line in conference room for conference calls.

ii. Maintenance for all office equipment and operating systems for the construction site office. This includes, but not limited to, HVAC equipment, plumbing, data, voice, phone infrastructure, etc. providing response periods of one day or less.

k. The General Contractor will provide network connections between five (5) computer stations and the printer.

l. The following furnishings provided by General Contractor:

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-11

TEMPORARY FACILITES AND CONTROLS 01 50 00-11

i. All furniture for private offices, conference room, and drawing layout area. This shall include tables, desk, chairs, conference table, rolling chairs, file cabinets, etc.

ii. Window blinds, 5-gallon water cooler/heater (hot & cold water service/refilled by the

General Contractor as required), & 18 cu ft refrigerator-freezer.

m. Area lighting consisting of (4) 150-watt outdoor HID fixtures to illuminate the perimeter.

n. GSA's Office Identification Sign: Provide 19.

2. The CMa shall maintain the GSA Field Offices in clean and orderly condition. Janitorial service shall be provided by the CMa, consisting of twice-weekly floor sweeping, weekly re-stocking of drinking water and bathroom supplies, and monthly floor mopping/waxing and rest-room cleaning. Service may only be performed during regular working hours, Monday through Friday.

3. The CMa shall provide, install, and maintain the following office equipment and services:

a. One FAX machine, featuring a multi-number auto-dial, number dialed indicator, screen and message log.

b. One multi-function color laser printer/scanner/copier capable of running standard, legal size and tabloid size paper.

c. One high-volume black and white and color laser printer capable of running standard, legal, tabloid size paper.

d. One personal computer station with application software (latest version) to include:

i. Virus protection.

ii. CD recorder.

ii. Checkpoint VPN SecureClient®

iii. Microsoft Office Professional®

iv. Internet Explorer®

v. Adobe Acrobat®

vi. Microsoft Project®

vii. AutoCAD®

viii. A licensed copy of the approved secure digital photo management system software

(e.g. Lynx)

e. One computer projector (SVGA or higher resolution) for presentation purposes.

f. One digital comera (6.0 megapixel or higher)

g. Printing Paper, toner, and other office supplies.

h. The General Contractor will provide the GSA one licensed seat of the construction schedule software in use for the detailed CPM scheduling.

i. At project completion, the CMa provided equipment will remain CMa property.

4. Adjacent paved parking area, 50’ x 60’,

a. Pavement structure: 2” HMAC (TxDOT spec 340) over 4” aggregate (TxDOT spec 247) over compacted native soil;

b. Delineate (6) 9’ x 18’ parking stalls with 4” pavement striping and 6’ wheel stops (concrete or treated timber); identify stalls as “GOVT USE ONLY” in 12” high letters using pavement marking paint.

c. Parking area shall be connected to the temporary site roads provided by Contractor for its use;

5. Transport Equipment: The General Contractor shall provide for CMa/GSA use one (1) four person, covered, electric cart with charging station installed at the GSA Field Offices. The

General Contractor is responsible for maintaining the cart in a fully charged and operation condition at all times. The General Contractor is required to handle all maintenance associated with the cart and charging station. This includes but is not limited to, replacing batteries, LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-12

TEMPORARY FACILITES AND CONTROLS 01 50 00-12

maintaining batteries, maintaining bearing, maintaining or replacing tires, maintaining all cart driveline components, and suspension, etc.

6. The General Contractor shall submit layouts and product data for review and approval prior to procurement and installation.

L. Temporary Movable Tent Structures: Provide temporary tent structures in locations and sizes indicated on G Series Sheets of the Combined Project drawings. The temporary movable tent structures shall be 120 degree, open end, high peak roof type; 100% waterproof; clear span width; and a minimum of 11'-0" eave height. Tents shall comply with the following:

1. Constructed of non-flammable, U.L rated material.

2. Designed to meet local code requirements, including but not limited to windstorm and wind tie down requirements.

3. Contractor shall provide sufficient electrical service to power existing baggage scanning equipment and power cooling fans at Bus Passenger Processing Tents

4. Contractor shall provide portable toilet facilities sufficient to serve 2000 people per day.

5. Contractor shall provide paved area under tent, and as indicated on the drawings, that is ADA accessible.

3.4 TEMPORARY PROTECTION FACILITIES

A. Temporary Facility Changeover: Except for using permanent fire protection facilities as soon as available, do not change over from temporary protection facilities until authorized by the Contracting

Officer's Representative.

B. Temporary Fire Protection: Until fire protection needs are supplied by permanent facilities, install and maintain temporary fire protection facilities of types needed to protect against reasonably predictable and controlled fire losses.

1. Comply with NFPA 10 "Standard for Portable Fire Extinguishers" and NFPA 241 "Standard for

Safeguarding Construction, Alterations, and Demolition Operations".

2. Locate fire extinguishers where convenient and effective for their intended purpose, but not less than one extinguisher at or near each access route exit or entrance, including stairwells on each floor.

3. Store combustible materials in containers in fire-safe locations.

4. Maintain unobstructed access to fire extinguishers, fire hydrants, temporary fire protection facilities and access routes. Prohibit smoking in hazardous fire-exposure areas.

5. Provide supervision of welding operations, combustion-type temporary heating units and other sources of fire ignition.

C. Permanent Fire Protection: At the earliest feasible date in each area of the Project, complete installation of the permanent fire protection facilities, including connected services, and place into operation and use.

Instruct key personnel in the use of the facilities.

D. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and the public of the hazard involved. Where appropriate and needed, provide lighting, including flashing red or amber lights.

E. Enclosure Fence: When excavation begins, install an enclosure fence with lockable entrance gates.

Install in a manner that will prevent people and animals from easily entering the site, except by the entrance gates.

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-13

TEMPORARY FACILITES AND CONTROLS 01 50 00-13

1. Locate where indicated or, if not indicated, enclose the entire site or the portion determined sufficient to accommodate construction operations.

2. Provide open-mesh chain link fencing with posts set in a compacted mixture of gravel and earth.

3. Provide either open-mesh chain link fencing with posts set in a compacted mixture of gravel and earth, or provide 8 feet high plywood fence framed with four nominal 2x wood rails and preservative-treated wood posts spaced not more than 8 feet apart.

F. Security Enclosure and Lockup: Install substantial temporary enclosure of partially completed areas of construction. Provide locking entrances to prevent unauthorized entrance, vandalism, theft and similar violations of security.

1. Storage: Provide a secure lockup for valuable stored materials and equipment.

2. Enforce discipline in connection with the installation and release of material to minimize the opportunity for theft and vandalism.

G. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations, and minimize the possibility that air, waterways, and subsoil might be contaminated or polluted or that other undesirable effects might result.

Avoid using tools and equipment that produce harmful noise. Restrict use of noise-making tools and equipment to hours that will minimize complaints from persons near the site.

3.5 OPERATION, TERMINATION, AND REMOVAL

A. Supervision: Enforce strict discipline in use of temporary facilities. Limit availability of temporary facilities to essential and intended uses to minimize waste and abuse.

B. Maintenance: Maintain facilities in good operating condition until removal. Protect from damage by freezing temperatures and similar elements.

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage.

2. Protection: Prevent water-filled piping from freezing. Maintain markers for underground lines.

Protect underground lines from damage during excavation operations.

C. Termination and Removal: Unless the Contracting Officer's Representative requests that a temporary facility be maintained longer, each temporary facility shall be removed when the need for its service has ended and can be replaced by authorized use of a permanent facility. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with the temporary facility.

Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.

1. Materials and facilities that constitute temporary facilities are the property of the Contractor, except the Government reserves the right to take possession of project identification signs.

2. Remove temporary paving not intended for or acceptable for integration into permanent paving.

Where the area is intended for landscape development, remove soil and aggregate fill that do not comply with requirements for subsoil or fill in the area. Remove materials contaminated with road oil, asphalt and other petrochemical compounds, and other substances that might impair growth of plant materials or lawns. Repair or replace street paving, curbs, and sidewalks at temporary entrances, in accordance with the requirements of the governing authority.

3. Prior to project completion, replace clean and restore permanent facilities used during the construction period including, but not limited to, the following:

LAREDO 1 & 2 PORTS OF ENTRY 01 50 00-14

TEMPORARY FACILITES AND CONTROLS 01 50 00-14

a. Replace air filters and clean inside of ductwork and housings.

b. Replace significantly worn parts and parts subject to unusual operating conditions.

c. Replace lamps burned out or noticeably dimmed by hours of use.

END OF SECTION 01 50 00

Expansion and Modernization of the (Laredo) Convent Avenue Project No. NTX00007

United States Land Port of Entry

STRUCTURE DEMOLITION 024116-3

SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

B. Buildings immediately adjacent to demolition area will be occupied. Conduct building demolition so operations of occupied buildings will not be disrupted.

1. Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.

2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.

a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from authorities having jurisdiction.

C. Owner assumes no responsibility for buildings and structures to be demolished.

1. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

D. Hazardous Materials: Hazardous materials (lead-based paint) are present in the buildings and structures to be demolished. A report on the presence of hazardous materials is included in specification section

02 83 33 – REMOVAL AND DISPOSAL OF LEAD-CONTAINING PAINT. Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation for lead-based paint is specified elsewhere in the Contract

Documents.

2. Previously completed asbestos surveys did find small quantities of asbestos material in the building. All asbestos material is thought to have been subsequently removed from the building and related structures. The Contractor shall notify the Government immediately upon encountering any suspected asbestos material on the site including (but not limited to) concealed ceiling cavities, concealed vertical chases and attic spaces.

3. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.

E. On-site storage or sale of removed items or materials is not permitted.

1.8 COORDINATION

A. Arrange demolition schedule so as not to interfere with Owner's on-site operations or operations of adjacent occupied buildings.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. Satisfactory Soils: Comply with requirements in Section 310513.

Expansion and Modernization of the (Laredo) Convent Avenue Project No. NTX00007

REMOVAL AND DISPOSAL OF LEAD 1

SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

SECTION 02 83 33 - REMOVAL AND DISPOSAL OF LEAD-CONTAINING PAINT

PART 1 – GENERAL

1.1 SUMMARY

The Convent LPOE Building was originally constructed in the 1940’s and was renovated in the 1980’s. The two-story structure is approximately 20,000 square feet in size. PSI conducted an asbestos and lead-based paint survey in June 2012. PSI developed these specifications for remediation of intact and damaged (poor) exterior and interior surfaces coated with lead-based paint as part of this project.

1. Refer to attached Appendix C-1 at the end of this specification for known locations and existing conditions (poor/intact) of lead based paints. The General Contractor shall field verify all lead-based paint conditions.

2. It is intended that Lead-based paint indicated as “intact” condition will remain as existing and shall be stabilized with new paint in accordance with the room finish schedule and painting specification.

Stabilized lead-based paint will still be required to meet the reference guidelines included in this specification.

3. Lead-based paint indicated as “poor” condition will be removed from the buildings, related structures and site in accordance with this specification.

1.2 APPLICABLE PUBLICATIONS

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI Z88.2 1980 Respiratory Protection

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD)

Lead Based Paint2012 Guidelines for the Evaluation and Control of Lead-

Based Paint Hazards in Housing

CODE OF FEDERAL REGULATIONS (CFR)

29 CFR 1910.134 1988 Respiratory Protection

29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists

29 CFR 1926.59 1988 Hazard Communication

Expansion and Modernization of the (Laredo) Convent Avenue Project No. NTX00007

REMOVAL AND DISPOSAL OF LEAD 2

SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

29 CFR 1926.62 Lead (Interim Final Rule, 5/93)

40 CFR 260 Hazardous Waste Management System General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards for Generators of Hazardous Waste

40 CFR 263 Standards for Transport of Hazardous Waste

40 CFR 264 Standard for Owners and Operators of Hazardous

Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and Operators of

Hazardous Waste Treatment, Storage, and Disposal

Facilities

40 CFR 266 Standard for Management of Specific Hazardous

Waste and Facilities

49 CFR 172 Hazardous Materials Tables and Hazardous

Materials Communications Regulations

49 CFR 178 Shipping Container Specifications

UNDERWRITERS LABORATORY (UL)

UL 586 1985 (R 1988) High-Efficiency, Particulate, Air Filter

Units, Sixth Edition

1.3 DEFINITIONS

1.3.1 Action Level

Employee exposure, without regard to use of respirators, to an airborne concentration of lead of 30 micrograms per cubic meter of air averaged over an 8-hour period. As used in this section, "30 micrograms per cubic meter of air" refers to the action level.

1.3.2 Area Monitoring

Sampling of lead concentrations within the lead control area and outside the lead control area which is representative of the airborne lead concentrations that may reach the breathing zone of personnel

Expansion and Modernization of the (Laredo) Convent Avenue Project No. NTX00007

REMOVAL AND DISPOSAL OF LEAD 3

SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.

potentially exposed to lead.

1.3.3 Physical Boundary

Area physically roped or partitioned off around an enclosed lead control area to limit unauthorized entry of personnel. As used in this section, "inside boundary" shall mean the same as "outside lead control area".

1.3.4 Certified Industrial Hygienist (CIH)

As used in this section refers to an Industrial Hygienist employed by the Contractor and is certified by the

American Board of Industrial Hygiene in comprehensive practice.

1.3.5 Decontamination Unit

Room for decontamination of equipment, contaminated debris and personnel. Decontamination unit shall consist of five chambers including dirty room, air lock, shower room, air lock and clean room.

Provisions shall be made for storage of worker's personal possessions in the clean room.

1.3.6 Eight-Hour Time Weighted Average (TWA)

Airborne concentration of lead averaged over an 8-hour workday to which an employee is exposed.

1.3.7 High Efficiency Particulate Air (HEPA) Filter Equipment

HEPA filtered vacuuming equipment with an UL-586 filter system capable of collecting and retaining lead-contaminated paint dust. A high efficiency particulate filter means 99.97 percent efficient against 0.3 micron size particles.

1.3.8 Lead

"Lead" means metallic lead, inorganic lead compounds, and organic lead soaps. Excluded from this definition are other organic lead compounds.

1.3.9 Lead Control Area

A lead control area isolated by physical boundaries to prevent unauthorized entry of personnel.

1.3.10 Lead Permissible Exposure Limit (PEL)

Fifty micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR

1926.62. If an employee is exposed for more than 8 hours in a workday, the PEL shall be determined by the following formula: