Amendment_2_-_BMO_Phase_II_Solicitation_GS06Q-17-RL-0004_Questions_ _Answers.pdf

PDF 103 KB Posted

Attached to
GSA Building Maintenance & Operations Small Business (BMO SB) Final Phase II, Zones 2-6, RFP
Solicitation number
GS06Q-17-RL-0004
Issued by

About this file

Amendment 2 - BMO Phase II Solicitation GS06Q-17-RL-0004 Questions Answers

View the file

Other files

File Type Posted
Award_Notice_for_Solicitation__GS06Q-17-RL-0004.docx DOCX document
Amendment_6_-_Final__BMO_Small_Business_Phase_II_Zones_2-6_RFP_GS06Q-17-RL-0004.pdf PDF
Amendment_6_-_SF30_GS06Q-17-RL-0004.pdf PDF
Amendment_5_-_Final__BMO_Small_Business_Phase_II_Zones_2-6_RFP_GS06Q-17-RL-0004.pdf PDF
Amendment_5_-_SF30_GS06Q-17-RL-0004.pdf PDF
Amendment_4_-_Final__BMO_Small_Business_Phase_II_Zones_2-6_RFP_GS06Q-17-RL-0004.pdf PDF
Amendment_4_-_SF30_GS06Q-17-RL-0004.pdf PDF
Amendment_4_-_BMO_Phase_II_Solicitation_GS06Q-17-RL-0004_Questions_ _Answers.pdf PDF
Amendment_3_-_Final__BMO_Small_Business_Phase_II_Zones_2-6_RFP_GS06Q-17-RL-0004.pdf PDF
Amendment_3_-_BMO_Phase_II_Solicitation_GS06Q-17-RL-0004_Questions_ _Answers.pdf PDF
Amendment_3_-_SF30_GS06Q-17-RL-0004.pdf PDF
Amendment_2_-_ATTACHMENT_J.19_CONTRACTOR_KEY_PERSONNEL_CONTACT_INFORMATION.docx DOCX document
Amendment_2_-_ATTACHMENT_J.13_PRICE_TEMPLATE_Z6_SB.xlsx XLSX spreadsheet
Amendment_2_-_ATTACHMENT_J.10_PRICE_TEMPLATE_Z3_SB.xlsx XLSX spreadsheet
Amendment_2_-_52.212-4_Full_Text_for_Offeror_reference _if_needed.pdf PDF
Amendment_2_-_Final__BMO_Small_Business_Phase_II_Zones_2-6_RFP_GS06Q-17-RL-0004.pdf PDF
Amendment_2_-_SF30_GS06Q-17-RL-0004.pdf PDF
Amendment_2_-_ATTACHMENT_J.14_RELEVANT_PROJECT_EXPERIENCE_TEMPLATE_SB.docx DOCX document
Amendment_2_-_ATTACHMENT_J.11_PRICE_TEMPLATE_Z4_SB.xlsx XLSX spreadsheet
Amendment_2_-_ATTACHMENT_J.1_STANDARD_FORM_33_(SF33)_Small_Business.pdf PDF
Amendment_2_-_ATTACHMENT_J.9_PRICE_TEMPLATE_Z2_SB.xlsx XLSX spreadsheet
Amendment_2_-_ATTACHMENT_J.2_PROPOSAL_CHECKLIST_SB.xlsx XLSX spreadsheet
Amendment_2_-_ATTACHMENT_J.12_PRICE_TEMPLATE_Z5_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.3_SELF_SCORING_TABLE_SB.xlsx XLSX spreadsheet
SF30_-_BMO_SB_Amendment_01.pdf PDF
ATTACHMENT_J.5_BMO_PRODUCT_SERVICE_CODES_(PSCs)_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.15_RELEVANT_PROJECT_EXPERIENCE_MATRIX_SB.docx DOCX document
ATTACHMENT_J.18_GSA_FORM_527.pdf PDF
ATTACHMENT_J.1_STANDARD_FORM_33_(SF33)_Small_Business.pdf PDF
ATTACHMENT_J.17_QUALITY_ASSURANCE_SURVEILLANCE_PLAN.docx DOCX document
ATTACHMENT_J.2_PROPOSAL_CHECKLIST_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.19_CONTRACTOR_KEY_PERSONNEL_CONTACT_INFORMATION.docx DOCX document
ATTACHMENT_J.13_PRICE_TEMPLATE_Z6_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.12.1_Wage_Determination_Zone_5_San_Francisco.pdf PDF
Final__BMO_Small_Business_Phase_II_Zones_2-6_RFP_GS06Q-17-RL-0004.pdf PDF
ATTACHMENT_J.8_PAST_PERFORMANCE_SURVEY.docx DOCX document
ATTACHMENT_J.11.1_Wage_Determination_Zone_4_Houston.pdf PDF
ATTACHMENT_J.14_RELEVANT_PROJECT_EXPERIENCE_TEMPLATE_SB.docx DOCX document
ATTACHMENT_J.3_SELF_SCORING_TABLE_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.10_PRICE_TEMPLATE_Z3_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.12_PRICE_TEMPLATE_Z5_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.13.1_Wage_Determination_Zone_6_Chicago.pdf PDF
ATTACHMENT_J.6_SUSTAINABLE_PRODUCT_LIST_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.16_PROJECT_ZONE_COVERAGE_TEMPLATE_SB.docx DOCX document
ATTACHMENT_J.4_STANDARDIZED_LABOR_CATEGORIES_AND_DEFINITIONS_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.7_PRE-AWARD_SURVEY_(SF_1408)_SB.pdf PDF
ATTACHMENT_J.9_PRICE_TEMPLATE_Z2_SB.xlsx XLSX spreadsheet
ATTACHMENT_J.9.1_Wage_Determination_Zone_2_Boston.pdf PDF
ATTACHMENT_J.10.1_Wage_Determination_Zone_3_Atlanta.pdf PDF
ATTACHMENT_J.11_PRICE_TEMPLATE_Z4_SB.xlsx XLSX spreadsheet
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Submitted

Zone Page Number

Section Number

Section Title

Paragraph Number

Question/Comment Answer

10/10/16 N/A N/A N/A N/A N/A Good afternoon. We just saw the final solicitation files posted for BMO Zones 2 - 6. Thanks. Within the files, we didn't see an Industry Day or any Pre Bid Conference information and just wanted to ask in case we happened to miss

it. Any information you can provide would be appreciated.

Industry Days to discuss the BMO Phase II Draft Solicitations were held in January and February of 2016 in San Francisco, Atlanta, Fort Worth, Kansas City, and Boston. Transcripts of these events are posted to our GSA Interact BMO webpage. (https://interact.gsa.gov/document/bmo-phase-2-industry-day-series-presentation-transcripts). No Pre-Bid Conference will be held for this Solicitation.

10/11/16 N/A N/A N/A N/A N/A Could you please provide the incumbent contract number? If not, is this a new requirement?

This is a new contract vehicle. It is a governmentwide, multiple award, IDIQ contract. There is not a previous contractor as this is a new vehicle.

10/14/16 2 through

Attachm ent J.3

Entire Workbook

NA NA SB Self Scoring Table is in "protected" or "locked" status. Please advise how bidders may unlock to insert data.

Amendment 01, completed on 10/14, provides the corrected Attachment J.3 Self Scoring Table to the Solicitation.

10/15/16 N/A N/A N/A N/A N/A Is there a scheduled site visit? BMO SB is a governmentwide, multiple award, IDIQ contract. As such, contract users will post/solicit their RFQ's to the awarded vendors and any site visits would be indicated within the individual task order RFQ's if applicable.

10/17/16 N/A N/A N/A N/A N/A Who’s your current vendor and contract value? This is a new contract vehicle. It is a multiple award, IDIQ contract that can be used by various Government agencies. There is not a previous contractor as this is a new vehicle. The contract users will post their RFQ's to the awarded vendors and any site visits would be indicated within those task order RFQ's if applicable. For more information on these solicitations, please visit our Interact site: (https://interact.gsa.gov/blog/gsa-releases-final-rfps-bmo-phase-ii-multiple-award-contracts). There are links to the solicitations themselves and more information about the BMO concept.

10/18/16 N/A N/A N/A N/A N/A 1. How is this solicitation related to services already available under GSA's 03FAC Facilities Maintenance and Management schedule? Are the similarities recognized? What is the rationale for duplication except to create work for government employees and the vendor community? 2.

Commissioning is a professional service rather than a maintenance activity.

Was it intentionally included? 3. Zones outlined do not correspond to areas of DoL Wage Determinations. The only good reason for having zones is the fluctuation in prevailing wages. How do you expect offerors to reconcile this in pricing? 4. Why are the States of Oregon and Washington omitted from geographic coverage? 5. Was GSA unable to find a way to make this solicitation more complicated? 6. What is the expected value of the CAF to be charged? Can the value be substantiated?

1. While some similarities exist between GSA Schedule 03FAC and BMO, they're completely different contract vehicles with different terms, conditions, and offerings.

2. Commissioning was intentionally included.

3. Numerous Department of Labor Wage Determinations exist within the various Zones. Offerors should carefully read the Pricing Templates (Attachments J.9, J.10, J.11, J.12, J.13) and Sections M.6 and B.2.for details on how Pricing shall be handled under this solicitation.

4. Oregon and Washington are anticipated to be included in future Phases of BMO.

5. Thank you for your comment. GSA understands how some offerors may deem a Governmentwide Strategic Sourcing solicitation with multiple zones as complicated. GSA is hopeful that such an opinion does not prevent offerors from proposing on this solicitation.

6. Per G.3.1 of the Solicitation, the Contract Access Fee (CAF) is a set fee of 2.0% of the total fixed-price or total estimated costs, including options, at the Task Order level.

10/19/16 2 - 6 130 & Attachm ent J.1, SF 33

L.10 & J.1, Block

9 (SF 33)

Proposal Instructions

1st paragraph (page 130) & Block 9

L.10 requires 9 copies TOTAL -- 6 print (paper) copies and 3 electronic (on flash drives). However, Block 9 of the SF 33 requires "an original and 9," which would be 10 (ten) copies total. Please clarify.

This has been corrected and a new SF33 has been posted with the amendment. In total, 9 copies are required (6 paper and 3 electronic on DVD+R Disks)

10/19/16 2 - 6 129 L.10 Proposal Instructions , Paper Copies

5th bullet Are headers and footers with organizational information (e.g., offeror name, page numbers, etc.) excluded from the requirement for 12 point font?

Yes, font size for header and footers are excluded from the 12 point font requirement.

10/19/16 2 - 6 129 L.10 Proposal Instructions , Paper Copies

5th bullet The following Government-provided attachments that are to be completed and returned are not in 12 point font, nor do many, if any, of them have 1" margins: Attachments J.1, J.2, J.3, J.7, J.8, J.9, J.10, J.11, J.12, J.13, J.14, J.15, J.16, J.18, J.19, and J.20. Are these excluded from the requirement for 12 point font and 1" margins?

Any forms or charts are excluded from the 12 point font and 1" margin requirement.

10/19/16 2 - 6 129 L.10 Proposal Instructions , Paper Copies

5th bullet Are Sections I, K, and copies of SAM Registration excluded from the requirement for 12 point font?

Any forms or charts are excluded from the 12 point font and 1" margin requirement.

10/19/16 2 - 6 131 L.10.4 Section 4 - Price

Both Bullets These two bullets request "Price" and "Price Template." What data, in addition to the Price Templates, is to be provided to fulfill the "Price" requirement? Please clarify.

This has been corrected and posted with the amendment. The first bullet "Price" has been removed.

10/19/16 2 - 6 131 L.10.5 Proposal Format Table

Section 1, M.4.1.1

Should the signed SF 30s of any amendments issued be included at Section M.4.1.1, also? The instructions state it is limited solely to the SF 33. Please clarify.

Yes, the signed SF30's (amendments) should be included along with the completed SF33 (Attachment J.1).

10/19/16 2 - 6 131 -

L.10.5 Proposal Format Table

Page Limitation Column

Should the instructional pages of attachments be deleted/removed from the submitted print/electronic copies?:

Instructional pages can be deleted from the template prior to printing or savings to submit.

10/19/16 2 - 6 144 M.4.3.2.7 Additional Evaluation Criteria Points for Relevant Project Experience for Large Square Footage Projects

Single Paragraph

Please confirm that large square footage projects are those greater than

20,000 SF.

Yes, this is correct. Projects greater than 20,0000 SF are considered large for purposes of this Solicitation.

10/19/16 2 - 6 148 M.4.10 Past Performan ce

2nd paragraph

Given that an offeror may submit anywhere from 3 to 51 projects, why is an offeror limited to only 3 past performance surveys?

In accordance with M.4.10, it is true that an offer shall only submit three past performance surveys.

10/19/16 2 - 6 None None Attachment J.20

None When is Attachment J.20 to be provided? There is no attachment J.20 for the Small Business Solicitation. Attachment J.19 (Contractor Key Personnel Contact Information) shall be completed and incorporated into an offeror (with the rest of the proposal documents) by the Solicitation deadline.

10/19/16 N/A N/A N/A N/A N/A We will verify the RFP to check if various questions from the draft were answered in the solicitation. I believe that the time given for questions and the response date are too tight.

Thank you for y our comment. The BMO team will take this under consideration.

10/19/16 3 127 L.3 Proposal Submission Instructions

5 Are offeror's allowed to adjust the page setup (i.e. margins, orientation, print area) for the Section J attachments required for the printed proposal submission? Some of the Section J attachments are not setup for printing.

As an example, attachment J.2 Proposal Checklist will print on 3 pages rather than 1 page based on the current print setup.

Regarding forms and tables, the page setup (margins, orientation, and print area) may be adjusted for printing purposes. When making such adjustments, please ensure the documents are visually legible.

10/19/16 3 129 L.10 Proposal Instructions

1 Are offeror's to submit three (3) individual USB Flash Drives with a copy of electronic proposal or one (1) USB Flash Drive with three copies of electronic proposal?

The requirement for use of a USB Flash Drive has been changed to DVD+R Disk. Offerors are to submit 3 separate DVD+R Disks each containing a copy of the electronic proposal.

10/19/16 3 129 L.10 Proposal Instructions

2 Is there a specific font required or are offerors allowed to choose any font as long as the font size is 12?

No specific font type is specified.

10/19/16 3 129 L.10 Proposal Instructions

2 Are offeror's allowed to insert page numbers on the Section J attachments provided by the Government for proposal submission? Please note that some of the attachments provided by the Government to be submitted in Sections 1-3 can not be modified by the offeror to include page numbers.

Documents that are locked do not require page numbers.

10/19/16 3 129 L.10 Proposal Instructions

3 How are offeror's to label a USB Flash Drive? The requirement for use of a USB Flash Drive has been changed to DVD+R Disk. It is at the Offeror's discretion for how to label the submitted DVD+R Disks. Please just make sure the Disks are accurately and clearly externally labeled with the company's name and Solicitation Number.

10/19/16 3 140 M.4.2.1 SAM

(System for Award Manageme nt)

2 Statement: The offeror shall submit a current copy of their SAM registration to include EPLS information. Question: What EPLS information should an offeror submit?

EPLS information to be submitted with the Offeror's SAM registration should be the Entity Registration Summary along with the Exclusions Summary.

10/19/16 3 108 K Reps and Certs

2 What information is the offeror to complete and submit under paragraph (b) of Provision 52.212-3 if the offeror has completed the annual representations and certification electronically via the SAM website?

Per the instruction provided in Section K, Complete and submit (via pdf) only paragraph (b) of Provision 52.212-3 if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) website accessed through http://www.acquisition.gov. Per the end of paragraph (b), if there are exceptions to the reps and certs listed in the SAM website, then the offeror shall identify those.

10/19/16 3 140 M.4.2.4 Financial Information

2 Should the offeror submit its most recent reviewed/audited financial statements (i.e. 2015) in lieu of completing Section III of GSA 527?

Yes, in lieu of completing Section III of the 527, offerors may provide prepared Financial Statements with notes.

10/19/16 3 131 L.10.5 Proposal Format Table

I.3 and K.3 Please clarify what the offeror is to submit for this requirement. Any provision or clause that requires completion (fill in the blank), whether provided in full text or incorporated by reference, shall be addressed by the vendor and submitted with their proposal. Note: When the fill-in clause or provision is more appropriately completed at the task order level, complete the fill-in with “N/A.”

10/19/16 3 49 G.2.6 Contractor Key Personnel

6 What Section of proposal should offerors include Attachment J.19? This has been corrected and posted with the amendment where J.19 has been added to the table in L.10.5 and to Attachment J.2 Proposal Check List. Attachment J.19 should be included in Section 1 - General Information

10/19/16 3 J Attachment J.14

J-M If an offeror is submitting contract experience for an entire military base which includes over 100 total buildings, does the offeror need to list each individual building type, size, # of stories or can an offeror list a range of building types, sizes and # of stories?

This has been corrected and posted with the amendment. See Attachment J.14 for the change.

10/19/16 3 58 H.6.2 Predomina nt Task Order

NAICS

Determinati on

2 If an offeror meets the small business size standard under the predominant BMO NAICS 561210 but isn't considered a small business under the individual NAICS (i.e. 238220, 238210, etc.), should an offeror submit its proposal for the BMO SB or BMO Full and Open strategic sourcing solution

RFP?

Offerors who are considered a small business under NAICS code 561210 - Facility Support Services with a size standard of $38.5 million are considered a small business under the BMO Solution. However, small business offerors are able to compete and receive an award under both BMO Small Business and BMO Unrestricted solicitations. It is up to the small business offeror to determine if they would like to submit offers for only the Small Business solicitation, only the Unrestricted solicitation, or both.

10/19/16 N/A N/A N/A N/A N/A Can we bid the electrical BMO only? No. Per Section C.3 and C.4 of the Solicitation, to qualify, offerors must provide all required services dependent on the Service Group (O&M and/or FSS). For O&M, this includes HVAC, Electrical, and Plumbing and Pipefitting. For FSS, this includes Janitorial and Grounds Maintenance/Landscaping. If proposing both O&M and FSS, offerors must propose HVAC, Electrical, Plumbing and Pipefitting, Janitorial, and Grounds Maintenance/Landscaping.

10/20/16 2,3,4,5,6 Attachm ents

J.9, J.10, J.11, J.12, J.13

Price Template

N/A The price templates (J.9, J.10, J.11, J.12, J.13) that are included as attachments to the Final Solicitation Package – GS06Q17RL0004 – do not work. They all appear to be password protected. At this time, the contractors cannot enter any numbers into the spreadsheets, due apparently to some type of password protection. The entering of these wage numbers is a very lengthy process, especially to enter in multiple zones. Will this be corrected fairly soon? If not, will there be a due date extension to allow the contractors adequate time to enter the proper information?

There is no error in the stated documents. For Attachments J.9, J.10, J.11, J.12, and J.13, offeror information can only be inputted into those cells highlighted in yellow. The remainder of the document is locked and cannot be changed. Regarding the Price Proposal Templates and how to properly complete these documents, please refer to Lines 19 and 20 of the "Instructions Tab" of that document. Additional BMO proposal pricing information is provided in Section M.6 of the Solicitation. Task Order pricing information is provided in Section B.2 of the Solicitation.

The closing date for this solicitation has been extended to Friday, December 9, 2016. This change is reflected in the amendment.

10/20/16 2 11 B Services, Ordering and Prices

B.1.2 Is it the government's intention to issue task orders with no further competition or will task orders be competed for by contractors within the

BMO SB?

Offerors awarded a BMO SB contract will have the opportunity to then compete with other BMO SB Awardees for task orders solicited by customers through the BMO vehicle except where otherwise provided by law or regulation. [i.e. FAR 16.505(b)]

10/20/16 N/A N/A N/A N/A N/A Is this the same as before, we would have to bid on all required services not just elevator?

To qualify for a BMO award, offerors must propose all required services.

For O&M, this includes HVAC, Electrical, and Plumbing and Pipefitting. For FSS, this includes Janitorial and Grounds Maintenance/Landscaping. If proposing both O&M and FSS, offerors must propose HVAC, Electrical, Plumbing and Pipefitting, Janitorial, and Grounds Maintenance/Landscaping.

10/21/16 2-6 143 L Instructions Conditions, and Notices to Offerors or Responden ts

M.4.3.2.1.5 Please confirm that if the offer is submitting a Project Experience Template to get credit for a single Service Category, the offer need not fill in all the other Service Categories Performed information required by section W of the Relevant Project Experience Template.

If Attachment J.14 - Relevant Project Experience Template is submitted to receive credit for a single service category, then only that specific service would be identified and described in Block W.

10/21/16 2-6 143 L Instructions Conditions, and Notices to Offerors or Responden ts

M.4.3.2.2 Does the extra credit apply just to the 3 primary Project Experience Templates or to those templates submitted to qualify in just one or two additional service categories?

Regarding additional evaluation credit outlined in M.4.3.2.2, some of the additional credit applies to only the "Required" services and some of the additional credit applies to other areas of the contract such as optional services, socio-economic status, etc. Please refer to Attachment J.3 - Self Scoring Table or Section M.5 Scoring Tables to see how the additional credit is applied.

10/21/16 2-6 143 L Instructions Conditions, and Notices to Offerors or Responden ts

M.4.3.2.4 Does socio-economic status refer to the offeror or to the companies that may be listed in Section G of the Project Experience Template? If to the offeror, where on the template do we enter the offeror's socio-economic status?

Socio-economic status refers to the small business designation the offerors is certified as. This information located in Block G has been removed from Attachment J.14 Relevant Project Experience Template and the corrected version posted with the amendment. An offeror's socio-economic status will be identified on Attachment J.3 Self Scoring Table.

10/21/16 2-6 143 L Instructions Conditions, and Notices to Offerors or Responden ts

M.4.3.2.1 This section requires the offeror to complete Attachment J-14, Relevant Project Experience Template. Para 5 of the Experience Template states a requirement that the narrative for each O&M Service Category in Section W of the template must be unique for the specific project and non-repetitive.

This implies that the narrative must somehow be different for each project.

This ignores the fact that work in each specific Service Category is intrinsically repetitive and the same for each project. The only difference is in the numbers and types of equipment and any unique manufacturer’s specification. One needs only to look at the typical Statement of Work in any GSA solicitation for facility operations and maintenance to understand the repetitive nature of the work. They are all pretty much the same down to the punctuation. The same can be said for the FSS Service Categories. Pest control in accordance with an Integrated Pest Management Plan should be exactly the same for each project where the Pest Control Service Category is performed. Indeed, GSA has been trying for years to standardize solicitations so that they are the same for each project, easily understood by the service offerors, and leading to standard work procedures and products subject to standard evaluation criteria. The Government should expect significant duplication in presentation of work in the same service categories for different projects. Request the language of this requirement be revised to remove the apparent penalty for any duplication in narrative.

While the services performed may be duplicative in some cases there will always be differing circumstances for each project. Examples could include location/sqft/# of elevators/# of buildings/specific requirements (i.e. grass cut kept to 3" vs. grass cut weekly)/etc. Because of this, there will always be the ability to provide a description specific to the task.

10/21/16 2-6 43 F.3 Period of Performan ce

1 Would the Government provide an estimated Notice-To-Proceed date? The Notice-to-Proceed date is undetermined at this time.

10/21/16 All 131 L.10 Proposal Instructions

Electronic Copies

The RFP states that the USB flash drives need to be labeled. Can simply place a sticker with the required information onto the USB drive?

The requirement for use of a USB Flash Drive has been changed to DVD+R Disk. Yes, a sticker with the required information is acceptable.

Please just make sure the Disks are accurately and clearly externally labeled with the company's name and Solicitation Number.

10/21/16 All 19, 137 and elsewher e

C.3 Scope/Req uirements

All These pages state that we are to identify the Zone or Zones we are proposing on. Is there any particular section or page where we should identify this information?

The Zone(s) being applied for should be identified on Attachment J.14 Relevant Project Experience Template as well as in Attachment J.16 Project Zone Coverage Template where a capabilities statement is required. Please refer to the instructions provided in these two documents.

10/21/16 2-6 20 C.3 Scope/Req uirements;

C3 Paragraphs C.3, L.3, and M.4.4 indicate the states covered under this solicitation. Will the remaining 24 states not covered under BMO Zone 1 and

The remaining states are anticipated to be covered in future BMO phases.

10/21/16 2-6 144 L.3 Proposal Submission Instructions

L.3 Paragraphs C.3, L.3, and M.4.4 indicate the states covered under this solicitation. Will the remaining 24 states not covered under BMO Zone 1 and Zones 2 -6 be covered under another BMO solicitation in the future?

The remaining states are anticipated to be covered in future BMO phases.

10/21/16 2-6 144 M.4.4 Project Zone Coverage

M.4.4 Paragraphs C.3, L.3, and M.4.4 indicate the states covered under this solicitation. Will the remaining 24 states not covered under BMO Zone 1 and Zones 2 -6 be covered under another BMO solicitation in the future?

The remaining states are anticipated to be covered in future BMO phases.

10/21/16 2-6 29 C.3 Scope/Req uirements;

C.3 Will Colorado be included in a future BMO Solicitation? Colorado is anticipated to be covered in a future BMO phase.

10/21/16 2-6 M.4 Sustainabili ty Plan

M.4.9 Section M.4.9 states the Sustainability Plan “should describe in detail how the offeror will meet the minimum sustainability requirements identified in the Scope of Services, Section C“.

A review of Section C, Scope of Services indicates there are no identifiable Sustainability requirements within the section. There are several references to sustainable topics in Paragraph C.9 Definitions (such as C.9.35 Green Cleaning, and C.9.36, GSA Green Purchasing Program).

There are, however, Sustainability Requirements cited in Section H, Paragraph 14 through 14.3 inclusive that deal with Sustainability requirements.

Does the Government want offerors to submit the Sustainability Plan to meet the requirements stated in M.4.9 and Section H, Paragraphs H.14 through H.14.3 inclusive?

This has been corrected and posted with the amendment. M.4.9 now references Section H instead of Section C.

10/21/16 2-6 70 H.14.1 Green Purchases

H.14.1 The link cited in Paragraph H.14.1, http://yosemite1.epa.gov/oppt/eppstand2.snf, does not appear to work.

This has been corrected and posted with the amendment. H.14.1 now references: https://www.epa.gov/greenerproducts/about-environmentally-preferable-purchasing-program

10/21/16 All 84 H.35.4 Cooperatio n with other Contractor s on Governme nt Sites

1 Is the government going to issue a change order in cases where the contractor needs to escort other contractors trough the building? Are there any maximum weekly hours expected to be worked by the contractor when cooperating with other contractors?

Change orders such as this would occur at the task order level if, applicable. Specific requirements such as maximum weekly work hours, as they relate to other contractors in the work environment, would also be detailed at the task order level, should they exist.

10/21/16 All 140 M.4.2.4 Financial Information

1 What does it means adequate financial resources? Can the government specify a more objective term such as bonding capacity limit or available cash flow etc.?

Sufficient financial resources available in order to operate efficiently and sufficiently well to complete awarded Government task orders.

10/21/16 All 140 M.4.2.4 Financial Information

1 How can a contractor demonstrate the ability to obtain adequate financial resources?

Adequate financial resources is vendor's internal decision and how to obtain that is not dictated or suggested by the Government. Please complete and submit the information required in the Attachment J.19 GSA Form 527.

10/21/16 All 140 M.4.3.2.1 Pass/Fail Requireme nts for Relevant Project Experience

Item Number

With regard to Section M.4.3.2.1, what is GSA’s rationale for limiting relevant project experience to those “located within the Contiguous United States, to include Alaska and Hawaii”? It would seem that building maintenance and operations experience of the same scope and complexity as that contemplated by the RFP would be relevant, no matter where the work was performed.

Thank you for your comment. You are correct, past experience it is limited to the contiguous United States, to include AK, and Hi. At this time, the solicitation requirements remain unchanged in this area.

10/21/16 All 146 M.4.7 Uncompen sated Overtime Policy

1 Uncompensated Overtime Policies could vary significantly and FAR 52.237- 10 is not specific on what an acceptable policy should be. Could the government provide an example of a recommended policy? Is total hours accountability desired?

BMO is requesting submission of the company's. Uncompensated Overtime Policy. The Government does not have recommended samples as this is a vendor policy issue.

10/21/16 2-6 19 C.2 Period of Performan ce

1 The total contract period is stated to be 10 years, but the NonSCLS tabs in the Pricing Template have columns for 15 years. Please clarify the total period of performance.

Per Section F.4.1 of the Solicitations, "After the BMO SB contract term expires, BMO SB contract will remain active until the final task order is closed-out and shall govern the terms and conditions with respect to active task orders to the same extent as if it were completed during the BMO SB contract term. Accordingly, the cumulative term of BMO SB contract may span up to 10 years and the cumulative term of all task orders placed under BMO SB contract may span up to 15 years."

As an example: If a task order is issued on the last day of the option period, that task order could potentially be for up to a 5-year period. Thus, the BMO terms and conditions would govern that additional time outside of the 10-year BMO contract term.

10/21/16 2-6 108 K.1 FAR

Provisions Incorporate d by Reference

1 (52.252-1 Solicitation Provisions Incorporated by Reference

(FEB 1998))

The RFP states, "The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer." Please clarify whether offerors should complete additional blocks, if any, in these referenced provisions or completed only the provisions in I.3 and K.3 and identified explicitly in the proposal format.

Any provision or clause that requires completion (fill in the blank), whether provided in full text or incorporated by reference, shall be addressed by the vendor and submitted with their proposal. Note: When the fill-in clause or provision is more appropriately completed at the task order level, complete the fill-in with “N/A.”

10/21/16 2-6 125 L.1 FAR and

GSAR

Provisions Incorporate d by Reference

1 (52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998))

The RFP states, "The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer." Please clarify whether offerors should complete additional blocks, if any, in these referenced provisions or completed only the provisions in I.3 and K.3 and identified explicitly in the proposal format.

Any provision or clause that requires completion (fill in the blank), whether provided in full text or incorporated by reference, shall be addressed by the vendor and submitted with their proposal. Note: When the fill-in clause or provision is more appropriately completed at the task order level, complete the fill-in with “N/A.”

10/21/16 2-6 129 L.10 Proposal Instructions

3, second bullet

Is starting each section and sub-section on a new page sufficient for them to be "separated"?

Each section and sub-section shall be separated and titled correctly in accordance Proposal Format Table (see section L.10.5). Please make sure your titles are present and your separation evident. Note: Sections 1-4 need to be clearly marked, labeled, and easy to find.

10/21/16 2-6 129 L.10 Proposal Instructions

3, fourth bullet

If paper copies are submitted in binders, is each section of the proposal (1-4) required to be submitted in a separate binder? For six paper copies of each of four sections, this would be a total of 24 binders.

Each section is not required to be in a separate binder

10/21/16 2-6 132 L.10.5 Proposal Format Table

Sub-Section # M.4.2.3

How is the requirement to "Complete Provision 52.212-3 in Section K.3 as directed" different from the requirement in I.3 and K.3, which also includes K.3?

Provision 52.212-3 deals specifically with an offerors Reps and Certs.

Separate from Provision 52.212-3, offerors shall complete fill-ins for all applicable provision and clauses.

10/21/16 2-6 132 L.10.5 Proposal Format Table

Sub-Sections # M.4.2.3 and # I.3 and K.3

Both requirements related to K.3 exclude the first page of Section K, which identifies the offeror name and DUNS number. Please confirm that this first page of Section K is NOT to be submitted.

The offeror should fill in their company name and DUNS number on the first page of Section K and submit with their offer.

10/21/16 2-6 134 M Evaluation Factors for Award

1 (FAR

52.252-1 Solicitation Provisions Incorporated by Reference

(FEB1998))

The RFP states, "The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer." Please clarify whether offerors should complete additional blocks, if any, in this referenced provision or completed only the provisions in I.3 and K.3 and identified explicitly in the proposal format.

Any provision or clause that requires completion (fill in the blank), whether provided in full text or incorporated by reference, shall be addressed by the vendor and submitted with their proposal. Note: When the fill-in clause or provision is more appropriately completed at the task order level, complete the fill-in with “N/A.”

10/21/16 2-6 134 M.1 Basis for Awards

1 What does "Project Locations relevant your Zone" mean? The verbiage of "Project Locations relevant to your Zone" has been removed from the solicitation and the change posted with the amendment.

10/21/16 2-6 140 M.4.2.3 Represent ations and Certificatio ns (Reps and Certs)

1 Please confirm whether the entire Section K must be completed or only K.3 must be completed (per the Proposal Format Table in L.10.5).

Any provision or clause that requires completion (fill in the blank), whether provided in full text or incorporated by reference, shall be addressed by the vendor and submitted with their proposal.

10/21/16 2-6 143 M.4.3.2.4 Additional Evaluation Criteria for Socio- Economic Status Certificatio n

1 Please confirm that "has been certified" means at any time during the history of the company, even if the company has grown and so, for example, graduated from the 8(a) program.

This has been corrected and posted with the amendment. Additional evaluation criteria will be given to those small businesses that hold current certifications or are currently certified in any of the various socio-economic groups.

10/21/16 2-6 148 M.4.10 Past Performan ce

2 If an offer is submitting more than three projects for Relevant Project Experience, for which three projects should the offeror submit a Past Performance Survey?

It is at the offeror's discretion which 3 projects to submit Past Performance Surveys for. Reminder: the surveys submitted must be related to 3 of the projects submitted in the Relevant Project Experience Section.

10/21/16 2-6 151 M.6 Section 4- Price

Last The RFP states, "total of 10 years" for exempt labor categories. However, the relevant tab of the Price Template for each zone includes columns for a total of 15 years. Please confirm that offerors should propose rates for 15 years.

Per Section F.4.1 of the Solicitations, "After the BMO SB contract term expires, BMO SB contract will remain active until the final task order is closed-out and shall govern the terms and conditions with respect to active task orders to the same extent as if it were completed during the BMO SB contract term. Accordingly, the cumulative term of BMO SB contract may span up to 10 years and the cumulative term of all task orders placed under BMO SB contract may span up to 15 years."

As an example: If a task order is issued on the last day of the option period, that task order could potentially be for up to a 5-year period. Thus, the BMO terms and conditions would govern that additional time outside of the 10-year BMO contract term.

10/21/16 2-6 Sheet 1 Attachme nt J.2, Row 28

Sub- Section

N/A Should the section reference be M.4.9.1 instead of M.4.9.2? M.4.9.2 references additional evaluation criteria.

This has been corrected and posted with the amendment. Attachment J.2 - Proposal Checklist now references M.4.9.1 for this section.

10/21/16 2-6 Sheet 1 Attachme nt J.2, Row 29

Section, Sub- Section

N/A Should the section reference be M.4.9.1 instead of M.4.9.2? M.4.9.2 references additional evaluation criteria.

This has been corrected and posted with the amendment. Attachment J.2 - Proposal Checklist now references M.4.10

10/21/16 2-6 All Attachme nt J.8

N/A N/A The Past Performance Survey does not include a line for the signature of the Rater. Please clarify whether or not a signature of the Rater is required or desired.

A signature is not required on the Past Performance Surveys.

10/21/16 2-6 1 Attachme nt J.19

Contractor Key Personnel Information

N/A The solicitation number appears to be incorrect. Also, this form is not identified in either the Proposal Format Table in L.10.5 or in the Attachment J.2, Proposal Checklist. Where is Attachment J.19 to be included in the proposal?

This has been corrected and posted with the amendment. Attachment J.19 now reflects Solicitation GS06Q-17-RL-0004. Attachment J.19 should be included in Section 1 - General Information. The table in L.10.5 as well as Attachment J.2 - Proposal Checklist have also been updated to reflect this change.

10/21/16 2 - 6 144 M.4.4 Project Zone Coverage

3 Do we have to submit five (5) different versions of pricing for each of the zones

Offerors who are proposing on multiple zones must complete and submit the Price Template associated with each of those proposed zones.

10/21/16 2 - 6 129 L.10 Proposal Instructions

1 Each section must be fastened or bound together. Can we use a 3 ring binder to bound together?

Yes, a 3-ring binder is acceptable.

10/21/16 All 14 B.2.2.1 Non- Exempt Labor Categories

1 The non-exempt labor categories are provided as SCA positions with the regional multiplier based on SCA type positions. There may be a task order that comes out that would require the use of CBA positions. The CBA's generally will have more required cost such as Pension, higher H&W costs, Training costs, Joint Apprentice Contributions, etc. Due to this the regional multiplier would be much less for the SCA positions than what we would actually use for the CBA positions. Will Offerors be able to price accordingly to the CBA agreements and not be held accountable for the regional multiplier percentage?

The regional multiplier applies to the applicable prevailing wage regardless of the prevailing wage, whether that is SCA, DBA or CBA. Please refer to Sections M.6, B.2.2.1, B.2.2.1.1, and B.2.2.2, of the Solicitation for information on IDIQ level and task order level pricing.

10/21/16 All 82 H.33 Minimum Task Order Awards or Estimated Value

1 The Contractor shall attain a minimum of 3 task order awards or a total task order estimated value of $325k prior to exercise of Option 1. Does this criteria apply separately to each zone or collectively to all zones awarded to the Contractor?

This criteria applies to the each awarded vendor's IDIQ BMO SB contract as a whole and not the individual zones.

10/21/16 All 90 I Contract Clauses

Instructions The instructions state to "Complete and submit" the fill-in clauses under I.3 of 52.222-42 and 52.223-3. FAR 52.222-42 is typically filled in by the Government contracting agency. Additionally, these two clauses seem applicable at the task order not parent contract level. They are not addressed in Sections L.10 or M.4 as being part of the offer Will the Government clarify when and how these two fill-in clauses are to be completed and submitted?

Any provision or clause that requires completion (fill in the blank), whether provided in full text or incorporated by reference, shall be addressed by the vendor and submitted with their proposal. Note: When the fill-in clause or provision is more appropriately completed at the task order level, complete the fill-in with “N/A.”Clause 52.222-42 and 52.223-3 should be addressed at the Task Order level.

10/21/16 All 129 L.10 Proposal Instructions Number of Copies

1 Offerors are to submit 9 copies in total of the proposal. The SF 33 (Atch J.1), block 9, states to submit an original and 9 copies. Does the Government want 9 copies (including the original) or the original and 9 copies?

This has been corrected and a new SF33 has been posted with the amendment. In total 9 copies are required (6 paper and 3 electronic on DVD+R Disks).

10/21/16 All 127

L.3

L.10

Proposal Submission Instructions Proposal Instructions , Paper Copies

5th bullet

“Offerors are prohibited from modifying, in any way, shape, or form, any documents, printed or electronic, associated with this solicitation and any amendment(s) thereto unless specifically authorized to do so.” Some of the attachments (e.g., Proposal Checklist and Self Scoring Table) are too large to fit on 8.5”x11” paper with 1” margins as required by Section L.10. May offerors print such attachments on 11”x17” paper?

Offerors may print such attachments on 11"x17" paper. Additionally, regarding forms and tables, the page setup (margins, orientation, and print area) may be adjusted for printing purposes. When making such adjustments, please ensure the documents are visually legible.

10/21/16 All 129 L.10 Proposal Instructions , Paper Copies

5th bullet May a font size smaller than 12 be used in headers and footers? Yes

10/21/16 All 129 L.10 Proposal Instructions , Electronic Copies

2nd bullet The second bullet states: "The USB Flash Drive shall be labeled with the Solicitation Number and Company Name." Given the difficulty of affixing labels to flash drives, will the Government allow the use of CD-ROMs instead of flash drives?

The requirement for use of a USB Flash Drive has been changed to DVD+R Disk. It is at the Offeror's discretion for how to label the submitted DVD+R Disks. Please just make sure the DVD+R Disks are accurately and clearly externally labeled with the company's name and Solicitation Number.

10/21/16 All 132 L.10.5 Proposal Format Table

Section 2, M.4.2.3

Offerors are to complete 52.212-3 from Section K.3. Per Section K, "See Provision 52.212-3 listed under K.3 shown below" on pg 108, Offerors are to complete and submit only paragraph (b) of 52.212-3. If Offerors have completed representations and certifications electronically in SAM, does the Government want Offerors to submit only completed paragraph (b) or all of 52.212-3 with just paragraph (b) completed?

If Representations and Certifications have been completed electronically in SAM, only paragraph (b) of 52.212-3 should be submitted. Per the end of paragraph (b), if there are exceptions to the reps and certs listed in the SAM website, then the offeror shall identify those.

10/21/16 All 132 L.10.5 Proposal Format Table

Section 2, I.3 and K.3

The solicitation includes 52.252-1 which states listed provisions may include blocks that must be completed and submitted with the offer. If provisions/clauses requiring fill-in have been completed electronically in an Offeror’s SAM registration and are current, complete, and accurate, is an Offeror exempt from filling them in and submitting them?

Please refer to the "INSTRUCTIONS" in Section K (second and third paragraph) as it relates to an Offeror's SAM registration. Regarding 52.252- 1, any provision or clause that requires completion (fill in the blank), whether provided in full text or incorporated by reference, shall be addressed by the vendor and submitted with their proposal. Note: When the fill-in clause or provision is more appropriately completed at the task order level, complete the fill-in with “N/A.” Clause 52.222-42 and 52.223-3 should be addressed at the Task Order level.

10/21/16 All 134 M.1 Basis for Awards

3 Zones will be awarded to Offerors by CLIN and multiple awards may be made in each CLIN. If an Offeror is awarded more than one zone, does this result in a separate contract for each zone or a single contract collectively including all awarded zones?

The result is a single contract including multiple awarded zones.

10/21/16 All 137 M.4.1.1 Standard Form 33

(SF33)

First sentence on page

Does the Government require signed copies of amendments (SF30s) to be submitted in addition to acknowledging them in Block 14 of the SF33?

Yes, the signed SF30's (amendments) should be included along with the completed SF33 (Attachment J.1).

10/21/16 All 151 M.6 Section 4- Price

1, 3rd bullet The government states that Regional Multiplier includes "other costs." Can the government clarify what is covered by "other costs"?

Any costs other than G&A, Overhead, and Profit that an offeror may need to apply to non-exempt labor categories when proposing at the task order level.

10/25/16 N/A N/A N/A N/A N/A I just wanted to mention that many of our projects have been performed in VA San Juan which is a very large and complex facility and it is part of VISN 7 which includes Florida too. We have also performed many projects for GSA Caribbean which is part of GSAR2. With all these I just want to stress the fact that the projects performed by MASE in these locations have the same regulations as if they were performed in Florida (VISN7) or New York (R2).

Another point is that the solicitation is accepting past experiences on commercial customers within the 50 states and in my personnel opinion a past experience on a federal facility in Puerto Rico is more relevant than a past experience on the commercial sector.

Thank you for your comment. The BMO team has reviewed the request and will consider it in future strategies.

10/25/16 N/A N/A N/A N/A N/A I recall during a meeting that the GSA had mentioned that contractors responses/submissions for Phase II can be provided in electronic format rather than the 6 hard copies. I haven’t seen any formal communications that eliminates the hard copy and I remember that Phase 1 was approximately 7,500 pages! Not too sustainable, right?

As indicated in L.10 of the solicitation we are requiring six paper versions and three electronic versions (on DVD+R Disks) of the proposal.

10/26/16 N/A N/A N/A N/A N/A Hello, we are an elevator contractor with several GSA contracts for elevator maintenance. We have a handful of areas we cover and are not in all states How will this RFP affect us and what can we do to be part of future elevator work for this RFP?

Please refer to Section C.3, C.4 and Section M. If you do not believe your company can meet the BMO requirements, serving as a subcontractor for a BMO vendor may be a good opportunity. Another option is detailed in Section M.4.1.4 Contract Teaming Arrangement Commitment Letter.

10/31/16 2 Attach.

J.9; Price Templat eZ2

N/A N/A Cell D328 Cell D328 is blank and should include the Base Wage of $23.18 for the Mechanical Door Repairers labor category.

Please confirm this understanding and provide the correction.

Thank you for your comment. This has been corrected and posted with the amendment for all the Price Templates.

10/31/16 5 Attach.

J.12;

Price Templat eZ5

N/A N/A Cell D338 Cell D338 is populated with 29,40 instead of $29.40. Because of this error, the Fully Loaded Hourly Labor Rate in Cell G338 does not include the Base Wage Rate of $29.40.

Please confirm this understanding and provide the correction.

Thank you for your comment. This has been corrected and posted with the amendment for all the Price Templates.

10/31/16 All (2-6) RFP, Pg.

Section I Contract Clauses

N/A The RFP instruction is to complete and submit (via pdf) the fill-in Clauses listed under I.3 of 52.222-42 Statement of Equivalent Rates for Federal Hires. This requires the offeror to provide employee class/labor category, hourly rate and fringe benefit for all employees under the purview of the SCA.

This information is identified in the ‘Price Proposal Template SCLS’ tab in attachments J.9 – J.13.

Is the offeror required to provide this information separately, in addition to attachments J.9 – J.13?

Any provision or clause that requires completion (fill in the blank), whether provided in full text or incorporated by reference, shall be addressed by the vendor and submitted with their proposal. Note: When the fill-in clause or provision is more appropriately completed at the task order level, complete the fill-in with “N/A.” Clause 52.222-42 and 52.223-3 should be addressed at the Task Order level.

10/31/16 ALL Pg 14 B.2.2.1 Non- Exempt Labor Categories

1 The first sentence stated we are to provide all pricing for all SOC labor codes. If we aren't bidding s certain labor code at this time do we just zero out the line item?

At the task order level, BMO vendors will only be able to bid services for which they have submitted BMO pricing and been approved for. When completing a given Price Template (Attachment J.9, J.10, J.11, J.12, J.13), please refer to Row 19 of the amended "Instructions" Tab within these documents which state, "Indicate all labor categories and all levels that are being proposed by using the dropdown box, located in Column C, to place an "x" in the associated labor category/level cell. Labor categories and levels containing an "x" indicate the labor categories and levels the offeror is proposing. Labor categories or levels not submitted , may not be utilized in support of the contract."

10/31/16 ALL Pg 15 B.2.2.2 Exempt Labor Categories

1 The first sentence stated we are to provide all pricing for all exempt labor codes. If we aren't bidding s certain labor code at this time do we just zero out the line item?

At the task order level, BMO vendors will only be able to bid services for which they have submitted BMO pricing and been approved for. When completing a given Price Template (Attachment J.9, J.10, J.11, J.12, J.13), please refer to Row 25 of the "Instructions" Tab within these documents which state " Submit the fully loaded hourly labor rate for all labor categories and all levels that are being proposed for use on the BMO contract in column C. Labor categories or levels not submitted, may not be utilized in support of the contract."

10/31/16 ALL Pg 16 B.2.4.1 Ceiling Rates for T&M and L- H Task Orders

4 The section states no profit on ODC's. Are we allowed to charge O/H and G&A?

For a T&M CLIN, the treatment of costs other than Labor Hours is fixed by the T&M & LH Payment clause. Section B.2.4 of the Solicitation has been changed and posted with the amendment and now references 52.212-4 and 52-212-4 Alterative 1 (May 2014) instead of 52.232-7. Full text of these clauses have been provided as an attachment in the amendment.

10/31/16 ALL Pg 20 C.4 Performan ce Objectives

1 Please confirm we have the option to bid Facilities Support Services group but it's not a requirement.

Yes, Offerors may bid the Operations and Maintenance Service Group, the Facility Support Service Group, or Both Service Groups. To qualify for a BMO award, offerors must propose all required services. For O&M, this includes HVAC, Electrical, and Plumbing and Pipefitting. For FSS, this includes Janitorial and Grounds Maintenance/Landscaping. If proposing both O&M and FSS, offerors must propose HVAC, Electrical, Plumbing and Pipefitting, Janitorial, and Grounds Maintenance/Landscaping. Please Note: Per C.4, "If an offeror is proposing both service groups the offeror shall submit one proposal under O&M, including the FSS as optional services."

10/31/16 ALL Pg 50 CG.3.1 Contract Access Fee (CAF)

4 The RFP states the Gov may change the CAF. If the CAF changes will it be for future proposal bids after the change? For example if we bid a job and we have 4 years left on the job and bid the 2% but GSA increased the CAF to 2.25% do we charge the .25% additional to our customer? if so what happens if it's a FFP and they will not allow the change?

Any changes made by the BMO Program Office to the Contract Access Fee (CAF) would apply to new orders following the change.

10/31/16 ALL Pg 93 I.3 FAR and

GSAR

Clauses in Full Text

N/A Will the Gov be adding in "52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C. 206 and 41 U.S.C.