PochNlobbyQA.doc
DOC document 31 KB Posted
- Attached to
- Interior Renovations of North Public Lobby, U. S. Post Office and Courthouse, Pittsburgh, PA
- Solicitation number
- GS-03P-10-AZ-C-0012
About this file
Questions/answers
View the file
Other files
Show 40 more
Latest 50 of 83 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Conference
Interior Renovations of North Public Lobby
US Post Office and Courthouse, (POCH), Pittsburgh, PA.
April 13, 2010
9:00 A.M.
Questions:
1. Where are the drawings and specs posted?
Response: All government postings are located on www.fedbizops.gov. Only contractors registered in the Central Contractor Registration may access the drawings and specifications portion of the solicitation.
2. Are the drawings only scaled in metric dimensions?
Response: Yes, all GSA drawings are scaled as metric. No Standard architectural scaled drawings are available.
3. Are only professional photographers required to take project photos?
Response: To be answered in amendment 02.
4. Where will the contractors’ field office be located?
Response: To be answered in amendment 02.
5. What are the expectations on intervals for rodent/pest control, i.e. once a week, once a month, etc?
Response: Minimal interval to be based upon exterminator’s recommendation.
6. Can Freight elevator be used to transport debris to 2nd floor dock for load out during North Lobby Demo/Renovations?
Response: To be answered in amendment 02.
7. During the pre-bid meeting GSA stated “No addendums had been issued to date”. However, three (3) addendums are identified on fedbizops for this project. Please clarify.
Response: The actual scope of work and solicitation was not amended. The additional postings appearing as “amendments” were to covert cad files to pdf due to technical concerns in opening these files. Therefore, no previous acknowledgement was required for these addendums.
8. Page 7 of 22 of the solicitation states “the offerer must provide a GC Reference Form for each reference”. Is this a GSA form to be completed or are we to develop our own form with the required information?
Response: Provide your own form with the required solicitation.
9. During the pre-bid meeting GSA stated questions will be accepted until 4/21/10. Assuming answers are posted by the end of business on 4/22/10, which would only allow one day to finalize and mail the proposal. Can the bid due date be extended to ensure sufficient time to address these answers and include in the final proposal?
Response: The bid date is not extended.
File details come from the government source that posted it. Updated .